Malachite Resources Limited ABN

Similar documents
HIGH-GRADE GOLD MINERALISATION CONTINUES ALONG STRIKE AT THE BODDINGTON SOUTH GOLD PROJECT

STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE AT SYNDICATED S 100% BARBARA SOUTH LODE

For personal use only

High Grade Gold Intercepts at Bangaba

New High Grade Gold-Copper Extensions At Mutiny s Deflector Deposit Highlight Project s Significant Growth Potential

For personal use only

Trouser Legs Mine Strong Drilling Results - including g/t Au Potential for Further Mine Development

Malachite Resources Limited ABN

Aurora Tank Gold Drilling Update

New Drilling Program Commences at Mutiny s Deflector Deposit

Queensland Mining Corporation Limited

LATEST DRILL RESULTS REVEALS MINERALISATION OPEN AT STRIKE AND DEPTH AT KATANNING GOLD DEPOSIT

NEW COBAR-STYLE COPPER DISCOVERY IN NSW

ASX Announcement 24 December Drilling results confirm depth potential of Lamboo Project

Market Release October

For personal use only

African Energy Resources Limited

******************* *******************

New High Grade Lode Discovered at Wagtail South

For personal use only

High Grade Gold Intersections at Harry Smith Prospect

High-grade Copper and Gold Discovered at Productora

Developing the +1.2Moz Pilbara Gold Project

For personal use only

For personal use only

ASX ANNOUNCEMENT 21 MARCH 2011

For personal use only

For personal use only

Drilling Program Commences on Iron Oxide Copper Gold Targets

Chalice, Higginsville Drilling

For personal use only

High-grade Gold in First Drilling Undertaken at Productora South

For personal use only

MOUNT DOROTHY AND ELAINE DOROTHY PROSPECTS UPDATE

ASX Release and Media Announcement 27 September Central Eyre Iron Project 2011 Stage VI Drilling Programme Completion

EXPLORATION UPDATE: BODDINGTON SOUTH GOLD PROJECT AND DOOLGUNNA STATION PROJECT

Ausgold awarded EIS grant for Jinkas deep drilling

Hits of up to 123gpt show Chesterfield emerging as a high grade gold project

RC DRILLING TO RESUME THIS WEEK AT CARLISLE REEFS

EXPLORATION SUCCESS AT COYOTE GOLD MINE

RC Drilling Confirms Zeus Gold Prospect

For personal use only

FIVE RIGS DRILLING AT KARLAWINDA

STRONG GOLD IN SOIL ANOMALY OUTLINED AT MARY HARRISON PROJECT HIGHLIGHTS

Mountain Maid Gold System Displays Major Size Potential

Drilling program commences on Cloncurry and Mount Isa projects

For personal use only

CRATER MOUNTAIN MAJOR MULTIPLE MINERALISATION EVENTS POTENTIAL ASSOCIATED WITH PORPHYRY SYSTEM NOW IDENTIFIED

Further Extensions to the Netiana Lodes at Balogo, Burkina Faso

Norwest successfully lists on ASX, Drilling commenced at Warriedar Gold Project

ASX ANNOUNCEMENT FURTHER EXPLORATION SUCCESS AT NULLAGINE

For personal use only

QUEEN SHEBA - RESOURCE TABLE: AUGUST 2011 RESOURCE CATEGORY. Tonnes Au Ag Cu (000) g/t g/t % GLOBAL RESOURCE TABLE: CONTAINED METAL

60% upgrade of Flying Doctor Resource to 104,600 tonnes of contained zinc and lead.

ASX RELEASE. Monax Signs Option Deal Over Four Queensland Gold Mining Leases

Mt Cannindah IP Data Reprocessing & 3D Geological Modelling Identifies Potential Resource Extensions

A1 GOLD MINE 14 LEVEL STOCK WORKS TARGET FURTHER HIGH GRADE DRILL INTERCEPTS

For personal use only

For personal use only

Boseto Near Mine Exploration Update. North East Plutus, South West Petra and Nexus Propsects

SIMUKU DRILLING TO OVER 1000 METRES DEMONSTRATES SIGNIFICANTLY INCREASED TONNAGE POTENTIAL OF THE INFERRED RESOURCE

Resource Diamond Drilling Commences at Productora. Strong results continue from Productora central area drilling

SIGNIFICANT GOLD MINERALISATION INTERSECTED AT MANIEMA PROJECT, DRC 21.7m at 3.58g/t Au HIGHLIGHTS

ASX and Media Release

New Zone of High Grade Gold Mineralisation Discovered at Balogo, Burkina Faso

ASX Announcement NAKRU DRILLING AND TRENCHING INTERSECTS 11 METRES AT 2.84 G/T GOLD AND 28.4 METRES AT 1.1% COPPER

For personal use only

For personal use only

Further High Grade Gold Mineralisation Intersected in Bonanza Zones at Mt Kare Gold/Silver Deposit PNG

704,000 OUNCE MIYABI GOLD PROJECT UPDATE

New Zone of High Grade Gold Discovered at Balogo

CORPORATE UPDATE. Feasibility Study being finalised for completion towards the end of April.

NEW DISCOVERIES AT THE RED OCTOBER MINE

KINGSTON RESOURCES LIMITED

MORE HIGH-GRADE GOLD INTERSECTIONS FROM CITADEL S SHAYBAN PROJECT, SAUDI ARABIA

King of the Hills Gold Project, Leonora, to commence production in Q2 2011

News Release DRILLING STEPPED UP AT FORRESTANIA NICKEL PROJECT AND UPDATE ON DIGGERS SOUTH PRE - FEASIBILITY STUDY

Caravel commences major new drilling program at Calingiri copper-molybdenum project 8,500-9,000m of RC drilling planned across multiple targets

Drill testing of gold zones at Albury Heath intersect impressive quartz lodes

SITE WORKS COMMENCE AT A1 GOLD MINE, EASTERN VICTORIA

More High Grade Gold Intercepts from the Netiana Lodes at Balogo, Burkina Faso

Monument Announces NOA 7/8 Drilling Program Results at Burnakura Gold Project

ASX Announcement ASX Code: MAR 10 April 2018

P ROJ EC T UPDATE PANDA HILL NIOBIUM PROJ ECT

High Grade Gold Results from RAB Drilling at the Central Bore Prospect

Diamond Drilling to Commence in Axiom s Quang Tri Tenement, Vietnam

ASX RELEASE / MEDIA RELEASE 2,810 ppb gold in shallow auger samples Four new parallel zones defined up to 1500m in strike

Kalman Mineral Resource Update

ROE HILLS COBALT AND GOLD DRILLING ADVANCES

24 October Dear Shareholders, 2014 ANNUAL REPORT

ASX/Media Announcement

BUNDARRA RESOURCE UPDATE

INAUGURAL FARM IN DRILL RESULTS AT CALARIE PROJECT

ENCOURAGING GOLD-BASE METALS AT MAY DAY, MOLY- GOLD AT ATTUNGA

FOUR EAGLES MINERALISATION REPORT ACCEPTED AND DRILLING TO RECOMMENCE

For personal use only

MT PLEASANT AUGER GEOCHEM RESULTS OUTLINE A NEW GOLD ZONE TO THE NORTH-EAST OF FIDELATAS PROSPECT HIGHLIGHTS

TANDARRA GOLD PROJECT DRILLING COMMENCES AND FOUR EAGLES GOLD PROJECT DRILLING UPDATE

For personal use only

Transcription:

Malachite Resources Limited ABN 86 075 63 268 ASX Announcement ASX Code: MAR 27 October 20 NEW DRILLING RESULTS AT LORENA SUPPORT COMMENCEMENT OF MINING FEASIBILITY STUDY Malachite Resources Limited ( Malachite or the Company ) is pleased to advise that assays from recent drilling at the Company s wholly owned Lorena Gold Project ( Lorena ) near Cloncurry have now been received and collated. Key new drilling results include: HOLE No. LMRC077: LMRC078: LMRC080: LMRC084: LMRC086: LMRC088: GOLD ASSAY 4m @ 2.9g/t Au 2m @ 7.0g/t Au 2m @ 2.9g/t Au 6m @ 7.9g/t Au 6m @ 8.6g/t Au 7m @ 2.5g/t Au As anticipated, the new results have extended the existing high grade ore body to the southeast along strike, at depths amenable to an open cut mining method (Fig.). Encouraged by these results, the Company plans to move on immediately to update the resource estimate and commence a mining feasibility study to advance an initial open cut mining operation. COMMENTS ON DRILLING RESULTS The latest program comprised 5 reverse circulation percussion ( RC ) drill holes and a total of,978m of drilling. Of the 5 holes drilled, 2 holes intersected gold mineralisation and one hole was abandoned, due to broken ground, before it reached the targeted ore zone area. This strike rate reinforces confidence in the geological model developed by the Company for the project. Results for this program are summarised in Table. The recent drilling program successfully extended the gold mineralisation along strike. The Lorena A Lode remains open at depth and additional high grade zones will now be targeted at depth down plunge or down dip, as predicted by the geological model. The current drill program intersected lower grade gold intersections immediately down plunge from the high grade zone. Although these gold grades were lower than desired, the recent drilling confirmed that the A Lode structure continues as expected down plunge and continues to be mineralised with gold. Experience elsewhere has shown that most lode gold deposits consist of discrete high grade zones that are Suite 502, Tower B, 799 Pacific Highway, Chatswood NSW 2067 P O Box 528, West Chatswood NSW 55 Tel. (02) 94 6033 Fax (02) 94 6066 www.malachite.com.au

LORENA PROJECT 2 enclosed within broader low grade envelopes. Lorena seems to be conforming to that pattern and for this reason, further high grade zones will be targeted at deeper levels than so far drilled. MINING FEASIBILITY STUDY An updated mineral resource estimate will be undertaken by a recognised geological consulting group over the next couple of months, incorporating the successful results of the two phases of drilling carried out by Malachite this year. The resource so defined will then form the basis of an open pit mining feasibility study to commence in earnest once the resource block model is completed. This study will address, inter alia, mining methods and costs, metallurgical and processing technology parameters, environmental issues, capital costs, financing issues and approval processes. The Company is confident that the resource will continue to grow when drilling resumes but in the meantime, the feasibility study to be undertaken will be sufficiently flexible to be able to be scaled upwards to match a gold production rate appropriate to the resource size and characteristics. The intention of the Company is to fast track the project into production as soon as practicable. ONGOING EXPLORATION Since completion of the recent drilling, Malachite has been conducting an ongoing exploration program over part of the newly granted mining leases immediately adjacent to the west of the existing mine. This has involved geological mapping and a detailed soil geochemical survey, on a 00x20m grid basis. This work is intended to reveal new targets for drilling in the first half of 202, with potential to add to the open pit recoverable gold resources at the Lorena property. The next phase of drilling is also expected to include diamond drilling of the deeper extensions of the known Lorena A Lode and will include two deep holes that will be drilled utilising already approved funds provided by the Queensland Government s exploration drilling initiative. ABOUT LORENA The Lorena Gold Project is wholly owned by Malachite and is located about 5km east of Cloncurry in northwest Queensland. Malachite is the holder of an existing mining lease (ML747), five newly granted mining leases (MLs9092 9096), one EPM (EPM889) and two EPMAs at Lorena. Lorena has a mineral resource containing 78,000 ozs of gold. It has a measured resource of 77,880t at 9.8g/t Au containing 56,000 ozs ( A Lode ) and an inferred resource of 95,000t at 7.2g/t Au containing 22,000 ozs ( B Lode ). The resource is within a potential open pit mine and is open at depth and along strike. The gold bearing ore is principally of massive and stringer sulphide type and copper gold mineralisation occurs in conjunction with the gold ore body.

LORENA PROJECT 3 For further information please telephone Geoff Hiller on (02) 94 6033 or email the company at info@malachite.com.au and visit the website: www.malachite.com.au G. HILLER Chief Executive Officer 27 October 20 COMPETENT PERSON STATEMENT: The information in this report that relates to Exploration Results and Mineral Resources is based on information compiled by Dr Garry Lowder, who is a full time employee of the Company and is a Fellow of the Australasian Institute of Mining and Metallurgy. Dr Lowder has sufficient experience which is relevant to the style of mineralisation and type of deposits under consideration and to the activities which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Dr Lowder consents to the inclusion in this report of the matters based on his information in the form and context in which it appears.

6m @ 7.9g/t Au 6m @ 8.6g/t Au 7m @ 2.5g/t Au 4m @ 2.9g/t Au Figure

LORENA PROJECT 5 Table : Results of Drilling at Lorena : August September, 20 Hole No. Total Depth Azimuth (deg Dip (deg) Collar Coordinates MGA (UTM Zone 54) From (m) To (m) (m) MGA) Easting Northing LMRC 076 75 66 70 463394 7708883 08 3 [2.7] 077 33 48 57.5 463429 770884 92 95 05 08 06 09 Intercept Length (m) [Approx. True Width] 078 40 22 57.5 463428 7708840 08 0 2 079 35 46 62 463454 7708826 96 080 69 44 59.5 463402 7708840 22 24 2 08 52 42 60 46342 770882 25 27 2 082 69 42.5 60 463435 770880 35 36 [] 04 97 05 4 [4] [] [] [] [] Grade g/t Au.5 A Lode 2.9.2 2.0 Comments A Lode 7.0 A Lode. 4. A Lode 2.9 A Lode 0.7 Also 0.7% Cu 0.5 A Lode structure 083 6 49 6 46340 7708772 Did not reach target depth due to broken ground 084 00 2 72 463500 770885 48 54 6 7.9 A Lode [4] 085 09 47 60 463495 7708829 No significant intersection 086 00 45 70 463493 7708827 68 76 74 77 6 [4.5] [0.7] 8.6 2.3 A Lode 087 70.5 60 463502 7708854 No significant intersection 088 94 350 72 463497 7708839 55 58 56 64 [0.5] 7 [4.5] 089a 20 22 66 463490 7708802 05 07 2 [.5] 090 5 47 69 463492 7708793 32 33 [0.5].2 2.5 A Lode. A Lode Structure 0.6 A Lode Structure