Plans for CESR (or Life Without CLEO)

Similar documents
III. CesrTA Configuration and Optics for Ultra-Low Emittance David Rice Cornell Laboratory for Accelerator-Based Sciences and Education

Modeling CESR-c. D. Rubin. July 22, 2005 Modeling 1

CesrTA Status Report Mark Palmer for the CesrTA Collaboration March 4, 2009 ESR

The TESLA Dogbone Damping Ring

Lattice Design and Performance for PEP-X Light Source

CESR-c Status and Accelerator Physics

On-axis injection into small dynamic aperture

e + e Factories M. Sullivan Presented at the Particle Accelerator Conference June 25-29, 2007 in Albuquerque, New Mexico e+e- Factories

Ultra-Low Emittance Storage Ring. David L. Rubin December 22, 2011

ILC Damping Ring Alternative Lattice Design (Modified FODO)

ILC Damping Ring Alternative Lattice Design **

Critical R&D Issues for ILC Damping Rings and New Test Facilities

CESR-c Wigglers. A. Temnykh for CESR operating group LEPP, Cornell University, Ithaca, NY 14850, USA

Beam beam simulation. S.Isaacman, A.Long,E.Pueschel, D.Rubin. October 1,

CesrTA Program Overview

WG2 on ERL light sources CHESS & LEPP

Accelerator Physics. Accelerator Development

Lattice Design for the Taiwan Photon Source (TPS) at NSRRC

First propositions of a lattice for the future upgrade of SOLEIL. A. Nadji On behalf of the Accelerators and Engineering Division

BEPC AND THE FUTURE PROGRAM AT IHEP

CESRTA Preliminary Recommendations for the ILC Damping Rings

ThomX Machine Advisory Committee. (LAL Orsay, March ) Ring Beam Dynamics

The Luminosity Upgrade at RHIC. G. Robert-Demolaize, Brookhaven National Laboratory

6 Bunch Compressor and Transfer to Main Linac

Status of Optics Design

Status of SuperKEKB Design: Lattice and IR

S. Guiducci. Table 1 PADME beam from Linac. Energy (MeV) 550. Number of positrons per pulse Pulse length (ns)

THE CONVERSION AND OPERATION OF THE CORNELL ELECTRON STORAGE RING AS A TEST ACCELERATOR (CESRTA) FOR DAMPING RINGS RESEARCH AND DEVELOPMENT*

Aperture Measurements and Implications

The Metrology Light Source - Status

Practical Lattice Design

BEAM-BEAM SIMULATION STUDIES OF CESR-c AND OBSERVATIONS IN CESR

Optics considerations for

Exploration of a Tevatron-Sized Ultimate Light Source

LHC Luminosity and Energy Upgrade

Wigglers for Damping Rings

2.6 Electron transport lines

Iranian Light Source Facility (ILSF) Project

ERL upgrade of an existing X-ray facility: CHESS at CESR

SPPS: The SLAC Linac Bunch Compressor and Its Relevance to LCLS

Beam Diagnostics and Instrumentation JUAS, Archamps Peter Forck Gesellschaft für Schwerionenforschnung (GSI)

ILC Beam Dynamics Studies Using PLACET

Accelerator R&D Opportunities: Sources and Linac. Developing expertise. D. Rubin, Cornell University

Conceptual design of an accumulator ring for the Diamond II upgrade

Emittance Growth and Tune Spectra at PETRA III

Choosing the Baseline Lattice for the Engineering Design Phase

STATUS OF BEPC AND PLAN OF BEPCII

SLS at the Paul Scherrer Institute (PSI), Villigen, Switzerland

M. Biagini, LAL & INFN French-Ukrainian Workshop on the instrumentation developments for high energy physics LAL, November

On behalf of: F. Antoniou, H. Bartosik, T. Bohl, Y. Papaphilippou (CERN), N. Milas, A. Streun (PSI/SLS), M. Pivi (SLAC), T.

The Electron-Ion Collider

The MAX IV Thermionic preinjector

BEAM - BEAM TAILS STUDY FOR DAΦNE. D. Shatilov (BINP), M. Zobov

Emittance Dilution In Electron/Positron Damping Rings

Accelerator Physics at Cornell. Jeff Smith October 6th, 2006

Jan. 5, 2006 Development of a Helical Undulator for ILC Positron Source

Space Charge Effects in the TESLA Damping Ring

Accelerator. Physics of PEP-I1. Lecture #7. March 13,1998. Dr. John Seeman

COMBINER RING LATTICE

September 9, 2002 David Rubin/ Cornell 1. US LC SG Accelerator Review Committee. UCLC Briefing to the. UCLC Briefing. Cornell

SBF Accelerator Principles

CESR CREATING NEW FORMS OF MATTER. Meet CESR in Action. To Increase Luminosity

ELIC: A High Luminosity And Efficient Spin Manipulation Electron-Light Ion Collider Based At CEBAF

Lecture 2: Modeling Accelerators Calculation of lattice functions and parameters. X. Huang USPAS, January 2015 Hampton, Virginia

Low energy electron storage ring with tunable compaction factor

Simulations of synchrotron-radiation-induced electron production in the CESR vacuum chamber wall

Developments for Cornell's X Ray ERL

CRAB WAIST COLLISIONS IN DAΦNE AND SUPER-B DESIGN

Overview of LHC Accelerator

Construction Status of SuperKEKB

Measurements and simulations of electron-cloudinduced tune shifts and emittance growth at CESRTA

Abstract. 1. Introduction

The FAIR Accelerator Facility

Transverse Field Profile of the NLC Damping Rings Electromagnet Wiggler

Diagnostics Needs for Energy Recovery Linacs

ILC Spin Rotator. Super B Workshop III. Presenter: Jeffrey Smith, Cornell University. with

Luminosity Considerations for erhic

FACET-II Design Update

Accelerator Physics. Tip World Scientific NEW JERSEY LONDON SINGAPORE BEIJING SHANGHAI HONG KONG TAIPEI BANGALORE. Second Edition. S. Y.

LHC Upgrade Plan and Ideas - scenarios & constraints from the machine side

Electron Cloud Studies at the Cornell Electron Storage Ring. Matt Lawson

F. Zimmermann and M.-P. Zorzano, CERN, Geneva, Switzerland

Commissioning of PETRA III. Klaus Balewski on behalf of the PETRA III Team IPAC 2010, 25 May, 2010

Beam Dynamics. Gennady Stupakov. DOE High Energy Physics Review June 2-4, 2004

On the future plan of KEK for ILC(International Linear Collider) Junji Urakawa(KEK) Contents

LOW EMITTANCE MODEL FOR THE ANKA SYNCHROTRON RADIATION SOURCE

Beam Optics design for CEPC collider ring

Numerical study of FII in the ILC Damping Ring

NEXT GENERATION B-FACTORIES

The 2015 erhic Ring-Ring Design. Christoph Montag Collider-Accelerator Department Brookhaven National Laboratory

10 GeV Synchrotron Longitudinal Dynamics

Letter of Intent for KEK Super B Factory

Low slice emittance preservation during bunch compression

Transverse dynamics Selected topics. Erik Adli, University of Oslo, August 2016, v2.21

LOLA: Past, present and future operation

Advanced Storage Photon Ring Source Upgrade Project:

ELECTRON DYNAMICS WITH SYNCHROTRON RADIATION

SLS Status and Development of an SLS2 Upgrade

Beam. RF antenna. RF cable

DAΦNE upgrade with large Piwinski angle and Crab Waist scheme

Transcription:

CESR-c Plans for CESR (or Life Without CLEO) Mark A. Palmer David L. Rubin Second ILC Accelerator Workshop August 18, 2005

2 Outline CESR-c/CLEO-c Schedule Preliminary Concept Possibilities for CESR as a Test Facility Low Emittance Optics for CESR Unique Features Conclusion

3 CESR-c/CLEO-c Schedule CLEO-c high energy physics running to end in first half of 2008 Starting in roughly June 2008, primary CESR operation will be for CHESS (Cornell High Energy Synchrotron Source) users Part-time operation as an ILC Damping Ring Test Facility is also possible

4 North and South Interaction Regions South IR provides dispersion-free insertion region in standard optics Remove CLEO South IR provides ~18 m of free space Cryogenic support locally available North IR can be configured similarly Also ~18 m insert region No cryogenic support (at present) Preliminary Concept

5 South IR 18 m insertion region

6 Proof of Concept Design Low Emittance Lattice Place 8 (of 12) wigglers in the South IR Optimize for low emittance operation Most parameters maintained at conservative values NOTE: Do not expect that present values represent the limits of what can be done Further exploration of lattice options is planned/needed Use of all 12 wigglers in non-dispersive regions will reduce ε h by a factor 2/3 from this trial configuration

7 South IR Layout First Pass Trial Layout Strong vertical focusing of concentrated set of wigglers has serious implications for quadrupole arrangement in insertion region Need to optimize insertion region layout Q h Wig Wig Q v Wig Wig Q h Wig Wig Q v Wig Wig Q h ~18 m

8 Low Emittance Lattice Functions Note E-W asymmetry

9 Tracking Symplectic integration map through standard CESR-c wiggler map Yellow ellipse is 3σ of injected beam Assume coupled injected beam with: ε h =1000 nm ε v = 500 nm No problems with DA Room to further optimize lattice for low emittance Dynamic Aperture

10 Parameter Value Comment Low Emittance Lattice Parameters Wigglers 8 @ 2.1T Expect that this can be raised to 12 Beam Energy 2.0 GeV σ E /E 8.4 x 10-4 ε x 1.7 nm Reduction by 2/3 with full wiggler complement τ x,y 67 ms Further reduction with full wiggler complement Q x 13.53 Need to investigate higher tune options. Not constrained by usual CESR pretzel issues Q y 9.59 Q z 0.098 σ z 7.5 mm α c 7.1 x 10-3 Requires higher RF voltage than we typically employ.

Vertical Emittance Estimates Beam-Beam Scan with 1-on-1 Collisions in 1.88 GeV HEP Conditions Differential vertical displacement controlled by phase advance between vertical separators in North Fast Luminosity Monitor provides measurement of overlap Measure σ y = 2.66 µm ε y = 0.64 nm ε y / ε x ~ 0.005-430 -440-450 -460-470 -480 ip_vscan 2005_march_14_104149, 1x1x0.5mA collision, d = 4.4mkm / 100cu vnose1 FLMRAW sig_y = 2.66 mkm E-SIZE P-SIZE -490 0-500 -400-300 -200-100 0 100 200 300 250 200 150 100 50 Low Emittance Lattice Estimates: m1 m2 m3 With ε x =1.7 nm ε y ~ 9 pm m4 Chisq R With ε x =1.0 nm ε y ~ 5 pm Possible improvement w/o CLEO solenoid? y = m1 + m2 * exp(-(m0-m3)^2/4/m4^2) August 18, 2005 Plans for CESR Mark A. Palmer 11 Value -485.72 48.351-72.909 60.442 314.67 0.98501 Error 0.85505 1.5231 2.8486 2.509 NA NA VNOSE1 eps_y = 6.4e-10m, eps_y / eps_x = 5.7e-3 = 4.7e-3

12 Much Still To Do Further optimization of lattice parameters Exploration of alternate layout options Better evaluation of space and cryogenic support issues Beam dynamics estimates Lattice development for full range of energies Evaluation of Touschek Lifetime Rough scaling from CESR-c modeling at 2 GeV (CLNS 01/1742): CESR-c DR Test N b 6.5 x 10 10 2 x 10 10 σ E /E 8.1 x 10-4 8.4 x 10-4 σ z 10.2 mm 7.5 mm ε x 214 nm 1.7 nm ε y 920 pm 8.5 pm τ Touschek 6 hrs 442 sec

13 Experimental Configuration I North and South IRs offer ~36 m of insertion area 12 wigglers require ~19 m Can perhaps reduce this requirement if can create a low dispersion point near one of the existing wiggler locations Quadrupoles and Correctors will need ~ 8 m This nominally leaves ~9 m for other devices Ideally will want this last region to be in South IR Ease of access Cryogenic Support South IR also offers the possibility of an extraction line for diagnostics SCIR quads (48.4 T/m) available if desired for highly focused beam tests

14 South IR Extraction Line Option e + ~40 m available for extraction line and diagnostics 18 m South insertion region

Experimental Configuration II Items to Test Extraction Technologies Kickers Deflecting Cavities HOM Beam Stability Tests can be done in-ring (pinger mode, turn-by-turn diagnostics) If extraction line looks favorable can also consider kicker extraction into diagnostics-equipped line ILC DR wigglers Probe e + dynamics at low emittance Intrabeam scattering Electron cloud effects Range of bunch spacings can be tested (granularity of 2ns RF buckets) August 18, 2005 Plans for CESR Mark A. Palmer 15

Experimental Configuration III Diagnostics CHESS lines offer infrastructure for additional ring diagnostics Free during low energy operations Example: XRAY beam profile monitor (see next slide) Longitudinal diagnostics Streak camera Coherent Radiation Measurements in the Far IR (A. J. Sievers, etal) Tested in CESR s Linac More advanced system being tested at TTF Possible use in CESR or in extraction line Provide stations to install other devices August 18, 2005 Plans for CESR Mark A. Palmer 16

17 Testbed for New Instrumentation X-ray Beamsize Monitor (Alexander, Ernst, Palmer) Diode array Devices in hand Readout electronics in hand Final assembly and testing in ring this fall Initial configuration: Pinhole optics setup in CHESS line

18 Flexible energy operation 1.5 2.5 GeV/beam with wigglers Unique Features of a CESR Test Facility Explore energy dependence of parameters Will be configured for e + operation Explore e + only effects Allows for extraction line into available space in flare

19 Summary CESR can be configured for low emittance operation after CLEO detector removal Significant insertion space can be made available for DR hardware studies The most interesting (and straightforward) setup is to study positrons Significant amount of further evaluation is needed Would welcome input and participation from all interested parties