NUCLEAR REGULATORY COMMISSION. 10 CFR Chapter 1 [NRC ] Clarification on Endorsement of Nuclear Energy Institute Guidance in Designing

Similar documents
NUCLEAR REGULATORY COMMISSION [NRC ] Instructions for Recording and Reporting Occupational Radiation Dose Data

NUCLEAR REGULATORY COMMISSION. [Docket No ; NRC ] Strata Energy, Inc.; Ross Uranium In Situ Recovery Facility; Source and

NUCLEAR REGULATORY COMMISSION. 10 CFR Parts 50, 52, 54, and 100. [Docket Nos. PRM ; NRC ]

NUCLEAR REGULATORY COMMISSION. 10 CFR Part 50. Docket No. PRM [NRC ] Petition for Rulemaking Submitted by Sherwood Martinelli

POLICY ISSUE (INFORMATION)

REGULATORY GUIDE 1.54 (Draft was issued as DG-1076) SERVICE LEVEL I, II, AND III PROTECTIVE COATINGS APPLIED TO NUCLEAR POWER PLANTS

10 CFR 50 Appendix I Time for a Change?

September 9, The meeting was noticed on July 24, 2014 (ML14206A735). The meeting attendance list is provided in Enclosure 1.

Welcome to the NRC. Nuclear Energy Tribal Working Group 10/13/2016

Boundary Expansion of Thunder Bay National Marine Sanctuary; Correction and Expansion of Fagatele Bay National Marine

Fact Sheet United States Nuclear Regulatory Commission Office of Public Affairs Washington, D.C Telephone: 301/

Department of Energy OffIce of Worker Protection Programs and Hazards Management Radiological Control Technical Position RCTP

BLUE RIDGE ENVIRONMENTAL DEFENSE LEAGUE

Department of Transportation. National Highway Traffic Safety Administration. [Docket No. NHTSA ; Notice 2]

Subject: Availability of New and Revised Public Housing Agency (PHA) Five-Year and Annual Plan Templates and Other Forms

Seismic Source Characterization in Siting New Nuclear Power Plants in the Central and Eastern United States

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C January 11, 2016

Apportioning Transient Combustible Fire Frequency via Areal Factors: More Complicated Than It May Seem

The following procedures describe how application managers will review chemical additives during the permit application review phase.

10ý) imiffi~ollips,, CROSSFLW. .Pagei1. From: To: Date: Subject: Warren Lyon John Nakoski Wed, Nov 1, :59 PM CROSSFLOW

Licensing Small Modular Reactors An Overview of Regulatory and Policy Issues

Chapter X: Radiation Safety Audit Program

Transcontinental Gas Pipe Line Corporation Compliance Filing in Docket No. RP05-369

Nuclear Regulatory Commission

May 5, 2011 RETAKE EXAMINATION REPORT LETTER NO /OL-11-01, UNIVERSITY OF CALIFORNIA - IRVINE

FRACTURE ANALYSIS FOR REACTOR PRESSURE VESSEL NOZZLE CORNER CRACKS

Controlled Substances: TSCA the Toxic Substances Control Act

Globally Harmonized System Update

Guidance for Industry M4: The CTD General Questions and Answers

August 23, Washington, D.C Washington, D.C

Pursuant to Section 205 of the Federal Power Act ( FPA ) 1 and the Commission s

Decay Heat Estimates for MNR

Guide to Registration Requirements for Active Substance Manufacturers, Importers and Distributors in Ireland

Davis-Besse Reactor Pressure Vessel Head Degradation. Overview, Lessons Learned, and NRC Actions Based on Lessons Learned

RPR 29 CYCLOTRON RADIOCHEMISTRY LABORATORY

Results of the EPA Method 1631 Validation Study

C L I E N T A LERT. Ha r m o n i z i n g Ha z a rd Co m m u n i c a t i o n : OSHA Pr o p o s e s t o. I. Ba c k g r o u n d

PWSCC Crack Growth Rate (CGR) Expert Panel Status Update

DE PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE

GIS ADMINISTRATOR / WEB DEVELOPER EVANSVILLE-VANDERBURGH COUNTY AREA PLAN COMMISSION

Internal Audit Report

Derogation Criteria for the Requirements for Generators Network Code

OTTER POINT ADVISORY PLANNING COMMISSION. Notice of Meeting on Tuesday, June 5, 2018 at 7 p.m.

Law on Spatial Planning

Author(s): Charles K. Cover, P.E. Federal Energy Regulatory Commission

The Acta Group K-REACH Webinar Questions and Answers December 4, 2014

SAo%22{ W3F A4.05 PR. March 30, U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.

MEMORANDUM OF UNDERSTANDING. between the ASSOCIATION OF AMERICAN STATE GEOLOGISTS. and the U.S. DEPARTMENT OF THE INTERIOR OFFICE OF SURFACE MINING

TSCA SECTION 13 IMPORTER CERTIFICATION PROCEDURE

ISO Radiological protection Sealed radioactive sources General requirements and classification

WM2011 Conference, February 27 - March 3, 2011, Phoenix, AZ

UNITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, D.C FORM 8-K

EPA's Revision to the 40 CFR Part 136 Method Detection Limit (MDL) Procedure

ISO INTERNATIONAL STANDARD. Reference radiation fields Simulated workplace neutron fields Part 1: Characteristics and methods of production

Please click the link below to view the YouTube video offering guidance to purchasers:

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. Interconnection for Wind Energy ) Docket No. RM

REGULATORY GUIDE OFFICE OF NUCLEAR REGULATORY RESEARCH. REGULATORY GUIDE 4.15 (Draft was issued as DG-4010, dated November 2006)

ATTACHMENT Mitigating Systems

423.1 General. In addition to other applicable requirements in this code, storm shelters shall be constructed in accordance with ICC 500.

Food Safety Regulations

Responsibilities: Effective Date: November Revision Date: February 8, VP, Facilities and Construction Management. Issuing Authority:

TORNADO VS HURRICANE WHICH IS MORE DETRIMENTAL TO THE SAFETY OF US NUCLEAR POWER PLANTS

METEOROLOGY PANEL (METP) WORKING GROUP- METEOROLOGICAL OPERATION GROUP (MOG) FIRST MEETING

Regulation of Agricultural Biotechnology in the United States: Role of USDA-APHIS Biotechnology Regulatory Services

LABORATORY MANAGEMENT PLAN (LMP) TABLE OF CONTENTS 4. UNIVERSITY OF PITTSBURGH LMP PART I CHEMICAL WASTE REMOVAL FROM LABORATORIES...

ISO INTERNATIONAL STANDARD

May 22, Mr. Tim Tyler TRWME Properties, LLC 240 Hwy. 65 N Conway, AR RE: Royal Oaks Vista Subdivision Site. Dear Mr.


Exhibit IV-1: Initiation of Zoning Map Amendments Case Report HEARING DATE: MAY 3, 2012

INTERNATIONAL STANDARD

Metallic materials Brinell hardness test. Part 3: Calibration of reference blocks

Multi Analyte Custom Grade Solution. Calcium, Iron, Potassium,

Hazard Communication Standard and GHS Update. Maureen Ruskin Deputy Director Directorate of Standards and Guidance

Administration by the CER of the Carbon Revenue Levy

Compliance Guide Controlled Substances, Controlled Substance Analogues, Chemical Precursors, and Chemical Laboratory Apparatus MOU

Outage dates (duration): September 2, 1996 to February 6, 1998 (1.4 years) Reactor age when outage began: 19.5 years

ANALYSIS CERTIFICATE OF

Georgia Board of Professional Engineers & Land Surveyors The Office of the Secretary of State 237 Coliseum Drive Macon, Georgia 31217

RADIATION SAFETY GUIDELINES FOR NON-USERS

Public Disclosure Copy

U.S. NUCLEAR REGULATORY COMMISSION March 2007 REGULATORY GUIDE OFFICE OF NUCLEAR REGULATORY RESEARCH

Chemical Donation Policy. Santa Clara University (SCU) 500 El Camino Real Santa Clara, CA 95053

THE NEWFOUNDLAND AND LABRADOR GAZETTE

Notice of Inventory Completion: U.S. Department of Defense, Army Corps of Engineers,

PHA Plans. Strategic Planning for PHAs

CRS Report for Congress

IMPACT OF WEATHER CHANGES ON TVA NUCLEAR PLANT CHI/Q (χ/q) Kenneth G. Wastrack Doyle E. Pittman Jennifer M. Call Tennessee Valley Authority

External Dosimetry at NPPs; NVLAP, Noble Gas, and TEDE

APPLICATION FOR CHANGE OF WATER RIGHT

Lower Bound of Optimization for the Public Considering Dose Distribution of Radiation due to Natural Background Radiation

4 th IHO-HSSC Meeting IHB, Taunton, September Report to HSSC-4 by the Correspondence Group on Definition and Length of Coastline

AS/NZS ISO :2015

Geospatial Data Solutions: Site and Corridor Siting Projects. Rachel Turney-Work

1.0 PURPOSE AND FORMAT OF THE FINAL EIR

El Paso Natural Gas Company, L.L.C.; Semi-Annual Activity Report Washington Ranch Storage Facility Docket Nos. RP72-6, et al.

TODAY - March 20, 2000

Safety of Spent Fuel Storage

1 Introduction / Background

DOWNLOAD OR READ : UNCONSOLIDATED LAWS OF NEW YORK GENERAL CITY MODEL EDITION PDF EBOOK EPUB MOBI

Government. The Scottish. Health and Social (are Integration Primary (are Division. Dear Colleague

Transcription:

This document is scheduled to be published in the Federal Register on 06/25/2018 and available online at https://federalregister.gov/d/2018-13570, and on FDsys.gov [7590-01-P] NUCLEAR REGULATORY COMMISSION 10 CFR Chapter 1 [NRC-2017-0154] Clarification on Endorsement of Nuclear Energy Institute Guidance in Designing Digital Upgrades in Instrumentation and Control Systems AGENCY: Nuclear Regulatory Commission. ACTION: Regulatory issue summary; issuance. SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) issued a Regulatory Issue Summary (RIS) entitled, RIS 2002-22, Supplement 1, Clarification on Endorsement of Nuclear Energy Institute Guidance in Designing Digital Upgrades in Instrumentation and Control Systems. This RIS supplement clarifies RIS 2002-22, which remains in effect. The NRC continues to endorse Nuclear Energy Institute (NEI) - 01-01, as stated in RIS 2002-22 and clarified RIS 2002-22, Supplement 1. This RIS supplement clarifies the guidance in RIS 2002-22 for preparing and documenting qualitative assessments that licensees can use to develop written evaluations to address the criteria in NRC s regulations for digital instrumentation and control (I&C) modifications. This clarification is intended to reduce regulatory uncertainty for licensees applying the process set in the NRC s regulations and making digital I&C modifications without prior NRC approval.

DATES: The RIS 2002-22, Supplement 1 is available as of [INSERT DATE OF PUBLICATION IN THE FEDERAL REGISTER]. ADDRESSES: Please refer to Docket ID NRC-2017-0154 when contacting the NRC about the availability of information regarding this document. You may obtain publicly-available information related to this document using any of the following methods: Federal Rulemaking Web Site: Go to http://www.regulations.gov and search for Docket ID NRC-2017-0154. Address questions about NRC dockets to Jennifer Borges; telephone: 301-287-9127; e-mail: Jennifer.Borges@nrc.gov. For technical questions, contact the individual listed in the FOR FURTHER INFORMATION CONTACT section of this document. NRC s Agencywide Documents Access and Management System (ADAMS): You may obtain publicly-available documents online in the ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ADAMS Public Documents and then select Begin Web-based ADAMS Search. For problems with ADAMS, please contact the NRC s Public Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or by e-mail to pdr.resource@nrc.gov. The ADAMS accession number for each document referenced (if it is available in ADAMS) is provided the first time that it is mentioned in this document. RIS 2002-22, Supplement 1 is available under ADAMS Accession No. ML18143B633. 2

NRC s PDR: You may examine and purchase copies of public documents at the NRC s PDR, Room O1-F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. RIS 2002-22, Supplement 1 is also available on the NRC s public Web site at http://www.nrc.gov/reading-rm/doc-collections/gen-comm/reg-issues/ (select 2002 and then select 2002-22, Supplement 1 ). FOR FURTHER INFORMATION CONTACT: Tekia Govan, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; telephone: 301-415-6197, e-mail: Tekia.Govan@nrc.gov. SUPPLEMENTARY INFORMATION: Supplement 1 of RIS 2002-22, Clarification on Endorsement of Nuclear Energy Institute Guidance in Designing Digital Upgrades in Instrumentation and Control Systems (ADAMS Accession No. ML18143B633), is intended for 1) all holders of operating licenses under part 50 of title 10 of the Code of Federal Regulations (CFR), Domestic Licensing of Production and Utilization Facilities, and 2) all holders of a combined license under 10 CFR part 52, Licenses, Certifications, and Approvals for Nuclear Power Plants. In 2002, the NRC staff issued RIS 2002-22 to notify addressees that the NRC staff had reviewed NEI-01-01 and was endorsing the report for use as guidance in designing and implementing digital upgrades to nuclear power plant instrumentation and control systems. Following the NRC staff s 2002 endorsement of NEI 01-01, holders of operating licenses have used this guidance in support of digital design modifications 3

implemented without prior NRC approval in accordance with 10 CFR 50.59. The NRC inspections of documentation for these activities uncovered inconsistencies in the performance and documentation of engineering evaluations and associated technical bases for determinations on the 10 CFR 50.59(c)(2) evaluation criteria. This RIS Supplement clarifies the RIS 2002-22 endorsement of the NEI 01-01 guidance by providing additional guidance for developing and documenting qualitative assessments that are used to provide an adequate basis for a licensee s determination that a digital modification will exhibit a low likelihood of failure to support a conclusion when applying the evaluation criteria set in 10 CFR 50.59, that a license amendment is not needed. The NRC published a notice of opportunity for public comment on a previous draft of this RIS in the Federal Register on July 3, 2017 (82 FR 30913). Subsequently, the NRC published a second notice of opportunity for public comment on the revised RIS on March 14, 2018 (83 FR 11154). As noted in the March 14, 2018 Federal Register notice (FRN), [t]he NRC staff engaged in multiple communications with the public and stakeholders and continued internal discussions about the RIS. As a result of these efforts, the NRC has substantially rewritten the RIS. Due to the extensive nature of these revisions, and in light of this additional opportunity for comment, the NRC is not directly responding to each comment received in the previous comment period. The NRC received comments from seven commenters as a result of the March 14, 2018 FRN. The NRC considered all comments, some of which resulted in changes to the RIS, and discussed the evaluation of these comments and the resulting changes to the RIS in a memorandum that is publicly available in ADAMS under Accession No. ML18115A298. 4

As noted in 83 FR 20858 (May 8, 2018), this document is being published in the Rules section of the Federal Register to comply with publication requirements under 1 CFR chapter I. Dated at Rockville, Maryland, this 20 th day of June, 2018. For the Nuclear Regulatory Commission. Tekia Govan, Project Manager, ROP Support and Generic Communication Branch, Division of Inspection and Regional Support, Office of Nuclear Reactor Regulation. [FR Doc. 2018-13570 Filed: 6/22/2018 8:45 am; Publication Date: 6/25/2018] 5