SIGNIFICANT GOLD MINERALISATION INTERSECTED AT MANIEMA PROJECT, DRC 21.7m at 3.58g/t Au HIGHLIGHTS

Similar documents
For personal use only

Developing the +1.2Moz Pilbara Gold Project

Drilling Commences at Telfer West Gold Project

ASX/Media Announcement 14 July 2010

For personal use only

GEOPACIFIC REPORTS HIGH GOLD VALUES IN AUGER SOIL SAMPLES FROM THE QALAU AND TATAIYA PROSPECTS, RAKI RAKI PROJECT,

For personal use only

Auger Drilling Progress Report - Moktedu Trend Prospect 5km Gold Trend Confirmed Along Strike from 3.5Moz Deposit

HIGH-GRADE GOLD MINERALISATION CONTINUES ALONG STRIKE AT THE BODDINGTON SOUTH GOLD PROJECT

Auger Drilling Progress Report - Meguet Trend Prospect Multiple Highly Anomalous Gold Discoveries within 8km Mineralised Corridor

ASX RELEASE ACTIVITY UPDATE SPARGOVILLE PROJECT WA MINING AND EXPLORATION

Hits of up to 123gpt show Chesterfield emerging as a high grade gold project

COARSE GRAINED MAGNETITE DISCOVERED NORTH OF YORK

ASX RELEASE REVIEW OF GLANDORE DATA TO DEFINE DRILL PROGRAM

ASX RELEASE / MEDIA RELEASE 2,810 ppb gold in shallow auger samples Four new parallel zones defined up to 1500m in strike

High Grade Gold Intercepts at Bangaba

******************* *******************

Malachite Resources Limited ABN

For personal use only MANIEMA GOLD PROJECT. Gold Exploration Democratic Republic of Congo ASX: VEC VECTOR RESOURCES.COM.

For personal use only

For personal use only

Norwest successfully lists on ASX, Drilling commenced at Warriedar Gold Project

Resource Diamond Drilling Commences at Productora. Strong results continue from Productora central area drilling

BUNDARRA RESOURCE UPDATE

MT PLEASANT AUGER GEOCHEM RESULTS OUTLINE A NEW GOLD ZONE TO THE NORTH-EAST OF FIDELATAS PROSPECT HIGHLIGHTS

Encouraging drill results from Paroo Range

Highlights. Wa Project. Kandia Prospect. South Wa. Julie West Jang Trend. Corporate

RC DRILLING TO RESUME THIS WEEK AT CARLISLE REEFS

For personal use only

DIAMOND AND AIR CORE DRILLING TO COMMENCE ON WHITELAW GOLD BELT

New Zone of High Grade Gold Discovered at Balogo

SUMBA EXPLORATION UPDATE

For personal use only

For personal use only

Co-O MINE MINERAL RESOURCE UPDATE

FOCUS MINERALS REPORTS ENCOURAGING FIRST ROUND RESULTS FROM COOLGARDIE NEAR MILL PROGRAMME

ASX Announcements & Media Release

For personal use only

SUMMARY HIGHL. The project is located close to road and gas pipeline infrastructure and a large service centre.

For personal use only

Trouser Legs Mine Strong Drilling Results - including g/t Au Potential for Further Mine Development

FURTHER DRILLING SUCCESS AT BARLEE GOLD PROSPECT

New High Grade Gold-Copper Extensions At Mutiny s Deflector Deposit Highlight Project s Significant Growth Potential

For personal use only

For personal use only

RC Drilling Confirms Zeus Gold Prospect

NEW COBAR-STYLE COPPER DISCOVERY IN NSW

Queensland Mining Corporation Limited

Drilling program commences on Cloncurry and Mount Isa projects

Aurora Tank Gold Drilling Update

CRATER MOUNTAIN MAJOR MULTIPLE MINERALISATION EVENTS POTENTIAL ASSOCIATED WITH PORPHYRY SYSTEM NOW IDENTIFIED

For personal use only

For personal use only

ASX Announcement. New economic gold results confirm Dave East as an exciting new discovery. Highlights. 4 July 2011

RC drilling begins at Akoko Project marking commencement of 2010/11 exploration field season

704,000 OUNCE MIYABI GOLD PROJECT UPDATE

Drilling Program Commences on Iron Oxide Copper Gold Targets

ASX Announcement. FLEM survey underway at Henrietta Cobalt Nickel Prospect, Tasmania ASX: AX8 HIGHLIGHTS. Market Data. Board and Management.

ASX RELEASE. Maiden graphite drill program commences at Monax s Waddikee Project in South Australia

ASX ANNOUNCEMENT FURTHER EXPLORATION SUCCESS AT NULLAGINE

MARCH 2015 QUARTERLY ACTIVITY REPORT

Exploration Update: RC Drilling Commenced at Lucky Strike

102 metres strike length averaging 32.62g/t Gold extends overall surface vein sampling to date to 726 metres strike length averaging 24.

For personal use only

ASX ANNOUNCEMENT. Spectacular radiometric results at Mad Gap Project and East Kimberley Joint Venture

A1 GOLD MINE 14 LEVEL STOCK WORKS TARGET FURTHER HIGH GRADE DRILL INTERCEPTS

EXPLORATION SUCCESS AT COYOTE GOLD MINE

For personal use only

QUARTERLY ACTIVITIES REPORT FOR THE PERIOD ENDING 30 SEPTEMBER 2018

For personal use only

ASX Announcement NAKRU DRILLING AND TRENCHING INTERSECTS 11 METRES AT 2.84 G/T GOLD AND 28.4 METRES AT 1.1% COPPER

ACQUISITION OF THE MCCLEERY COPPER-COBALT PROJECT, CANADA

STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE AT SYNDICATED S 100% BARBARA SOUTH LODE

ROE HILLS COBALT AND GOLD DRILLING ADVANCES

New High Grade Lode Discovered at Wagtail South

Gold Exploration Update

For personal use only

High Grade Gold Drill Results Extend Buccaneer

NEW PHASE OF RESOURCE EXTENSION AND UPGRADE DRILLING COMMENCES AT BARDOC GOLD PROJECT, WA

Significant New Mineralised Zone Paroo Range (RGU:100%)

High Grade Gold Results from RAB Drilling at the Central Bore Prospect

For personal use only

Acquisition of Kilfoyle Project, Northern Territory

EIS sponsored Diamond drilling to commence at Zanex

For personal use only

MINCOR /GOLDEN RIM FIJI JOINT VENTURE SIGNIFICANT NEW EXPLORATION RESULTS

New area of extensive artisanal gold workings discovered on Wa Project

ENCOURAGING GOLD-BASE METALS AT MAY DAY, MOLY- GOLD AT ATTUNGA

For personal use only

African Energy Resources Limited

Hampton Hill Mining NL

March 26 th Expansive Exploration Target Defined at Leonora Gold Project

Chalice, Higginsville Drilling

Option agreement with Randgold set to commercialise Massigui Gold Project

Rock chip sampling confirms high grade quartz vein 500m long and up to 20m wide

COARSE NUGGET PATCH LATERITE EXTENDED BY 600% TO 22 SQ.KM AT MERTONDALE

SUMBA EPITHERMAL GOLD SYSTEM

A review of the large Red Dragon prospect was completed following the 2011 field season, the

For personal use only

Diamond Drilling to Commence in Axiom s Quang Tri Tenement, Vietnam

Transcription:

ERONGO ENERGY LIMITED Registered Office: Postal Address: Contact Details: ACN 114 175 138 LEVEL 1, SUITE 5, THE BUSINESS CENTRE PO BOX 131 TELEPHONE 61 8 9380 1333 55 SALVADO ROAD, SUBIACO SUBIACO WA 6904 FACSIMILE 61 8 9380 6761 WESTERN AUSTRALIA 6008 ADMIN@ERONGOENERGY.COM.AU WWW.ERONGOENERGY.COM.AU 19 July 2012 SIGNIFICANT GOLD MINERALISATION INTERSECTED AT MANIEMA PROJECT, DRC 21.7m at 3.58g/t Au HIGHLIGHTS Results received from single deep drill hole at Kabotshome Prospect at Maniema Gold Project, DRC Results include: o 20.25m @ 2.5g/t Au (from 319m) including 8m @ 4.03g/t Au o 21.7m @ 3.58g/t Au (from 354m) including 5.7m @ 8.74g/t Au The hole ended in mineralisation Result confirms continuity and improving grade at depth at Kabotshome The mineralisation is of a similar style and structural setting to Banro s Twangiza (5.6Moz) and Namoya (2Moz) deposits Erongo Energy Limited (ASX: ERN) ("Erongo" or the "Company") is pleased to announce that it has received results for a single deep diamond hole drilled on its most advanced Kabotshome Prospect on PR 4804 at the Maniema Gold and Tin Project ( Maniema Project ) in east central Democratic Republic of Congo (DRC). Drill hole KBD07 was drilled under previous drill holes KBD02 (16.65m @ 2.02g/t Au from 33.35m) and KBD03 (18m @ 2.03g/t Au from 68m). Two significant zones of mineralisation of 20.25m @ 2.5g/t Au from 319m (including 8m @ 4.03g/t Au from 320m) and 21.7m @ 3.58g/t Au from 354m (including 5.7m @ 8.74g/t Au) were reported. Results are summarised in Table 1 and Figures 1 and 2. Drill hole KBD07 was stopped short in highly mineralised fine grained silicified sediments as all drill rods were exhausted and the hole had to be stopped within the mineralised zone. At the Kabotshome Prospect, the Company is targeting a structurally complex mineralised shear where one or more broad high grade zones of mineralisation occur along the structure. One such zone was intersected at the bottom of KBD07 (21.7m @ 3.58g/t including 5.7m @ 8.74g/t Au) where the true thickness of this high grade chute needs to be established by deepening the hole. Future drilling at regular intervals along the structure will also identify the surface position of this high grade chute and will identify any additional zones of high grade mineralisation along the structure. Gold mineralisation reported at Banro Corporation s Twangiza and Namoya deposits located to the east in the same mineral province reflect similar high grade chute geometries. 1

Interpretation of an airborne magnetic and radiometric survey flown over the project area suggests that the Kabotshome hill is underlain by a large anticlinal fold structure. The eastern limb of the fold is dominated by mafic volcanics while the western limb is comprised mostly of sediments. The mineralised shear is interpreted to lie along the near vertical axial plane of the fold structure where sediments are in contact with volcanic rocks. Additional mineralised shear structures can be expected parallel to the main shear in both rock types. All drilling completed to date at Kabotshome has returned significant results and this most recent result confirms that mineralisation extends deeper than 300m below surface with a significant increase in grade. This mineralisation is also open to the north and south. Several additional targets have been identified along mafic volcanic contact zones with associated soil anomalies within the Kabotshome Prospect area from the geophysical survey. The Company now plans to deepen KBD07 and to drill a series of holes along the remainder of the 1km structure which will help to identify additional high grade zones of mineralisation and give a better indication of the potential overall grade of mineralisation at Kabotshome. The Company will also analyse all soil sampling, trenching and drilling results received to date in conjunction with the interpretation of the geophysical survey to follow up with trenching and pitting on new target areas while it procures a suitable drill rig for future work. The Company remains confident that the Kabotshome Prospect has significant gold resources to support an open pit and underground mining operation. For further information regarding Erongo Energy, please contact: Mark Gasson Simon Hinsley Managing Director Investor Relations Tel: +41 798 824 602 Tel: +61 3 9622 2104 Email: mark@gasson.co.za Email: simon@nwrcommunications.com.au Erongo Energy website: www.erongoenergy.com.au. The information in this report that relates to exploration results is based on information compiled by Mr Mark Gasson who is a member of the Australasian Institute of Mining and Metallurgy. Mr Gasson, the Managing Director of the Company, has sufficient relevant experience in respect of the style of mineralization, the type of deposit under consideration and the activity being undertaken to qualify as a Competent Person within the definition of the 2004 Edition of the AusIMM s Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Gasson consents to the inclusion in this report of the matters that are based on his information in the form and context in which it appears. 2

Table 1: Summary of Significant Intersections Received, KBD07, Kabotshome Prospect, Maniema Project, DRC Hole_ID Easting (me) Northing (mn) EOH Dip (deg) Azim (deg) From To Width Au (g/t) KBD07 489501 9584040 375.7-60 260 4.1 7.05 2.95 1.24 13 13.5 0.5 1.28 43 45.5 2.5 1.6 54 55.5 1.5 1.4 72 73 1 1.76 86.5 90 3.5 0.94 259 259.6 0.6 1.61 319 339.25 20.25 2.5 incl 320 328 8 4.03 350 350.75 0.75 6.43 354 375.7 21.7 3.58 incl 370 375.7 5.7 8.74 3

Figure 1: Borehole Locality Map at the Kabotshome Prospect, PR 4804 4

Figure 2: Section 9584025N 5