Folsom Dam Water Control Manual Update Joint Federal Project, Folsom Dam

Similar documents
Folsom Dam Water Control Manual Update Joint Federal Project, Folsom Dam

Integrating Weather Forecasts into Folsom Reservoir Operations

FORECAST-BASED OPERATIONS AT FOLSOM DAM AND LAKE

Folsom Dam Water Control Manual Update

PRELIMINARY DRAFT FOR DISCUSSION PURPOSES

Missouri River Basin Water Management

Missouri River Basin Water Management Monthly Update

Missouri River Basin Water Management Monthly Update

Evapo-transpiration Losses Produced by Irrigation in the Snake River Basin, Idaho

Cost of Inflow Forecast Uncertainty for Day Ahead Hydropower Production Scheduling

Missouri River Basin Water Management Monthly Update

Updated 2018 Restoration Allocation & Default Flow Schedule February 16, 2018

APPENDIX J MODELING TEHCNICAL MEMORANDUM (RESSIM MODELING)

A Report on a Statistical Model to Forecast Seasonal Inflows to Cowichan Lake

9. PROBABLE MAXIMUM PRECIPITATION AND PROBABLE MAXIMUM FLOOD

3.0 TECHNICAL FEASIBILITY

Kootenai Basin Water Supply Update and Sturgeon Flow Augmentation Kootenai Valley Resource Initiative

Operator and Modeler Collaboration on Truckee- Carson River Operations Using Ensembles River Ware User Group Meeting Thursday February 1, 2018

Restoration Goals TFG Meeting. Agenda

Great Lakes Update. Great Lakes Winter and Spring Summary January June Vol. 187 Great Lakes Update August 2012

NRC Workshop Probabilistic Flood Hazard Assessment (PFHA) Jan 29-31, Mel Schaefer Ph.D. P.E. MGS Engineering Consultants, Inc.

2015 Fall Conditions Report

Missouri River Basin Water Management Monthly Update

Albeni Falls Operations Meeting 2015

Reclamation Perspective on Operational Snow Data and Needs. Snowpack Monitoring for Streamflow Forecasting and Drought Planning August 11, 2015

Great Lakes Update. Volume 199: 2017 Annual Summary. Background

Updated 2018 Restoration Allocation & Default Flow Schedule May 22, 2018

Attachment B to Technical Memorandum No.2. Operations Plan of Ross Valley Detention Basins

Appendix E Plots from the Evaluation of the CNRFC Operational Hydrologic Model

January 25, Summary

Changing Hydrology under a Changing Climate for a Coastal Plain Watershed

Flooding Performance Indicator Summary. Performance indicator: Flooding impacts on riparian property for Lake Ontario and the Upper St.

Three main areas of work:

Sierra Weather and Climate Update

REDWOOD VALLEY SUBAREA

Proposal to limit Namakan Lake to 1970 Upper Rule Curve for remainder of summer


SYSTEM BRIEF DAILY SUMMARY

San Francisco Public Utilities Commission Hydrological Conditions Report For April 2014

Hydrologic Conditions in the Delaware River Basin

Development and Testing of Alternate Forecast-Based Flood Operations Rules for West Point Lake

Jackson County 2013 Weather Data

Hydrologic Conditions in the Delaware River Basin

Climate also has a large influence on how local ecosystems have evolved and how we interact with them.

GAMINGRE 8/1/ of 7

Drought in Southeast Colorado

Colorado s 2003 Moisture Outlook

San Francisco Public Utilities Commission Hydrological Conditions Report For March 2016

Seasonal Hydrometeorological Ensemble Prediction System: Forecast of Irrigation Potentials in Denmark

Preliminary Viability Assessment (PVA) for Lake Mendocino Forecast Informed Reservoir Operations (FIRO)

2003 Moisture Outlook

Typical Hydrologic Period Report (Final)

Lower Tuolumne River Accretion (La Grange to Modesto) Estimated daily flows ( ) for the Operations Model Don Pedro Project Relicensing

SYSTEM BRIEF DAILY SUMMARY

DROUGHT IN MAINLAND PORTUGAL

Water Temperature Monitoring of the Klamath River Mainstem

Upper Missouri River Basin February 2018 Calendar Year Runoff Forecast February 6, 2018

Highlights of the 2006 Water Year in Colorado

Study 16.5 Probable Maximum Flood (PMF)

Lake Winnebago Regulation Meeting

2011 Flood: Technical Review of Lake Manitoba, Lake St. Martin and Assiniboine River Water Levels Summary

Incorporating Large-Scale Climate Information in Water Resources Decision Making

A Review of the 2007 Water Year in Colorado

Climate Change and Water Supply Research. Drought Response Workshop October 8, 2013

Fire Season Prediction for Canada, Kerry Anderson Canadian Forest Service

APR-SEP. Forecast Are in KAF % Average 10 % 30 Year. Forecast Period

Modeling of peak inflow dates for a snowmelt dominated basin Evan Heisman. CVEN 6833: Advanced Data Analysis Fall 2012 Prof. Balaji Rajagopalan

Study 16.5 Probable Maximum Flood (PMF)

ResSIMLite vs. ResSIM Model Comparison

Project No India Basin Shadow Study San Francisco, California, USA

January 22, Coronado National Forest 300 West Congress Street Tucson, AZ Jim Upchurch, Forest Supervisor. Dear Mr.

CFCAS project: Assessment of Water Resources Risk and Vulnerability to Changing Climatic Conditions. Project Report II.

Souris River Basin Spring Runoff Outlook As of March 1, 2019

Missouri River Basin Climate Outlook 1 May Dr. Dennis Todey State Climatologist South Dakota State Univ.

HyMet Company. Streamflow and Energy Generation Forecasting Model Columbia River Basin

The Huong River the nature, climate, hydro-meteorological issues and the AWCI demonstration project

What Does It Take to Get Out of Drought?

MINNESOTA POWER ST LOUIS RIVER PROJECT FERC 2360 ISLAND LAKE RESERVOIR TECHNICAL COMMITTEE MEETING SUMMARY

Hydrogeology and Simulated Effects of Future Water Use and Drought in the North Fork Red River Alluvial Aquifer: Progress Report

Technical note on seasonal adjustment for M0

AN OVERVIEW OF ENSEMBLE STREAMFLOW PREDICTION STUDIES IN KOREA

Monthly Long Range Weather Commentary Issued: February 15, 2015 Steven A. Root, CCM, President/CEO

The Colorado Drought of 2002 in Perspective

Chiang Rai Province CC Threat overview AAS1109 Mekong ARCC

A. Identification of Temperature as the Cause of Non-Attainment

THE STATE OF SURFACE WATER GAUGING IN THE NAVAJO NATION

Variability of Reference Evapotranspiration Across Nebraska

LOMR SUBMITTAL LOWER NEHALEM RIVER TILLAMOOK COUNTY, OREGON

2003 Water Year Wrap-Up and Look Ahead

Jackson County 2018 Weather Data 67 Years of Weather Data Recorded at the UF/IFAS Marianna North Florida Research and Education Center

February 10, Mr. Jeff Smith, Chairman Imperial Valley Water Authority E County Road 1000 N Easton, IL Dear Chairman Smith:

2. PHYSICAL SETTING FINAL GROUNDWATER MANAGEMENT PLAN. 2.1 Topography. 2.2 Climate

Memo. I. Executive Summary. II. ALERT Data Source. III. General System-Wide Reporting Summary. Date: January 26, 2009 To: From: Subject:

Seasonal Climate Watch June to October 2018


Upper Missouri River Basin January 2018 Calendar Year Runoff Forecast January 3, 2018

USA National Weather Service Community Hydrologic Prediction System

UWM Field Station meteorological data

Midwest and Great Plains Climate and Drought Update

YACT (Yet Another Climate Tool)? The SPI Explorer

Transcription:

Folsom Dam Water Control Manual Update Joint Federal Project, Folsom Dam Public Workshop May 25, 2016 Sacramento Library Galleria 828 I Street, Sacramento, CA US Army Corps of Engineers BUILDING STRONG

WELCOME & INTRODUCTIONS 2

PURPOSE OF MANUAL UPDATE Revise operation rules for Folsom Dam to reduce flood risk based on the capabilities of the Folsom Joint Federal Project (JFP). Reflect operational capabilities created by improved weather forecasts. Potentially reduce the volume of flood control reservation in Folsom Reservoir at any particular time by comparison to the operations that have been in effect since 95 3

OBJECTIVES OF MANUAL UPDATE Pass the Probable Maximum Flood while maintaining 3 feet of freeboard below the top of dam to stay within the dam safety constraints of the U.S. Department of Interior, Bureau of Reclamation. Control a 1/100 annual chance flow ( 100-year flood ) to a maximum release of 115,000 cubic feet per second as criteria set by the Sacramento Area Flood Control Agency to support Federal Emergency Management Agency levee accreditation along the American River. Control a 1/200 annual chance flow ( 200-year flood ) as defined by criteria set by the State of California (State) Department of Water Resources to a maximum release of 160,000 cubic feet per second, when taking into account all the authorized modifications within the American River Watershed. 4

TODAY S DISCUSSION Tentatively-Selected Plan Environmental Effects of the Tentatively-Selected Plan Project Milestone Schedule 5

Water Control Diagrams 1,000 Flood Space (TAF) 0 800 Storage (TAF) 600 400 Existing (USACE) Basin Wetness Existing (USBR-SAFCA) Upstream Storage Credit Alternative 1 Upstream storage credit + basin wetness 400 Tentatively Selected Plan (TSP) 600 670 Forecast 200 Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct 6

Forecast-based TOC 7

Water Control Diagram 8

1986 event pattern scaled to 100-yr Forecast operation reflects perfect forecast USBR/SAFCA US storage Alt. 1 US storage and basin wetness TSP Forecast 9

1986 event pattern scaled to 200-yr Forecast operation reflects perfect forecast USBR/SAFCA US storage Alt. 1 US storage and basin wetness TSP Forecast 10

1997 event pattern scaled to 100-yr Forecast operation reflects perfect forecast USBR/SAFCA US storage Alt. 1 US storage and basin wetness TSP Forecast 11

1997 event pattern scaled to 200-yr Forecast operation reflects perfect forecast USBR/SAFCA US storage Alt. 1 US storage and basin wetness TSP Forecast 12

Forecast Ensemble EXAMPLE 133

Forecast Ensemble 12/8/1996 14

Forecast Ensemble 12/9/1996 15

Forecast Ensemble 12/10/1996 16

Forecast Ensemble 12/11/1996 17

Forecast Ensemble 12/12/1996 18

Forecast Ensemble 12/13/1996 19

Forecast Ensemble 12/14/1996 20

Forecast Ensemble 12/15/1996 21

Forecast Ensemble 12/16/1996 22

Forecast Ensemble 12/17/1996 23

Forecast Ensemble 12/18/1996 24

Forecast Ensemble 12/19/1996 25

Forecast Ensemble 12/20/1996 26

Forecast Ensemble 12/21/1996 27

Forecast Ensemble 12/22/1996 28

Forecast Ensemble 12/23/1996 29

Forecast Ensemble 12/24/1996 300

Forecast Ensemble 12/25/1996 31

Forecast Ensemble 12/26/1996 32

Forecast Ensemble 12/27/1996 33

Forecast Ensemble 12/28/1996 34

Forecast Ensemble 12/29/1996 35

Forecast Ensemble 12/30/1996 36

Forecast Ensemble 12/31/1996 37

Forecast Ensemble 1/1/1997 38

Forecast Ensemble 1/2/1997 39

Forecast Ensemble 1/3/1997 40

Forecast Ensemble 1/4/1997 41

Forecast Ensemble 1/5/1997 42

Compute Forecasted Inflow Volumes 1-day 2-day 3-day 5-day 43

1997 Event Hindcast Series 3-day volume updated daily 61 ensemble traces 21 probabilistic traces Each trace reflects one value of Non- Exceedence Probability (NEP) 44

Robustness Testing Considers uncertainty in forecast indicated by the forecast ensemble. Tests operation using imperfect forecasts. Used to identify operational NEP value. 45

Robustness Test Example 1986 event pattern scaled to 200-yr 21 simulations corresponding to NEP values ranging from 0% to 100% (5% increments). Perfect forecast shown as black dashed line for reference. 46

Pass 100-yr event at 115 kcfs Pass 200-yr event at 160 kcfs Robustness Summary Project Goals Minimum NEP (%) (1986 / 1997 patterns) 0% / 0% (ALL PASS) 0% / 0% (ALL PASS) Other Metrics of Interest Minimum NEP (%) (1986 / 1997 patterns) Pass 200-yr event at 160 kcfs (24-hr late forecast) 55% / 60% Pass 200-yr event at 115 kcfs 65% / 75% Additional robustness tests and results in Engineering Report 47

Regulated Peak Flow-Frequency Best Estimate curves Reflects weighting of 1955, 1964, 1986, 1997 event patterns Starting storages: Folsom at TOC, headwaters at 20% AEP storage Forecast operation using 75% NEP Pending Review 48

Summary Both the TSP and Alternative 1 satisfy project goals. The TSP allows larger events to be routed at peak releases of 115 and 160 kcfs. The TSP allows greater storage during winter, and promotes end of event refill. 49

ENVIRONMENTAL EFFECTS OF THE TENTATIVELY-SELECTED PLAN

FOLSOM DAM OPERATIONS 1,000 Flood Space (TAF) 0 Conservation Pool 800 Storage (TAF) 600 400 200 Flood Reservation Pool Variable Space Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct 50 400 600 670 Existing WCD 400/670 TAF Flood Space Upstream Storage Credit Tentatively Selected Plan 400/600 TAF flood space Forecasted Inflow Volume WCD = Water Control Diagram

TENTATIVELY-SELECTED PLAN WATER CONTROL DIAGRAM 1,000 Conservation Pool 800 Storage (TAF) 600 400 Flood Reservation Pool Variable Space Tentatively Selected Plan 400/600 TAF flood space Forecasted Inflow Volume 200 Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct 51

1,200,000 1,100,000 1,000,000 900,000 Top of Surcharge Top of Flood Pool 1997 EVENT PATTERN SCALED TO 100-YR 800,000 Storage (ac-ft) 700,000 600,000 500,000 400,000 Existing Operations 300,000 200,000 300,000 02 03 04 05 06 07 08 09 10 11 12 13 14 15 Simulation Date (January) 16 17 18 19 20 21 22 US storage and basin wetness alternative 250,000 200,000 150,000 Flow (cfs) 100,000 160,000 release limit 115,000 release limit Tentatively Selected Plan Forecasted inflow 50,000 0 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 Simulation Date (January)

COMPARATIVE MODELING APPROACH AND RESULTS 53

LOWER AMERICAN RIVER (LAR) MODELING APPROACH System-Wide Operations Detailed Folsom Operations LAR Water Temperature HEC-5Q Daily timestep Water Temperatures Includes meteorological conditions CalSim 2 Flow & Storage HEC-ResSim Reservoir Releases & Storage Includes inflow temperatures Monthly Timestep Simulates Shasta-Folsom- Trinity-Delta operations Differences in alternatives limited to the Folsom Reservoir topof-conservation Hourly timestep Simulates detailed Folsom Reservoir flood operations Matches CalSim 2 end-of-month storage River Hydraulics HEC-RAS Hourly timestep Includes detailed river geometry River Stages and Flow 54

RESERVOIR STORAGE 55

Period of Record Hydrology Presents Some Opportunities for Water Supply Benefits 13 of 82 years (16%) provide a benefit to water supply 56

Folsom Storage Folsom storage increased during most months Forecast-informed operations allow higher average winter storages Increased spring curve allows greater spring refill 57

Folsom End-of-Month Storage Existing Operation vs Tentatively Selected Plan 58

FISHERIES 59

By species By life stage Fisheries Evaluation Approach Flow & water temperature Spawning habitat Redd dewatering (LAR only) Early life stage mortality (LAR only) Delta parameters 60

Evaluated Species at a Range of Locations 61

Lower American River Flow Similar most of the time during most months Long-term Average Flows (cfs) Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Existing Operation 2,127 3,082 3,585 4,825 5,441 4,227 3,146 3,639 3,475 3,439 2,434 2,582 Tentatively Selected Plan 2,074 3,005 3,515 4,439 5,025 4,119 3,667 3,767 3,449 3,384 2,411 2,562 Difference -53-77 -70-386 -416-108 521 128-26 -55-23 -20 Percent Difference -2.5-2.5-2.0-8.0-7.6-2.6 16.6 3.5-0.7-1.6-0.9-0.8 During Dry Years Lower During Fall, Higher During Summer Dry Years - Long-term Average Flows (cfs) Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Existing Operation 2225 2510 2050 1744 1873 2456 1714 1711 2054 3203 2081 1537 Tentatively Selected Plan 2,172 2,486 1,981 1,718 1,574 2,045 1,798 1,826 2,073 3,270 2,048 1,514 Difference 53 24 69 26 299 411 84 115 19 67 33 23 Percent Difference -2-1 -3-2 -16-17 5 7 1 2-2 -2 62

American River Steelhead Spawning Habitat (WUA) Spawning Habitat is at optimal almost 50 percent of the time. More spawning habitat availability with tentatively selected plan than with existing operations. Optimal Spawning Habitat Availability 64

American River Steelhead Redd Dewatering Reduced Redd Dewatering Conditions with the tentativelyselected plan than with existing operations 64

American River Water Temperature Similar most of the time during most months Warmer during March & April Slightly cooler during May, June, and August under relatively warm conditions Dry Years - Average Temperatures ( F) Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Existing Operation 63.0 57.1 50.8 46.5 47.0 50.4 54.9 60.2 63.8 64.8 64.6 65.7 Tentatively Selected Plan 62.7 57.0 50.6 46.5 47.0 50.6 55.1 59.6 63.4 64.9 64.5 65.6 Difference -0.3-0.1-0.2 0.0 0.0 0.2 0.2-0.6-0.4 0.1-0.1-0.1 66

American River Fall-Run Chinook Early Life-Stage Mortality Slight improvement to Chinook early life-stage mortality 66

Fisheries Evaluation Summary Slight benefits to evaluated species in the Lower American River and CVP/SWP system-wide area Flow fluctuations Water temperature Improved end-of-may storages at Folsom Dam provide for increased cold water pool volumes Improved management of Lower American River temperatures during summer and fall 67

RECREATION 68

Recreation Metrics Reservoirs Boating Recreation Metric: Reservoir pool elevations vs. boat ramp access elevations Shoreline Recreation Metric: Reservoir pool elevations vs. optimum general recreation elevation and optimum shoreline use elevation 69

Reservoir Recreation Folsom Comparison Results Folsom Reservoir Boat Ramp Access Threshold Existing Operations vs. Tentatively-Selected Plan Folsom Reservoir Swim Access Threshold Existing Operations vs. Tentatively-Selected Plan 71

Folsom Reservoir Recreation Elevations 71

Recreation Metrics American River Boating Recreation Metric: Flow stage vs. acceptable flow ranges for recreational activities and recreational facility availability Consistency of LAR flows with the American River Parkway Plan and the California and National Wild and Scenic Rivers Acts. 72

Lower American River Recreation Threshold Difference 73

Lower American River Recreation Threshold Difference 74

LOWER AMERICAN RIVER TERRESTRIAL HABITAT 75

Lower American River Cottonwood Growth No decrease in average number of days for cottonwood radial growth maintenance and optimal growth No substantial difference in peak flows necessary to inundate terraces for cottonwood dispersal and regeneration 76

Lower American River Backwater Recharge Minor fluctuation in backwater flows Not enough to alter existing backwater recharge 77

FIXED-400,000 AF OPERATION VS. TENTATIVELY-SELECTED PLAN See Hand-Outs 78

PROJECT MILESTONE SCHEDULE APRIL 2016 USACE COMPLETES ADMINISTRATIVE DRAFT ENGINEERING REPORT & WATER CONTROL MANUAL UPDATE MAY 2016 APRIL SEPTEMBER 2016 PUBLIC WORKSHOP: TENTATIVELY-SELECTED PLAN & ENVIRONMENTAL EFFECTS OF THIS PLAN USACE/PARTNER REVIEW; USACE-REQUIRED INDEPENDENT SAFETY ASSURANCE REVIEW USACE COMPLETES DRAFT NEPA / CEQA DOCUMENTS AUGUST SEPTEMBER 2016 AUGUST DECEMBER 2016 PUBLIC REVIEW OF DRAFT NEPA / CEQA DOCUMENTS PUBLIC MEETING FOR DRAFT NEPA / CEQA DOCUMENTS OBTAIN BIOLOGICAL OPINION (135-DAY REVIEW) MARCH 2017 APRIL 2017 PUBLIC & ENVIRONMENTAL AGENCIES REVIEW OF FINAL NEPA / CEQA DOCUMENTS 79

DISCUSSION 80