Press Release Thunder Bay: August 2, 2018

Similar documents
Premier Updates Mercedes Mine Exploration Over 45,000 Metres Drilled During the Year

Press Release Thunder Bay: December 20, 2016 Shares Issued: 201,313,187

V Sample from C.O.D vein 15 metres southwest of V

KIRKLAND LAKE GOLD ANNOUNCES 120 METRE DOWN-PLUNGE EXTENSION OF SWAN ZONE

San Gold Drills New Mine Horizon Adjacent to Rice Lake Mine, Returns 10.4 Metres Grading 25.7 g/t Au

News Release. Infill Drilling Program

June 4, 2015 News Release Valley of the Kings Underground Infill Drilling Underway

Cove Gold Project 2201 Discovery Update, May 2014

MCEWEN MINING ANNOUNCES EXPLORATION UPDATE FOR EL GALLO 1, MEXICO

MEXICAN GOLD INTERSECTS 7.18 G/T GOLD EQUIVALENT (2.00 G/T AU, G/T AG, 3.05 % CU) OVER 14.0 METERS AT LAS MINAS DIKE CONTACT ZONES

Wallbridge Completes Successful Initial Drill Program at Beschefer

Highlights include: Hole TTD050: 6.12 g/t Au over 7.00 metres from metres o Including g/t Au over 1.18 metres

North American Palladium Announces Positive Exploration Results from Lac des Iles Mine

July 15, 2015 News Release Valley of the Kings Underground Infill Drilling Progresses

Strategic Phase 2 Exploration Program Launched at Island Gold High-Grade Resource Potential Identified Laterally and at Depth

CROCODILE GOLD INTERSECTS 7.1 G/T AU OVER 4.5 METERS INCLUDING 11.2 G/T AU OVER 2.6 METERS AT THE UNION REEFS PROJECT, PROSPECT DEPOSIT

Fortuna provides review of Brownfields exploration programs

Probe Metals Intersects 3.2 g/t Gold Over 45.5 Metres At Val-d Or East

DRILLING AT ASCOT S PREMIER PROPERTY EXTENDS GOLD MINERALIZATION 150 METRES WEST TOWARDS UNDERGROUND PORTAL

CROCODILE GOLD CONTINUES POSITIVE EXPLORATION RESULTS INTERSECTS HIGH GRADE GOLD AT UNION REEFS PROJECT

Assay Results Highlights (as of November 16, 2017) representing approximately 4,500 metres ( m ) of drilling:

AVION GOLD DJAMBAYE II ZONE, TABAKOTO PROJECT, MALI, RETURNS HIGH GRADE INTERCEPTS OF 7.56 G/T Au OVER 7.0 METRES AND G/T Au OVER 3.

SilverCrest Expands Babicanora High Grade Footprint to 600 metres; New High Grade Vein Discoveries Highlight District Scale Potential

Probe Metals Continues to Expand Gold Zones At Val-d Or East

Probe Metals Continues to Intersect Significant Gold Mineralization in Expansion Drilling at Val-d Or East, including 4.1 g/t Gold Over 15.

Sabina Gold & Silver Reports 2018 Drilling has Commenced at Back River Gold Project

Coeur Mining Provides Silvertip Exploration Update

Interval (meters) To (meters)

Detour Gold Reports Drilling Results from Lower Detour

PRESS RELEASE. DUBUISSON NORTH DRILLING CUTS g/t AU OVER 5.0 METRES NEW S50 EAST DISCOVERY, 3.39 g/t AU OVER 25.9 METRES

June 4, 2014 News Release Valley of the Kings Exploration Program Underway; Project Update

May 12, 2016 News Release Valley of the Kings Infill Drilling Intersects 37,000 Grams Per Tonne Gold

October 8, 2015 News Release Brucejack Regional Drilling Intersects Over 8,000 Grams Per Tonne Gold

Minsud to recommence resource outline diamond drilling at the Chita Valley Cu- Au-Ag-Mo Project, San Juan, Argentina

Suite 1800 Two Bentall Centre 555 Burrard Street Vancouver, BC V7X 1M9 Tel: (604) Tel: (888) April 8, 2018 SBB NR SBB TSX

MEDIA RELEASE OCEANAGOLD ANNOUNCES FURTHER DOWN DIP EXTENSIONS OF MINERALISATION AT PANEL 2: FRASERS UNDERGROUND MINE

KIRKLAND LAKE GOLD REPORTS WIDE, HIGH-VALUE GOLD INTERCEPTS AT SWAN ZONE UP TO 200 METRES FROM CURRENT MINERAL RESERVES

Probe Metals Confirms Continuity of Gold Mineralization on its Val-d Or East Project And Increases 2017 Drill Program to 75,000 metres

ET and and and

MEXICAN GOLD SAMPLES 5.11 G/T GOLD & 7.15 % ZINC OVER 2.0 METRES AND G/T GOLD OVER 1.4 METRES AT CHANGARRO ZONE, LAS MINAS PROJECT

GOLDPLAY ANNOUNCES FURTHER SAMPLING RESULTS FROM SAN MARCIAL HISTORICAL CORE; CONFIRMS OPEN PIT TARGET NEAR SURFACE WITH gpt AgEq.

Probe Metals Discovers New High Grade Gold Zone on Val-d Or East Project: Intersects 12.6 g/t Gold Over 7.3 Metres

Wallbridge Options 100% of the Beschefer Project near Fenelon Gold

BK Copper Project Strong Copper Results Confirm and Extend BKM

August 20, 2018 SBB NR SBB TSX

BELO SUN RELEASES RESULTS FROM 65 DRILL HOLES FURTHER EXTENDING THE OURO VERDE DEPOSIT ALONG STRIKE NORTHWEST AND DOWN DIP

Underground Exploration Drilling Complete; Brucejack Mineralization Extends to the East

Probe Metals Intersects 1,122 g/t Gold Over 0.7 Metres in New Zone at Val-d Or East

September 24, 2012 #

MANN SILVER-COBALT MINE. PORE: TSXV PowerOre.com

True Width (m) Carneritos to

Vendetta Reports Additional High Grade Drilling Results from Zones 2 and 3 at Pegmont Lead-Zinc Project

NEWS RELEASE TSX-V Ticker: SWA 23 April 2013 SWA.WT SARAMA RESOURCES EXTENDS HIGH-GRADE MINERALISATION AT MM PROSPECT IN BURKINA FASO

MEXICAN GOLD SAMPLES G/T GOLD AND 37.2 G/T SILVER OVER 0.42 METRES AT PUEBLO NUEVO HISTORICAL MINES

Asiamet Drilling Further Extends BKM Mineralisation

QMX GOLD CONTINUES TO INTERSECT STRONG MINERALIZATION AT BONNEFOND, INTERSECTING 39.5 g/t Au OVER 2.4 METRES AND 31.5 g/t Au OVER 1.

Toronto, Canada March 4, 2013

AVINO SILVER & GOLD MINES LTD.

Canadian Gold Miner Grab Sample Returns 29.5 Grams per tonne Gold from South Kirkland Project

NEWS RELEASE. FOR IMMEDIATE RELEASE Shares Outstanding: 35,190,286

(TSXV: GPLY, OTCQB: GLYXF

Skeena Intersects g/t AuEq over metres at Eskay Creek

SABINA GOLD &SILVER REPORTS COMPLETION OF DRILLING AT ECHO DEPOSIT, BACK RIVER, NUNAVUT.

NEWS RELEASE November 5, 2018

Drilling Highlights: Phase II BCV Infill Drilling

North American Palladium Provides Update on Lac des Iles Exploration Program

BELO SUN INTERSECTS NEW HIGH GRADE ZONE AT GROTA SECA AND EXPANDS GRANDE DEPOSIT

PRESS RELEASE WESDOME PLANS AGGRESSIVE DRILLING AND DEVELOPMENT PROGRAM IN 2011

NEWS RELEASE. Foran Mining Intersects High Grade Zinc at McIlvenna Bay. Results expand area of known mineralization

555 Burrard Street, Suite 375, Vancouver, B.C. V7X 1M June 13, 2017 SBB NR SBB TSX

IDM Mining s Underground Drilling Intersects g/t Au and g/t Ag over 6.80 Meters True Width at the Red Mountain Gold Project

The new sulphide mineralization lies within a 1.4 kilometer long east-west trending

Highlights from the four holes announced in this news release include:

KIRKLAND LAKE GOLD EXPANDS NEW HIGH-GRADE ZONE BELOW TAYLOR MINE, REPORTS MINERALIZED EXTENSIONS ALONG STRIKE AND AT DEPTH

Ongoing Drilling of Kiena Deep a Zone Confirms Multiple High Grade Lenses and Extends Zone Down Dip

NEWS RELEASE ORCA GOLD REPORTS CONTINUED SUCCESS AT GSS

CROCODILE GOLD INTERSECTS GRAMS PER TONNE GOLD OVER 2.05 METERS BELOW THE PROSPECT DEPOSIT AT UNION REEFS

For Immediate Release ASCOT DRLLING AT UNICORN INTERSECTS MORE HIGH-GRADE GOLD

LH Property Update: Magnum Goldcorp Hits High Grade Gold 16.9 m of g/t, including 10.9 m of g/t, and as well, 11 m of 20.

REGULUS DISCOVERS NEW GOLD-RICH, HIGH-GRADE COPPER-GOLD ZONE AT RIO GRANDE

BOREAL EXPANDS DISCOVERY ZONE OF HIGH-GRADE ZINC, SILVER AND LEAD MINERALIZATION AT GUMSBERG PROJECT IN SWEDEN

Fortuna Updates Reserves and Resources

MINERAL MOUNTAIN RESOURCES LTD. MMV.TSX-V

BELO SUN DISCOVERS NEW MINERALIZED ZONE AT ITS VOLTA GRANDE GOLD PROJECT, BRAZIL

KIRKLAND LAKE GOLD EXTENDS HIGH-GRADE GOLD MINERALIZATION AT MACASSA, NEW GOLD SYSTEM DISCOVERED AT DEPTH

INV METALS ANNOUNCES DRILL RESULTS AT LOMA LARGA AND INITIAL PROSPECTING RESULTS ON NEW REGIONAL PROPERTIES

55 Adelaide Street East, Suite St-Charles west, Suite 411, West Tower

OSISKO METALS INTERSECTS 10.49% ZINC+LEAD OVER METRES AND 12.15% ZINC+LEAD OVER METRES AT PINE POINT

Monument Announces NOA 7/8 Drilling Program Results at Burnakura Gold Project

KIRKLAND LAKE GOLD INTERSECTS NEW MINERALIZATION AT TAYLOR MINE, CONTINUES TO EXTEND PORPHYRY DEPOSITS TO DEPTH

Rich Saddle North Au-Cu-Ag Porphyry Expands by 275m Along Strike and 250m Down-Dip

CHAMPION IRON REPORTS EXPLORATION RESULTS AT POWDERHORN PROJECT, NEWFOUNDLAND

No SIERRA METALS CONTINUES TO EXPAND MINERALIZATION AT ITS BOLIVAR MINE, CHIHUAHUA STATE, MEXICO

Scadding Property Sudbury District, Ontario

CANDENTE UPDATES CAÑARIACO NORTE MINERAL RESOURCE ESTIMATE

West Pender Street Vancouver, BC V6C 2V6 Tel: Fax: TSX-V: GBR NEWS RELEASE

NEWS RELEASE NOVEMBER 15, 2018 HANNAN COMPLETES DRILLING AT BALLYHICKEY, DEFINES SIGNIFICANT ZINC TARGET AT KILMURRY, CO.

555 Burrard Street, Suite 1800, Vancouver, B.C. V7X 1M Nov 20, 2017 SBB NR SBB TSX

This area in SE Sullivan Gulch was never mined by previous operators

April 26, 2012 SBB NR SBB-T

Transcription:

Press Release Thunder Bay: August 2, 2018 PREMIER GOLD CONFIRMS NEW HIGH-GRADE EXTENSIONS AT MERCEDES Drill results include 21.95 m at 36.65 g/t Au and 171.30 g/t Ag PREMIER GOLD MINES LIMITED ( Premier or The Company ) (TSX:PG) is pleased to provide an exploration update, including the confirmation of high grade extensions, at the Company s 100%-owned Mercedes Mine, located in the State of Sonora, Mexico. The ongoing 40,000 metre surface and underground drill programs include definition and expansion of the main gold bearing horizons and testing new zones on the property. Underground drilling at the Rey de Oro deposit, one of several zones being brought into production this year, has confirmed the extension of a high-grade vein system that exhibits some of the best widths drilled to date. Recent highlights include: UG-R018-002 with 6.21 g/t Au and 101.83 g/t Ag across 16.55 metres UG-R018-006 with 36.65 g/t Au and 171.30 g/t Ag across 21.95 metres UG-R018-007 with 8.10 g/t Au and 121.32 g/t Ag across 20.50 metres UG-R018-008 with 8.33 g/t Au and 67.66 g/t Ag across 9.20 metres These high grade results and good widths are similar to our success at the Aida vein zone intersected earlier this year and confirms our belief that substantial potential exists to expand the mine life at Mercedes stated Charlie Ronkos, Executive Vice-President of Premier. These initial intercepts suggest a zone with grades well in excess of the current reserve grade at Mercedes. Rey de Oro Additional drills are being mobilized to Rey de Oro in order to continue step-out and delineation drilling of this vein extension. These results include some of the widest vein intercepts on the property and are located proximal to recently constructed underground mine workings (see Figure 1 below). Figure 1 Longitudinal Section - Rey de Oro vein target Table 1 summarizes recent intercepts from 2018 drilling at Rey de Oro.

Table 1 Highlight drill intercepts from the Rey de Oro vein target Hole ID Coordinates Azimuth/ Dip Elevation Comment From To True Width Au Ag R18-204D 552166N/3357830E 17/-55 1287 119.20 120.70 1.50 1.40 5.45 16.00 R18-205D 552335N/3357703E 25/-55 1278 Exploration 129.70 134.20 4.50 4.35 2.59 13.33 and 154.22 156.20 1.98 1.70 2.59 6.02 R18-206D 552335N/3357703E 25/-55 1278 150.20 151.20 1.00 0.95 3.55 6.00 and 152.20 154.20 2.00 1.90 3.20 6.00 and 155.20 155.70 0.50 0.50 2.36 9.00 UG-RDO18-001 552166N/3357830E 61/1 1062 Infill 101.95 109.00 7.05 5.45 7.81 71.12 Including 105.00 108.05 3.05 2.75 12.71 86.38 UG-RDO18-002 552082N/3357855E 25/5 1063 Infill 77.80 86.92 9.12 7.15 8.77 259.46 and 88.75 91.50 2.75 1.90 1.23 108.00 and 94.00 110.55 16.55 11.50 6.21 101.83 Including 103.35 106.75 3.40 2.55 20.10 82.08 and 117.43 118.95 1.52 1.20 3.40 31.00 UG-RDO18-003 552082N/3357855E 25/-8 1062 Delineation 74.50 80.60 6.10 4.75 1.64 146.50 and 85.20 88.35 3.15 3.10 1.76 102.00 and 105.00 108.05 3.05 2.90 1.76 102.00 UG-RDO18-004 552082N/3357855E 41/5 1062 Delineation 74.50 80.00 5.50 4.25 1.55 93.90 UG-RDO18-006 552082N/3357855E 8/3 1062 Delineation 89.15 111.10 21.95 15.50 36.65 171.30 Including 89.15 105.70 16.55 11.10 47.94 200.16 and 141.60 149.22 7.62 5.25 3.46 42.59 UG-RDO18-007 (1060) UGRDO18-008 (1060) and 161.42 164.90 3.48 2.45 3.07 5.00 552049N/3357880E 230/4 1060 Infill 62.53 83.06 20.53 18.55 8.10 121.32 Including 70.15 73.20 3.05 2.90 14.91 107.87 Including 79.30 81.80 2.50 2.35 30.70 165.50 and 88.75 92.30 3.55 3.30 2.78 40.00 and 94.55 96.07 1.52 1.45 2.49 19.00 552049N/3357880E 22/-4 1060 Infill 86.92 88.45 1.53 1.40 2.65 37.00 and 91.35 100.55 9.20 6.75 8.33 67.66 Including 94.55 97.60 3.05 2.75 16.10 113.45 and 121.50 123.10 1.60 1.46 2.97 9.00 Aida A surface and underground drill program is underway to define the high-grade Aida target that is located to the west of the main Mercedes vein (see Figure 2) and proximal to existing mine workings. Broad zones of mineralization have returned multiple high-grade intercepts as highlighted in Table 2. 2

Table 2 Highlight drill intercepts from the Aida target Hole ID Coordinates Azimuth/ Dip Elevation Comment 3 From To True Width -864D 549003N/3355797E 202/-46 1176 Infill 93.50 95.00 1.50 1.45 2.79 11.00 Au Ag and 96.50 99.08 2.58 2.37 2.40 41.18 and 100.17 104.50 4.33 3.35 3.12 43.25 and 118.00 119.00 1.00 0.90 2.54 9.00 and 135.50 141.50 6.00 4.05 12.04 8.91 Including 137.00 138.00 1.00 0.90 52.50 13.00 and 167.00 170.00 3.00 2.47 4.84 38.50 M18-865D 549004N/3355798E 212/-48 1176 Infill 94.50 95.00 0.50 0.45 2.96 12.00 and 95.85 98.85 3.00 1.90 3.92 36.75 M18-866D 549004N/3355798E 212/-48 1176 Infill 83.50 84.25 0.75 0.62 1.84 24.00 and 84.25 85.68 1.43 1.40 3.77 27.47 M18-867D 548910N/3355750E 70/-60 1141 Infill 60.45 62.20 1.75 1.00 2.77 45.71 and 66.10 67.00 0.90 0.70 2.10 28.00 and 74.20 75.40 1.20 0.90 3.65 57.00 M18-869D 548814N/3356240E 219/-54 11615 245.35 246.35 1.00 0.80 3.08 8.00 and 248.35 249.35 1.00 0.80 1.96 7.00 M18-870D 548834N/3356265E 218/-54 1174 Infill 292.25 296.25 4.00 2.85 9.45 40.85 Including 293.25 295.20 1.95 1.42 15.69 50.70 M18-883D 54882N/3356048E 214/-50 1158 Infill 93.00 94.68 1.68 1.15 11.92 12.67 Including 93.45 94.68 1.23 0.91 15.85 10.00 M18-884D 548854N/3356048E 229/-58 1158 Infill 105.45 107.45 2.00 1.01 5.79 4.50 Including 106.45 107.45 1.00 0.80 11.20 4.00 M18-887D 548800N/3358262E 150/-45 1145 Infill 163.20 164.15 0.95 0.75 9.30 57.63 Including 163.20 163.70 0.50 0.40 17.35 51.00 M18-888D 548814N/3356240E 219.50/-45 1164 Infill 200.20 207.85 7.65 4.45 8.80 16.72 Including 202.40 204.20 1.80 1.00 24.11 19.44 M18-892D 548805N/3356198E 214/54 1169 Infill 199.43 207.80 8.37 5.10 3.71 27.40 Including 205.30 207.80 2.50 1.85 5.69 27.40 M18-893D 548911N/3355915E 216/-54 1155 Infill 106.30 107.20 0.90 0.75 4.43 48.00 M18-894D 548911N/3355915E Infill 76.20 80.58 4.38 2.55 5.26 152.06 M18-895D 548911N/3355915E 228/-50 1155 Infill 129.80 132.18 2.38 1.45 4.33 91.16 Including 131.30 131.85 0.55 0.40 13.40 113.00 and 151.30 152.30 1.00 0.65 1.74 40.00 and 153.50 154.30 0.80 0.60 4.23 46.00 M18-896D 548916N/3355968E 217/-46 1158 Infill 144.43 146.20 1.77 1.35 2.48 49.59 M18-897D 548916N/3355968E 228/-53 1158 Infill 160.30 163.30 3.00 1.95 5.06 81.66 and 167.30 169.30 2.00 1.45 2.68 81.50 and 171.30 174.56 3.26 2.05 2.64 136.25 M18-898D 549004N/3355797E 234/-59 1178 Infill 108.70 113.20 4.50 2.75 3.65 53.33 M18-899D 549004N/3355797E 155/-77 1178 Infill 95.20 117.70 22.50 14.55 12.11 25.74 Including 111.46 116.20 4.74 3.15 45.88 24.34 and 132.20 135.08 2.88 1.35 5.11 37.30

The 2018 drill program will also test for extensions of the known vein systems, and for new target areas on the property. The primary target areas are as follows (see Figure 2): 1. Drilling at the Axis target located to the west of the main Mercedes vein, has discovered a broad zone of low-grade mineralization with assays of up to 0.64 g/t Au and 0.79 g/t Ag across 31.5 metres; 2. Once the drift has been sufficiently established in H2 2018, drilling is expected to begin on the Marianas vein, located along the main Mercedes vein trend; and 3. Continued definition and step-out drilling at Diluvio and Lupita that were recently brought into production. Figure 2 Mercedes Regional Geology and target areas Production at Mercedes is expected to be weighted to the second half of the year owing to changes in the mining methods, the required additional drilling at the new Diluvio deposit and delays in permitting associated with the ventilation raise at Rey de Oro. Stope mining has commenced at Diluvio and the ramp up in production from Rey de Oro continues. As a result of these initiatives, monthly production in July has been the best so far in 2018. 4

Premier Gold Mines Limited is a gold producer and respected exploration and development company with a high-quality pipeline of precious metal projects in proven, accessible and safe mining jurisdictions in Canada, the United States, and Mexico. Stephen McGibbon, P. Geo., Executive Vice-President, Corporate and Project Development, is the Qualified Person for the information contained in this press release and is a Qualified Person within the meaning of National Instrument 43-101. Mercedes assay results are from core samples sent to ALS Chemex, an accredited mineral analysis laboratory in Lima, Peru or Vancouver, British Columbia, for preparation and analysis utilizing both fire assay and ICP methods. For a complete description of Mercedes s sample preparation, analytical methods and QA/QC procedures refer to the technical report for the Mercedes Mine dated April 18, 2018 (effective date December 31, 2017), entitled Technical Report on the Mercedes Gold-Silver Mine, Sonora State, Mexico. For further information, please contact: Ewan Downie, President & CEO Phone: 807-346-1390 e-mail: Info@premiergoldmines.com Web Site: www.premiergoldmines.com This Press Release contains certain information that may constitute "forward-looking information" under applicable Canadian securities legislation. Forward-looking information includes, but is not limited to, statements about strategic plans, including future operations, future work programs, capital expenditures, discovery and production of minerals, price of gold and currency exchange rates, timing of geological reports and corporate and technical objectives. Forward-looking information is necessarily based upon a number of assumptions that, while considered reasonable, are subject to known and unknown risks, uncertainties, and other factors which may cause the actual results and future events to differ materially from those expressed or implied by such forward-looking information, including the risks inherent to the mining industry, adverse economic and market developments and the risks identified in Premier's annual information form under the heading "Risk Factors". There can be no assurance that such information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such information. Accordingly, readers should not place undue reliance on forward-looking information. All forward-looking information contained in this press release is given as of the date hereof and is based upon the opinions and estimates of management and information available to management as at the date hereof. Premier disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, except as required by law. 5