Quarterly Report Quarter ended 30 June 2010

Similar documents
Commencement of Targeted RC Drilling Nabarlek Project

24 September Best results achieved at U40 Prospect (West Arnhem JV with Cameco Australia): o 1.34% eu 3 O 8

Alligator Energy Uranium Projects. 6 September 18 NT RESOURCES WEEK Greg Hall, CEO

KURUNDI PROJECT EXPANDED TO INCLUDE PHOSPHATE

SPOT MARKET URANIUM OXIDE FIRMS TO US$49.25 POUND

Significant New Mineralised Zone Paroo Range (RGU:100%)


ASX Release. 16 December 2010 LIMITED. EXPLORATION UPDATE Highlights

ASX ANNOUNCEMENT. Spectacular radiometric results at Mad Gap Project and East Kimberley Joint Venture

High Grade Gold Intercepts at Bangaba

For personal use only

NT RESOURCES LIMITED QUARTERLY ACTIVITIES REPORT FOR THE PERIOD ENDED 30 JUNE 2010 ASX CODE: NTR

DIAMOND AND AIR CORE DRILLING TO COMMENCE ON WHITELAW GOLD BELT

For personal use only

FOUR EAGLES MINERALISATION REPORT ACCEPTED AND DRILLING TO RECOMMENCE

For personal use only

CANYON TO ACQUIRE TWO GOLD PROJECTS IN BURKINA FASO Highlights

For personal use only

ATLAS GOLD LIMITED ABN QUARTERLY REPORT FOR THE PERIOD ENDED 31 MARCH 2005

Norwest successfully lists on ASX, Drilling commenced at Warriedar Gold Project

STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE AT SYNDICATED S 100% BARBARA SOUTH LODE

HIGH-GRADE GOLD MINERALISATION CONTINUES ALONG STRIKE AT THE BODDINGTON SOUTH GOLD PROJECT

Magnus Copper Project exploration update

Alligator commences drilling of TCC4 uranium prospect in Arnhem Land, NT 4 September 2018

Highlights. Wa Project. Kandia Prospect. South Wa. Julie West Jang Trend. Corporate

Hampton Hill Mining NL

ASX Announcement. New economic gold results confirm Dave East as an exciting new discovery. Highlights. 4 July 2011

Drilling program commences on Cloncurry and Mount Isa projects

Managing Director s Presentation

MAJOR EXPLORATION PROGRAMME TO COMMENCE AT ROSEBY

For personal use only

THUNDELARRA EXPLORATION

TWO HIGH-GRADE GOLD ZONES DISCOVERED AT HERMES GOLD PROJECT

For personal use only

ASX ANNOUNCEMENT Date: 03 October 2018 Number: 604/031018

Alligator prepares to drill its advanced TCC4 uranium prospect - 21 August 2018

For personal use only

For personal use only

AGM Presentation 6 November 2012

For personal use only

DECEMBER QUARTERLY REPORT

ROE HILLS COBALT AND GOLD DRILLING ADVANCES

RC drilling begins at Akoko Project marking commencement of 2010/11 exploration field season

For personal use only

For personal use only

Significant Copper-Gold JORC Exploration Target

Chalice, Higginsville Drilling

TANDARRA GOLD PROJECT DRILLING COMMENCES AND FOUR EAGLES GOLD PROJECT DRILLING UPDATE

Drilling Commences at Telfer West Gold Project

For personal use only

Sepola Project Area in Mali Extended

ASX announcement. Mylo-Frontier Pilbara Gold Project acquisition. 27 November Summary

APOLLO SOUTH AUSTRALIAN EXPLORATION UPDATE

Exploration targets identified to increase Browns Range Project s mine life

ASX/MEDIA RELEASE 25 November EMERGENT CONFIRMS MAJOR JORC RESOURCE UPGRADE TO 561Mt FROM PREVIOUS 127Mt AT BEYONDIE IRON PROJECT

For personal use only

CORPORATE UPDATE. Feasibility Study being finalised for completion towards the end of April.

ASX RELEASE ACTIVITY UPDATE SPARGOVILLE PROJECT WA MINING AND EXPLORATION

STRONG GOLD IN SOIL ANOMALY OUTLINED AT MARY HARRISON PROJECT HIGHLIGHTS

For personal use only

Sipa Resources Limited

MAIDEN URANIUM RESOURCE PROOF OF CONCEPT

Deep Yellow Revises Resource Estimate at INCA Uranium Deposit in Namibia

ASX Announcement. FLEM survey underway at Henrietta Cobalt Nickel Prospect, Tasmania ASX: AX8 HIGHLIGHTS. Market Data. Board and Management.

For personal use only

Acquisition of Kilfoyle Project, Northern Territory

Lake Resources N L, Quarterly Report, January - March 2013 LAKE RESOURCES NL QUARTERLY REPORT JANUARY MARCH 2013

The Company was admitted to the Official List on 12 November 2010 and its shares commenced trading

QUARTERLY ACTIVITIES REPORT For the Quarter ended 30 September 2018

AMENDED ASX ANNOUNCEMENT

Encouraging drill results from Paroo Range

Axiom Announces First Energy Project Eden Vale Sedimentary Uranium

QUARTERLY ACTIVITIES REPORT FOR THE PERIOD ENDING 30 SEPTEMBER 2018

For personal use only

For personal use only

For personal use only

For personal use only

For personal use only

EXTENSIVE GOLD TREND DISCOVERED AT THE BASAWA GOLD PROJECT, LIBERIA

For personal use only. Copper, Zinc and Uranium Projects in NT and SA ASX CODE: CXO

CHALICE GOLD MINES LIMITED HIGHLIGHTS. Quarterly Report 31 March Activity. IPO completed 24 March 2006, raising the maximum of $7.

SECOND ADVANCED GOLD PROJECT IDENTIFIED AT THREE RIVERS PROJECT

SUMBA EPITHERMAL GOLD SYSTEM

For personal use only

Mountain Maid Gold System Displays Major Size Potential

For personal use only

For personal use only

Queensland Mining Corporation Limited

HIGHLY SUCCESSFUL SEISMIC SURVEY DOUBLES SIZE OF DEEP PALAEOVALLEY AT LAKE WELLS POTASH PROJECT

New Zone of High Grade Gold Mineralisation Discovered at Balogo, Burkina Faso

GEOPACIFIC REPORTS HIGH GOLD VALUES IN AUGER SOIL SAMPLES FROM THE QALAU AND TATAIYA PROSPECTS, RAKI RAKI PROJECT,

Silver City Minerals

Quarterly Activities Report

For personal use only

For personal use only

DRILLING CONFIRMS CLEAVERVILLE FORMATION MAGNETITE POTENTIAL ON THE MIAREE MAGNETITE TREND HIGHLIGHTS

For personal use only

Drilling Program Commences on Iron Oxide Copper Gold Targets

Encounter Resources Limited (ASX Code: ENR)

AGM Presentation 12 November 2013

Transcription:

28 July 2010 The Company Announcement Officer Australian Securities Exchange Ltd via electronic lodgement Quarterly Report Quarter ended 30 June 2010 Highlights PhosEnergy - Uranium Extraction Technology Cameco invests a further US$5 million for continued process development. Ongoing bench scale testwork at ANSTO to confirm expected improvements in operating costs. Exploration Our Strengths Breakthrough PhosEnergy Process Nabarlek Project A rare investment opportunity Multiple near term growth opportunities Reconnaissance RC drill program completed at the Nabarlek Project. Targeted RC drilling on the West Arnhem Joint Venture commenced. Prospective Frome Basin exploration licence applications covering 819km 2 offered to grant. $100,000 co-funding grant awarded by the NT Government under the Bringing Forward Discovery Initiative for the Headwaters Project. Corporate Cash Balance at the end of the quarter was $10.6 million. HEAD OFFICE Level 5 29 King William Street Adelaide, SA 5000 T: +61 8 8110 0700 F: +61 8 8110 0777 E: reception@uel.com.au PERTH OFFICE Level 2, 1292 Hay Street West Perth, WA 6005 GPO Box 2890 Perth, WA 6001 T: +61 8 9322 3990 F: +61 8 9322 5800 w w w. u e l. c o m. a u

1 URANIUM EXTRACTION TECHNOLOGY 1.1 Activities Funding As announced on 5 th July, 2010 Cameco Corporation has invested the second tranche of US$5 million, bringing their total investment in the ongoing development and commercialisation of the PhosEnergy Process to US$7.5 million. Cameco has the right to earn up to 63% in the technology through staged investment of US$16.5 million. Technical and Business Development Continuous bench scale development testwork was completed on phosphate samples from two fertiliser production facilities. Results which support UEQ s capital and operating cost assumptions for the process were achieved. A third phosphate sample will be tested in the coming weeks. The results from the testing of these phosphate streams will form the basis for ongoing discussions with the owners of the phosphate fertiliser facilities. Additionally, bench scale testwork has been undertaken during the quarter to further reduce operational risk and lower operating costs. Previous pilot plant test work indicated potential operating costs in the range of US$25 to US$30 per pound. 1.2 Background Uranium Equities through USA registered Urtek LLC ( Urtek ) is developing a new technology for the extraction of uranium from phosphoric acid streams produced in the production of phosphate based fertilisers ( the PhosEnergy Process ). Cameco Corporation is funding the ongoing development and commercialisation of the PhosEnergy Process through a staged investment of up to US$16.5 million. If Cameco earns its interest it has agreed to provide funding for a minimum of 50% of UEQ s portion of capital expenditure for the construction of the first commercial plant, repayable out of earnings. A Non-provisional patent application has been filed in the USA, Jordan and the Patent Cooperation Treaty (PCT) signatory countries. Additional provisional patent applications outlining potentially significant improvements to the Process have been filed in Australia. 2

2 Exploration Activities 2.1 Nabarlek Project (NT) 2010 Field Season Exploration activities commenced on the Nabarlek Project with a reconnaissance reverse circulation (RC) and aircore drill program on the Nabarlek Mineral Lease (UEQ 100%). The RC drilling program completed on the Mineral Lease tested for geochemical dispersion beneath thin sandstone cover in the northern areas of the Lease which had previously received little or no effective drilling. The program consisted of drilling broadly spaced traverses providing vital information on geological and structural framework of the region as well as identifying anomalous geochemistry and alteration information to assist with targeting future programs. A total of 48 RC drillholes were completed for 4445 metres (Figure 1). Aircore drilling will target areas of geochemical and alteration dispersion beneath thin alluvial cover over bedrock in the eastern portion of the Mineral Lease (Figure 1). Figure 1 RC and aircore geochemical drilling traverses on the Nabarlek Mineral Lease. Preliminary data from the reconnaissance geochemical program is currently being compiled. 3

Targeted RC Drilling As announced on 15 th July 2010, a comprehensive drilling program testing several prospects on the West Arnhem Joint Venture with Cameco Australia (UEQ 40%, Cameco 60%) commenced mid July. The program, targeting a combination of geochemical and geophysical anomalies will consist of approximately 35 RC drill holes and 65 aircore drill holes. Of high priority in the program will be the testing of the Coopers Prospect and the N147 Prospect Basement Target. Figure 2 N147 and Coopers Geochemistry with Drill targets. 4

2.2 Headwaters Project (NT) 2010 Field Season A $100,000 co-funding grant was awarded by the NT Government under the Bringing Forward Discovery Initiative for the Headwaters Project, located in the prospective East Alligator Uranium Field, West Arnhem Land. The funding will be applied towards direct drilling costs testing for Westmoreland-style targets in the northern most tenement. Planning is underway for field season work on the project which is being funded, under a JV agreement, by Vale Exploration Pty Ltd ( Vale ), a wholly owned Australian subsidiary of Vale S.A. Figure 3 The Headwaters Project The tenements lie within the Arnhem Land Plateau along the western margin of the Proterozoic McArthur Basin (Figure 3). Rocks consist of fluvial sandstone with minor interbedded volcanic sequences overlying the strongly deformed and metamorphosed basement rocks which host the major unconformity-related uranium deposits of the Alligator Rivers Region. A review of the exploration potential of the Headwaters Project has identified geological environments that hold similarities to the style of uranium mineralisation present at Westmoreland in north-west Queensland. 5

2.3 Frome Basin (SA) UEQ has secured a strategic holding in the prospective Frome Basin and is progressing through the grant process for two exploration licences, covering 819km 2. The area offers potential for the development of sandstone-hosted rollfront and palaeochannel targets of the type developed at the Four Mile and Beverley Deposits in the western Frome Basin. The acquisition of these tenements results from the company s ongoing strategy of consolidating land positions in highly prospective yet under-explored Australian uranium provinces such as the Alligator Rivers region, the Frome Basin and the Rudall River - Kintyre region. 2.4 Rudall River Data review and target generation on the Rudall River Uranium Project (UEQ 40%: Cameco 60%) continued during the quarter. The Project lies to the east and directly adjacent to the lease containing the Kintyre Deposit (70% Cameco: 30% Mitsubishi Development Pty Ltd). The Kintyre deposit from published reports may host 62 to 80 million pounds U 3 O 8 with an average grade of 0.30 0.40% U 3 O 8. The Project tenements cover historic uranium prospects with the western tenements having analogous structural settings to that seen at Kintyre. TEMPEST electromagnetic targets have been identified and remain to be systematically tested. 3.0 CORPORATE The Company s cash position at 30 June, 2010 stood at $10.6 million, inclusive of a restricted $1.8 million performance bond. Bryn Jones Managing Director Mobile: +61 (0) 412 577 406 Competent Person Statement The information in this announcement that relates to Exploration Results is based on information compiled by Mr. Grant Williamson, Geology Manager - Exploration of Uranium Equities Limited, who is a Member of the Australian Institute of Geoscientists and of the Australasian Institute of Mining and Metallurgy Inc.. Mr. Williamson has sufficient experience in the field of activity being reported to qualify as a Competent Person as defined in the 2004 edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves, and consents to the release of information in the form and context in which it appears here. 6

About Uranium Equities Uranium Equities Limited (UEQ) has two main areas of focus: The development of the PhosEnergy Process; and exploration activities directed at a small core of high quality exploration assets which include the key Nabarlek Project. The PhosEnergy Process is an innovative patented process for the extraction of uranium as a by-product from phosphate in the production of phosphate based fertilisers. The global annual production potential of uranium from the phosphate industry is in the order of 20 Mlbs U3O8. This quantity of uranium is mined in phosphate ores but not recovered annually on a worldwide basis. The major phosphate based fertiliser producers are located in Northern Africa, North America and Asia. The PhosEnergy Process has been proven to pilot scale with results establishing a robust process capable of achieving high levels of uranium recovery at the lower end of the cost curve. The Nabarlek Project provides a rare near mine exploration opportunity surrounding the historic Nabarlek uranium deposit (24 Mlbs @ 1.84% U3O8). The deposit lies within an extensive uranium mineral system which extends over more than 50 square kilometres within the Mineral Lease and the surrounding tenements. The mineral system which contains widespread anomalous uranium geochemistry and ore grade mineralisation at several locations remains largely untested. 7