Estimation of Radioactivity and Residual Gamma-ray Dose around a Collimator at 3-GeV Proton Synchrotron Ring of J-PARC Facility

Similar documents
Progress in Nuclear Science and Technology, Volume 6,

Measurement of activation of helium gas by 238 U beam irradiation at about 11 A MeV

NEW ARRANGEMENT OF COLLIMATORS OF J-PARC MAIN RING

Comparison with simulations to experimental data for photoneutron reactions using SPring-8 Injector

Benchmark Test of JENDL High Energy File with MCNP

Neutronics Experiments for ITER at JAERI/FNS

Energy response for high-energy neutrons of multi-functional electronic personal dosemeter

Production target and beam dump in the slow-extraction beam line. Hadron Beam Line Group Target and Monitor Group

Intercomparison between Monte Carlo codes and experiments for induced activities due to high energy electrons

Status of the AGS Experiment for Mercury Spallation

Measurement of induced radioactivity in air and water for medical accelerators

New irradiation zones at the CERN-PS

Study on Radiation Shielding Performance of Reinforced Concrete Wall (2): Shielding Analysis

Integral Benchmark Experiments of the Japanese Evaluated Nuclear Data Library (JENDL)-3.3 for the Fusion Reactor Design

Radiation Safety Considerations for the TPS Accelerators

Neutron and Gamma-ray Emission Double Dierential Cross Sections. *5 Energy Conversion Engineering, Kyushu University, Kasuga-koen, Kasuga-shi 816.

Application and Validation of Event Generator in the PHITS Code for the Low-Energy Neutron-Induced Reactions

1.E Neutron Energy (MeV)

Recent Developments of the PHITS code

Since the beam from the JNC linac is a very high current, low energy beam, energy loss induced in the material irradiated by the beam becomes very lar

Practical Radiation Control at KEK

STATUS REPORT ON SURVEY AND ALIGNMENT OF J-PARC AFTER THE EARTHQUAKE

Bulk shielding design for the MAX IV facility

Accelerator Facility Accident Report

PULSE-TO-PULSE TRANSVERSE BEAM EMITTANCE CONTROLLING FOR MLF AND MR IN THE 3-GeV RCS OF J-PARC

Estimate of Photonuclear Reaction in a Medical Linear Accelerator Using a Water-Equivalent Phantom

Shutdown dose calculations for the IFMIF test facility and the high flux test module

Monte Carlo Simulation concerning Particle Therapy

Response measurement of various neutron dose equivalent monitors in MeV neutron fields

External MC code : PHITS

ARTICLE. Progress in Nuclear Science and Technology Volume 4 (2014) pp Yoshiko Harima a*, Naohiro Kurosawa b and Yukio Sakamoto c

Measurements and Calculations of Neutron Energy Spectra Behind Polyethylene Shields Bombarded by 40- and 65-MeV Quasi-Monoenergetic Neutron Sources

Shielding calculations for the design of new Beamlines at ALBA Synchrotron

neutron building Project Title: Moderator design of RANS2 and investigating of radiation equivalent dose for Name: Sheng Wang

Radiation damage calculation in PHITS

Shielding calculations with MCNPX at the European spallation source

Status of J-PARC Transmutation Experimental Facility

Current issues of radiation safety regulation for accelerator facilities in Japan

Particle Size of Radioactive Aerosols Generated During Machine Operation in High-energy Proton Accelerators

Radiation Protection At Synchrotron Radiation Facilities

Shielding Design to Obtain Compact

Beam Extraction by the Laser Charge Exchange Method Using the 3-MeV LINAC in J-PARC )

Monitoring System for the Gold Target by Radiation Detectors in Hadron Experimental Facility at J-PARC

The residual radioactivity of a water-copper beam dump for the TESLA Test Facility

Dump optimization Residual dose rates optimization Conclusions. E. Iliopoulou (HSE-RP-AS) EDMS Status RP Assessment - East Area Upgrade 1

1. RADIOACTIVITY AND RADIATION PROTECTION

ACTIVATION ANALYSIS OF DECOMISSIONING OPERATIONS FOR RESEARCH REACTORS

Some Comments to JSSTDL-300

SLAC-PUB Submitted to Radiation Protection and Dosimetry. Work supported by Department of Energy contract DE-AC02-76SF00515

D. Ene, J. C. David, D. Doré, D. Ridikas CEA-Saclay, IRFU / Service de Physique Nucléaire, Gif-sur-Yvette

Simulation and design of a transportable and compact neutron source based radiography system for industrial applications

Performance Studies of the Vibration Wire Monitor on the Test Stand with Low Energy Electron Beam

STATUS OF THE J-PARC FACILITY

Radiation Shielding of Extraction Absorbers for a Fermilab Photoinjector

Radiation Safety Assessment of the CLS Beamlines Using FLUKA Monte-Carlo Code

Characterization of Large Structures & Components

Advanced Storage Photon Ring Source Upgrade Project:

Status of standard data on shielding calculation in standard committee of the Atomic Energy Society of Japan

arxiv: v1 [physics.ins-det] 9 Apr 2018

Analyses of shielding benchmark experiments using FENDL-3 cross-section data starter library for ITER and IFMIF applications

Gabriele Hampel 1, Uwe Klaus 2

Occupational Radiation Protection at Accelerator Facilities: Challenges

The photoneutron yield predictions by PICA and comparison with the measurements

Calculation of the Dose Equivalent Rate from Induced Radioactivity Around the CNGS Target and Magnetic Horn

Radiation shielding for undulator beamline in Indus-2 synchrotron radiation source

Fluence-to-Dose Conversion Coefficients for Muons and Pions Calculated Based on ICRP Publication 103 Using the PHITS Code

In our recent paper [1], applicability of the self-activation of an NaI scintillator has been studied for the photo-neutron monitoring around

BULK-I. Radiation Shielding Tool for Proton Accelerator Facilities

Fast-Neutron Production via Break-Up of Deuterons and Fast-Neutron Dosimetry

A Beam Dump Facility (BDF) at CERN - The Concept and a First Radiological Assessment

JAPAN PROTON ACCELERATOR RESEARCH COMPLEX

ESTIMATION OF 90 SCATTERING COEFFICIENT IN THE SHIELDING CALCULATION OF DIAGNOSTIC X-RAY EQUIPMENT

European Organisation for Nuclear Research European Laboratory for Particle Physics

H4IRRAD generic simulation results

Internal Report DESY D3-86 January Production of radioactive nuclides in soil and groundwater near the beam dump of a Linear Collider. K.

8 th International Workshop on Radiation Safety at Synchrotron Radiation Sources

Reliability and Traceability in Radiation Calibration

Journal of Radiation Protection and Research

Reactor radiation skyshine calculations with TRIPOLI-4 code for Baikal-1 experiments

Journal of Radiation Protection and Research

ARTICLE. II. Method 1. Detector Figure 1 shows a schematic view of the spectrometer. The spectrometer consists of two 2-inch-diameter BF 3

Induced radioactivity in the target and solenoid of the TT2A mercury target experiment (ntof11)

In vacuum ID beam line shielding commissioning and direct gasbremsstrahlung measurements at Synchrotron SOLEIL

How J-PARC recovered from the big earthquake

Radiation safety of the Danish Center for Proton Therapy (DCPT) Lars Hjorth Præstegaard Dept. of Medical Physics, Aarhus University Hospital

COMPARISON OF COMPUTER CODES APPLICABILITY IN SHIELDING DESIGN FOR HADRON THERAPY FACILITIES *

Improvements and developments of physics models in PHITS for radiotherapy and space applications

Part E. Radiation monitors. Radiation Safety - JUAS 2014, X. Queralt. Part E. Radiation monitors

Conditions Around the Proton Beam Window of the Spallation Neutron Source

FLUKA Calculations for the Shielding Design of the SPPS Project at SLAC*

Radiation protection considerations along a radioactive ion beam transport line

SSA Measurements with Primary Beam at J-PARC

Review of ISOL-type Radioactive Beam Facilities

Radiation field inside the tunnel of the Linear Collider TESLA

Evaluation of Geometric Progression (GP) Buildup Factors using MCNP Codes (MCNP6.1 and MCNP5-1.60)

Reduction of Radioactive Waste by Accelerators

Planning and preparation approaches for non-nuclear waste disposal

Calculations of Photoneutrons from Varian Clinac Accelerators and Their Transmissions in Materials*

Daniela Ene. Radioprotection Studies for the ESS Superconducting Linear Accelerator Preliminary Estimates

Measurement of 40 MeV Deuteron Induced Reaction on Fe and Ta for Neutron Emission Spectrum and Activation Cross Section

Transcription:

Estimation of Radioactivity and Residual Gamma-ray Dose around a Collimator at 3-GeV Proton Synchrotron Ring of J-PARC Facility Y. Nakane 1, H. Nakano 1, T. Abe 2, H. Nakashima 1 1 Center for Proton Accelerator Facilities, Japan Atomic Energy Research Institute, Tokai-mura, 319-1195 Ibaraki-ken, Japan. E-mail: nakane@shield4.tokai.jaeri.go.jp 2 Startcom Co., Ltd., 4-18-10, Hayamiya, 179-0085 Tokyo, Japan Abstract. Estimation of radioactivity and residual dose in accelerator tunnel is very important for the shielding design of a high-intensity proton accelerator facility. In the present work, radioactivity and residual dose rate around the collimator were estimated for 3-GeV proton synchrotron of the J-PARC facility. Exposure dose due to radioactivity in the components of the collimator, local shields and concrete walls of accelerator tunnel around the collimator section were calculated by using PHITS, DCHAIN-SP and QAD-CGGP2. 1. Introduction The high-intensity proton accelerator facility [1,2], J-PARC (Japan Proton Accelerator Research Complex), is now under construction as a joint project between Japan Atomic Energy Research Institute (JAERI) and High Energy Accelerator Research Organization (KEK). The facility comprises accelerator complex of a 400-MeV linear accelerator (Linac), a 3-GeV proton synchrotron (PS) ring of 1MW and a 50-GeV PS ring of 750 kw, and experimental facilities for particle physics, nuclear physics, materials science, life science and nuclear technology. Accelerator components and concrete walls of accelerator tunnel in the facility are activated by primary and secondary hadrons due to a beam loss. At almost all areas of the facility, the beam loss rate is assumed to be in less than 1 W/m, of which condition makes "Hands-on-Maintenance" possible. On the other hand, local beam losses of kw order are assumed at restricted areas such as beam injection, extraction and collimator areas. The access in these areas must be permitted even though the maintenance using remote handling is examined in order to reduce the exposure at the position near apparatus. The estimation of residual gamma-ray dose caused by the activations around the areas is one of the most crucial issues for radiation safety on maintenance. For the 3-GeV PS ring, the estimation of residual dose rate around the collimator is the most important because the largest local beam loss is assumed and much frequency of maintenance is expected. The collimator was placed downstream from the injection area, which will collect 400 MeV and 4 kw proton beam halo. In the present work, radioactivity and the residual dose around the collimator in the 3-GeV PS ring were estimated in the calculations on the bases of the actual design of the facility for the condition after accelerator operation of a year. 2. Calculation 2.1. Condition in the calculation FIG. 1 shows an overview of the collimation system in the 3-GeV PS ring. In order to localize the beam loss, six sets of collimators with shields surrounding them were placed downstream from the injection area of the 3-GeV PS ring. Sum of proton beam loss (halo) at the collimator section will be 4 kw. The distributions of the beam loss in the collimators and the components around them were estimated from the calculation [3] by STRUCT [4]. It was found from the results that the total beam losses at the position of the 2nd collimator and the beam duct around the collimator were estimated to be 1566W, which is the largest beam loss in the six collimators. In the present work, radioactivity and the residual dose around the 2nd collimator with the components around them were estimated in the calculations. Exposure dose due to radioactivity in the components, the shields and the concrete walls of accelerator tunnel around the collimator were calculated for the irradiation condition of 5500 hours, on the assumption of a year of accelerator operation of the 3-GeV ring. 1

HO beam dump Proton beam from Linac #1 #2 #3 #4 #5 #6 collimat or Injection sect ion Collimator section FIG. 1. Overview of the collimation system in the 3-GeV PS ring of the facility. 2.2. Calculation geometry FIG. 2 shows the top and the side views of the calculation geometry. Three-dimensional calculation geometry shown in the figure was used in the calculations. Proton beams of 400 MeV impinge in the copper collimators modeled as a hollow cylinder, and stainless steel beam ducts near the collimator shown in the figure. Inner diameter and thickness of the collimator and the beam ducts are listed in Table I. From the calculation results by STRUCT, proton beam losses at the 2nd collimator, and the upstream and the downstream beam ducts near the collimator are assumed to be 910W, 520W and 136W, respectively [3]. For both the bulk shielding and the self-shielding for the activations, the collimator is covered with a collimator shield of iron and concrete complex shown in the figure. For driving the collimator, 200-mm-width x 280-mm-height openings are prepared on the x- and y-axis directions in the collimator shield. For the bulk shielding, the local shields of iron and concrete complex shown in the figure are placed around the beam ducts of the upstream and the downstream X concrete iron copper beam loss collimator wall steel 400 400 520W 910W 136W 2550 unitfmm Proton 400400400400 500 1300 ƒó 377 beam duct Z Y local shield (upstream side) # 1 # 2 1500 # 3 local shield (downstream side) # 4 5650 Proton 100 70 50 1200 500 800 1200 400400 350 300 350 wall 480 800 ƒó 377 beam duct 1200 3200 Z 200 2500 4000 (a) Top view (b) Side view FIG. 2. Calculation geometry. 2

Inner diameter of hollow cylinder (cm) Table I. Calculation conditions. thickness of hollow cylinder (cm) length of hollow cylinder (cm) Collimator 19.2 6.0 20.0 Beam duct 37.7 0.2 17.2 (upstream) 23.8 (downstream) side of the collimator shield. The concrete walls of the accelerator tunnel around the collimator were considered in the calculations. Residual dose around the collimator #2 were estimated at the four estimation positions shown in the figure. The positions #1 and #2 were placed on the side of the collimator, of which the collimator could watch directly through the opening of the collimator shield. The positions #3 and #4 were placed on the side of the downstream local shield. 2.3. Calculation method Nuclides produced by the reactions of the components with the primary proton beam halo and the secondary particles above 1 MeV and secondary neutrons above 20 MeV were calculated in the present work by using the particle and heavy ion transport code system, PHITS [5]. The PHITS is a new version of the high-energy particle transport code, NMTC/JAM [6] with the extension to heavy ion transport calculation. The energy spectra of secondary neutrons below 20 MeV are also calculated in the code. The induced radioactivity and the energy spectra of gamma-ray in the components were calculated by using the DCHAIN-SP 2001 code [7]. In the calculation, nuclide productions in the components due to neutrons below 20 MeV are obtained from the energy spectra with the activation cross sections library prepared in the code, while the calculated results by PHITS are used for the productions due to charged particles above 1 MeV and neutrons above 20 MeV. Using the results, the residual dose rates at four estimation points shown in the FIG. 2 were calculated by using the point kernel code, QAD-CGGP2 [8] with effective dose conversion coefficients defined in ICRP Pub.74 [9]. 3. Results and discussion 3.1. Time evolution of residual dose rate FIG. 3 shows the calculated results of time evolution of residual dose rate caused by the activations of the components around the collimator for the condition after accelerator operation of a year. The figure shows that the dose rate after a day cooling from the end of operation is about half of that after an hour cooling, and that after a year cooling is about an order smaller than that after a day cooling. For the condition after a month cooling from the end of operation, calculated results of dose rate at the positions #1 and #2 are 11.6 and 2.1 msv/h, respectively. This means that it is difficult to access at the positions for a longer time without additional shield for the condition after a month cooling. On the other hand, the dose rate at the positions #3 and #4 are 23 and 118 µsv/h, respectively, for the condition after a month cooling from the end of operation. This means that it is possible to access for several hours at the position for the condition after a month cooling. 3.2. Contribution of dose rates due to activation in each component Calculated results of dose rates due to activations in each component for the conditions after a day cooling from the end of operation of a year are listed in Table II. The results show that the contributions of dose rates due to activations of the collimator and the collimator shield are dominant at the position #1, #2 and #4 because of the positions could watch them directly. On the other hand, those due to activations of the downstream local shield around the beam ducts are dominant at the position #3 because the position is near the local shield and could not watch the collimator directly. The dose rate at the position #4 is higher than that at the position #3, though the distance from the beam line to the position #4 is longer than that to the position #3. This can be attributed that the dose 3

rate due to the activations of the collimator and the collimator shield is higher at the position #4 because the position could watch the collimator directly. It was found from the results that the contribution of dose rate due to activation of concrete wall of accelerator tunnel is small since the collimator and the ducts are covered with the collimator shield and the local shields during operation. Dose rate (µsv h -1 ) 10 6 10 5 10 4 10 3 10 2 10 1 Position #1 Position #2 Position #3 Position #4 10 0 10-2 10-1 10 0 10 1 10 2 10 3 Cooling time (days) FIG. 3. Calculated results of time evolution of residual dose rate caused by activations of components around the collimator for the condition after a year of accelerator operation. Table II. Dose rates (µsv/h) due to activations of each components at the condition of a day cooling. Position #1 Position #2 Position #3 Position #4 Collimator 17840.8 3551.9 0.0 20.9 Iron shield around collimator 3595.2 179.2 0.2 193.9 Concrete shield around collimator 294.3 43.1 1.9 28.0 Upstream beam duct 0.5 0.5 0.0 0.0 Iron shield around upstream duct 12.7 1.7 0.2 1.4 Concrete shield around upstream duct 2.0 0.5 0.3 0.2 Downstream beam duct 5.5 4.1 0.0 25.1 Iron shield around downstream duct 176.5 43.6 32.4 8.5 Concrete shield around downstream duct 13.6 5.5 62.2 7.4 Concrete wall of accelerator tunnel 0.9 2.3 0.1 2.5 Total 21942 3832 97.2 288 3.3. Additional calculations of dose rates on the assumption of maintenance In the present work, two kinds of additional estimations were performed on the assumption of the maintenance of the collimator and the apparatus around the beam duct. One is the calculation of dose rates with removing the downstream local shields around the beam duct after the end of operation for the maintenance of the collimator and the apparatus, the other is the calculation with an additional lead plug of 5-cm-thick inserted in an opening of the collimator shields after the end of operation for the 4

maintenance of the collimator. Comparison results of the dose rates at the positions of #3 and #4 for the cases with and without the downstream local shield are listed in Table III for the conditions after 1 and 30 days cooling from the end of operation of a year. It was found from the results, the dose rates for the condition without the local shield at the position of #3 and #4 are several tens times and several times higher than those for the condition with the local shield, respectively. For the case without the local shield, the dose rate at the position #3 is higher than that at the position #4, while that for the case with the local shield at the position #3 is lower than that at the position #4. This can be attributed that the dose due to activity in the beam duct is mainly contributed to the total dose at the positions of #3 and #4 for the case without the local shields. Comparison results of the dose rates at the positions of #1 and #2 for the cases with and without the lead plug are listed in Table IV. With using the lead plug, the dose rate could be reduced about 1~2 order smaller than that without the plug at the positions of #1 and #2 for the conditions after 1 and 30 days cooling from the end of operation of a year. As the results, it is possible to access for a longer time at the position #2 with using the plug for the condition after 30 days cooling. Table III. Calculated results of dose rate (µsv/h) for the cases with and without the local shields. Position #3 Position #4 without shield with shield ratio without shield with shield ratio 1 day cooling 2533 97.2 26.1 811 288 2.82 30 days cooling 1048 23.1 45.4 336 118 2.85 Table IV. Calculated results of dose rate (µsv/h) for the cases with and without the lead plug. Position #1 Position #2 with plug without plug ratio with plug without plug ratio 1 day cooling 2879 21942 0.13 125 3832 0.03 30 days cooling 1447 11571 0.13 64.2 2078 0.03 4. Conclusions Radioactivity and residual dose rate around the collimator in the 3-GeV PS ring were estimated in the calculations. Assuming to kw order beam losses in the collimator, the dose rate near the collimator reached more than 10 msv/h for the condition after 30 days cooling from the end of operation of a year. Especially, the dose rate is very high at the positions could watch the collimator directly through an opening of the collimator shield. In order to enable to access for a longer time, inserting an additional shield is required for reduction of the dose due to the activity in the collimator and the collimator shield. Calculated results show that it is permitted to access near the collimator with inserting the lead plug after the end of operation. From the calculation results on the assumption with removing the local shields after the end of operation for the maintenance of the collimator and the apparatus, the dose rate for the case without the local shields is 1~2 order higher than that with the shields because the activity in the beam duct is still high after a month cooling from the end of operation. For more accurate estimations of exposure dose, the examination of maintenance scenario with considerations of the results in the present work will be required. Acknowledgement The authors would like to thank Drs. N. Nakao of KEK, Y. Sakamoto and N. Sasamoto of JAERI for their useful suggestions and discussions about the estimations of radioactivity and residual dose. Authors wish to thank Dr. K. Yamamoto of JAERI for his technical help about the calculations by using STRUCT. 5

References 1. The Joint Project Team of JAERI and KEK, The Joint Project for High-Intensity Proton Accelerators, JAERI-Tech 99-056, Japan Atomic Energy Research Institute (JAERI) (1999). 2. High-intensity Proton Accelerator Project Team, Accelerator Technical Design Report for High-intensity Proton Accelerator Facility Project, J-PARC, JAERI-Tech 2003-044, Japan Atomic Energy Research Institute (JAERI) (2003). 3. Yamamoto, K., Kinsho, M., Noda, F., Irie, Y., Shirakata, M., Beam Collimator Design for the 3GeV Synchrotron of the JAERI-KEK Joint Project, in Proceedings of the 2001 Particle Accelerator Conference, Chicago, 2001, p.3615-3617. 4. Drozhdim, A., Mokhov, N., The STRUCT Program User s Reference Manual, FNAL (2001). 5. Iwase, H., Niita, K., Nakamura, T., Development of General-Purpose Particle and Heavy Ion Transport Monte Carlo Code. J. Nucl. Sci. Technol., 39:1142-1151, (2002). 6. Niita, K., Takada, H., Meigo, S., Ikeda, Y., High-energy Particle Transport Code NMTC/JAM. Nucl. Instrum. Methods Phys. Res., B184: 406-4420, (2001). 7. Kai, T., Maekawa, F., Kosako, K., Kasugai, Y., Takada, H., Ikeda, Y., DCHAIN-SP 2001: High Energy Particle Induced Radioactivity Calculation Code, JAERI-Tech 2001-016, Japan Atomic Energy Research Institute (JAERI) (2001) (in Japanese). 8. Sakamoto, Y., Tanaka, S., QAD-CGGP2 and G33-GP2: Revised Version of QAD-CGGP and G33-GP, JAERI-M 90-110, Japan Atomic Energy Research Institute (JAERI) (1990). 9. International Commission on Radiological Protection, Conversion Coefficients for Use in Radiological Protection Against External Radiation, ICRP Publication 74, Ann. ICRP 26(3/4), Oxford: Elsevier Science, (1996). 6