A B C PAD A HIGHLIGHTS

Similar documents
SALAZAR ANNOUNCES AN UPDATED RESOURCE REPORT OF 5.53 MT INDICATED AND 1.46 MT INFERRED AT ITS HIGH GRADE VMS EL DOMO DEPOSIT

OSISKO METALS INTERSECTS 10.49% ZINC+LEAD OVER METRES AND 12.15% ZINC+LEAD OVER METRES AT PINE POINT

NEWS RELEASE NOVEMBER 15, 2018 HANNAN COMPLETES DRILLING AT BALLYHICKEY, DEFINES SIGNIFICANT ZINC TARGET AT KILMURRY, CO.

BOREAL EXPANDS DISCOVERY ZONE OF HIGH-GRADE ZINC, SILVER AND LEAD MINERALIZATION AT GUMSBERG PROJECT IN SWEDEN

NEWS RELEASE. Foran Intersects Over 28 Metres of Copper Mineralization

NEWS RELEASE. FORAN INTERSECTS 9.4% ZINC OVER 6.1 METRES Feasibility Drilling Continues

EXPLOR INTERSECTS MULTIPLE COPPER ZONES GRADES UP TO 3.65% CU OVER 5.35 METERS ON THE CHESTER COPPER PROPERTY

Spruce Ridge Resources Ltd Leslie Road West, Puslinch, ON N0B 2J0 Telephone: (519) , Fax: (519)

Hole (93) From (m) To (m) m Au (g/t) Ag (g/t) Cu (%) Pb (%) Zn (%) CMLP

NEWS RELEASE. Foran Completes Winter Program with High-Grade Copper and/or Zinc in All Holes Drilled at Bigstone

NEWS RELEASE. Foran Mining Intersects High Grade Zinc at McIlvenna Bay. Results expand area of known mineralization

(TSXV: GPLY, OTCQB: GLYXF

Skeena Intersects g/t AuEq over metres at Eskay Creek

HANNAN SEISMIC SURVEY IDENTIFIES MULTIPLE NEW DRILL TARGETS IN IRELAND

Murchison Minerals Ltd. Advancing High-Grade Zinc-Copper Project. Saskatchewan Geological Open House November 29, 2017

FALCO PACIFIC COMPLETES INITIAL MODEL FOR THE HORNE 5 GOLD/SILVER/ZINC/COPPER DEPOSIT

Drilling Extending Mineralization in La Mina North Zone

Highlights from the four holes announced in this news release include:

GOLDPLAY ANNOUNCES FURTHER SAMPLING RESULTS FROM SAN MARCIAL HISTORICAL CORE; CONFIRMS OPEN PIT TARGET NEAR SURFACE WITH gpt AgEq.

IDM Mining s Underground Drilling Intersects g/t Au and g/t Ag over 6.80 Meters True Width at the Red Mountain Gold Project

NEWS RELEASE FORAN INTERSECTS 27 METRES OF CONTINUOUS MINERALIZATION

Drilling Extending Mineralization in La Mina North Zone

Plateau Extends Falchani East Lithium Deposit Community Agreements Executed and Three Drill Rigs Active at Falchani West

Salazar intersects metres (13.07m true) averaging 2.65 g/t gold, g/t silver, 1.32% copper, 6.63% zinc at its Curipamba Project.

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AND g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

October 8, 2015 News Release Brucejack Regional Drilling Intersects Over 8,000 Grams Per Tonne Gold

BELO SUN RELEASES RESULTS FROM 65 DRILL HOLES FURTHER EXTENDING THE OURO VERDE DEPOSIT ALONG STRIKE NORTHWEST AND DOWN DIP

Pahtavaara Drill Program Intersects 32.8 G/T Gold Over 2.0M And 2.1 G/T Gold Over 18.0M In The Karoliina Zone

REGULUS DISCOVERS NEW GOLD-RICH, HIGH-GRADE COPPER-GOLD ZONE AT RIO GRANDE

QMX GOLD CONTINUES TO INTERSECT STRONG MINERALIZATION AT BONNEFOND, INTERSECTING 39.5 g/t Au OVER 2.4 METRES AND 31.5 g/t Au OVER 1.

Red Pine Releases Inferred Resource Report Improves Grade and Tonnage for Wawa Gold Project

Highlights include: Hole TTD050: 6.12 g/t Au over 7.00 metres from metres o Including g/t Au over 1.18 metres

GOLD REACH (GRV) ANNOUNCES A 141% INCREASE IN INDICATED AND 91% INCREASE IN INFERRED RESOURCES AT SEEL

V Sample from C.O.D vein 15 metres southwest of V

MEXICAN GOLD INTERSECTS 7.18 G/T GOLD EQUIVALENT (2.00 G/T AU, G/T AG, 3.05 % CU) OVER 14.0 METERS AT LAS MINAS DIKE CONTACT ZONES

Canadian Gold Miner Grab Sample Returns 29.5 Grams per tonne Gold from South Kirkland Project

AUGUSTINE VENTURES ANNOUNCES HIGH GRADE GOLD BEARING TENSION VEINS IN THE HANGING WALL OF THE SURLUGA DEPOSIT

Surface Trenching Highlights. Santos Target. To (m) Width (m) Au (g/t) Comment. (m) Santos (1)-includes internal dilution

True Width (m) Carneritos to

NEWS RELEASE. September 30 th, Trading Symbols: GTP (TSX-V) P01 (FRANKFURT) COLTF (OTC Pink)

82 Richmond Street East Toronto, ON M5C 1P1 T: E: W: eskaymining.com

West Pender Street Vancouver, BC V6C 2V6 Tel: Fax: TSX-V: GBR NEWS RELEASE

SAVARY GOLD DRILLING EXTENDS KNOWN ZONES AND INTERSECTS SIGNFICANT GOLD MINERALIZATION AT FOUR NEW TARGETS

NORTHERN SUPERIOR RESOURCES INC. 1351C Kelly Lake Road, Unit 7 Sudbury, Ontario, Canada P3E 5P5 Tel: (705) Fax: (705)

Detour Gold Reports Drilling Results from Lower Detour

EL CONDOR IN-FILL DRILLING INTERSECTS 26.9 METERS 2.19% CU & 0.58% NI

PUMA EXPLORATION AND TREVALI MINING CORPORATION DRILLED 13.1% Zn, 4.8% Pb OVER 27.0 METERS AT MURRAY BROOK DEPOSIT

NEWS RELEASE TSX-V Ticker: SWA 23 April 2013 SWA.WT SARAMA RESOURCES EXTENDS HIGH-GRADE MINERALISATION AT MM PROSPECT IN BURKINA FASO

NEWS RELEASE. Tigray Intersects 28.2 metres at 8.50 grams per tonne gold at Mato Bula, Adyabo Project, Northern Ethiopia

Monument Announces NOA 7/8 Drilling Program Results at Burnakura Gold Project

COPPER MOUNTAIN COMPLETES PHASE 2 DRILL PROGRAM AT NEW INGERBELLE WITH CONTINUED POSITIVE RESULTS

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

BELO SUN INTERSECTS NEW HIGH GRADE ZONE AT GROTA SECA AND EXPANDS GRANDE DEPOSIT

North American Palladium Announces Positive Exploration Results from Lac des Iles Mine

Probe Metals Confirms Continuity of Gold Mineralization on its Val-d Or East Project And Increases 2017 Drill Program to 75,000 metres

Eloro Outlines Major New Mineralized Trend on La Victoria Project, Peru; Sample Results Return Values To 33 Grams Gold Per Tonne

CROCODILE GOLD INTERSECTS 7.1 G/T AU OVER 4.5 METERS INCLUDING 11.2 G/T AU OVER 2.6 METERS AT THE UNION REEFS PROJECT, PROSPECT DEPOSIT

23 January, 2018 CSE: RFR For Immediate Release. Renforth extends Parbec Gold Deposit strike 60m with gold in all 7 drillholes

The Inferred Mineral Resource Statement prepared by SRK for the Talbot Deposit is detailed below.

KIRKLAND LAKE GOLD ANNOUNCES 120 METRE DOWN-PLUNGE EXTENSION OF SWAN ZONE

Barsele Expansion drill hole AVA18013 at the Avan Zone intersects 21.0 metres grading 3.68 g/t gold.

Minsud to recommence resource outline diamond drilling at the Chita Valley Cu- Au-Ag-Mo Project, San Juan, Argentina

MEDIA RELEASE OCEANAGOLD ANNOUNCES FURTHER DOWN DIP EXTENSIONS OF MINERALISATION AT PANEL 2: FRASERS UNDERGROUND MINE

ET and and and

LME m averaging 0.65 g/t Au and 0.32% Cu, or 1.19 g/t Au Equiv LME m averaging 0.64 g/t Au and 0.11% Cu, or 0.

QMX GOLD INTERSECTS 29.8 G/T AU OVER 3.0 METERS AND 19.3 G/T AU OVER 3.2 METERS AT BONNEFOND

CALIFORNIA GOLD COMMENCES RESOURCE EXPANSION DRILLING AT NEW ZONE ON ITS FREMONT PROPERTY

Drilling Highlights: Phase II BCV Infill Drilling

Probe Metals Intersects 3.2 g/t Gold Over 45.5 Metres At Val-d Or East

Probe Metals Continues to Intersect Significant Gold Mineralization in Expansion Drilling at Val-d Or East, including 4.1 g/t Gold Over 15.

May 17, Two holes explored the extension at depth of the historic Sta Rosa vein

Toachi Mining Inc. Drills Four High Grade Gold-Copper-Zinc-Silver intercepts at the Gold-Rich La Plata VMS Project in Ecuador

PROJECT 81 Lucas Gold Deposit 2018 Winter Drilling Program Assay Results

Sherlock drilling returns best intercept to date of 0.63% Cu and 7.45 g/t Ag over m

Pacific Empire Minerals Provides Copper King RC Drilling Results

The new sulphide mineralization lies within a 1.4 kilometer long east-west trending

SABINA GOLD &SILVER REPORTS COMPLETION OF DRILLING AT ECHO DEPOSIT, BACK RIVER, NUNAVUT.

Colt Resources intersects 17.4% Cu over 0.42 metres (0.32 m true width) at Miguel Vacas Copper Project in its Borba exploration concession in Portugal

Sept 20, 2012 TSX Venture Exchange Tier 1 Trading Symbol: OK

Corvus Gold Drills g/t Gold, Extends Mother Lode Sediment Hosted Gold System to at Least 450 Metres Along Strike

GRAPHITE ONE DRILLS 165.3M of 4.23% GRAPHITE INCLUDING 46.4M OF 6.6%, 14.3M of 10.1% and 21M of 10.1% GRAPHITE

Hole ID From (m) To (m) Interval (m) Au (g/t) Ag (g/t) AuEq (g/t)* Zn (%)

55 Adelaide Street East, Suite St-Charles west, Suite 411, West Tower

EXCELLON ANNOUNCES LA PLATOSA EXPLORATION RESULTS: HIGH GRADES CONTINUE TO EXTEND MANTO SULPHIDES DRILL HOLE ENCOUNTERS SOURCE ENVIRONMENT INDICATORS

Copper Lake Samples g/t Gold and g/t Gold from the Queen Alexandra Gold Mine Property

U3O8 Corp. reports results of infill drilling at Aricheng C in the Kurupung Project, Guyana

STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE AT SYNDICATED S 100% BARBARA SOUTH LODE

TROILUS GOLD CORP. INITIATES 30,000 METRE DRILL PROGRAM ON TROILUS PROPERTY

Vendetta Reports Additional High Grade Drilling Results from Zones 2 and 3 at Pegmont Lead-Zinc Project

Probe Metals Continues to Expand Gold Zones At Val-d Or East

SilverCrest Expands Babicanora High Grade Footprint to 600 metres; New High Grade Vein Discoveries Highlight District Scale Potential

CHAMPION IRON REPORTS EXPLORATION RESULTS AT POWDERHORN PROJECT, NEWFOUNDLAND

InZinc Intersects 6.8m of 16.5% Zinc Focuses on Western Expansion of High Grades at West Desert Project

NEWS RELEASE CANADIAN ZINC REPORTS REMAINING DRILL RESULTS AT LEMARCHANT DEPOSIT, SOUTH TALLY POND PROJECT, NEWFOUNDLAND

BALMORAL INTERSECTS g/t GOLD OVER 7.99 METRES, BUG LAKE SOUTH, DETOUR GOLD TREND PROJECT, QUEBEC

FALCO ANNOUNCES INITIAL HORNE 5 DRILLING RESULTS. Confirmation Holes in Line with Historical Data

Assay Results Highlights (as of November 16, 2017) representing approximately 4,500 metres ( m ) of drilling:

July 15, 2015 News Release Valley of the Kings Underground Infill Drilling Progresses

BELO SUN DISCOVERS NEW MINERALIZED ZONE AT ITS VOLTA GRANDE GOLD PROJECT, BRAZIL

NEWS RELEASE FULLER PROPERTY CONTINUES TO DELIVER GOOD RESULTS 2.53 GRAMS PER TONNE GOLD OVER METRES

Transcription:

Murchison Minerals Intercepts 12.30% Zinc, 0.70% Copper, 0.18% Lead and 42.03 g/t Silver 14.97% ZnEq over 6.37 Metres and Extends Known Limits of Brabant McKenzie VMS Deposit June 25, 2018 (Toronto, Ontario): Murchison Minerals Ltd. (the Company ) (MUR TSXV) is pleased to announce the results of its 19 hole 9,004 metre 2018 winter diamond drilling program (the Program ) on its Brabant McKenzie Zinc Copper Silver deposit (the Deposit ), located in North Central Saskatchewan. HIGHLIGHTS Mineralization intercepted in all 19 completed drill holes Known limits of mineralization extended Results continue to demonstrate high grade nature and continuity of mineralization Developing new polymetallic zone identified above main mineralized zones Multiple zones of mineralization encountered Additional drill targets identified for potential tonnage additions to resources The Program was designed to test the robustness and predictability of the geological model in determining mineralization outside the known limits of the Deposit s previously reported resource estimate of 1.5 million indicated tonnes grading 7.46% zinc, 0.70% copper and 4.5 million inferred tonnes grading 5.99% zinc and 0.62% copper as outlined in the technical report filed on SEDAR, dated March 13, 2018 (the Technical Report ). The Program focused on testing the peripheral edges and infill drilling in areas of missing information identified within the Deposit in order to potentially expand the tonnage of the current inferred resource and, where possible, infill and upgrade inferred resources to the indicated category. The Program was also designed to, where possible, identify and test possible higher grade areas of the Deposit including a newly identified polymetallic zone located stratigraphically above the main mineralized zones. The Program was based on down hole geophysics and the new geological model and utilized 3 drill pads (A, B and C) established in the 2017 drill program (Figure 1). Volcanogenic massive sulphide (VMS) style zinc copper mineralization was intersected in all diamond drills holes with the exception of hole BM18 001A which was abandoned at 61 metres due to excessive deviation (Table 1 and 2). Figure 1 2018 Brabant McKenzie Project Drill Hole Location A B C View of 2018 Diamond Drill Holes in Plane of Mineralization BM18 015 BM18 011 BM18 016 BM18 010 BM18 014 BM18 013 BM18 017 BM18 018 BM18 019 BM18 007 BM18 004 BM18 005 BM18 008 BM18 001 BM18 009 BM18 003 BM18 002 PAD A B 2017 Indicated Resource of zinc equivalent greater than 5% 2017 Inferred Resource of zinc equivalent greater than 5% Approximate outline of geological model 2018 Drill hole trace Test of Northern edge of mineralization Deposit central lateral extent south Hangingwall polymetallic mineralization Image Source: TECVHNICAL REPORT ON THE RESOURCE ESTIMATE UPDATE FOR THE BRABANT MCKENZIE PROPRTY, BRABANT LAKE, SASKATCHEWAN, CANADA FOR MURCHISON MINERALS LTD. Toronto, Ontario, Canada Effective Date: September 27, 2017 C Deposit down dip and south lateral extent of mineralization Non Orthogonal Section in Approximate Plane of Mineralization Looking South East

Table 1 2018 Brabant McKenzie Project Diamond Drill Results Hole ID From To Interval Zn% Cu% Pb% Ag g/t Zn Eq (metres) (metres) (metres) BM18 001A hole abandoned BM18 001 611.04 614.17 3.13 1.92 0.19 0.00 5.50 2.43 BM18 002 574.65 581.61 6.96 0.80 0.50 0.06 19.63 2.28 including 578.38 578.87 0.49 4.56 0.08 0.01 7.30 4.88 BM18 003 590.01 591.15 2.90 2.93 0.22 0.02 6.79 3.54 BM18 004 431.87 434.43 2.56 2.32 0.38 0.15 34.98 3.91 including 432.10 432.43 0.33 12.20 0.19 0.00 7.50 12.74 BM18 005 445.50 450.40 4.90 2.66 0.36 0.02 7.78 3.57 BM18 006 not drilled BM18 007 621.00 621.36 0.36 10.90 0.63 0.01 14.30 12.50 BM18 007 622.85 623.25 0.40 7.24 0.06 0.02 9.28 7.57 BM18 008 460.24 462.85 2.61 10.95 0.52 0.01 11.86 12.26 BM18 009 473.35 484.13 10.78 1.58 0.48 0.01 12.75 2.83 including 473.35 474.24 0.89 5.28 0.39 0.02 10.28 6.30 including 476.84 478.40 1.56 1.85 1.41 0.02 37.11 5.52 including 481.16 482.84 1.68 3.14 0.85 0.01 22.71 5.38 BM18 010 221.16 232.82 11.66 2.37 0.72 0.07 28.68 4.48 including 225.08 228.22 3.14 5.12 0.83 0.01 19.05 7.24 BM18 011 269.72 275.06 5.34 2.10 1.69 0.01 32.18 6.26 including 273.72 275.06 1.34 4.20 3.22 0.01 58.28 12.05 BM18 012 303.98 304.65 0.67 12.10 0.64 0.01 16.00 13.75 BM18 012 308.79 311.95 3.16 1.00 1.24 0.01 34.16 4.27 BM18 012 318.67 319.66 0.99 7.37 0.43 0.06 19.17 8.69 BM18 013 308.40 308.70 0.30 12.80 0.17 0.01 6.30 13.29 BM18 013 315.70 316.70 1.00 3.34 1.14 0.02 24.70 6.21 BM18 013 351.00 354.00 3.00 4.50 0.36 0.10 16.14 5.65 BM18 014 322.60 324.50 1.90 0.71 0.45 0.01 7.52 1.80 BM18 015 214.66 215.13 0.47 19.70 1.24 0.00 17.40 22.62 BM18 015 218.82 219.13 0.31 12.30 0.23 0.00 6.30 12.90 BM18 015 219.95 220.36 0.41 4.44 0.36 0.00 5.30 5.29 BM18 016 249.90 250.32 0.42 11.00 0.06 0.00 4.80 11.22 BM18 017 357.60 363.00 5.40 6.35 0.68 0.47 63.09 9.39 BM18 017 379.60 383.60 4.00 8.11 0.47 0.67 72.62 11.06 BM18 017 416.10 417.90 1.80 11.89 1.09 0.41 67.18 15.82 BM18 018 400.20 401.45 1.25 5.68 0.45 0.53 59.46 8.22 BM18 019 497.40 503.77 6.37 12.53 0.70 0.18 42.03 14.97 Length density weighted intercepts. Holes were drilled to attempt intercept perpendicular to lens/mineralization. Actual true thickness may be less than intercepts reported. ZnEq is based on zinc = $1.20/lb, copper = $2.50/lb, lead = $1.00/lb and silver = $16/oz.

Table 2 2018 Brabant McKenzie Drill Hole Locations Hole Number Easting Northing Elevation Dip Az Start TD (metres) (metres) BM18 001A 580,393.00 6,221,095.00 376.00 62.14 77.50 61.00 BM18 001 580,393.00 6,221,095.00 376.00 62.14 77.50 675.00 BM18 002 580,390.00 6,221,081.00 376.00 124.15 80.26 693.00 BM18 003 580,393.00 6,221,095.00 376.00 148.15 59.03 549.00 BM18 004 580,393.00 6,221,095.00 376.00 125.80 53.15 537.00 BM18 005 580,393.00 6,221,095.00 376.00 138.35 46.60 549.00 BM18 007 580,390.00 6,221,093.00 381.00 58.92 71.55 747.00 BM18 008 580,393.00 6,221,095.00 376.00 110.00 57.00 546.00 BM18 009 580,393.00 6,221,095.00 376.00 136.98 70.27 600.00 BM18 010 580,889.00 6,221,339.00 386.00 148.80 43.83 276.00 BM18 011 580,879.00 6,221,337.00 383.00 10.75 83.27 348.00 BM18 012 580,632.00 6,221,084.00 386.00 130.00 48.00 387.00 BM18 013 580,632.00 6,221,084.00 386.00 145.00 54.00 399.00 BM18 014 580,632.00 6,221,084.00 386.00 155.00 53.00 399.00 BM18 015 580,896.00 6,221,334.00 390.00 42.00 73.00 390.00 BM18 016 580,895.00 6,221,331.00 390.00 222.00 88.00 348.00 BM18 017 580,632.00 6,221,084.00 386.00 62.00 67.00 450.00 BM18 018 580,632.00 6,221,084.00 386.00 96.00 76.00 447.00 BM18 019 580,632.00 6,221,084.00 386.00 0.00 90.00 603.00 Total 9,004.00 PAD A NORTHERN DEPOSIT EXTENT Four holes were drilled from Pad A and focused on the untested northern edge of the Deposit. All holes continued to demonstrate the zonation of elevated copper values in this area of the Deposit. BM18 010 intersected 11.66 metres of 2.37% zinc, 0.72% copper and 28.68 g/t silver (4.88% ZnEq) including 3.24 metres of 5.12% zinc, 0.83% copper and 19.05 g/t silver (7.25% ZnEq). BM18 011 intersected 5.34 metres of 2.10% zinc, 1.69% copper and 32.18 g/t silver (6.26% ZnEq). Additionally, BM18 15 and BM18 16 continued to show the continuity of the mineralizing system with significant zinc grade intercepts including 19.70% zinc over 0.47 metre, 12.30% zinc over 0.36 metre and 11.00% zinc over 0.42 metre.

PAD B Six diamond drill holes were drilled from Pad B tested the central, lateral extent of the Deposit to the south as well as a newly identified polymetallic zone. This zone could not be included in the Technical Report s resource estimate because of the poorly understood continuity of mineralization. All diamond drill holes intersected mineralization, usually in several zones and all continued to demonstrate the predictability and apparent continuity of the mineralizing system of the Deposit. DEPOSIT CENTRAL LATERAL EXTENT BM18 013 encountered multiple zones of mineralization including 3.00 metres of 4.50% zinc, 0.36% copper and 16.14 g/t silver (5.65% ZnEq). Additional intercepts included: 0.3 metre of 12.80% zinc, 0.17% copper, 6.30 g/t silver (13.75% ZnEq) and 1.00 metre of 3.34%, 1.14% copper, 24.70 g/t silver (6.21% ZnEq) BM18 012 intercepted multiple high grade intercepts of zinc and copper, including: 0.67 metre of 12.10% zinc, 0.64% copper, 16.00 g/t silver (13.75% ZnEq), 3.16 metres of 1.00% zinc, 1.24% copper, 34.16 g/t silver (4.27% ZnEq) 0.99 metre of 7.37% zinc, 0.43% copper, 19.17 g/t silver (8.69% ZnEq) POLYMETALLIC ZONES Diamond drill holes BM18 017, BM18 018, BM18 019 tested the polymetallic zone and encountered extensive mineralization in all three holes. BM18 019 encountered of 6.37 metres of 12.53% zinc, 0.70% copper and 42.03 g/t silver (14.97% ZnEq). BM18 017 intercepted multiple zones of high grade mineralization including: 5.40 metres grading 6.35% zinc, 0.68% copper, 63.09 g/t silver (9.39% ZnEq) and, 4.00 metres of 8.11% zinc, 0.47% copper, 72.62g/t silver (11.06% ZnEq) BM18 018 intercepted 1.80 metres of 11.89% zinc, 1.09% copper, 67.18 g/t silver, (15.82% ZnEq) PAD C Pad C was set up to test the southern down dip portion of the Deposit and add definition between widely spaced previous drill holes. A total of eight diamond drill holes were completed from this pad. DEPOSIT DOWN DIP INFILL Holes BM18 001, BM18 002, BM18 007, BM18 008, BM18 009 infilled the potential down dip extension of known mineralization in the area previously identified during the 2017 diamond drill program. As predicted in the geological model and confirmed by drilling, the continuity and high grade nature of the mineralization continues to be demonstrated to depth. Specifically, drilling confirmed that the

mineralization encountered at 950 metres down dip in the 2017 drilling appears contiguous with the main Deposit. BM18 008 focused on a high grade mineralized corridor identified in the geological model and successfully confirmed its down dip extent by intersecting 2.61 metres grading 10.95% zinc and 0.52% copper, 11.86 g/t silver (12.26% ZnEq) BM18 009 intersected 10.78 metres grading 1.58% zinc, 0.48% copper, 12.75 g/t silver (2.83% ZnEq) which included high grade intercepts of 1.56 metres of 1.85% zinc, 1.41% copper, 37.11 g/t silver (5.52% ZnEq) and 1.68 metres of 3.14% zinc, 0.85% copper, 22.71 g/t silver (5.38% ZnEq). High grade intercepts encountered in BM17 007 include 0.36 metre of 10.90% zinc, 0.63% copper, 14.30 g/t silver (12.50% ZnEq) and 0.40 metre 7.24% zinc, 0.06% copper, 9.28g/t silver (7.57% ZnEq). DEPOSIT SOUTHERN LATERAL EXTENT Diamond drill holes, BM18 003, BM18 004 and BM18 005 were drilled to test the lateral extent of the Deposit to the south. While all holes intersected mineralization, results currently suggest the limit of the Deposit is defined in this area. Mr. Kent Pearson, CEO stated, "We are excited about the results of this drill program, particularly the success in extending the Brabant McKenzie deposit s mineralization to depth. Additionally, we continue to be encouraged by the overall continuity and confirmation of the deposit s high grade nature. The results of this program provide important information to further our understanding of the deposit and indicate the presence of potential additional resources adjacent to those already known. Furthermore, additional diamond drill targets continue to be identified and show the deposit has further upside potential. The Company plans to provide an updated resource estimate for the Deposit using the results from the completed winter and proposed summer exploration programs as well as from further historical data compilation, geological modelling and interpretation. QA/QC The core was logged and split in a secured core logging facility. Individual samples were labelled, placed in plastic sample bags and sealed. Groups of samples were then placed in security sealed bags and shipped directly to the Saskatchewan Research Council Laboratories ("SRC") in Saskatoon, Saskatchewan for assay analysis. SRC used the ICP3 Base Metal Exploration Package for analysis. Check assays were undertaken by ALS Labs located in Vancouver B.C. Assay results for both methods were acceptable. SRC and ALS are independent of the Company. Both SRC and ALS are ISO17025 accredited. Qualifying Statement The foregoing scientific and technical disclosures have been reviewed and approved by Kent Pearson, P. Geo., and Finley Bakker P. Geo., and are qualified persons as defined by National Instrument 43 101. Mr. Bakker is an independent consultant to Murchison Minerals Ltd. and the Brabant McKenzie project. Mr. Pearson is President and Chief Executive Officer of Murchison Minerals Ltd. About the Brabant McKenzie Project The Brabant McKenzie project is located 175 km Northeast of La Ronge, Saskatchewan and approximately 3 km from the community of Brabant Lake. The area is accessed year round via Provincial Highway 102 and is serviced by grid power. The project consists of one mining lease which hosts the Deposit and an additional 15 mineral claims totaling 7,031 hectares which cover approximately 18 km of strike length over favourable geological horizons, multiple known mineralized showings and identified geophysical conductors.

The Brabant McKenzie Deposit hosts an indicated resource of 1.5 million tonnes grading 7.46% Zn, 0.70% Cu, 0.39% Pb, 31.16 g/t Ag, 10.09% ZnEq and an inferred resource of 4.5 million tonnes grading 5.99% Zn, 0.62% Cu, 0.39% Pb, 19.39 g/t Ag, 7.99% ZnEq as disclosed in the report dated November 25, 2017 and filed on SEDAR on March 13, 2018. About Murchison Minerals Ltd. Murchison Minerals Ltd. is a Canadian based exploration company focused on the exploration and development of the 100% owned Brabant McKenzie zinc copper project in North Central Saskatchewan. The Company also has the HPM nickel/copper/cobalt project in Quebec and gold projects in the Pickle Lake area of northwestern Ontario. Additional information about Murchison Minerals and its exploration projects can be found on the Company s website at www.murchisonminerals.com. For further information, please contact: Kent Pearson, President and Chief Executive Officer or Erik H. Martin, Chief Financial Officer info@murchisonminerals.com (416) 350 3776 Forward Looking Information Certain information set forth in this news release may contain forward looking information that involves substantial known and unknown risks and uncertainties. This forward looking information is subject to numerous risks and uncertainties, certain of which are beyond the control of the Company, including, but not limited to, the impact of general economic conditions, industry conditions, and dependence upon regulatory approvals. Readers are cautioned that the assumptions used in the preparation of such information, although considered reasonable at the time of preparation, may prove to be imprecise and, as such, undue reliance should not be placed on forwardlooking information. The parties undertake no obligation to update forward looking information except as otherwise may be required by applicable securities law. Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.