Blasting, fragmentation and wall quality result at West Wanagon slope stability project on Grasberg Mine

Similar documents
Coal Loss and Dilution Considerations for Western Canadian Foothills Open Pit Coal Projects

Central Queensland Coal Project Appendix 4b Geotechnical Assessment. Environmental Impact Statement

Stope Stability at the Big Gossan Skarn Deposit, Papua, Indonesia

Ring Blasting Design Modeling and Optimization

Blast design parameters and their impact on rock fragmentation

Curriculum Document Mining Technician: Strata Control Practitioner (Surface) Occupational Curriculum

GUIDELINES FOR OPEN PIT SLOPE DESIGN EDITORS: JOHN READ, PETER STACEY # & CSIRO. J x PUBLISHING

ANALYSIS OF A SLOPE FAILURE IN AN OPEN PIT MINE USING TSLOPE

11. GEOCHEMICAL CHARACTERIZATION

Ground vibrations level characterization through the geological strength index (GSI)

Mark Hawley, Piteau Associates Engineering Ltd. John Cunning, Golder Associates Ltd.

Deep Mill Level Zone, PT Freeport Indonesia From Feasibility to Production. May 2016

Analysis of Large-Scale Pit Slope Stability The Aitik Mine Revisited

Wall Control by Blasting Optimization at Las Cruces Open Pit Copper Mine (Spain)

Module 9 : Foundation on rocks. Content

A Strategic Rock Mechanics Study for The Kevitsa Open Pit Mine

Rockfall Modelling with Remedial Design and Measures along Part of a Mountainous Settlement Area, Southern Turkey

MINERAL CONTROL SYSTEM IN BAJO DE LA ALUMBRERA MINE, CATAMARCA, ARGENTINA

The design, optimisation, and use of the seismic system at the deep and high-stress block cave Deep Mill Level Zone mine

WE DELIVER THE USE OF RTK GPS IN BLAST OPTIMIZATION THE USE OF RTK GPS IN BLAST OPTIMIZATION THE CASE OF GOLD FIELDS GHANA LTD, TARKWA

Instituto De Ingenieros De Minas Del Peru

Prospecting Report 'S Office i DB Property, B.C. -J Negro Creek Nelson Mining District NTS 82F.050. Operator: Kootenay Gold Inc.

Improved Blasting and Bench Slope Design at the Aitik Mine

MAD345 - Mining II INTRODUCTION. 10 October Hacettepe University. Introduction Prospecting Mining Dilution Resource and Reserve Estimation

GEOLOGIC STRUCTURE MAPPING using digital photogrammetry

Oriented core application in texture analysis of J 1 formation in Kazan oil-gas condensate field. field (Tomsk Oblast)

Geological factors influencing the design of a narrow-reef autonomous gold miner

Earthquake Hazard Analysis Methods: A Review

Drill locations for the 2015 program are highlighted in the geology map below.

APPENDIX Q BLASTING IMPACT ASSESSMENT REPORT

IAEA SAFETY STANDARDS Geotechnical Aspects of Site Evaluation and Foundations in NPPs, NS-G-3.6

Mathias Jern nitroconsult.se)

Geotechnical project work flow

APPENDIX B SAMPLE ADEQUACY EVALUATION FOR ROSEMONT GEOLOGIC MATERIALS

JV Project Portfolio Executive Summary: Bruce Smith

Construction Technical Specifications on Rock-Foundation Excavating Engineering of Hydraulic Structures

Slope Stability Evaluation Ground Anchor Construction Area White Point Landslide San Pedro District Los Angeles, California.

Potential collapse due to geological structures influence in Seropan Cave, Gunung Kidul, Yogyakarta, Indonesia

Triggering of great earthquakes: calculation and analysis of combined tidal effect of the Moon and Sun

core samples and soil focusing on geochemistry and gold-sulphide paragenesis (Gunn et al.,

Protection of Underground Mine Structures Due to Adjoining Open-pit Mine Blasting

Fragmentation Management for the Downstream Value Chain. Scott G. Giltner

Coal Layer Identification using Electrical Resistivity Imaging Method in Sinjai Area South Sulawesi

Magnetic properties of soils from landslide potential area (Case study: Pasir Ipis-Lembang, West Bandung)

Application of Core Logging Data to generate a 3D Geotechnical Block Model

ITASCA Consulting Canada Inc.

Managing Muckpile Fragmentation. Scott G. Giltner

Importance of blast-design in reduction of blast-induced vibrations

NOTES ON SUBBASE AGGREGATE SPECIFICATION TNZ M/3. These notes must not be included in the Contract Documents.

Pierce County Department of Planning and Land Services Development Engineering Section

A STUDY ON THE BLASTING VIBRATION CONTROL OF CREEP MASS HIGH SLOPE

Prevention and remediation of rockslide at left portal of north tunnel of Da Nang Qu ang Ngai expressway in Quang Nam, Vietnam

New Deep Inferred Resources at Tara Mine

Causes of Dynamic Overbreak and Control Measures Taken at the Alborz Tunnel, Iran

Improving slope stability at Kışladağ Gold Mine

[1] Performance of the sediment trap depends on the type of outlet structure and the settling pond surface area.

IMPORTANCE OF UNDERSTANDING COMPOSITIONAL DIFFERENCES IN SIZE FRACTIONS

Hydraulic Impacts of Limestone Quarries and Gravel Pits. Jeff Green Minnesota DNR-Division of Ecological & Water Resources

List of Abstracts. Automation and Introduction of New Technologies in Blasting Operations (9)

Prediction of landslide run-out distance based on slope stability analysis and center of mass approach

Impact of maintenance in the automotive field. Experimental study of mechanical vibration

Slope Stabilization for Coal mining In Prabumulih District, South Sumatera Province, Indonesia

Geology and Nonrenewable Mineral Resources

IV. ENVIRONMENTAL IMPACT ANALYSIS G. GEOLOGY AND SOILS

Pit Slope Optimization Based on Hydrogeologic Inputs

NOA ASSESSMENT HARRIS QUARRY MENDOCINO COUNTY, CALIFORNIA TABLE OF CONTENTS

Dark Art. Ian de Bruyn

Gravity Data Analysis and Modelling for Basin Sedimen of Eastern Java Blocks

SLOPE STABILITY EVALUATION AND ACCEPTANCE STANDARDS

Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services

Integration of Seismic Refraction and 2D Electrical Resistivity in Locating Geological Contact

Construction Exits Rock pads

Azerbaijan International Mining Company Limited

Influence of Surrounding Soil Conditions and Joint Sealing on Seepage Resistance of a Sheet Pile Wall, Three Dimensional Numerical Analyses

Magnitude of Vibration vis-a-vis Charge per Delay and Total Charge

The Owl Creek Pit Part 1: Relocating Mine Rock from Surface Stockpiles to the Pit to Mitigate Acid Drainage

POTENTIAL OF THE DONGWE COPPER GOLD PROJECT

Improved Geohazard Analysis for Drilling Favorability Maps

Calibration of a Fragmentation Model for a New Mining Operation

Appendix K: Field Photographs

TRUNCATED GAUSSIAN AND PLURIGAUSSIAN SIMULATIONS OF LITHOLOGICAL UNITS IN MANSA MINA DEPOSIT

An Overview of Graphite Projects from Asia to Africa. Dr Mike Cunningham SRK Consulting (Australasia) Pty. Ltd.

CNSC Review of the Long-Term Safety Case for a Deep Geologic Repository

Diameter of a draw zone a case study from a block caving mine, Deep Ore Zone, PT Freeport Indonesia

Rock slope stability problems in Gold Coast area, Australia

Seepage Analysis for Shurijeh Reservoir Dam Using Finite Element Method. S. Soleymani 1, A. Akhtarpur 2

3.12 Geology and Topography Affected Environment

Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services

Aureus Mining New Liberty Project Geology

Appendix D Rock Blasting Report

Geotechnical Models and Data Confidence in Mining Geotechnical Design

Geophysical Methods for Screening and Investigating Utility Waste Landfill Sites in Karst Terrain

CCR Rule Compliance: Innovative Use of Geophysics to Certify Landfill Stability and Site Groundwater Monitoring Wells

AN ASSESSMENT OF SPECTREM AND ZTEM DATA OVER THE PEBBLE COPPER- GOLD PORPHYRY COPPER DEPOSIT, ALASKA

Evaluation of Ground Vibration Induced by Blasting During the Excavation of a Transportation Tunnel in Istanbul Metropolis

Determination of Failure Point of Asphalt-Mixture Fatigue-Test Results Using the Flow Number Method

Fragment Size Distribution of Blasted Rock Mass

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin

Exploration for Results: Moura Coal Mine

Rock slope rock wedge stability

Transcription:

IOP Conference Series: Earth and Environmental Science PAPER OPEN ACCESS Blasting, fragmentation and wall quality result at West Wanagon slope stability project on Grasberg Mine To cite this article: Y Prabawa et al 2018 IOP Conf. Ser.: Earth Environ. Sci. 212 012066 View the article online for updates and enhancements. This content was downloaded from IP address 148.251.232.83 on 06/01/2019 at 02:08

Blasting, fragmentation and wall quality result at West Wanagon slope stability project on Grasberg Mine Y Prabawa 1, L Bugaleng 1*, R Gautama 1, and E Widijanto 1 1 PT Freeport Indonesia *corresponding author: lbugalen@fmi.com Abstract. West Wanagon Slope Stability (WWSS) Project is part of final slope design of Wanagon OBS in Grasberg District, which provide around 150 Mton of Limestone as rock fill material, slope protection cover, drainage riprap layer and rock drain system. The design will balance operating objective with effective environmental, safety controls, geotechnical stable, adequate drainage with minimum erosion and facilitate revegetation. For past 3 year, PTFI has developed WWSS Geology Rock Model to identify various geology feature to lead blasting pattern and timing design to achieve fragmentation requirement and final slope quality. On 2017, there are 75 vibration monitoring data and give a result of blasting constant PPV= 137.63 SD^- 0.899. This is based on pattern 7m x 8m with timing 62 ms x 89 ms (74%), 49 ms x 96 ms (13%), 62 ms x 110 ms (5%), 46 ms x 50 ms (3%), 46 ms x 86 ms (3%) and other (2%). The result of blasting on slope wall quality using modified controlled blast evaluation chart (Read and Stacey, 2009) is able to achieve 1. Good Result=69.2%, 2. Geometry Achieved=3.8%, 3. Good Face Condition=23.1% and 4. Unacceptable result=3.9%. The fragmentation has taken at various location and has result that D50=174 mm, which meet slope cover requirement with screen to reduce fines content. Keywords: WWSS, West Wanagon Slope Stability, blasting, fragmentation, final wall quality 1. Introduction West Wanagon Slope Stability (WWSS) is part of final slope design of Wanagon OBS which begins in 2015 and planned to be completed in 2024. It is located on western of the Wanagon Basin from elevation 4200 m to 3200 m. The objective of this project are providing 150 million ton of limestone material to achieve final slope design that stable against surface erosion or runoff, seismic event and excess pore water pressures. The final slope design of Wanagon OBS is consisted of WWSS area, which provide limestone material, and Rehandle material (Figure 1). In WWSS area, slope was designed using ISA 43 o and BFA 70 o. While in the Rehandle material is designed using ISA 21 o (2.5H:1V) and BFA 26 o (2H:1V). The drainage system on the toe of each catch bench will construct using rock cover with specific criteria based on D 50 = 75 mm dan D 50 = 150 mm requirement and rock quality requirement. In order to get the material effectively from the ROM, several factor and condition should be determined such as (1) Geological conditions in the form of fault, karst, clay content, RQD, litology; (2) Drilling and blasting design; (3) Fragmentation Result; (4) Wall quality. Content from this work may be used under the terms of the Creative Commons Attribution 3.0 licence. Any further distribution of this work must maintain attribution to the author(s) and the title of the work, journal citation and DOI. Published under licence by Ltd 1

Figure 1. Wanagon Final Slope Boundary on topography 5 June 2018 2. Geological Condition Geology model for WWSS was very broad until 2014 and since the beginning of this project on 2015, several drilling holes on elevation 4200 m to 3925 m were added, in order to detail the geology lithology and structures. In general, the geology rock type in Wanagon Area consist of Limestone system (marbleized, argillaceous and karst), Idenberg#2 intrution and Wanagon sill, which can be seen on Figure 2. Idenberg intrution (Tif) is a micro diorite expose with complete sequence of alteration with the country rock. The limestone around Tif strongly altered to white marbleized limestone with low RQD 20-50% and contact polymics breccia also occurs between Tif Intrusion and limestone country rock. Tif Shows fine porphyritic texture with hornblende minerals, Pyrite <1%, Oxide 5-10% near contact breccia, clay 3-5% Limonite clay, and it develops at Idenberg #2 Fault zone. Based on this geology rock type, geotech engineer is able to determine material suitable for rock cover or deliver to other waste dump. It is also to determine the blasting pattern to meet fragmentation requirement. Figure 2. Geological Lithology Map Beside geology rock type, geology conducts structural map as seen on Figure 3. This structure will assist geotech engineer to analyze optimum blast pattern and delay time in order to create optimum 2

energy propagation that have minimal impact to the wall stability. The major structure involve in WWSS is NW, NE and NS direction. This combination of trend may cause planar or wedge failure as seen on Figure 3. Figure 3. Structural Mapping and Failure Potential Identification 3. Drilling and Blasting Design In the beginning of exposing WWSS on elevation 4200 m to 4000 m, the blast pattern was 7 m x 8 m in most of the area and applying maximum 800-900 kg of ANFO and ikon. With experience gain on its blasting result since 2015 to 2016, geotech engineer reviews all of previous blast design based on geology rock type, major strcuture involved, number of holes, maximum peak particle velocity and frequency; blast damage evaluation, slope achievement and fragmentation. In 2016 to 2017, several delay timing were introduced, vibration was monitored and the quality was assessed. The delay timing that introduce using 7 m x 8 m patter is 62 ms x 89 ms (74%), 49 ms x 96 ms (13%), 62 ms x 110 ms (5%), 46 ms x 50 ms (3%), 46 ms x 86 ms (3%) and other (2%). The blast charged and timing can be seen on Table 1. Table 1. Delay Timing and Explosive Requirement for Limestone rock at WWSS The blasting vibration is monitored, to evaluate actual PPV and Hz, then compare with predicted analysis and blasting criteria i.e. PPV < 120 ms and freq > 20 Hz. The result of blast vibration then collected to provide site-specific blast constants as shown on Figure 4. 3

Figure 4. Plot of SD and PPV in 2016 2017 Figure 5. Plot of Frequency and PPV in 2016-2017 4. Fragmentation The fragmentation from different blasting pattern, delay timing and rock type has different result. Therefore, it necessary to conduct fragmentation analysis in each of blasting therefore the characteristic of blasting design and rock can be determined for optimum material size following the criteria. The rock criteria for WWSS as seen on Table 2. Photogrammetry method is used to evaluate fragmentation after blasting is exposed by shovel. From all of the fragmentation analysis, that conducted on various location within WWSS, the result is 1) all of the sampling location, the requiremnt for D50=75 mm is met, 2) for D50 = 150 mm, 64% of sampling area is met criteria. The result of analysis can be seen on Figure 6 and Table 3. On all of the sampling analysis, it shows that the maximum fines content (size = 1 inch) is 10% and most of the material is higher than criteria. This result is indicating that in order to meet slope cover criteria, grizzly/sieve panel is required to separate fines material and crusher to reduce the material that higher than requirement. Beside that, it show that the blasting design need to be improve to provide optimum material size for slope cover. 4

Table 2. Rock Cover Requirement on WWSS Figure 6. Result of Fragmentation on WWSS 5

Table 3. The D 30, D 50 and D 60 from Fragmentation Analysis Area Material Type Sample WWSS - 4060L WWSS - 4045L WWSS 4015L - 4000L WWSS 3940L - 3925L WWSS 3925L - 3910L Argillaceous Limestone bedding soft material with high clay content D30 (mm) D50 (mm) D60 (mm) DS#02_Sample1_R1 31.6 110.91 164.2 DS#02_Sample2_R1 177.16 269.81 334.23 DS#09_R1 62.93 457.34 618.97 DS#19_002 46 116.68 158.67 DS#19_004 30.45 51.66 61.99 DS#19_005 56.19 112.72 141.97 DS#19_009 49.51 102.85 132.45 Area #1 (7x8) 125.24 225.06 273.40 Area #2 (7x8) 133.47 218.94 260.18 Area #3 (8x9) 169.55 279.63 326.43 Area #4 (7x8) 117.18 225.14 283.48 Area #5 (7x8) 195.46 273.85 314.07 Sample #02 95.91 216.71 255.70 Sample #04-2 44.31 116.94 153.80 Sample#06-1 65.39 165.86 211.79 Sample_01 180.43 235.42 262.09 Sample_02 151.19 198.54 222.44 Sample_03 157.74 209.51 237.20 Sample_04 58.09 93.37 110.18 D 50 = 75 mm D 50 = 150 mm D 50 = 75mm & D 50 = 150mm tidak tercapai D 50 = 75mm tercapai & D 50 = 150mm tidak tercapai D 50 = 75mm & D 50 = 150mm tercapai = = = 5. Wall Quality It is very important to achieve wall quality to achieve safe production, stable slope and mitigate rock fall hazard. In PTFI, the wall quality is determined using 1) Modified Controlled Blasting Evaluation Chart (Read and Stacey, 2009), 2) 3D Slope Audit, and 3) Shovel digging achievement. The wall mapping, using modified-controlled blasting evaluation chart, was conducted from elevation 4215 m until 3955 m. The result of mapping on the area is 35.82% good result, 26.37% geometry is achieved but the wall surface condition needs to be considered geometry achieved however face condition need attention, while 19.90% had good surface geometry but unacceptable results, and 17.91% of unacceptable result mapping. The plotted is in Figure 7. Figure 7. Plotting Mapping WWSS at Elevation 4215-3955 6

From the plotting, focus on wall quality improvement is from the assessment of the wall no 4 (unacceptable result) and No. 3 (good face geometry unacceptable) The laser scanner is used to conduct 3D Slope Audit to acquire detail wall point cloud, which will evaluation using CAD program. The CAD program will measure the catch bench width (CBW) and bench face angle (BFA) in every 1 m slice, then show its performance statistically. The success criteria for single bench (15m high wall) is defined as CBW target: 7.6 m occurs over 85%. The target CBW value comes from modified Richie formula. The target BFA value is 67 o occure over 85%. The audit slope is carried out at elevation 3970L to 3910L and the result can be seen on Table 4, Figure 8, Table 5 and Figure 9. Table 4. Result BFA WWSS Elevation 50% BFA Reliability 80% BFA Reliability Remark 3970L-3940L double bench 58.6 55.4 BFA 62 = 15% 3970L-3955L 55.9 53.2 BFA 62 = 15% 3955L-3940L East 66.0 63.0 BFA 62 = 82% 3955L-3940L West 65.3 61.3 BFA 62 = 73% 3940L-3925L East 60.4 56.1 BFA 62 = 42% 3940L-3925L West 68.5 65.0 BFA 62 = 94% 3925L-3910 West 62.0 60.4 BFA 62 = 67% Figure 8. Graph Result BFA WWSS 7

Table 5. Result CBW WWSS Elevation 50% CBW 80% CBW Reliability Reliability Remark 3955L 10.8 9.2 CBW 7.6 m = 90% 3940L East 8.4 6.8 CBW 7.6 m = 71% 3940L West 11.6 10.5 CBW 7.6 m = 100% 3925L West 11.6 10.5 CBW 7.6 m = 100% Figure 9. Graph Result CBW WWSS In order to assist shovel operator to achieve design, PerfectDig software is used to compare between actual (based on laser scanner) and design. PTFI criteria for success is: 1) offset is not more than 1m and over dug is not more than 0.5m otherwise the pre-split hole will damage. The result is color-based, that easy to understand by operator. In this case, the blue color means over dig and red color means under dig. 8

Elevation 3970L-3940L 3955L-3910 East Side 3955L-3910 West Side Block Underdig Table 6. Perfect Dig Result Wall Underdig Overdig Tonnage Wall Overdig Bench Underdig (% Area) Bench Overdig (% Area) Tonnage (% Area) (% Area) 1 893.4 0.0 100% 0% 2 12,085.7 0.0 100% 0% 100% 0% 3 2,852.9 0.0 100% 0% 100% 0% 4 12,017.6 0.0 100% 0% 100% 0% 5 4,812.4 0.0 100% 0% 100% 0% 6 9,318.9 172.5 65% 1% 100% 0% 7 10,471.4 571.0 62% 7% 79% 6% 8 12,826.8 2,084.2 44% 14% 67% 13% 9 5,276.8 195.0 73% 0% 69% 12% 10 288.7 107.3 3% 16% 46% 27% 8 10,259.0 1,516.0 25% 29% 73% 4% 14 6,093.0 924.0 15% 19% 79% 2% 15 2,251.0 537.0 8% 27% 73% 10% 1 1,714.0 20.0 63% 0% 94% 0% 2 1,976.0 582.0 17% 25% 84% 7% 3 730.0 232.0 5% 20% 79% 10% 4 889.0 301.0 8% 29% 80% 6% 5 1,199.0 134.0 23% 11% 81% 0% 6 1,062.0 17.0 75% 0% 97% 0% 7 33.0 0.0 94% 0% 8 9 1,097.0 13.0 50% 0% 92% 0% 10 1,853.0 8.0 72% 0% 85% 0% 11 3,966.0 237.0 35% 4% 83% 1% 12 706.0 154.0 34% 13% 58% 0% Figure 10. Perfect Dig Result Conclusion Good geology information will provide initial information to generate blast design and its relation to stable slope. The blast design should be controlled and fined tune in every blast, in order to meet requirement and keep the wall stable. 9

Controlled blasting can be achieved by collecting data from vibration monitoring and blast video. It will give blast engineer good understanding of rock behavior against blast vibration. The rock fragmentation analysis on each of blasting is able to determine to success of blasting related to material size requirement. In this case, meet criteria for rock cover. The wall quality should be met the criteria in order to perform safe production and stable slope. Each of the wall that not meet the designated quality, it should be stabilized. Failed to meet criteria in the first place, mean that additional cost will add to improve the wall. Reference [1] Read, John and Stacey, Peter. (2009). Guidelines for Open Pit Slope Design, Balkema book, p. 265-326. [2] Split Engineering. (2009). How to use split desktop v3, Split Engineering. [3] Haws, Nathan. (2015). Grasberg Mine. Lower Wanagon Stockpile Closure. Grading Phase Design Report. MWH American Inc. [4] Maptek. (2016). https://www.maptek.com/products/perfectdig/ 10