FILO MINING DRILLS 50 METRES OF G/T SILVER, 0.56% COPPER, 0.50 G/T GOLD AND 36 METRES OF 1.45% COPPER AT FILO DEL SOL

Similar documents
FILO EXPANDS OXIDE COPPER AND GOLD ZONES - DRILLING INTERSECTS 0.77% COPPER OVER 102 METRES AND 0.73 G/T GOLD OVER 112 METRES

NGEX DRILLS 42 METRES OF 1.13 G/T GOLD AND G/T SILVER AT FILO DEL SOL PROJECT

FILO MINING REPORTS UPDATED MINERAL RESOURCE ESTIMATE FOR THE FILO DEL SOL PROJECT

NGEX INTERSECTS 1.45% COPPER OVER 97.6 METRES AND G/T SILVER OVER 36 METRES AT FILO DEL SOL PROJECT

NGEX ANNOUNCES COPPER GOLD DISCOVERY AT NACIMIENTOS PROJECT

NGEX PROVIDES UPDATE ON EXPLORATION PROGRAM AT NACIMIENTOS PROJECT, ARGENTINA

Assay Results Highlights (as of November 16, 2017) representing approximately 4,500 metres ( m ) of drilling:

QMX GOLD CONTINUES TO INTERSECT STRONG MINERALIZATION AT BONNEFOND, INTERSECTING 39.5 g/t Au OVER 2.4 METRES AND 31.5 g/t Au OVER 1.

DRILLING AT ASCOT S PREMIER PROPERTY EXTENDS GOLD MINERALIZATION 150 METRES WEST TOWARDS UNDERGROUND PORTAL

V Sample from C.O.D vein 15 metres southwest of V

Plateau Extends Falchani East Lithium Deposit Community Agreements Executed and Three Drill Rigs Active at Falchani West

NEWS RELEASE. Tigray Intersects 28.2 metres at 8.50 grams per tonne gold at Mato Bula, Adyabo Project, Northern Ethiopia

News Release. Infill Drilling Program

IDM Mining s Underground Drilling Intersects g/t Au and g/t Ag over 6.80 Meters True Width at the Red Mountain Gold Project

NEWS RELEASE. March 22, 2017

NEWS RELEASE. Mountain Province Diamonds Completes the Kennady North Winter Exploration Program

Goldcrest Resources Ltd.

Northern Dynasty Minerals Ltd.

NEWS RELEASE August 10, 2017

True Width (m) Carneritos to

BELO SUN RELEASES RESULTS FROM 65 DRILL HOLES FURTHER EXTENDING THE OURO VERDE DEPOSIT ALONG STRIKE NORTHWEST AND DOWN DIP

BELO SUN DISCOVERS NEW MINERALIZED ZONE AT ITS VOLTA GRANDE GOLD PROJECT, BRAZIL

Probe Metals Intersects 3.2 g/t Gold Over 45.5 Metres At Val-d Or East

Probe Metals Continues to Intersect Significant Gold Mineralization in Expansion Drilling at Val-d Or East, including 4.1 g/t Gold Over 15.

October 8, 2015 News Release Brucejack Regional Drilling Intersects Over 8,000 Grams Per Tonne Gold

BELO SUN INTERSECTS NEW HIGH GRADE ZONE AT GROTA SECA AND EXPANDS GRANDE DEPOSIT

Canadian Gold Miner Grab Sample Returns 29.5 Grams per tonne Gold from South Kirkland Project

NEWS RELEASE July 26, 2018

FALCO PACIFIC COMPLETES INITIAL MODEL FOR THE HORNE 5 GOLD/SILVER/ZINC/COPPER DEPOSIT

MCEWEN MINING ANNOUNCES EXPLORATION UPDATE FOR EL GALLO 1, MEXICO

NEWS RELEASE ORCA GOLD REPORTS CONTINUED SUCCESS AT GSS

Probe Metals Continues to Expand Gold Zones At Val-d Or East

NEWS RELEASE August 8, 2018

QMX GOLD INTERSECTS 29.8 G/T AU OVER 3.0 METERS AND 19.3 G/T AU OVER 3.2 METERS AT BONNEFOND

REGULUS DISCOVERS NEW GOLD-RICH, HIGH-GRADE COPPER-GOLD ZONE AT RIO GRANDE

For Immediate Release ASCOT DRLLING AT UNICORN INTERSECTS MORE HIGH-GRADE GOLD

ET and and and

June 4, 2014 News Release Valley of the Kings Exploration Program Underway; Project Update

July 15, 2015 News Release Valley of the Kings Underground Infill Drilling Progresses

NEWS RELEASE. Mountain Province Diamonds Reports Additional Kimberlite Identified in Gahcho Kué Exploration Program

Eloro Outlines Major New Mineralized Trend on La Victoria Project, Peru; Sample Results Return Values To 33 Grams Gold Per Tonne

Minsud to recommence resource outline diamond drilling at the Chita Valley Cu- Au-Ag-Mo Project, San Juan, Argentina

AZUCAR MINERALS COMMENCES DRILLING AT THE EL COBRE PROJECT, MEXICO

NEWS RELEASE NOVEMBER 28th, 2017 Trading Symbols: TSX-V: AMZ; OTCQX: AXDDF

June 4, 2015 News Release Valley of the Kings Underground Infill Drilling Underway

Vendetta Reports Initial Results from 2017 Pegmont Program with High Grade Zone 3 Step Out Drilling

Vendetta Reports Additional High Grade Drilling Results from Zones 2 and 3 at Pegmont Lead-Zinc Project

BELO SUN RELEASES RESULTS FOR 74 ADDITIONAL DRILL HOLES AT ITS VOLTA GRANDE PROJECT

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AND g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

RED EAGLE MINING INTERCEPTS 35.5 METRES AT 2.28 GRAMS GOLD PER TONNE AT SANTA ROSA

PRESS RELEASE. DUBUISSON NORTH DRILLING CUTS g/t AU OVER 5.0 METRES NEW S50 EAST DISCOVERY, 3.39 g/t AU OVER 25.9 METRES

NEWS RELEASE November 5, 2018

Cordoba Minerals Provides an Update on Exploration Activities at the San Matias Copper-Gold Project in Colombia

Highlights from the four holes announced in this news release include:

NEWS RELEASE TSX-V Ticker: SWA 23 April 2013 SWA.WT SARAMA RESOURCES EXTENDS HIGH-GRADE MINERALISATION AT MM PROSPECT IN BURKINA FASO

Monument Announces NOA 7/8 Drilling Program Results at Burnakura Gold Project

COPPER MOUNTAIN COMPLETES PHASE 2 DRILL PROGRAM AT NEW INGERBELLE WITH CONTINUED POSITIVE RESULTS

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

Probe Metals Discovers New High Grade Gold Zone on Val-d Or East Project: Intersects 12.6 g/t Gold Over 7.3 Metres

NEWS RELEASE ORCA GOLD INDICATED AND INFERRED RESOURCES AT BLOCK 14 INCREASE BY 24% AND 48% RESPECTIVELY

AbraPlata defines gold-rich zone with up to 16.7g/t Au over 10.6m in the basement at its Diablillos property in Argentina

Pacific Empire Minerals Provides Copper King RC Drilling Results

AVION GOLD DJAMBAYE II ZONE, TABAKOTO PROJECT, MALI, RETURNS HIGH GRADE INTERCEPTS OF 7.56 G/T Au OVER 7.0 METRES AND G/T Au OVER 3.

Probe Metals Confirms Continuity of Gold Mineralization on its Val-d Or East Project And Increases 2017 Drill Program to 75,000 metres

LME m averaging 0.65 g/t Au and 0.32% Cu, or 1.19 g/t Au Equiv LME m averaging 0.64 g/t Au and 0.11% Cu, or 0.

(TSXV: GPLY, OTCQB: GLYXF

Detour Gold Reports Drilling Results from Lower Detour

OSISKO METALS INTERSECTS 10.49% ZINC+LEAD OVER METRES AND 12.15% ZINC+LEAD OVER METRES AT PINE POINT

Probe Metals Intersects 1,122 g/t Gold Over 0.7 Metres in New Zone at Val-d Or East

MINERA ALAMOS TO COMMENCE DRILLING AIMED AT EXPANDING AREAS OF DEFINED GOLD MINERALIZATION AT SANTANA/LOS VERDES PROPERTY, SONORA, MEXICO

CROCODILE GOLD CONTINUES POSITIVE EXPLORATION RESULTS INTERSECTS HIGH GRADE GOLD AT UNION REEFS PROJECT

Argonaut Gold announces San Agustín resource of 845,000 gold ounces and 28.3 million silver ounces (1,280,000 gold equivalent ounces)

INV METALS ANNOUNCES DRILL RESULTS AT LOMA LARGA AND INITIAL PROSPECTING RESULTS ON NEW REGIONAL PROPERTIES

Underground Exploration Drilling Complete; Brucejack Mineralization Extends to the East

55 Adelaide Street East, Suite St-Charles west, Suite 411, West Tower

Skeena Intersects g/t AuEq over metres at Eskay Creek

Highlights include: Hole TTD050: 6.12 g/t Au over 7.00 metres from metres o Including g/t Au over 1.18 metres

Orsu Metals hits 2.62 g/t Au over 22.2 metres and proves higher gold grades at Zone 23, Sergeevskoe Gold Project, Russia

Suite West Georgia Street Vancouver, B.C. V6E 4M3 NEWS RELEASE

Atacama Pacific Drills 208 Metres Grading 0.60 g/t Gold at Cerro Maricunga. Reports Further Positive Metallurgical Test Results

CROCODILE GOLD INTERSECTS 7.1 G/T AU OVER 4.5 METERS INCLUDING 11.2 G/T AU OVER 2.6 METERS AT THE UNION REEFS PROJECT, PROSPECT DEPOSIT

Orsu Metals completes Phase 2 drilling program and announces significant intercepts in drillhole SDH17-15 at Zone 23, Sergeevskoe Gold Project, Russia

A B C PAD A HIGHLIGHTS

TROILUS GOLD CORP. INITIATES 30,000 METRE DRILL PROGRAM ON TROILUS PROPERTY

930 West 1 st Street, Suite 202, North Vancouver, BC V7P 3N4. Tel: (604) Tel:

BALMORAL INTERSECTS g/t GOLD OVER 7.99 METRES, BUG LAKE SOUTH, DETOUR GOLD TREND PROJECT, QUEBEC

GOLDPLAY ANNOUNCES FURTHER SAMPLING RESULTS FROM SAN MARCIAL HISTORICAL CORE; CONFIRMS OPEN PIT TARGET NEAR SURFACE WITH gpt AgEq.

Drilling Highlights: Phase II BCV Infill Drilling

The new sulphide mineralization lies within a 1.4 kilometer long east-west trending

DRILLING FURTHER EXTENDS MINERALIZATION AT EXETER S CASPICHE GOLD-COPPER PORPHYRY PROJECT IN CHILE

Press Release Thunder Bay: August 2, 2018

At the contact, mineralization is associated with strong tourmalinization of the Bevcon Intrusion.

Junior Uranium explorer in the Athabasca Basin. Patterson Claims

CARACARA SILVER INC. PLANNING DRILL PROGRAM AT PILUNANI ZINC-LEAD PROJECT IN PERU

NEWS RELEASE. September 30 th, Trading Symbols: GTP (TSX-V) P01 (FRANKFURT) COLTF (OTC Pink)

NEWS RELEASE. Evrim announces initial drilling results at Cuale Gold Project in Mexico

EL CONDOR IN-FILL DRILLING INTERSECTS 26.9 METERS 2.19% CU & 0.58% NI

2. The latter two intersections occur outside the presently defined mineral resource.

BK Copper Project Strong Copper Results Confirm and Extend BKM

555 Burrard Street, Suite 375, Vancouver, B.C. V7X 1M June 13, 2017 SBB NR SBB TSX

Transcription:

NEWS RELEASE FILO MINING DRILLS 50 METRES OF 236.4 G/T SILVER, 0.56% COPPER, 0.50 G/T GOLD AND 36 METRES OF 1.45% COPPER AT FILO DEL SOL April 27, 2018: Mining Corp (TSXV, Nasdaq First North: FIL) (" Mining",, or the Company ) is pleased to announce results of the first batch of drill holes from the recently completed 2017/18 drill program at the del Sol project in San Juan Province, Argentina and Region III, Chile. A total of 9,411 metres was drilled during the program, which was completed at the end of March. Assay results for 20 reverse circulation (RC) holes are presented here, and the remainder will be released once the final assays have been received. In total, 31 RC holes and 9 diamond drill holes were completed during the program. Highlights of Field Program: Infill drilling is expected to convert a portion of the inferred oxide resource to indicated Step out drilling has extended mineralization beyond the current resource limits Over 4.5 tonnes of material was collected for metallurgical, geotechnical and environmental testing Geotechnical drilling has been completed Highlights from this first batch of drill holes include: VRC135: 20m @ 0.54% Cu, 0.96 g/t Au, 208.0 g/t Ag VRC137: 164m @ 0.33% Cu, 0.36 g/t Au, 27.4 g/t Ag VRC143: 36m @ 1.45% Cu, 0.34 g/t Au, 0.9 g/t Ag VRC152: 38m @ 0.33% Cu, 0.28 g/t Au, 313.6 g/t Ag VRC153: 12m @ 0.86% Cu, 1.91 g/t Au, 0.8 g/t Ag VRC155: 50m @ 0.56% Cu, 0.50 g/t Au, 236.4 g/t Ag Commenting on today s results, Adam Lundin, CEO of Mining stated, We are very pleased with the initial results from our 2017/18 drill season. We expect to convert a large portion of our inferred oxide resource to indicated, which was one of our primary objectives this season. The remainder of drill results will be released in Q2 of this year, followed by a resource update in Q3. One of the main goals of the 2017/18 drill program was to convert a part of the inferred oxide resource to the indicated category and most of the holes in this release were drilled for that purpose. The results suggest that we are well on our way to achieving this objective. The resource remains open laterally and to depth, and several other holes were drilled adjacent to the inferred resource in order to test for resource extensions. The holes in this release span a distance of 2.5 kilometres from VRC141 in the south to VRC153 in the north. Fourteen of the holes announced today were drilled into the zone of the deposit. Three of these (VRC136, VRC137 and VRC153) intersected mineralization outside of the 2017 resource limit, including extensions to the copper-gold oxide zone in VRC137 and VRC153 and to the hypogene zone in VRC136. Four holes (VRC137, VRC148, VRC150 and VRC155) intersected the gold oxide zone. Three of these gold-oxide zone intersections were in areas of inferred resource while VRC150 drilled through the indicated part of the gold oxide zone on its way to deeper inferred blocks in the underlying copper-gold oxide and silver zones. All of the zone holes intersected the copper-gold oxide zone, with the exception of VRC136 which started west of the Frontera fault and VRC151 which was stopped above the zone due to excessive hole deflection. All of these copper-gold oxide intersections are either within the inferred resource or adjacent to it.

Eight of the holes intersected the silver zone, including some high-grade intervals in holes VRC135, VRC152 and VRC155. In particular, VRC152 encountered an 8 metre section between 310 metres and 318 metres which assayed 726.3 g/t silver. These silver zone intersections are all along the edge of the indicated resource or within the adjacent inferred resource. Six of the holes presented here were drilled into the Tamberias zone. Three of these holes (VRC140, VRC142 and VRC144) extend the gold oxide zone beyond the 2017 resource limit. The other three (VRC139, VRC141 and VRC143) were drilled into the Tamberias copper-gold oxide zone either near the edge of the indicated resource or within the inferred resource and will allow for conversion of some of the inferred resource. A full table of the drill hole intersections, collar information and a plan map showing the locations of the drill holes are included within this release. The results of the 2017/18 drilling will be incorporated into an updated mineral resource estimate to support the Pre-Feasibility Study ( PFS ) which is currently underway. Diamond drill holes completed during the program will contribute data for the resource update and will also provide samples for metallurgical testwork forming an important part of the study. Metallurgical sample material was also collected from surface trenches during the field program. The PFS testwork program is being carried out at SGS Minerals metallurgical lab in Lakefield, Ontario and commenced in early April, 2018. Ongoing environmental and social programs continue in support of the PFS and to lay the groundwork for future environmental assessments and project permitting.

HOLE-ID From (m) To (m) Length (m) Cu % Au g/t Ag g/t VRC135 134 250 116 0.33 0.40 38.0 incl 178 198 20 0.54 0.96 208.0 VRC136 406 498 92 0.24 0.33 1.6 incl 464 498 34 0.41 0.27 1.6 VRC137 0 12 12 0.05 1.07 10.3 plus 12 176 164 0.33 0.36 27.4 Zone Purpose Resource Addition incl 114 170 56 0.47 0.35 66.6 VRC138 0 100 100 0.17 0.22 1.0 VRC139 0 100 100 0.33 0.37 1.9 incl 12 72 60 0.27 0.50 2.5 Tamb or incl 40 96 56 0.51 0.36 1.4 VRC140 0 100 100 0.01 0.30 2.4 Tamb Resource Addition VRC141 0 134 134 0.22 0.37 1.4 incl 2 34 32 0.18 0.50 2.4 Tamb VRC142 0 90 90 0.02 0.24 4.0 Tamb Resource Addition VRC143 0 118 118 0.68 0.45 1.4 incl 4 62 58 0.41 0.55 1.5 Tamb and incl 78 114 36 1.45 0.34 0.9 VRC144 0 120 120 0.03 0.33 7.8 incl 88 104 16 0.07 0.75 6.9 Tamb Resource Addition VRC145 102 220 118 0.34 0.56 1.3 incl 102 142 40 0.51 0.83 1.6 and incl 196 220 24 0.58 0.85 2.4 plus 230 238 8 0.23 0.16 129.3 VRC146 124 190 66 0.29 0.29 1.5 VRC147 72 200 128 0.32 0.26 23.0 incl 106 120 14 0.42 0.19 91.3 VRC148 50 104 54 0.01 0.59 1.5 plus 168 182 14 1.60 0.39 1.2 VRC149 174 359 185 0.31 0.30 8.0 incl 236 326 90 0.42 0.39 14.4 incl 314 320 6 0.43 0.25 117.7 VRC150 12 36 24 0.01 0.40 3.3 plus 220 320 100 0.40 0.37 45.0 incl 248 286 38 0.44 0.41 113.9 VRC151 No Significant Values VRC152 106 150 44 0.90 0.19 1.2 plus 260 346 86 0.34 0.32 139.9 incl 308 346 38 0.33 0.28 313.6 VRC153 162 272 110 0.42 0.43 1.5 incl 162 174 12 0.86 1.91 0.8 VRC155 28 82 54 0.03 0.63 1.0 plus 84 218 134 0.48 0.38 97.4 incl 168 218 50 0.56 0.50 236.4 Resource Addition

Mineralized zones within the del Sol deposit are flat-lying, and drilled widths are interpreted to be greater than 95% of true widths. The field program was carried out under the supervision of Bob Carmichael, B.A.Sc., P.Eng., who is the Qualified Person as defined by NI 43-101. Mr. Carmichael is Vice President, Exploration for the Company and has reviewed and approved the technical information contained in this news release. The Quality Control/Quality Assurance (QA/QC) program for the del Sol Project is under the management of Diego Charchaflie MSc., P.Geo (BC), a Qualified Person pursuant to NI 43-101. Samples were collected at the drill site by Company personnel with splitting carried out at the Company s field camp near the drill sites. Individual samples represent final splits from 2 metre intervals down the hole. Samples were delivered to the ALS preparation laboratory in Copiapo, Chile where samples were crushed and split and a 500g split was pulverized to 85% passing 200 mesh. The prepared samples were sent to the ALS assay laboratory in Lima, Peru. ALS is an accredited laboratory which is independent of the Company. Gold analyses were by fire assay fusion with AAS finish on a 30g sample. Copper and silver were analysed by atomic absorption following a 4 acid digestion. Samples were also analyzed for a suite of 36 elements with ICP-ES and a sequential copper leach analysis was completed on each sample. Copper and gold standards as well as blanks and duplicates (field, preparation and analysis) were randomly inserted into the sampling sequence for Quality Control. On average, 9% of the submitted samples correspond to Quality Control samples. ABOUT FILO MINING CORP. Mining s flagship project is its 100% controlled del Sol Project located on the border between San Juan Province, Argentina and Region III, Chile. del Sol is located between the prolific Maricunga and El Indio Gold Belts, two major mineralized trends that contain such deposits as Caspiche, La Coipa, Veladero, and El Indio. The region is mining-friendly and hosts a number of large scale mining operations. The project area is covered under the Mining Integration and Complementation Treaty between Chile and Argentina, which provides the framework for the development of cross border mining projects. HOLE-ID East North Elevation Length (m) Azimuth Dip VRC135 434789 6847801 5166 252 92-79 VRC136 434643 6848001 5163 498 70-75 VRC137 434852 6847699 5170 316 260-61 VRC138 434916 6847496 5166 100 0-90 VRC139 434999 6846465 5288 100 60-70 VRC140 434638 6846934 5100 100 0-90 VRC141 434883 6846395 5308 140 60-70 VRC142 434768 6846972 5101 90 0-90 VRC143 434925 6846532 5256 118 60-70 VRC144 434550 6846796 5126 120 0-90 VRC145 435170 6848425 5186 239 100-83 VRC146 435292 6848511 5123 190 90-70 VRC147 435291 6848511 5123 200 0-90 VRC148 434816 6848097 5229 182 0-90 VRC149 435015 6848735 5236 359 270-88 VRC150 435047 6848644 5229 320 185-88 VRC151 435019 6848736 5235 205 259-62 VRC152 435004 6848793 5242 396 0-90 VRC153 435329 6848800 5149 300 80-70 VRC155 434899 6847999 5166 89 270-85

ADDITIONAL INFORMATION Mining is listed on the TSX-V and Nasdaq First North Exchange under the trading symbol "FIL". Pareto Securities AB is the Company's Certified Adviser on Nasdaq First North. This information is information that Mining Corp. is obliged to make public pursuant to the EU Market Abuse Regulation. This information was submitted for publication, through the agency of the contact person set out below, on April 27, 2018 at 2:00 a.m. Toronto time. On behalf of the Board of Directors of Mining, Adam I. Lundin President and CEO For further information, please contact: Sophia Shane, Investor Relations (604) 806-3575. Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. Cautionary Note Regarding Forward-Looking Statements Certain statements made and information contained herein in the press release constitutes forward-looking information and forward-looking statements within the meaning of applicable securities legislation (collectively, forward-looking information ), concerning the business, operations and financial performance and condition of Mining Corp. The forward-looking information contained in this press release is based on information available to the Company as of the date of this press release. Except as required under applicable securities legislation, the Company does not intend, and does not assume any obligation, to update this forward-looking information. Generally, this forward-looking information can frequently, but not always, be identified by use of forward-looking terminology such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or statements that certain actions, events, conditions or results will, "may", "could", "would", "might" or "will be taken", "occur" or "be achieved" or the negative connotations thereof. All statements other than statements of historical fact may be forward-looking statements. Forward-looking information is necessarily based on estimates and assumptions that are inherently subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of the Company to be materially different from those expressed or implied by such forward-looking information, including but not limited to: risks and uncertainties relating to, among other things, the inherent uncertainties regarding cost estimates, changes in commodity prices, currency fluctuation, financing, unanticipated resource grades, infrastructure, results of exploration activities, cost overruns, availability of financing, materials and equipment, timeliness of government approvals, taxation, political risk and related economic risk and unanticipated environmental impact on operations, as well as other risks and uncertainties more fully described under "Risk Factors" and elsewhere in the Company's most recent Annual Information Form available under the Company's profile at www.sedar.com and on the Company's website. These risks and uncertainties may cause the actual results, level of activity, performance or achievements of the Company to be materially different from those expressed or implied by such forward-looking information. The Company believes that the expectations reflected in the forward-looking information included in this press release are reasonable, but no assurance can be given that these expectations will prove to be correct and such forward-looking information should not be unduly relied upon. This forward-looking information speaks as of the date of this press release. Forward-looking information in this news release includes, but is not limited to, statements regarding the Company s expectations with respect to conversion of inferred mineral resources to indicated mineral resources, timing for receipt of additional assay results, an updated mineral resource estimate to support a PFS, the assumptions used in the mineral resource estimates for the del Sol project; expected timing with respect to completion of a PFS, expectations with regard to potential for adding to mineral resources through exploration; estimations of commodity prices, mineral resources, and costs.

Statements relating to "mineral resources" are deemed to be forward looking information, as they involve the implied assessment, based on certain estimates and assumptions that the mineral resources described can be profitably produced in the future. Forward-looking information is based on certain assumptions that the Company believes are reasonable, including that the current price of and demand for commodities will be sustained or will improve, the supply of commodities will remain stable, that the general business and economic conditions will not change in a material adverse manner, that financing will be available if and when needed on reasonable terms and that the Company will not experience any material labour dispute, accident, or failure of plant or equipment. These factors are not, and should not be construed as being, exhaustive. Although the Company has attempted to identify important factors that would cause actual results to differ materially from those contained in forward-looking information, there may be other factors that cause results not to be as anticipated, estimated, or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. All forward-looking information contained in this document is qualified by these cautionary statements. Readers are cautioned not to place undue reliance on forward-looking information due to the inherent uncertainty thereof.

Frontera Fault 35000E Open 36000E 49000N VRC152 VRC151 VRC149 VRC148 VRC150 FILO VRC153 VRC146 VRC147 VRC145 Resource Outline EPITHERMAL DOMAIN Flamenco Fault NORTH VRC136 VRC155 48000N VRC135 VRC137 VRC138 PORPHYRY DOMAIN Drill Hole Collar: Current Release Drill Hole Collar: Previous Fault VRC140 VRC144 VRC142 TAMBERIAS VRC143 VRC139 Vicuna Porphyry Post-Mineral Volcanics Hydrothermal Breccias Porphyry Intrusion I Porphyry Intrusion II Sandstone and Conglomerate VRC141 Volcanics FILO DEL SOL PROJECT 0m 500m 1000m 46000N Geology - Drill Holes Plan View APRIL 2018