Solving a Multi-Level Capacitated Lot Sizing. Problem with Multi-Period Setup Carry-Over via a. Fix-and-Optimize Heuristic

Similar documents
A Fix-and-Optimize Approach for the Multi-Level Capacitated Lot Sizing Problem

Practical Tips for Modelling Lot-Sizing and Scheduling Problems. Waldemar Kaczmarczyk

Valid Inequalities for the Proportional Lotsizing and Scheduling Problem with Fictitious Microperiods. Waldemar Kaczmarczyk

Capacitated Lot-Sizing with. Linked Production Quantities. Knut Haase. University of Kiel

A parallel machine lot-sizing and scheduling problem with a secondary resource and cumulative demand

Discrete lot sizing and scheduling on parallel machines: description of a column generation approach

A Column-Generation Approach for a Short-Term Production Planning Problem in Closed-Loop Supply Chains

A column generation approach to the discrete lot sizing and scheduling problem on parallel machines

Classification of Dantzig-Wolfe Reformulations for MIP s

On the Equivalence of Strong Formulations for Capacitated Multi-level Lot Sizing Problems with Setup Times

ABCβ A Heuristic for Dynamic Capacitated Lot Sizing with Random Demand under a Fillrate Constraint

An Optimization Framework for Solving Capacitated Multi-level Lot-sizing Problems with Backlogging

Lot sizing and scheduling with sequence-dependent setup costs and times and e$cient rescheduling opportunities

The Subcoalition Perfect Core of Cooperative Games

Simulation of less master production schedule nervousness model

CAPACITATED LOT-SIZING PROBLEM WITH SETUP TIMES, STOCK AND DEMAND SHORTAGES

A Primal-Dual Algorithm for Computing a Cost Allocation in the. Core of Economic Lot-Sizing Games

Synchronization of Scarce Resources for a Parallel Machine Lotsizing Problem

Introduction into Vehicle Routing Problems and other basic mixed-integer problems

Formulation for less master production schedule instability under rolling horizon

Research Article Dynamic Programming and Heuristic for Stochastic Uncapacitated Lot-Sizing Problems with Incremental Quantity Discount

Column Generation for Extended Formulations

A comparison of sequencing formulations in a constraint generation procedure for avionics scheduling

ARTICLE IN PRESS. Int. J. Production Economics

This version is available at

Formulations and heuristics for the multi-item uncapacitated lot-sizing problem with inventory bounds

Solving Elementary Shortest-Path Problems as Mixed-Integer Programs

An Adaptive Partition-based Approach for Solving Two-stage Stochastic Programs with Fixed Recourse

Kybernetika. Terms of use: Persistent URL: Institute of Information Theory and Automation AS CR, 2012

Worst case analysis for a general class of on-line lot-sizing heuristics

Stabilized Branch-and-cut-and-price for the Generalized Assignment Problem

1 Production Planning with Time-Varying Demand

Large-scale optimization and decomposition methods: outline. Column Generation and Cutting Plane methods: a unified view

A Computational Analysis of Lower Bounds for Big Bucket Production Planning Problems

A Horizon Decomposition approach for the Capacitated Lot-Sizing Problem with Setup Times

2007/87. Valid inequalities for the single-item capacitated lot sizing problem with step-wise costs. Ayse Akbalik and Yves Pochet

Solving Multi-Item Capacitated Lot-Sizing Problems with Setup Times by Branch-and-Cut 1

An Exact Algorithm for the Steiner Tree Problem with Delays

Valid Inequalities and Restrictions for Stochastic Programming Problems with First Order Stochastic Dominance Constraints

The network maintenance problem

Production Planning and Control

A Computational Analysis of Lower Bounds for Big Bucket Production Planning Problems

A LAGRANGEAN DECOMPOSITION ALGORITHM FOR MULTI-ITEM LOT-SIZING PROBLEMS WITH JOINT PURCHASING AND TRANSPORTATION DISCOUNTS 1. Alain Martel.

Determining Production Capacity under the consideration of a multistage

56:270 Final Exam - May

A Bilinear Reduction Based Algorithm for Solving Capacitated Multi-Item Dynamic Pricing Problems.

1 Production Planning with Time-Varying Demand

Multi-Skill Resource-Constrained Project Scheduling: Formulation and Inequalities

Multi-Task/Multi-Stage Production Planning and Scheduling for Process Industries

2. Linear Programming Problem

Event-based MIP models for the resource constrained project scheduling problem

Adaptive Dynamic Cost Updating Procedure for Solving Fixed Charge Network Flow Problems.

New Instances for the Single Machine Total Weighted Tardiness Problem

Scenario Grouping and Decomposition Algorithms for Chance-constrained Programs

Integer Programming ISE 418. Lecture 8. Dr. Ted Ralphs

An Integrated Column Generation and Lagrangian Relaxation for Flowshop Scheduling Problems

Extended Job Shop Scheduling by Object-Oriented. Optimization Technology

Anja Wolter, Stefan Helber

Tightening a Discrete Formulation of the Quadratic Assignment Problem

Recoverable Robust Knapsacks: Γ -Scenarios

1 Column Generation and the Cutting Stock Problem

A polynomial time algorithm to solve the single-item capacitated lot sizing problem with minimum order quantities and concave costs

Time Aggregation for Network Design to Meet Time-Constrained Demand

A p-median Model for Assortment and Trim Loss Minimization with an Application to the Glass Industry

HYBRID FLOW-SHOP WITH ADJUSTMENT

A Branch-and-Cut Algorithm for the Stochastic Uncapacitated Lot-Sizing Problem

A Mixed-Integer Linear Program for the Traveling Salesman Problem with Structured Time Windows

Lecture 8: Column Generation

Section Notes 8. Integer Programming II. Applied Math 121. Week of April 5, expand your knowledge of big M s and logical constraints.

Batch delivery scheduling with simple linear deterioration on a single machine 1

Feasibility Pump Heuristics for Column Generation Approaches

Research Article A New Global Optimization Algorithm for Solving Generalized Geometric Programming

Mitigating end-effects in Production Scheduling

Extended Formulations, Lagrangian Relaxation, & Column Generation: tackling large scale applications

Section Notes 9. IP: Cutting Planes. Applied Math 121. Week of April 12, 2010

Graphical and Computer Methods

Ant Colony Optimization for Resource-Constrained Project Scheduling

The Stochastic Economic Lot Sizing Problem for Continuous Multi-Grade Production

A LAGRANGIAN RELAXATION FOR CAPACITATED SINGLE ALLOCATION P-HUB MEDIAN PROBLEM WITH MULTIPLE CAPACITY LEVELS

Monoidal Cut Strengthening and Generalized Mixed-Integer Rounding for Disjunctions and Complementarity Constraints

A Branch-and-Price Algorithm for Multi-Mode Resource Leveling

Applications. Stephen J. Stoyan, Maged M. Dessouky*, and Xiaoqing Wang

Advanced Linear Programming: The Exercises

Logic, Optimization and Data Analytics

Projection in Logic, CP, and Optimization

Cut-First Branch-and-Price-Second for the CARP Workshop on Large Scale Optimization 2012 Vevey, Switzerland

A Mathematical (Mixed-Integer) Programming Formulation for. Microbrewery. Spyros A. Reveliotis. Spring 2001

is called an integer programming (IP) problem. model is called a mixed integer programming (MIP)

Time-optimal scheduling for high throughput screening processes using cyclic discrete event models

Integer Programming, Constraint Programming, and their Combination

Introduction to integer programming III:

Indicator Constraints in Mixed-Integer Programming

A Branch and Bound Algorithm for the Project Duration Problem Subject to Temporal and Cumulative Resource Constraints

On the Polyhedral Structure of a Multi Item Production Planning Model with Setup Times

Exact Mixed Integer Programming for Integrated Scheduling and Process Planning in Flexible Environment

Scheduling Parallel Jobs with Linear Speedup

A New Compact Formulation for Discrete p-dispersion

A Column Generation Based Heuristic for the Dial-A-Ride Problem

Totally unimodular matrices. Introduction to integer programming III: Network Flow, Interval Scheduling, and Vehicle Routing Problems

Models and Cuts for the Two-Echelon Vehicle Routing Problem

Transcription:

Solving a Multi-Level Capacitated Lot Sizing Problem with Multi-Period Setup Carry-Over via a Fix-and-Optimize Heuristic Florian Sahling a, Lisbeth Buschkühl b, Horst Tempelmeier b and Stefan Helber a a Department of Production Management Leibniz University Hannover, Germany b Department of Supply Chain Management and Production University of Cologne, Germany June 2, 2008 Abstract This paper presents a new algorithm for the dynamic Multi-Level Capacitated Lot Sizing Problem with Setup Carry-Overs (MLCLSP-L). The MLCLSP-L is a big-bucket model that allows the production of any number of products within a period, but it incorporates partial sequencing of the production orders in the sense that the first and the last product produced in a period are determined by the model. We solve a model which is applicable to general bill-of-material structures and which includes minimum lead times of one period and multi-period setup carry-overs. Our algorithm solves 1

a series of mixed-integer linear programs in an iterative so-called Fix-and- Optimize approach. In each instance of these mixed-integer linear programs a large number of binary setup variables is fixed whereas only a small subset of these variables is optimized, together with the complete set of the inventory and lot size variables. A numerical study shows that the algorithm provides high-quality results and that the computational effort is moderate. 1 Introduction Capacitated dynamic lot sizing deals with the problem of determining time-phased production quantities that meet both given external demands and given capacity limits of the production system. The problem arises in production environments where the changeover of a resource from one product type to another causes setup time and/or setup costs. Numerous models to support dynamic lot sizing for singlelevel as well as multi-level production systems have been presented over the last decades. Big-bucket model formulations such as the (single-level) Capacitated Lot Sizing Problem (CLSP) and its multi-level extension, the Multi-Level Capacitated Lot Sizing Problem (MLCLSP), determine production quantities and periods only, without consideration of the actual production sequence of the orders within a time period. This type of modeling has the advantage that it allows a flexible re-sequencing of orders within a period, at the cost, however, that a detailed production plan must be generated in a subsequent planning step. On the other hand, a number of model variations completely integrate lot sizing and sequencing decisions, however, at a significant computational cost. These so-called small-bucket models are known as the Discrete Lot Sizing and Scheduling Problem (DLSP), the Continuous Setup Lot Sizing Problem (CSLP) and the Proportional Lot Sizing and Scheduling Problem (PLSP), among others. For recent detailed reviews on these models see e. g. Staggemeier and Clark (2001) and Sürie and Stadtler (2003). In order to ensure that an MLCLSP solution can be transformed into a feasible 2

production schedule, a planned lead time of at least one period must be introduced for each component product. In a multi-level bill-of-material (BOM) structure the cumulated flow time (in periods) from the beginning of the processing of the raw material to the completion of the finished product is then equal to the number of levels in the BOM structure. As for a period length of one week with a ten-level BOM structure this would result in a minimum flow time of at least ten weeks, the cumulated flow time can only be shortened by a reduction of the period length to, say, one day. However, if the time buckets are too small, then only a small number of products will be produced within a single period and in this case it will often happen that production in period t is continued in period t + 1 (and possibly periods t+2,...) without an additional setup. The big-bucket MLCLSP formulation counts this as a second setup, and therefore with short period lengths provides only a rough estimate of the real number of setups. The Multi-Level Capacitated Lot Sizing Problem with Linked Lot Sizes (MLCLSP- L), which is an extension of the big-bucket MLCLSP, allows to carry over the setup state of a resource to the next periods following the setup. This leads to more efficient setup patterns and shorter planning-induced flow times. In addition, due to its more realistic book-keeping of setups, it allows to find a feasible solution in cases when the standard MLCLSP formulation would fail. This is particularly likely in situations with high utilization. In the current paper, we consider the MLCLSP-L with multiple setup carryovers that allows to preserve the setup state of a resource over multiple periods. We apply the Fix-and-Optimize heuristic presented in Helber and Sahling (2008) to this variant of the MLCLSP-L. The Fix-and-Optimize heuristic, which is directly based on the formulation of the problem as a linear mixed-integer program, is rather flexible with respect to the incorporation of additional constraints. For example, constraints such as minimum lot sizes or maximum inventory levels can easily be included into the model without requiring a change to the solution approach. In addition, it has shown to outperform other well-known heuristics for multi-level lot sizing with respect to the solution quality. 3

The remainder of this paper is organized as follows: In Section 2 the related literature is discussed. In Section 3 we present a formal statement of the optimization problem. The Fix-and-Optimize heuristic is described in Section 4. Numerical results are discussed in Section 5. We conclude with some directions for further research in Section 6. 2 Related literature The option of setup carry-over was first formulated by Dillenberger et al. (1993, 1994), however, without consideration of the trade-off between setup and holding cost which is typical for lot size optimization. Haase (1994) added multi-period setup carry-overs to the CLSP and presented a backward scheduling procedure based on randomized regrets for the resulting CLSP-L. In a later paper, Haase (1998) treated the case of a single-period setup carry-over with a local search heuristic. Gopalakrishnan et al. (1995), Gopalakrishnan (2000) and Gopalakrishnan et al. (2001) developed modeling variants that differ with respect to the modeling of setups. Sox and Gao (1999) proposed a Lagrangean heuristic for a CLSP-L without setup times. Valid inequalities for the CLSP-L are derived by Sürie and Stadtler (2003) and used in a time-oriented decomposition approach with overlapping time windows. A standard MIP solver is applied to the subproblems that are defined during the decomposition. Quadt (2004) and Quadt and Kuhn (2005) use aggregation and decomposition techniques to solve a CLSP-L that is formulated for the bottleneck resource in a multi-stage production system. Gupta and Magnusson (2005) study the case of both sequence-dependent setup times and costs. The MLCLSP-L extends the MLCLSP through the inclusion of setup carry-overs. The MLCLSP which was introduced by Billington (1983) has been subject to substantial research for more than three decades. Tempelmeier and Helber (1994), Helber (1995) and Tempelmeier and Derstroff (1996) presented early product-oriented decomposition approaches for the MLCLSP with general bill-of-material structures. The heuristic proposed by Tempelmeier and Derstroff (1996) uses Lagrangean re- 4

laxation to decompose the original problem into a number of uncapacitated singleproduct Wagner-Whitin problems (see Wagner and Whitin (1958)). This yields a lower bound on the objective function value and a starting point for a heuristic finite scheduling procedure that aims at a feasible production plan and an upper bound on the minimum objective value. A linear programming-based approach that uses coefficient modification is proposed by Katok et al. (1998). A mixedinteger programming-based heuristic with internally rolling schedules is developed by Stadtler (2003). He solves a series of interrelated subproblems with overlapping time windows. The simple plant location formulation of the lot sizing problem is used to speed up the optimization process of the subproblems. The same idea is used for the single-level case treated in Sürie and Stadtler (2003). Stadtler (2003) reports high-quality solutions for small to medium-sized problems. However, as lead times are neglected, it is usually impossible to generate a feasible schedule from an MLCLSP solution. A similar algorithm is presented by Rossi (2003). Pitakaso et al. (2006) propose to decompose the MLCLSP with respect to products and periods. The form of the decomposition, which results in a sequence of subproblems comprising different sub-rectangles of the product-period matrix, is governed by an ant colony optimization (ACO) meta heuristic. Another populationbased memetic algorithm is proposed by Berretta and Rodrigues (2004). Tempelmeier and Buschkühl (2008) consider the MLCLSP-L with single-period setup carry-overs and modify the Lagrangean heuristic of Tempelmeier and Derstroff (1996) to deal with this situation. Helber and Sahling (2008) develop the Fix-and-Optimize approach for the ML- CLSP and compare it to the heuristics of Tempelmeier and Derstroff (1996) and Stadtler (2003). The numerical results show that this approach outperforms Stadtler s heuristic with respect to both solution time and quality and the Lagrangean heuristic of Tempelmeier and Derstroff with respect to the solution quality. In the sequel the Fix-and-Optimize approach is adjusted to solve the MLCLSP-L with linked lot sizes and multiple setup carry-overs. 5

3 Problem statement and model formulation We consider a general multi-level product structure with several end products. The external demand d kt for product k in period t is given and must be satisfied without backorders. For each product k an initial inventory ŷ k is given. Each product is produced on a single resource j with limited capacity b jt per period, that can be extended by using overtime O jt. In the heuristic to be presented, overtime is basically used as a slack variable in order to guarantee that the MIP solver always finds a feasible solution. Product k can only be produced in period t if the associated resource has the required product-specific setup state γ kt = 1. This setup state can either have been carried over from the preceding period t 1 or it can result from a new setup operation performed in period t. In the former case, the binary setup carry-over variable ω kt is set to 1. This may happen over multiple consecutive periods. A setup operation may cause setup costs as well as setup time. Our objective is to determine production quantities Q kt and end-of-period inventory levels Y kt for product k in period t as well as a setup pattern that minimize the sum of setup, holding and overtime costs. In the following mathematical formulation of the optimization model the notation in Table 1 is used. 6

Table 1: Notation used for model MLCLSP-L Indices and index sets: J set of resources (j {1,..., J}) K set of products (k {1,..., K}) T set of periods (t {1,..., T }) K j set of products produced by resource j set of immediate successors of product k N k Parameters: a ki number of units of product k required to produce one unit of product i (Gozinto factor) b jt available capacity of resource j in period t M kt big number d kt external demand of product k in period t oc j overtime cost per unit of overtime at resource j h k holding cost of product k per unit and period s k setup cost of product k tp k production time per unit of product k ts k setup time of product k physical initial inventory for product k ŷ k Decision variables: O jt overtime at resource j in period t Q kt production quantity (lot size) of product k in period t Y kt inventory of product k at the end of period t Yk 0 initial inventory of product k γ kt binary setup state variable of product k in period t ω kt binary setup carry-over variable for item k at the beginning of period t auxiliary variable for resource j in period t ν jt 7

Model MLCLSP-L min Z = k K subject to: [ ] sk (γ kt ω kt ) + h k Y kt + oc j O jt (1) t T j J t T Y k,t 1 + Q kt i N k a ki Q i,t+1 Y kt = d kt, k, t = 2,..., T 1 (2) Y k,t 1 + Q kt Y kt = d kt, k (3) ŷ k i N k a ki Q i1 Y 0 k = 0, k (4) Y 0 k + Q k1 i N k a ki Q i2 Y k1 = d k1, k (5) k K j [ tpk Q kt + ts k (γ kt ω kt ) ] b jt + O jt, j, t (6) Q kt M kt γ kt, k, t (7) ω kt 1, j, t (8) k K j ω kt γ k,t 1, k, t (9) ω kt γ kt, k, t (10) ω kt + ω k,t+1 1 + ν jt, j, k K j, t (11) (γ kt ω kt ) + ν jt 1, j, k K j, t (12) ω k1 = 0, k (13) Q kt, Y kt 0, k, t (14) Y 0 k 0, k (15) O jt, ν jt 0, j, t (16) γ kt, ω kt {0, 1}, k, t (17) The objective function (1) defines the sum of the setup, holding and overtime costs. A setup operation with associated setup costs and setup time for produkt k 8

occurs in period t if the resource is in the setup state (γ kt = 1) and there has been no setup carry-over (ω kt = 0). The inventory balance equations (2) to (5) reflect the planned lead time in the multi-level production structure. From the initial physical inventory ŷ k for product k only Y 0 k units enter the balance equations (5) for product k in period t = 1 as the remaining units are required by the successors items i N k in the first period, as described in equation (4). Given the lead time of one period between production stages, it is always possible to transform the setup pattern and the lot sizes into a detailed schedule for the resources. Constraints (6) ensure that the production quantities and setup times meet the capacity constraints for all resources. The inequalities (7) state that a product can only be produced in a period if its associated resource is in the correct setup state. According to inequalities (8), a setup carry-over into period t is possible for at most one product k at each resource j. Inequalities (9) and (10) require that in case of a setup carry-over, the resource is set up for product k both in periods t 1 and t. Constraints (11) and (12) model multi-period setup carry-overs. If the setup state of a resource is carried over from period (t 1) to t and further to period (t + 1), then no setup operation must occur in period t. Thus, ω kt + ω k,t+1 = 2 and ν jt = 1. Hence, according to (10), γ kt = 1, and (12), (γ kt ω kt ) = 0, which means that the resource remains in the setup state k. Equalities (13) state that there is no initial setup state for the resources in the first period. Constraints (14) (16) are the non-negativity constraints for the production quantity, inventory level, overtime and auxiliary variables. Setup state and carry-over variables are restricted to be binary, according to constraint (17). Formally, this version of the MLCLSP-L is always feasible as there is no limit on overtime. The overtime cost coefficient oc j can be used to price out undesired overtime from the solution by the algorithm presented in the next section. The solution of model MLCLSP-L with the help of a MIP solver is usually restricted to very small problem instances, as the linear-programming relaxation of the above inventory and lot size formulation provides only relatively weak lower bounds. However, the simple plant location reformulation applied by Stadtler 9

(2003) to the MLCLSP can also be used to reformulate model MLCLSP-L. We take advantage of this reformulation to compute lower and upper bounds on the objective function values as a benchmark in our numerical study in Section 5. 4 The Fix-and-Optimize Algorithm 4.1 Basic idea The reasoning behind our algorithm for the MLCLSP-L is that the number (2 K T ) of binary setup state and setup carry-over variables γ kt and ω kt determines most of the numerical effort in the Branch&Bound process required to solve the mixedinteger program. By contrast, the number of real-valued variables is of secondary importance. We therefore iteratively solve a series of subproblems s S that are derived from the MLCLSP-L in a systematic manner and that can be solved quickly. In each iteration of the decomposition algorithm we treat one such subproblem s S. For each subproblem s, most of the binary setup state variables γ kt are set to a fixed value γ fix kt. The same holds true for the binary setup carry-over variables ω kt, which are set to ω fix kt. This leads to a very limited number of non-fixed binary variables which are optimized in a given subproblem. A standard MIP solver is then used to solve the subproblem to optimality. From the solution of the subproblem we determine the new temporary solution for the binary setup variables. The next iteration of the algorithm treats a new subproblem with a different subset of fixed binary variables. However, in each subproblem we consider the complete set of real-valued decision variables. This eliminates the need to freeze a subset of the real-valued decision variables as well as to take care of end-of-horizon effects as in approaches with internally rolling schedules, e. g. the one proposed by Stadtler (2003). Note that our approach differs from a Relax-and-Fix heuristic (Pochet and Wolsey 2006, pp. 109) as we never deal with relaxed binary setup variables in our subproblems. 10

4.2 Definition of subproblems In order to define a subproblem, we use the additional notation shown in Table 2. Table 2: Additional notation for the definition of a subproblem Sets: (k, t) KT set of all product-period combinations KT opt γ,s KT set of product-period combinations for which binary setup state variables γ kt are optimized in the current subproblem (KT = K T ) KT opt ω,s KT set of product-period combinations for which binary setup carryover variables ω kt are optimized in the current subproblem KT fix γ,s KT set of product-period combinations for which binary setup state variables γ kt are fixed in the current subproblem KT fix ω,s KT set of product-period combinations for which binary setup carryover variables ω kt are fixed in the current subproblem Parameters: γ kt exogenous value of the fixed setup state variables γ kt ω kt exogenous value of the fixed setup carry-over variables ω kt estimated costs associated to product k Z k A subproblem MLCLSP-L-SUB is derived from model MLCLSP-L simply by adding the constraints γ kt = γ kt ω kt = ω kt (k, t) KT fix γ,s. (18) (k, t) KT fix ω,s. (19) This reduces the solution space with respect to the binary variables to the sets KT opt γ,s = KT \ KT fix γ,s and KT opt ω,s = KT \ KT fix ω,s. We are aware that this is not the mathematically most compact form to state the model. However, modern solvers automatically detect and resolve the redundancies of the current formulation. In our algorithm, we decompose the original problem into ordered sets s S of subproblems. The relative number s = KT opt γ,s + KT opt ω,s 2 KT (20) of non-fixed binary variables in subproblem s determines to which degree the lot sizing decision w. r. t. to products and periods are made simultaneously in an in- 11

stance of model MLCLSP-L-SUB. The larger s is for a given instance of problem MLCLSP-L-SUB, the more time-consuming is the solution process and the higher will be the quality of the solution. If an instance s of problem MLCLSP-L-SUB contains only few non-fixed setup variables, i.e, 0 < s 1, these should be selected very carefully, as there should be strong interdependencies between these variables in order to offer trade-offs to be used within the optimization. We propose the following three ways of decomposing the problem into ordered sets s S of subproblems: Product-oriented decomposition: In this type of decomposition, in a given subproblem s all binary setup state variables γ kt are optimized for a single product k over the complete planning horizon T. In addition, we optimize all binary setup carry-over variables ω kt for all products k K j(k) that require the same resource j(k) as product k. Resource-oriented decomposition: Here, with respect to the setup state variables γ kt, each subproblem s is defined for a (single) resource j and a time window of four consecutive periods. Unless this time window contains the first or last period, the setup carry-over variables ω kt refer to all the periods within this time window and the one period immediately following the current time window. Assume, for example, that in the current subproblem we are dealing with the setup states in periods 3, 4, 5 and 6. Then we would consider setup carry-overs from periods 3 to 7, again for all products k K j. In two successive subproblems s related to the same resource j we use an overlap of two periods, e.g. periods 1 to 4 for the first subproblem, periods 3 to 6 for the second one etc. Process-oriented decomposition: With respect to the input-output-relationships between products, in each subproblem s we consider the setup state variables γ kt of product k and one of its immediate successors i N k for a subset of periods t. For each edge in the BOM graph we define two successive subproblems s such that the first one covers the first half of the planning 12

horizon and the other one the second half. In addition, we consider the setup carry-over variables ω kt for all products k that require either the same resource as product k or as product k s immediate successor i, i. e. k (K j(k) K j(i) ). From these setup carry-over variables we consider the subset defined for the first half of the periods plus the immediately succeeding period in the first subproblem (periods 1 to 5 in our example) and the second half (periods 5 to 8) in the second subproblem. Note that each type of decomposition reflects a specific perspective on the overall optimization problem. The decomposition types are combined in the following four variants of our algorithm: Variant 1: Product-oriented decomposition only Variant 2: Product-oriented decomposition first, then resource-oriented decomposition Variant 3: Product-oriented decomposition first, then process-oriented decomposition Variant 4: Product-oriented decomposition first, then resource-oriented decomposition, finally process-oriented decomposition We observed that it can be worthwhile to treat each subproblem more than once, in particular until a local optimum is reached, which suggests an iterative layout of the heuristic. The product-oriented decomposition is the first step in all four variants of the algorithm. In this type of decomposition, we found it useful to start with those products that are responsible for most of the costs. To compute product-specific costs, we allocate overtime costs proportionally to the capacity requirements of the products. Given that the latter are not known in advance, we estimate productspecific costs Z k from the solution of the LP-relaxation of problem MLCLSP-L for 13

each product type as follows: Z k = t T + t T (s k (γ rel kt ω rel kt ) + h k Y kt ) [ tpk Q kt + ts k (γ rel kt i K j(k) t T [ ωkt rel)] t T [ tpi Q it + ts i (γ rel it oc j(k),t O j(k),t ] ω rel it )] (21) where γ rel kt and ω rel kt are the optimum values of the binary setup variables γ kt and ω kt in the LP-relaxation and Q kt, Y kt and O j(k),t are the corresponding optimum values of the other decision variables (lot sizes, inventory, overtime). In this cost allocation scheme, the cost of overtime is charged to the products proportionally to the capacity usage of the respective resource. We order the products according to decreasing Z k in the ordered set S of subproblems for the product-oriented decomposition. 4.3 The algorithm The basic structure of our method is outlined in Algorithm 1. At the beginning, we assume that each resource has the required setup state for all products it can possibly produce during each period. Given this setup state pattern, we initially determine production quantities, inventory levels, planned overtime and a first setup carry-over pattern. This initial solution yields an initial objective value Z new. Particularly in the presence of setup times, this solution may be economically unattractive, but we observed that the iterative algorithm prices out unnecessary setups and overtime quickly. After the initialization, the algorithm iterates through the ordered set of subproblems according to the selected variant of the algorithm (1 to 4, see above) either once (l max = 1) or until it reaches a local optimum (l max = ). Then it terminates and reports the solution that leads to the local optimum Z old. Note that each solution to a subproblem s yields an objective value Z that is at least as good as the currently best value Z old. For this reason, a new solution is only accepted if it yields lower cost than the currently best solution. We use a boolean variable CapF eas to indicate whether a capacity feasible solution has already been 14

found. A capacity infeasible solution (with overtime) is never accepted as a new solution if there is a known capacity feasible solution already. Algorithm 1 Fix-and-optimize algorithm γ kt = 1, (k, t) KT KT fix γ,s KT KT fix ω,s solve MLCLSP-L-SUB and determine objective function value Z Z new = Z ω kt = ω kt, (k, t) KT if j J t T O jt = 0 then CapF eas= yes else CapF eas= no end if l = 0 repeat l = l + 1 Z old = Z new for each decomposition S in the current variant of the algorithm do for each subproblem s S do determine KT opt γ,s and KT fix γ,s = KT \KT opt γ,s for subproblem s determine KT opt ω,s and KT fix ω,s = KT \KT opt ω,s for subproblem s solve MLCLSP-L-SUB and determine objective function value Z if j J t T O jt = 0 then CapF eas new = yes else CapF eas new = no end if if Z < Z old and {CapF eas new or [not(capf eas new ) and not(capf eas)]} then γ kt = γ kt, (k, t) KT opt γ,s ω kt = ω kt, (k, t) KT opt ω,s Z new = Z if CapF eas new then CapF eas= yes end if end if end for end for until l = l max or Z new = Z old 15

5 Numerical Results 5.1 Test sets and reference values In order to evaluate the solution quality of the proposed algorithm, we used test instances developed and explained in detail by Tempelmeier and Buschkühl (2008). A total number of 1,920 different problem instances with up to 40 products, 16 periods, and 6 resources are grouped into six classes as described in Table 3. A detailed description of the test instances is downloadable from http://www.scmp.unikoeln.de/publikationen/ors2008mlclspl.zip. Table 3: Dimensions of the test sets Products Demand periods Resources Test instances Class 1 10 4 3 480 Class 2 10 8 3 480 Class 3 20 8 6 240 Class 4 20 16 6 240 Class 5 40 8 6 240 Class 6 40 16 6 240 We compare our results to the lower and upper bounds obtained by a truncated Branch&Bound method using CPLEX 10.0 on a Unix workstation with eight parallel UltraSPARC-III-processors with 0.9 GHz each. Furthermore, we used the simple plant location reformulation of the MLCLSP-L. In many cases we were unable to compute the optimal solution within a given time limit of one CPU hour for each problem instance. The Fix-and-Optimize algorithm was implemented in Delphi on a 2.13 GHz Intel Pentium Core2 machine, whereby the CPLEX 10.2 callable library was used to solve the different instances of Problem MLCLSP-L-SUB. Depending on the variant of the algorithm as described in Section 4, in each instance of Class 1, 10% to 60% of the binary setup variables are considered simultaneously, i.e. 0.1 s 0.6 in any one instance of Problem MLCLSP-L-SUB. This fraction of the optimized binary variables decreases for larger problem instances with more products and periods. In Class 2 only 10% to 33.1% of the binary variables were optimized in a single instance of Problem MLCLSP-L-SUB. Furthermore, in Class 3, 10% to 36.3%, and in Class 4, 5% to 9.1% of the binary variables are 16

determined simultaneously. For Class 5, this range was 2.5% to 21.6% of the binary variables and 2.5% to 10.8% in Class 6. 5.2 Analysis of the numerical results The numerical results are presented in Tables 4 to 6. We report the following values for the four variants of the algorithm: ADUB denotes the average relative deviation of the solution from the upper bound obtained by the truncated Branch&Bound approach as explained above. ADLB denotes the average relative deviation of the heuristic solution from the strongest lower bound for the truncated Branch&Bound process. Feas is the fraction of problem instances, for which a feasible solution, i. e. a solution without overtime, could be found. Finally, Time is the computation time in CPU seconds. Table 4: Results for Class 1 and Class 2 Problem Class 1 Problem Class 2 ADUB ADLB Feas Time ADUB ADLB Feas Time [%] [%] [%] [sec] [%] [%] [%] [sec] Single iteration (l max = 1) Var 1 1.47 1.47 100.00 0.08 1.38 1.39 100.00 0.18 Var 2 0.18 0.18 100.00 0.11 0.33 0.34 100.00 0.41 Var 3 1.41 1.41 100.00 0.20 1.28 1.28 100.00 0.47 Var 4 0.18 0.18 100.00 0.24 0.33 0.33 100.00 0.70 Multiple iterations (l max = ) Var 1 0.74 0.74 100.00 0.12 0.83 0.84 100.00 0.29 Var 2 0.12 0.12 100.00 0.18 0.23 0.24 100.00 0.60 Var 3 0.73 0.73 100.00 0.27 0.81 0.81 100.00 0.64 Var 4 0.12 0.12 100.00 0.31 0.22 0.22 100.00 0.88 17

Table 5: Results for Class 3 and Class 4 Problem Class 3 Problem Class 4 ADUB ADLB Feas Time ADUB ADLB Feas Time [%] [%] [%] [sec] [%] [%] [%] [sec] Single iteration (l max = 1) Var 1 1.34 1.34 100.00 0.51 0.91 1.37 100.00 1.09 Var 2 0.55 0.55 100.00 1.02 0.29 0.74 100.00 3.21 Var 3 1.16 1.16 100.00 1.51 0.78 1.24 100.00 3.11 Var 4 0.52 0.52 100.00 2.10 0.27 0.73 100.00 5.23 Multiple iterations (l max = ) Var 1 0.81 0.81 100.00 0.83 0.58 1.04 100.00 1.77 Var 2 0.39 0.39 100.00 1.51 0.15 0.61 100.00 4.57 Var 3 0.80 0.80 100.00 1.98 0.56 1.02 100.00 4.18 Var 4 0.37 0.38 100.00 2.67 0.15 0.60 100.00 6.94 Table 6: Results for Class 5 and Class 6 Problem Class 5 Problem Class 6 ADUB ADLB Feas Time ADUB ADLB Feas Time [%] [%] [%] [sec] [%] [%] [%] [sec] Single iteration (l max = 1) Var 1 1.49 1.73 100.00 1.59 0.90 1.55 100.00 3.86 Var 2 0.60 0.83 100.00 2.71 0.32 0.97 100.00 8.57 Var 3 1.00 1.23 100.00 5.20 0.58 1.22 100.00 12.11 Var 4 0.50 0.72 100.00 6.56 0.25 0.89 100.00 16.76 Multiple iterations (l max = ) Var 1 0.75 0.98 100.00 2.65 0.47 1.12 100.00 5.97 Var 2 0.44 0.67 100.00 4.28 0.24 0.88 100.00 13.03 Var 3 0.65 0.88 100.00 7.00 0.40 1.04 100.00 15.88 Var 4 0.38 0.61 100.00 8.82 0.19 0.83 100.00 23.56 We observe the following: The Fix-and-Optimize Heuristic determined a feasible solution for all test instances. Furthermore, in the case of Variant 1 (productoriented decomposition) the solution found after a single iteration leads to a maximum average deviation within a problem class of 1.5% from the lowest-known upper bound. Furthermore, a single iteration of Variant 2 (resource-oriented decomposition) results in a better solution quality than multiple iterations of Variant 1. Variant 2 outperforms Variant 3 (process-oriented decomposition). However, a combi- 18

nation of both (Variant 4) leads to better solutions than Variant 2. Taking all problem classes together, the average deviation of the solution obtained with Variant 4 from the best-known upper bound is less than 0.5%. As expected, the solution time increases with the number of binary variables. Still, even in Class 6, our solution approach needs only 23.5 CPU seconds on average to generate high-quality solutions. 6 Conclusions and Outlook We have presented an algorithm to solve the MLCLSP-L with multi-period setup carry-overs. In the underlying model we assume a lead time of one period between production stages in order to guarantee that the production plans can be consistently disaggregated into a detailed schedule. The algorithm was tested against a large set of test problems. It appears that the crucial component of the algorithm is the selection of a good subset of products and periods over which the setup carry-over variables are optimized. If this subset fits well to the respective subset of setup state variables, the Fix-and-Optimize approach appears to work very well. Future work will address the case of parallel machines, which makes the MLCLSP- L formulation much more relevant for industrial applications. If multiple identical machines within a machine group exist, it may be economically attractive to have some machines continuously setup over several periods for a product with high regular demand while the setup of the other machines producing products with low and erratic demand is frequently changed. It might also be interesting to apply the Fix-and-Optimize approach to other small-bucket lotsizing models and to incorporate the limited capacity of the setup operators in the solution approach. Research in this direction is under way. 19

References Bahl, H. C., L. P. Ritzman, and J. N. D. Gupta (1987). Determining lot sizes and resource requirements: A review. Operations Research 35 (3), 329 345. Berretta, R. and L. F. Rodrigues (2004). A memetic algorithm for a multistage capacitated lot-sizing problem. International Journal of Production Economics 87 (1), 67 81. Billington, P. J. (1983). Multi-Level Lot-Sizing with a Bottleneck Work Center, Ph. D. Dissertation Cornell University. Cornell. Brahimi, N., S. Dauzere-Peres, N. M. Najid, and A. Nordli (2006). Single item lot sizing problems. European Journal of Operational Research 168 (1), 1 16. Buschkühl, L., F. Sahling, S. Helber, and H. Tempelmeier (2008). Dynamic capacitated lotsizing - a classification and review of the literature on big bucket problems. Dillenberger, C., L. F. Escudero, A. Wollensak, and W. Zhang (1993). On solving a large-scale resource allocation problem in production planning. In G. Fandel, T. Gulledge, and A. Jones (Eds.), Operations Research in Production Planning and Control, Berlin, pp. 105 119. Springer. Dillenberger, C., L. F. Escudero, A. Wollensak, and W. Zhang (1994). On practical resource allocation for production planning and scheduling with period overlapping setups. European Journal of Operational Research 75 (2), 275 286. Drexl, A. and A. Kimms (1997). Lot sizing and scheduling - survey and extensions. European Journal of Operational Research 99 (2), 221 235. Gopalakrishnan, M. (2000). A modified framework for modelling set-up carryover in the capacitated lotsizing problem. International Journal of Production Research 38 (14), 3421 3424. 20

Gopalakrishnan, M., K. Ding, J.-M. Bourjolly, and S. Mohan (2001). A tabu-search heuristic for the capacitated lot-sizing problem with set-up carryover. Management Science 47 (6), 851 863. Gopalakrishnan, M., D. M. Miller, and C. Schmidt (1995). A framework for modelling setup carryover in the capacitated lot sizing problem. International Journal of Production Research 33 (7), 1973 1988. Gupta, D. and T. Magnusson (2005). The capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times. Computers & Operations Research 32 (4), 727 747. Gupta, Y. P. and Y. Keung (1990). A review of multi-stage lot-sizing models. International Journal of Operations & Production Management 10 (9), 57 73. Haase, K. (1994). Lotsizing and scheduling for production planning. Berlin: Springer. Haase, K. (1996). Capacitated lot-sizing with sequence dependent setup costs. OR Spektrum 18 (1), 51 59. Haase, K. (1998). Capacitated lot-sizing with linked production quantities of adjacent periods. In A. Drexl and A. Kimms (Eds.), Beyond Manufacturing Resource Planning (MRP II) Advanced Models and Methods for Production Planning, pp. 127 146x. Berlin: Springer. Helber, S. (1995). Lot sizing in capacitated production planning and control systems. OR Spektrum 17, 5 18. Helber, S. and F. Sahling (2008). A fix-and-optimize approach for the multi-level capacitated lot sizing problem. Technical report, Institut für Produktionswirtschaft, Leibniz Universität Hannover, Königsworther Platz 1, D-30167 Hannover. Jans, R. and Z. Degraeve (2007). Meta-heuristics for dynamic lot sizing: a review and comparison of solution approaches. European Journal of Operational Research 177, 1855 1875. 21

Karimi, B., S. M. T. F. Ghomi, and J. M. Wilson (2003). The capacitated lot sizing problem: a review of models and algorithms. Omega 31, 365 378. Katok, E., H. S. Lewis, and T. P. Harrison (1998). Lot sizing in general assembly systems with setup costs, setup times, and multiple constrained resources. Management Science 44 (6), 859 877. Kuik, R., M. Salomon, and L. N. van Wassenhove (1994). Batching decisions: structure and models. European Journal of Operational Research 75, 243 263. Maes, J., J. O. McClain, and L. N. van Wassenhove (1991). Multilevel capacitated lotsizing complexity and LP-based heuristics. European Journal of Operational Research 53, 131 148. Maes, J. and L. van Wassenhove (1988). Multi-item single-level capacitated dynamic lot-sizing heuristics: A general review. Journal of the Operational Research Society 39 (11), 991 1004. Pitakaso, R., C. Almeder, K. F. Doerner, and R. F. Hartl (2006). Combining exact and population-based methods for the constrained multilevel lot sizing problem. International Journal of Production Research 44 (22), 4755 4771. Pochet, Y. and L. A. Wolsey (2006). Production Planning by Mixed Integer Programming. Heidelberg et al.: Springer. Quadt, D. (2004). Lot-Sizing and Scheduling for Flexible Flow Lines. Lecture Notes in Economics and Mathematical Systems 546. Springer. Quadt, D. and H. Kuhn (2005). Conceptual framework for lot-sizing and scheduling of flexible flow lines. International Journal of Production Research 43 (11), 2291 2308. Quadt, D. and H. Kuhn (2008). Capacitated lot-sizing with extensions: A review. 4OR: A Quarterly Journal of Operations Research 6 (1), 61 83. 22

Rossi, H. (2003). Ein heuristisches Dekompositionsverfahren für mehrstufige Losgrößenprobleme. Ph. D. thesis, Freie Universität Berlin, Fachbereich Wirtschaftswissenschaft. Salomon, M., L. G. Kroon, R. Kuik, and L. N. van Wassenhove (1991). Some extensions of the discrete lotsizing and scheduling problem. Management Science 37 (7), 801 812. Sox, C. R. and Y. Gao (1999). The capacitated lot sizing problem with setup carryover. IIE Transactions 31, 173 181. Stadtler, H. (2003). Multilevel lot sizing with setup times and multiple constrained resources: Internally rolling schedules with lot-sizing windows. Operations Research 51 (3), 487 502. Staggemeier, A. T. and A. R. Clark (2001). A survey of lot-sizing and scheduling models. In: 23rd Annual Symposium of the Brazilian Operational Research Society (SOBRAPO). Campos do Jordao SP, Brazil. S. 938 947. Sürie, C. and H. Stadtler (2003). The capacitated lot-sizing problem with linked lot sizes. Management Science 49 (8), 1039 1054. Tempelmeier, H. (2005). Material-Logistik. Modelle und Algorithmen für die Produktionsplanung und -steuerung in Advanced Planning-Systemen (6 ed.). Berlin: Springer. Tempelmeier, H. and L. Buschkühl (2008). A heuristic for the dynamic multi-level capacitated lotsizing problem with linked lotsizes for general product structures. OR Spectrum. DOI 10.1007/s00291-008-0130-y. Tempelmeier, H. and M. Derstroff (1996). A lagrangean-based heuristic for dynamic multilevel multiitem constrained lotsizing with setup times. Management Science 42 (5), 738 757. 23

Tempelmeier, H. and S. Helber (1994). A heuristic for dynamic multi-item multilevel capacitated lotsizing for general product structures. European Journal of Operational Research 75, 296 311. Wagner, M. H. and T. M. Whitin (1958). Dynamic version of the economic lot size model. Management Science 5, 89 96. Wolsey, L. A. (1995). Progress with single-item lot-sizing. European Journal of Operational Research 86, 395 401. 24