A Unique Metro Accident in Brazil Caused by Multiple Factors

Similar documents
Underground Excavation Design Classification

Geotechnical Monitoring for Safe Excavation of Large Rock Cavern: A Case Study

Introduction and Background

25th International Conference on Ground Control in Mining

Structurally controlled instability in tunnels

Further Research into Methods of Analysing the October 2000 Stability of Deep Open Pit Mines EXECUTIVE SUMMARY

DESIGN AND CONSTRUCTION OF LARGE

Building on Past Experiences Worker Safety

SLOPE STABILITY EVALUATION AND ACCEPTANCE STANDARDS

Session 3: Geology and Rock Mechanics Fundamentals

EXAMINATION PAPER MEMORANDUM

A new design approach for highway rock slope cuts based on ecological environment protection

Moglicë HPP - Albania. Jorge Terron

3/8/17. #20 - Landslides: Mitigation and Case Histories. Questions for Thought. Questions for Thought

Predicting rock conditions ahead of the face

Quantitative Classification of Rock Mass

14 Geotechnical Hazards

Section 19.1: Forces Within Earth Section 19.2: Seismic Waves and Earth s Interior Section 19.3: Measuring and Locating.

10. GEOTECHNICAL EXPLORATION PROGRAM

Ground Support in Mining and Underground Construction

Ground support modelling involving large ground deformation: Simulation of field observations Part 1

NNN99. Rock Engineering for the Next Very Large Underground Detector. D. Lee Petersen CNA Consulting Engineers

Application of Core Logging Data to generate a 3D Geotechnical Block Model

MEMORANDUM SUBJECT: CERTIFICATE IN ROCK MECHANICS PAPER 1 : THEORY SUBJECT CODE: COMRMC MODERATOR: H YILMAZ EXAMINATION DATE: OCTOBER 2017 TIME:

SUPPORT MEASURES EFFECTIVENESS DURING THE EXCAVATION OF SYMBOL MOUNTAIN S TUNNEL

Module 9 : Foundation on rocks. Content

SYLLABUS AND REFERENCES FOR THE STRATA CONTROL CERTIFICATE. METALLIFEROUS MINING OPTION Updated November 1998

An introduction to the Rock Mass index (RMi) and its applications

In-situ Experiments on Excavation Disturbance in JNC s Geoscientific Research Programme

Section Forces Within Earth. 8 th Grade Earth & Space Science - Class Notes

ROCK MASS PROPERTIES FOR TUNNELLING

Reservoir Geomechanics and Faults

Appendix 6 Geotechnical report

Weak Rock - Controlling Ground Deformations

Borehole Camera And Extensometers To Study Hanging Wall Stability Case Study Using Voussoir beam - Cuiabá Mine

Final design of Belesar III and Los Peares III Hydropower Projects. (Galicia, Spain).

Power Cavern Design & Back Analysis Using Phase 2

EMERGENCY INVESTIGATION OF EXTREMELY LARGE SINKHOLES, MAOHE, GUANGXI, CHINA

Is Stress Important to the Stability of Underground Wedges?

1 of 46 Erik Eberhardt UBC Geological Engineering ISRM Edition

SYLLABUS AND REFERENCES FOR THE STRATA CONTROL CERTIFICATE COAL MINING OPTION

Rock slope rock wedge stability

Chapter 6 Bearing Capacity

STRESSES AROUND UNDERGROUND OPENINGS CONTENTS

Special edition paper

REGARDING SOME DYNAMIC CHARACTERISTICS OF THE SOILS AND THE LIQUIFACTION POTENTIAL OF SANDS IN SOFIA

GROUND RESPONSE AND SUPPORT MEASURES FOR PIR PANJAL TUNNEL IN THE HIMALAYAS

Siva Bharatha Murthy. T Page 4.31

Flin Flon Mining Belt

Application of a transversely isotropic brittle rock mass model in roof support design

Yoshinori KAWAMURA, Oriental Consultants Global Co., Ltd.

Module 6: Stresses around underground openings. 6.2 STRESSES AROUND UNDERGROUND OPENING contd.

AGENDA ITEM 6 APPENDIX /0151/DET GROUND WATER & SURFACE WATER MANAGEMENT PLAN

Canada Line Project. Stability of the Twin Bored Tunnels Under False Creek. Vancouver, British Columbia

Two Case Studies on Soil Nailed Slope Failures

Geotechnical & Mining Engineering Services

ENGINEERING GEOLOGY AND ROCK ENGINEERING

Notes Week 1 Engineering Geology Problems

The Mine Geostress Testing Methods and Design

N.Nikolaev Antech TFA ltd, Sofia, Bulgaria. V.Parushev University of Mining and Geology, Sofia, Bulgaria. S.Nikolaev Antech TFA Ltd.

CONTROLLING FACTORS BASIC ISSUES SAFETY IN OPENCAST MINING WITH SPECIAL REFERENCE TO SLOPE STABILITY


NUMERICAL MODELLING OF THE BRUSNICE TUNNEL

An Hypothesis Concerning a Confined Groundwater Zone in Slopes of Weathered Igneous Rocks

Answers: Internal Processes and Structures (Isostasy)

GEOLOGY, SOILS, AND SEISMICITY

A STUDY ON THE BLASTING VIBRATION CONTROL OF CREEP MASS HIGH SLOPE

Available online at ScienceDirect. Procedia Engineering 191 (2017 )

Some Aspects on the Design of Near Surface. Tunnels - Theory and Practice. Thomas Marcher¹, Taner Aydogmus²

Methods of Interpreting Ground Stress Based on Underground Stress Measurements and Numerical Modelling

IAEA SAFETY STANDARDS Geotechnical Aspects of Site Evaluation and Foundations in NPPs, NS-G-3.6

Entrance exam Master Course

Use of monitoring data during construction to refine cavern design

The effect of discontinuities on stability of rock blocks in tunnel

CHAPTER FIVE 5.0 STABILITY OF CUT SLOPES IN THE STUDY AREA. them limited by a thick canopy of vegetation and steep slope angles.

ontribution of Geotechnical and Rock echanics design to vertical shaft nking and design

COMPARING THE RMR, Q, AND RMi CLASSIFICATION SYSTEMS

Eurocode 7 from soil mechanics to rock mechanics. Luís Lamas, LNEC, Lisbon, Portugal Didier Virely, CEREMA, Toulouse, France

Risk assessment of collapse in shallow caverns using numerical modeling of block interactions with DDA: Suggested approach and case studies

Background. Valley fills Sites in the Area. Construction over Mine Spoil Fills

Fracture pattern of anisotropic rock by drilling or cutting using the PFC

Landslide FE Stability Analysis

Slope Stability Evaluation Ground Anchor Construction Area White Point Landslide San Pedro District Los Angeles, California.

Finite difference modelling in underground coal mine roadway

Roadway Support Technology with Sliding Cracking Surrounding Rock under Tectonic Stress

J.V. Herwanger* (Ikon Science), A. Bottrill (Ikon Science) & P. Popov (Ikon Science)

Successful Construction of a Complex 3D Excavation Using 2D and 3D Modelling

Observational Methods and

Monitoring longwall weighting at Austar Mine using microseismic systems and stressmeters

GIBE II TUNNEL PROJECT - ETHIOPIA - 40 BARS OF MUD ACTING ON THE TBM

ON THE FACE STABILITY OF TUNNELS IN WEAK ROCKS

Advanced numerical modelling methods of rock bolt performance in underground mines

ENCE 3610 Soil Mechanics. Site Exploration and Characterisation Field Exploration Methods

Earthquakes and Earth s Interior

Brittle Deformation. Earth Structure (2 nd Edition), 2004 W.W. Norton & Co, New York Slide show by Ben van der Pluijm

Critical Borehole Orientations Rock Mechanics Aspects

HOOVER DAM: Grout Curtain Failure and Lessons Learned in Site Characterization

ENGINEER S CERTIFICATION OF FAULT AREA DEMONSTRATION (40 CFR )

Tsukuba, Japan International Institute of Seismology and Earthquake Engineering Building Research Institute STUDY TRIP TO ITAKO CITY

Rock slope stability planar shear failure

Transcription:

A Unique Metro Accident in Brazil Caused by Multiple Factors 1

MAIN CAUSES OF ACCIDENT Ridge of jointed rock exactly along cavern roof Ridge of rock missed by drilling due to low spot Weathering of sides of ridge of rock preventing arching above cavern roof Discontinuity under Rua Capri (favourable orientation in normal circumstances) Water cracked sewage pipe/flowing after collapse Unusually high precipitation in December 2006 Undetected clay below and behind part of left wall Coincidences of location and time (also for victims) 2

Location (next to 7 traffic lanes and railway) 3

Eleven boreholes around shaft and eastern station cavern Exceeds international norm: L borehole / L tunnel by a factor of 2 to 4 4

WHAT WAS EXPECTED ON AVERAGE CONCERNING ROCK COVER 5

Borehole SM 8704 drilled near centre of (future) station cavern. Rock encountered at 18 m depth, at elevation 706m. (3 m above cavern roof) Low rock cover confirmed same as mean of five holes nearest cavern (see next two holes also!) 6

Note consistent 17 to 18 m of soil and saprolite in closest boreholes 8702 and 8703 7

EXTRAORDINARY REALITY: SUB SURFACE RIDGE OF ROCK UNDETECTED (grossly simplified here) Most of collapsed rock in centre of cavern fell 10 m, reaching elevation 704 707 m, i.e. 1 to 4m above the (original) cavern arch. (Rock elevation contrast omitted from public institution report) 8

SCHEMATIC OF WHY RIDGE of ROCK WAS MISSED WHEN DRILLING (drawings of fallen top 5 6 m omitted from public institution report) 9

SOME NECESSARY CHAINAGES FF marks the eastern boundary a steep discontinuity 10

Principal components of the collapse 11

View of cavern floor 15 months later 12

Some details of the complex geology 13

Example of facemapping in cavern Notably RMRparameter recordings, and joint set descriptions including clay in principal and secondary joints 14

ROCK QUALITY LOGGING (Six of the face logs) The core of better quality rock was indistinct close to the shaft Increased volume of good rock in direction of Rua Capri (towards the East) 15

Lattice girder count at two of the mapped sections RMR rock class values of the core (B) and the surrounding rock (A) on right. Tassometer deformations were 15 mm and 21 mm at these locations. 16

Increased volume of Class III rock as Rua Capri was approached. (Reduced grout take consistent with this). (String model, 8 th Feb 2007) 17

Independent Q logging, following collapse; range 0.1 to 4, similar to cavern logging, and similar to IPT logging for São Paulo Metrô from 1996 1997. 18

Q logging of 7 nearest holes, see numbers 1 to 7 with Q calculation for 5 holes along station cavern 19

CROSS HOLE VELOCITY : SOLUTION with LESS NOISE AT INSTRUMENT HORIZONS. ONLY JUSTIFIED WHERE PROBLEMS ANTICIPATED DRILLING AT PINHEIROS DID NOT GIVE EVIDENCE OF PROBLEMS. (Vp/km gradient = 1/s = 2.0/0.01 = 200 (= exceptionally high). 20

Approximate correspondence between IPT cross hole seismic at the Marginal, and Q logging results for five nearest boreholes 21

HEAVY PRIMARY SUPPORT WAS USED FOR THE STATION ARCH Cambota and recessed elephant feet support the top heading 22

Due to assumed low rock cover (3 m): lattice girders @ 0.85 m c/c + 35 cm S(fr) for temporary support of top heading (A cheaper B+S(fr) design was rejected) 23

One of the most robust support methods from the Q system: RRS (rib reinforced shotcrete) would also have failed under the Pinheiros ridge of rock loads and there was assumed to be insufficient rock cover for efficient bolt action 24

Possible clue concerning Pinheiros collapse geometry, from distant IPT seismic profile: with Rua Capri, houses, and boundary discontinuity superimposed. (Note lack of velocities due to problems with noise, differentially weathered steep structures). 25

An imagined sequence of increasing sub surface differential weathering 26

An advanced stage of weathering: a wedge shaped ridge surrounded by clay 27

Relic joint structures in overlying saprolite assumed to have contributed to loading 28

Core stone phenomena in massive granites (drawing from Linton, 1955 more jointing deeper saprolite) 29

POST COLLAPSE EXCAVATION REVEALS LIKELY COLLAPSE MECHANISMS 30

Nominal cota 704 m on either side of the cavern. Fallen materials towards centre 31

Cota 705 707 m, estaca 7.085 m. Example of fallen core material. Has fallen 9 to10 m but still has a top elevation of 706.5 m (approx.) Previously at elevation 716, or 10 m above assumed (drilling determined) levels. 32

The smooth and weathered appearance of the edge of the fallen rock 33

Folded lattice girders due to footing failure next to left wall (early chainage only). Pre grouting tubing holds block together. 34

Evidence for elephant footing failure, due to inwards displacement of wall S(mr). 35

Crushed excavator Damage is indirect evidence of the many thousands of tons of fallen rock 36

Folded arch/wall/arch support 37

TENSILE FAILURE OF CAMBOTA STEEL (along Abril: left side of cavern) 38

Some investigations of the potential failure mechanisms using numerical models 1. Elephant footing failure (cracking of rock) using FRACOD (Dr. Baotang Shen, Australia) 2. Overall cavern failure modelling (ridge of rock loading) using UDEC (Dr. Stavros Bandis, Greece) 39

FRACOD (BEM fracture mechanics) modelling of possible rock cracking below elephant-feet (from 100, 250 or 500 tons/m loading) Examples of cracking WITHOUT and WITH joints present 40

FRACOD results: three loading levels (2.5, 6 and 12 MPa) three UCS assumptions (16, 10 and 5 MPa) three deformation moduli assumptions (8, 5, 2.5 GPa) 41

Modelled footing displacements. Thinnest lines for the weakest rock (5MPa) Thickest lines for the strongest rock (16 MPa) 42

Input data suggestions to numerical modellers: Dr. Shen, Dr. Bandis 43

The UDEC model on the left did not cause collapse: the increasingly thick wedge of weathered material (red colour) seen on the right was required. 44

Preliminary modelling without rock support 45

Recognisable maximum deformation of 21 mm. Heavy loading of support is (of course) modelled. 46

Axial forces (blue fence ) and bending moments (red fence ). Deformation only 26 mm, until plastic hinges were softened. ( Elephant footing failure also commencing) 47

N M interaction diagram. Points beyond the red curve are treated as plastic hinges and are softened. General failure commences. 48

Ultimate failure of support: deformation vectors 49

This block diagram now shows loss of contact on left of ridge 50

Finally the assumed triggering mechanism Water and water pressure from cracked pipe Located at rear discontinuity, beneath R. Capri Change of cross section just before discontinuity D=1000mm 700mm: A1/A2 = 2.0 Assumed source of water pressure rise Water flowing from cracked pipe after collapse (Unusually high rainfall in December 2006) Clay deformation softening pore pressure effect? 51

700 mm diameter sewage pipe presumed cracked by down dip shearing, when the cavern arch approached and passed 20 m below this discontinuity. 52

The fractured pipe that may have supplied the various adverse geological structures with water and water under pressure. (We now know that FF was not a fault, just a major discontinuity) 53

The storm drain that fate determined should cross the geological discontinuity surface (red) at the rear 54

CONCLUSIONS and RECOMMENDATIONS 1. The physical impossibility of performing necessary but unreasonable levels of sub urban site investigation will prevent the execution of shallow city metro projects, unless a limited level of risk is accepted. 2. Elimination of risk would involve socially and commercially unacceptable degrees of disturbance beneath too many roads and buildings. 3. Deeper construction from the underground, as practiced of necessity in many cities lacking suitable geology, could be a future, cheaper, and safer solution for São Paulo, and would also result in less settlement damage. 4. Rock conditions for tunnelling are invariably more favourable at depth, whereas the near surface is more unpredictable due to the effects of deep weathering and locally reduced rock quality. 5. It is too optimistic to expect almost zero risk just because of numerous prior projects in a city, or because of the insight of talented geologists. 55

END 56