Probabilistic Analysis of a Desalination Plant with Major and Minor Failures and Shutdown During Winter Season

Similar documents
Reliability Analysis of a Seven Unit Desalination Plant with Shutdown during Winter Season and Repair/Maintenance on FCFS Basis

Reliability Analysis of a Single Machine Subsystem of a Cable Plant with Six Maintenance Categories

Stochastic Analysis of a Two-Unit Cold Standby System with Arbitrary Distributions for Life, Repair and Waiting Times

Reliability and Economic Analysis of a Power Generating System Comprising One Gas and One Steam Turbine with Random Inspection

Stochastic and Cost-Benefit Analysis of Two Unit Hot Standby Database System

Comparative study of two reliability models on a two -unit hot standby system with unannounced failures

OPTIMIZATION OF COST MAINTENANCE AND REPLACEMENT FOR ONE-UNIT SYSTEM RELIABILITY MODEL WITH POST REPAIR

Reliability Analysis of a Fuel Supply System in Automobile Engine

Research Article Stochastic Analysis of a Two-Unit Cold Standby System Wherein Both Units May Become Operative Depending upon the Demand

RELIABILITY ANALYSIS OF A FUEL SUPPLY SYSTEM IN AN AUTOMOBILE ENGINE

Stochastic Modelling of a Computer System with Software Redundancy and Priority to Hardware Repair

STOCHASTIC MODELLING OF A COMPUTER SYSTEM WITH HARDWARE REDUNDANCY SUBJECT TO MAXIMUM REPAIR TIME

3-Unit System Comprising Two Types of Units with First Come First Served Repair Pattern Except When Both Types of Units are Waiting for Repair

Cost-Benefit Analysis of a System of Non-identical Units under Preventive Maintenance and Replacement Subject to Priority for Operation

COST-BENEFIT ANALYSIS OF A SYSTEM OF NON- IDENTICAL UNITS UNDER PREVENTIVE MAINTENANCE AND REPLACEMENT

A Comparative Study of Profit Analysis of Two Reliability Models on a 2-unit PLC System

Comparative Analysis of Two-Unit Hot Standby Hardware-Software Systems with Impact of Imperfect Fault Coverages

Stochastic Analysis of a Cold Standby System with Server Failure

Reliability Analysis of Two-Unit Warm Standby System Subject to Hardware and Human Error Failures

Reliability Analysis of a Two Dissimilar Unit Cold Standby System with Three Modes Using Kolmogorov Forward Equation Method

Stochastic analysis of edible oil refinery industry

Stochastic Modeling of a Computer System with Software Redundancy

IEOR 4106: Introduction to Operations Research: Stochastic Models Spring 2011, Professor Whitt Class Lecture Notes: Tuesday, March 1.

Stochastic outlook of two non-identical unit parallel system with priority in repair

COMPARATIVE RELIABILITY ANALYSIS OF FIVE REDUNDANT NETWORK FLOW SYSTEMS

STOCHASTIC ANALYSIS OF A TWO UNIT SYSTEM WITH VACATION FOR THE REPAIR FACILITY AFTER m REPAIRS

Stochastic Modeling of Repairable Redundant System Comprising One Big Unit and Three Small Dissimilar Units

Probabilistic Analysis of a Computer System with Inspection and Priority for Repair Activities of H/W over Replacement of S/W

by: Mohammad El-Moniem Soleha

Markov Chain Profit Modelling and Evaluation between Two Dissimilar Systems under Two Types of Failures

Availability. M(t) = 1 - e -mt

A Markov model for estimating the remaining life of electrical insulation in distribution transformer

EE 445 / 850: Final Examination

Monte Carlo Simulation for Reliability Analysis of Emergency and Standby Power Systems

Linmin Hu, Jiandong Li and Wenming Fang. Received November 2007; accepted January 2008

Analysis for Parallel Repairable System with Degradation Facility

Chapter 2. Planning Criteria. Turaj Amraee. Fall 2012 K.N.Toosi University of Technology

Analysis of a Machine Repair System with Warm Spares and N-Policy Vacations

Cost Analysis of a vacation machine repair model

Chapter 3 sections. SKIP: 3.10 Markov Chains. SKIP: pages Chapter 3 - continued

Unique Journal of Engineering and Advanced Sciences Available online: Research Article

Analysis of Rainfall and Other Weather Parameters under Climatic Variability of Parbhani ( )

Business Case: UV Facility Backup Generator

Markov Reliability and Availability Analysis. Markov Processes

Chapter 3 sections. SKIP: 3.10 Markov Chains. SKIP: pages Chapter 3 - continued

ANALYSIS FOR A PARALLEL REPAIRABLE SYSTEM WITH DIFFERENT FAILURE MODES

Availability Analysis of Refining System of a Sugar Plant Using Markov Process

RTO Winter Resource Adequacy Assessment Status Report

STOCHASTIC REPAIR AND REPLACEMENT OF A STANDBY SYSTEM

IEOR 6711: Stochastic Models I, Fall 2003, Professor Whitt. Solutions to Final Exam: Thursday, December 18.

Cyber Physical Power Systems Power in Communications

Winter Season Resource Adequacy Analysis Status Report

International Journal on Mechanical Engineering and Robotics (IJMER)

Reliability and Availability Simulation. Krige Visser, Professor, University of Pretoria, South Africa

1. Reliability and survival - basic concepts

The Markov Decision Process (MDP) model

NEGST. New generation of solar thermal systems. Advanced applications ENEA. Comparison of solar cooling technologies. Vincenzo Sabatelli

Outage Coordination and Business Practices

APPENDIX 7.4 Capacity Value of Wind Resources

Review Paper Machine Repair Problem with Spares and N-Policy Vacation

FORECAST ACCURACY REPORT 2017 FOR THE 2016 NATIONAL ELECTRICITY FORECASTING REPORT

Asymptotic Confidence Limits for a Repairable System with Standbys Subject to Switching Failures

Stochastic Reliability Analysis of Two Identical Cold Standby Units with Geometric Failure & Repair Rates

Time-varying failure rate for system reliability analysis in large-scale railway risk assessment simulation

Batch Arrival Queuing Models with Periodic Review

An M/M/1 Queue in Random Environment with Disasters

A new condition based maintenance model with random improvements on the system after maintenance actions: Optimizing by monte carlo simulation

Dependable Systems. ! Dependability Attributes. Dr. Peter Tröger. Sources:

International Journal on Mechanical Engineering and Robotics (IJMER)

Cost Analtsis for a Nuclear Power Plant with Standby Redundant Reactor Vessel

Report on Reliability of ComEd Electrical Service within Downers Grove. Prepared November 13, 2015

A STUDY OF ASYMPTOTIC AVAILABILITY MODELING FOR A FAILURE AND A REPAIR RATES FOLLOWING A WEIBULL DISTRIBUTION

Failure modeling and maintenance optimization for a railway line

Winter Season Resource Adequacy Analysis

Key Words: Lifetime Data Analysis (LDA), Probability Density Function (PDF), Goodness of fit methods, Chi-square method.

2 Theory. 2.1 State Space Representation S 2 S 1 S 3

Stochastic Renewal Processes in Structural Reliability Analysis:

TL 9000 Quality Management System. Measurements Handbook. SQ Examples

Queueing Systems: Lecture 3. Amedeo R. Odoni October 18, Announcements

Seasonal Climate Watch April to August 2018

Reliability analysis of a linear consecutive 2-out-of-3 system in the presence of supporting device and repairable service station

Reading: Karlin and Taylor Ch. 5 Resnick Ch. 3. A renewal process is a generalization of the Poisson point process.

Sales Analysis User Manual

Part II: continuous time Markov chain (CTMC)

System Simulation Part II: Mathematical and Statistical Models Chapter 5: Statistical Models

INSPIRE Monitoring and Reporting Implementing Rule Draft v2.1

An M/M/1/N Queuing system with Encouraged Arrivals

RELIABILITY OF REPAIRABLE k out of n: F SYSTEM HAVING DISCRETE REPAIR AND FAILURE TIMES DISTRIBUTIONS

Fault-Tolerant Computing

IS YOUR BUSINESS PREPARED FOR A POWER OUTAGE?

Contents Preface The Exponential Distribution and the Poisson Process Introduction to Renewal Theory

A hybrid Markov system dynamics approach for availability analysis of degraded systems

Forecasting of Electric Consumption in a Semiconductor Plant using Time Series Methods

Probabilistic Evaluation of the Effect of Maintenance Parameters on Reliability and Cost

Measuring the Economic Impact of Tourism on Cities. Professor Bruce Prideaux James Cook University Australia

Reliability evaluation of a repairable system under fuzziness

Queueing Theory and Simulation. Introduction

Performance analysis of a juice packaging plant using BFT

The Scope and Growth of Spatial Analysis in the Social Sciences

Evaluating the value of structural heath monitoring with longitudinal performance indicators and hazard functions using Bayesian dynamic predictions

Transcription:

Probabilistic Analysis of a Desalination Plant with Major and Minor Failures and Shutdown During Winter Season Padmavathi N Department of Mathematics & Statistics Caledonian college of Engineering Muscat, Sultanate of Oman padma@caledonian.edu.om S. M. Rizwan rizwan@caledonian.edu.om Department of Mathematics & Statistics Caledonian college of Engineering Muscat, Sultanate of Oman Anita Pal Department of Mathematics National Institute of Technology Durgapur, India Gulshan Taneja Department of Statistics M D University Rohtak, India anita.buie@gmail.com drgtaneja@gmail.com Abstract In many desalination plants, multi stage flash desalination process is normally used for sea water purification. The probabilistic analysis and profitability of such a complex system with standby support mechanism is of great importance to avoid huge loses. Thus, the aim of this paper is to present a probabilistic analysis of evaporators of a desalination plant with major and minor failure categories and estimating various reliability indicators. The desalination plant operates round the clock and during the normal operation; six of the seven evaporators are in operation for water production while one evaporator is always under scheduled maintenance and used as standby. The complete plant is shut down for about one month during winter season for annual maintenance. The water supply during shutdown period is maintained through ground water and storage system. Any major failure or annual maintenance brings the evaporator/plant to a complete halt and appropriate repair or maintenance is undertaken. Measures of plant effectiveness such as mean time to system failure, availability, expected busy period for maintenance, expected busy period for repair, expected busy period during shutdown & expected number of repairs are obtained by using semi-markov processes and regenerative point techniques. Profit incurred to the system is also evaluated. Seven years real data from a desalination plant are used in this analysis. Keywords: Desalination Plant, Minor/Major Failures, Repairs, Semi Markov, Regenerative Process.. NOTATIONS O U Operative state of evaporator Under Maintenance during summer International Journal of Scientific and Statistical Computing (IJSSC), Volume (5) : Issue ():204 5

U U U F Under Maintenance during winter before service Under Maintenance during winter after service Under Maintenance during summer before service Failed unit is under minor repair during summer F Failed state of the evaporator due to minor repair during summer F Failed unit is under major repair during summer F Failed state of the evaporator due to major repair during summer F Failed unit is under minor repair during winter before service F Failed state of the evaporator due to minor repair during winter before service F Failed unit is under major repair during winter before service F Failed state of the evaporator due to major repair during winter before service F F Failed unit is under minor repair during winter after service Failed state of the evaporator due to minor repair during winter after service F F Failed unit is under major repair during winter after service Failed state of the evaporator due to major repair during winter after service F β β 2 λ γ γ γ 2 α α 2 λ p Failed state of one of the evaporator Rate of the unit moving from summer to winter Rate of the unit moving from winter to summer Rate of failure of any component of the unit Maintenance rate Rate of shutting down Rate of recovery after shut down during winter Repair rate for minor repairs Repair rate for major repairs Maintenance rate including the rate of inspection Probability of occurrence of minor repair International Journal of Scientific and Statistical Computing (IJSSC), Volume (5) : Issue ():204 6

p 2 Probability of occurrence of major repair Symbol for Laplace convolution Symbol for Stieltje s convolution * Symbol for Laplace Transforms ** Symbol for Laplace Stieltje s Transforms C 0 C C 2 C 3 C 4 A 0 Revenue per unit uptime Cost per unit uptime for which the repairman is busy for maintenance Cost per unit uptime for which the repairman is busy for repair Cost per unit uptime for which the repairman is busy during shutdown Cost per unit repair require replacement (all costs are taken in Rial Omani i.e., RO) Steady state availability of the system Expected busy period of the repairman during maintenance Expected busy period of the repairman for repair Expected busy period of the repairman during shutdown Expected number of repairs require replacement () c.d.f. of first passage time from a regenerative state i to a failed state j q ij (t), Q ij (t) p.d.f. and c.d.f. of first passage time from a regenerative state i to a regenerative state j or to a failed state j in (0, t] g m (t), G m (t) g m (t),g m (t) g s (t), G s (t) g r (t), G r (t) g (t), G (t) g 2 (t), G 2 (t) p.d.f. and c.d.f. of maintenance rate p.d.f. and c.d.f. of maintenance time including inspection p.d.f. and c.d.f. of shutdown rate p.d.f. and c.d.f. of recovery rate p.d.f. and c.d.f. of repair rate for minor repairs p.d.f. and c.d.f. of repair rate for major repairs 2. INTRODUCTION Desalination is a water treatment process that removes the salt from sea water or brackish water. It is the only option in arid regions, since the rainfall is marginal. In many desalination plants, multi stage flash desalination process is normally used for water purification which is very expensive and involves sophisticated systems. Since, desalination plants are designed to fulfil the requirement of water supply for a larger sector in arid regions, they are normally kept in International Journal of Scientific and Statistical Computing (IJSSC), Volume (5) : Issue ():204 7

continuous production mode especially during summer except for emergency/forced/planned outages. It is therefore; very important that the efficiency and reliability of such a complex system is maintained in order to avoid big loses. Establishing the numerical results of various reliability indices are extremely helpful in understanding the significance of these failures/maintenances on plant performance and assesses the impact of these failures on the overall profitability of the plant. Many researchers have expended a great deal of efforts in analysing industrial systems to achieve the reliability results that are useful for effective equipment/plant maintenance. Bhupender and Taneja [] analysed a PLC hot standby system based on master-slave concept and two types of repair facilities, and many such analyses could be seen in the references therein. Mathew et al. [2] have presented an analysis of an identical two-unit parallel continuous casting plant system. Padmavathi et al. [3] have presented an analysis of the evaporator 7 of a seven unit desalination plant which fails due to any one of the six types of failures with the concept of inspection. Padmavathi et al. [4] explored a possibility of analyzing a desalination plant with emergency shutdown/unit tripping and online repair. Recently, Rizwan et al. [5] analyzed the desalination plant under the situation where repair or maintenance being carried out on a first come first served basis. Padmavathi et al. [6] analyzed a desalination plant with shutdown during winter season under the condition that the priority is given to repair over maintenance. However, analysis in [5] & [6] could have been better and more realistic results could be obtained if failures are categorized as minor and major failures and the repairs could be undertaken accordingly as the time to repair minor failures is comparatively lesser than the time required for fixing major failures. Also, it is viable to inspect the unit in order to identify the type of the failure and deal with it accordingly. Thus, as a future direction of [5], a variation into the analysis is shown and hence this paper is an attempt to present a probabilistic analysis of the plant under minor and major failure categories including inspection for estimating various reliability indicators. Seven years failure data of a desalination plant in Oman have been used for this analysis. Component failure, maintenance, plant shutdown rates, and various maintenance costs involved are estimated from the data. The desalination plant operates round the clock and during the normal operation; six of the seven evaporators are in operation for water production while one evaporator is always under scheduled maintenance and used as standby evaporator. This ensures the continuous water production with minimum possible failures of the evaporators. The complete plant is shut down for about a month during winter season because of the low consumption of water for annual maintenance; the water supply during this period is maintained through ground water and storage system. The evaporator fails due to any one of the two types of failure viz., minor and major. Repairable and serviceable failures are categorised as minor failures, whereas the replaceable failures are categorised as major failures. Any major failure or annual maintenance brings the plant to a complete halt and goes under forced outage state. Using the data, following values of rates and various costs are estimated: Estimated rate of failure of any component of the unit (λ) = 0.0000274 per hour Estimated rate of the unit moving from summer to winter (β ) = 0.000235 per hour Estimated rate of the unit moving from winter to summer (β 2 ) =0.000235 per hour Estimated rate of maintenance (γ) = 0.00488 Estimated rate of shutting down (γ ) = 0.000455 per hour Estimated rate of recovery after shut down during winter (γ 2 ) = 0.003889 per hour Estimated value of failure rate including inspection (λ ) = 0.403889 per hour Estimated value of repair rate of minor repairs (α ) = 0.09926 per hour Estimated value of repair rate of major repairs (α 2 ) = 0.05970 per hour Probability of occurrence of minor repair (p ) = 0.749 Probability of occurrence of major repair (p 2 ) = 0.258 The revenue per unit uptime (C 0 ) = RO 596.7 per hour International Journal of Scientific and Statistical Computing (IJSSC), Volume (5) : Issue ():204 8

Cost per unit uptime for which the repairman is busy for maintenance (C ) = RO 0.0626 per hour The cost per unit uptime for which the repairman is busy for repair (C 2 ) = RO 0.003 per hour Cost per unit uptime for which the repairman is busy during shutdown (C 3 ) = RO 6.378 per hour The cost per unit repair require replacement (C 4 ) = RO 3.246 per hour The plant is analysed probabilistically by using semi-markov processes and regenerative point techniques. Measures of plant effectiveness/reliability indicators such as the mean time to system failure, plant availability, expected busy period during maintenance, expected busy period during repair, expected busy period during shut down and the expected number of repairs are estimated numerically. 3. MODEL DESCRIPTION AND ASSUMPTIONS There are seven evaporators in the desalination plant, of which 6 operate at any given time and one evaporator is always under scheduled maintenance. Maintenance of no evaporator is done if the repair of some other evaporator is going on. The various states of the evaporator are categorized under summer (states 0, 2, 5, 7,and 2), winter (states, 4, 8, 9, 3 and 4), complete shutdown for overhaul/major service (state 3), and after major service (states 6, 0, 5, 6, 7and 8). The plant goes into shutdown for annual maintenance during winter season for one month. On completion of maintenance/repair, the repairman inspects as to whether the unit has failed due to minor/major failure, before putting the repaired unit into operation. If a unit is failed in one season, it gets repaired in that season only. Not more than two units fail at a time. During the maintenance of one unit, more than one of the other units cannot get failed. All failure times are assumed to have exponential distribution with failure rate ( λ ) whereas the repair times have general distributions. 4. TRANSITION PROBABILITIES AND MEAN SOJOURN TIMES A state transition diagram showing the possible states of transition of the plant is shown in Fig.. The epochs of entry into states 0,, 2, 3, 4, 5, 6, 7, 8, 9, 0, 5 and 6 are regeneration points and hence these states are regenerative states., 2, 3, 4, 7 and 8 are non-regenerative states. The transition probabilities are given by: dq = γe ( ) dt, dq = β e ( ) G(t)dt, dq =6λe ( ) G(t)dt, dq = γe ( ) dt, dq = γ e ( ) G(t)dt, dq =6λe ( ) G(t)dt, dq = β e G(t)dt, dq = e g (t)dt, dq = e g (t)dt, dq = γ e dt dq = γ e G(t)dt, dq = g (t)e dt, dq = g (t)e dt, dq = e g (t)dt, dq () =6λe g (t)dt,dq () =6λe g (t)dt, dq = β e ( ) G(t)dt, dq = e ( ) g (t), dq, =6λ e ( ) G(t)dt, dq = e g (t)dt,dq () = 6λe g (t)dt,dq () =6λe g (t)dt dq = e ( ) g (t)dt, dq = γ e ( ) G(t)dt, dq () = 6λe ( ) γ e G(t)dt,dQ () = 6λe ( ) e g (t)dt, dq () = 6λe ( ) e g (t)dt, dq = e ( ) g (t)dt, dq = γ e ( ) G(t)dt, dq () = 6λe ( ) γ e G(t)dt,dQ () = 6λe ( ) e g (t)dt, International Journal of Scientific and Statistical Computing (IJSSC), Volume (5) : Issue ():204 9

FIGURE : State Transition Diagram. dq () = 6λe ( ) e g (t)dt, dq, = β e G(t)dt, dq, = e g (t)dt, dq, = e g (t)dt, dq, = β e ( ) G(t)dt, dq, = e ( ) g (t)dt, () dq, = 6λe ( ) e () g (t)dt, dq, = 6λe ( ) e g (t)dt, (,) = 6λe ( ) β e g (t)dt, dq, dq (,), = 6λe ( ) β e g (t)dt dq, = e ( ) g (t)dt, dq, = β e ( ) G(t)dt, () dq, = 6λe ( ) e () g (t)dt, dq, = 6λe ( ) e g (t)dt, (,) = 6λe ( ) β e g (t)dt, dq, (,) = 6λe ( ) β e g (t)dt dq, By these transition probabilities it can be verified that, p + p +p = ; p + p +p = ; p +p +p = ; p = p +p +p = ; p +p () + p () = ; p + p +p, = p +p () ( + p ) = ; p +p + p () + p () +p () = p +p + p () + p () +p () =; p, +p, +p, = () () p, +p, + p, + p, +p (,), +p (,), = () p, +p, + p, + p (,), + p (,) (), +p, = International Journal of Scientific and Statistical Computing (IJSSC), Volume (5) : Issue ():204 20

The mean sojourn time ( μ i ) in the regenerative state i is defined as the time of stay in that state before transition to any other state. If T denotes the sojourn time in the regenerative state i, then: μ =E(T)=P(T>); μ = (6λ+ β +γ ) ; μ = μ = ( γ + ) ; μ = = (6λ+ + γ ) ; μ = = (6λ+ β + α ) ; = (6λ+ γ +γ ) ; μ = (6λ+ ) ; μ = ( β + ) ; μ = (6λ+ β +γ) ; μ = (6λ+ + γ ) ; μ = (6λ+ α + β ) ( β + ) ; γ ; (6λ+ α ) ; The unconditional mean time taken by the system to transit for any regenerative state j when it (time) is counted from the epoch of entry into state i is mathematically stated as: Thus, m = tdq (t)= q (0), m + m +m = μ ; m + m +m = μ ; m +m +m = μ ; m =μ m +m + = μ ; m +m () + m () = k (say); m + m +m, = μ m +m () ( + m ) = k (say); + + () + () + () = k (say); + + () + () + () =k (say); m, +m, +, = μ () (), +, +, +, + (,), + (,), = k (say); (), +, +, + (,), + (,) (), +, = k (say) 5. THE MATHEMATICAL ANALYSIS 5. Mean Time to System Failure To determine the mean time to system failure, the failed states are considered as absorbing states and applying the arguments used for regenerative processes, the following recursive relation for φ i (t) is obtained: ø 0 (t) = Q 00 (t) ø 0 (t) + Q 0 (t) ø (t) + Q 02 (t) ø (t) = Q (t) ø (t) + Q 3 (t) ø 3 (t) + Q 4 (t) ø 3 (t) = Q 36 (t) ø 6 (t) ø 6 (t) = Q 60 (t) ø 0 (t) + Q 66 (t) ø 6 (t) + Q 6,0 (t) Taking the Laplace Stieltje s transforms of the above equations and solving them for φ ** o (s); (s)= N(s) D(s) Where, N(s)=Q (s) Q (s)q (s) Q (s)q (s)+q (s)q (s)q (s)+q (s)q (s) Q (s)q (s)q (s)+q (s)q (s)q (s)q, (s) D(s)= Q (s) Q (s) Q (s)+q (s)q (s)+q (s)q (s)+q (s)q (s) Q (s)q (s)q (s) Q (s)q (s)q (s)q (s) International Journal of Scientific and Statistical Computing (IJSSC), Volume (5) : Issue ():204 2

The mean time to system Failure (MTSF), when the unit started at the beginning of state 0 is given by: (s) MTSF= lim = N s D where, N =p μ p p μ +p p p p μ p p μ +p p p μ +p p p p μ + p μ p p μ p p μ +p p p μ +2p p p p μ +p μ p p μ p p μ + p p p μ + p 02 μ 0 + p 0p 4 μ 0 + p 0p 4 μ p 02p μ 0 p 02p μ p 02p 66 μ 0 p 02p 66 μ 6 p 0p 4p 66μ 0 p 0p 4 p 66μ p 0p 4 p 66μ 6 + p 02p p 66μ 0 + p 02p p 66 μ + p 02p p 66μ 6 + p 0p 3 p 36 p 69 μ 0 + p 0p 3 p 36 p 6, 0 μ + p 0p 3 p 36 p 69 μ 3 + p 0p 3 p 36 p 6,0 μ 6 D= p p +p p p p p p p +p p +p p p p p Similarly, by employing the arguments used for regenerative processes, we obtain the recursive relations for other reliability indices; availability analysis of the plant, expected busy period for maintenance, expected busy period for repair, expected busy period during shut down, and the expected number of repairs. The profit incurred by the plant is also evaluated by incorporating the steady-state solutions of various reliability indices and costs: P= C A C B C B C B C R 6. PARTICULAR CASE For this particular case, it is assumed that the failures are exponentially distributed whereas other rates are general. Using the values estimated from the data as summarized in section and expressions of various reliability indicators as shown in section 4, the following values of the measures of system effectiveness/reliability indicators are obtained: Mean Time to System Failure = 256 days Availability (A 0 ) = 0.9603 Expected Busy period for Maintenance ( ) = 0.9584 Expected Busy period for repair( ) = 0.008 Expected Busy period during shutdown ( ) = 0.0397 Expected number of repairs ( ) = 0.0002 Profit (P) = RO 572.287 per unit uptime. 7. CONCLUSION Measures of plant effectiveness in terms of reliability indices have been estimated numerically. Estimated reliability results facilitate the plant engineers in understanding the system behavior and thereby open a scope of improving the performance of the plant by adopting suitable maintenance strategies. As a future direction the modeling methodology could be extended for similar industrial complex system performance analysis. 8. REFERENCES [] B Parashar and GTaneja, Reliability and profit evaluation of a PLC hot standby system based on a master-slave concept and two types of repair facilities. IEEE Transactions on reliability, Vol. 56(3), pp. 534-539, 2007. International Journal of Scientific and Statistical Computing (IJSSC), Volume (5) : Issue ():204 22

[2] A G Mathew, S M Rizwan, M C Majumder, K P Ramachandran and G Taneja, Reliability analysis of an identical two-unit parallel CC plant system operative with full installed capacity, International Journal of Performability Engineering, Vol. 7(2), pp. 79-85, 20. [3] S M Rizwan, N Padmavathi and G Taneja, Probabilistic Analysis of an Evaporator of a Desalination Plant with Inspection, i-manager s Journal on Mathematics, Vol. 2, (), pp. 27 34, Jan.- Mar. 203. [4] N Padmavathi, S M Rizwan, A Pal and G Taneja, Reliability Analysis of an evaporator of a Desalination Plant with online repair and emergency shutdowns, Aryabhatta Journal of Mathematics & Informatics, Vol. 4(), pp. -2, Jan. June 202. [5] S M Rizwan, N Padmavathi, A Pal, G Taneja, Reliability analysis of seven unit desalination plant with shutdown during winter season and repair/maintenance on FCFS basis, International Journal of Performability Engineering, Vol. 9 (5), pp. 523-528, Sep. 203. [6] N Padmavathi, S M Rizwan, A Pal, G Taneja, Probabilistic analysis of an evaporator of a desalination plant with priority for repair over maintenance, International Journal of Scientific and Statistical Computing, Vol. 4 (), pp.-9, Feb. 203. International Journal of Scientific and Statistical Computing (IJSSC), Volume (5) : Issue ():204 23