STATUS REPORT ON SURVEY AND ALIGNMENT OF J-PARC AFTER THE EARTHQUAKE

Similar documents
How J-PARC recovered from the big earthquake

Survey and Alignment of the J-PARC

ALIGNMENT OF CAVITIES AND MAGNETS AT J-PARC LINAC

STATUS OF THE J-PARC FACILITY

NEW ARRANGEMENT OF COLLIMATORS OF J-PARC MAIN RING

PULSE-TO-PULSE TRANSVERSE BEAM EMITTANCE CONTROLLING FOR MLF AND MR IN THE 3-GeV RCS OF J-PARC

STATUS REPORT ON STORAGE RING REALIGNMENT AT SLRI

Operational Experience with J-PARC Injection and Extraction Systems

Estimation of Radioactivity and Residual Gamma-ray Dose around a Collimator at 3-GeV Proton Synchrotron Ring of J-PARC Facility

Front end, linac upgrade, and commissioning of J-PARC. Y. Liu KEK/J-PARC, Japan

STATUS OF KEKB. Ryuhei Sugahara, Yasunobu Ohsawa High Energy Accelerator Research Organization (KEK) Oho 1-1, Tsukuba, Ibaraki, Japan

Beam Extraction by the Laser Charge Exchange Method Using the 3-MeV LINAC in J-PARC )

Performance Studies of the Vibration Wire Monitor on the Test Stand with Low Energy Electron Beam

THE SPEAR3 UPGRADE PROJECT AT SLAC *

Application of Carbon Nanotube Wire for Beam Profile Measurement of Negative Hydrogen Ion Beam

Accelerator Facility Accident Report

MAGNET INSTALLATION AND ALIGNMENT FOR THE FUJI TEST BEAM LINE AT KEKB

THE GSI FUTURE PROJECT: AN INTERNATIONAL ACCELERATOR FACILITY FOR BEAMS OF IONS AND ANTIPROTONS

JAPAN PROTON ACCELERATOR RESEARCH COMPLEX

Fine Alignment of the ATF Damping Ring

DEVELOPMENT OF FFAG AT KYUSYU UNIVERSITY


ALIGNMENT RESULT FOR MAGNET UNITS OF THE SPRING-8 STORAGE RING

Field Investigation and Dynamic Analysis of Damaged Structure on Pile Foundation during the 2011 off the Pacific Coast of Tohoku Earthquake

The Alignment of BEPCII RING

J-PARC Japan Proton Accelerator Research Complex. J-PARC Status after March 11. J-PARC at Tokai-mura, Ibaraki-ken

PoS(KAON09)023. Beam Hole Photon Veto For J-PARC K O TO experiment. Yosuke Maeda Kyoto University

Bulk shielding design for the MAX IV facility

Seismic Activity and Crustal Deformation after the 2011 Off the Pacific Coast of Tohoku Earthquake

Design Status of the PEFP RCS

Tsukuba, Japan International Institute of Seismology and Earthquake Engineering Building Research Institute STUDY TRIP TO ITAKO CITY

Accelerator Design and Construction Progress of TPS Project

Advanced Storage Photon Ring Source Upgrade Project:

TORSION OF SURFACE PLATE OF THE ACTIVE SUPPORT TABLE FOR THE ATF DAMPING RING

Calculation of the Dose Equivalent Rate from Induced Radioactivity Around the CNGS Target and Magnetic Horn

HIGH POWER BEAM OPERATION OF THE J-PARC RCS AND MR. Yoichi Sato for J-PARC Accelerator Group May 3 rd, 2018 THYGBF1, IPAC2018

Survey & Alignment of Pohang Light Source

Shielding calculations for the design of new Beamlines at ALBA Synchrotron

The CNGS neutrino beam

PREPARING THE SPS COMPLEX ALIGNMENT FOR FUTURE LHC RUNS

The Results of HLS Measurement and Geological Investigation at Pohang Light Source

THE SPEAR3 UPGRADE PROJECT AT SLAC * Abstract

III. CesrTA Configuration and Optics for Ultra-Low Emittance David Rice Cornell Laboratory for Accelerator-Based Sciences and Education

New irradiation zones at the CERN-PS

David Martin High Precision Beamline Alignment at the ESRF IWAA, Grenoble 3-7 October 2016

HIRFL STATUS AND HIRFL-CSR PROJECT IN LANZHOU

Special edition paper

SURVEY AND ALIGNMENT FOR THE SYNCHROTRON LIGHT SOURCE ELETTRA

Technological Challenges for High-Intensity Proton Rings

Alignment of S-LSR. H. Souda, M. Tanabe, T. Ishikawa, M. Ikegami, T. Takeuchi*, H. Tongu, T. Shirai, A. Noda


Figure 1 Overview of the T2K experiment

Update on Optics Modeling for the ATF Damping Ring at KEK Studies for low vertical emittance

6 Bunch Compressor and Transfer to Main Linac

Shielding Design for the Imaging and Medical Beamline at the Australian Synchrotron

The Alignment Concept For The Fermilab Recycler Ring Using Permanent Magnets

PoS(NuFact2017)088. EMuS in CSNS. Guang Zhao 1. Institute of High Energy Physics Beijing, China

REAL-TIME MEASUREMENT IN SLOW DISPLACEMENT OF THE TUNNEL FLOOR DUE TO DYNAMIC GROUND MOTION AT THE KEKB INJECTOR LINAC

Investigation of the Effect of Space Charge in the compact-energy Recovery Linac

Beam monitors in J-PARC

Lattice Design and Performance for PEP-X Light Source

Physics 2135 Exam 3 April 18, 2017

Beam Diagnostics and Instrumentation JUAS, Archamps Peter Forck Gesellschaft für Schwerionenforschnung (GSI)

Design and performance of Hall probe measurement system in CSNS

Survey and Alignment of the Fermilab Electron Cooling System

3. Synchrotrons. Synchrotron Basics

PREX Simulation Update

First neutrino beam and cosmic tracks. GDR neutrino

Alignment of the Dipole Magnets in the Cornell Electron-Positron Storage Ring

China high-intensity accelerator technology developments for Neutron Sources & ADS

Chapter 12. Magnetism and Electromagnetism

SPEAR3 Alignment Chapter For Nuclear Instrumentation and Methods in Physics Research, Section A June 25, 2004

Status of J-PARC Transmutation Experimental Facility

APPLICATIONS OF ADVANCED SCALING FFAG ACCELERATOR

REPORT ON THE TOHOKU AREA PASIFIC OFFSHORE EARTHQUAKE

SLAC-PUB Submitted to Radiation Protection and Dosimetry. Work supported by Department of Energy contract DE-AC02-76SF00515

The 10th International Workshop on Accelerator Alignment, KEK, Tsukuba, February 2008 ALIGNMENT OF S-LSR

Status Report on the Survey and Alignment Activities at Fermilab

Beam Optics for Parity Experiments

OPTIMIZATION OF COMPENSATION CHICANES IN THE LCLS-II BEAM DELIVERY SYSTEM

Proposal to convert TLS Booster for hadron accelerator

2.6 Electron transport lines

Crustal deformation by the Southeast-off Kii Peninsula Earthquake

Polarization Preservation and Control in a Figure-8 Ring

LIS section meeting. PS2 design status. Y. Papaphilippou. April 30 th, 2007

Radiation Safety Assessment of the CLS Beamlines Using FLUKA Monte-Carlo Code

THE ALIGNMENT OF THE LHC DURING THE SHUT-DOWN D. Missiaen, CERN, Geneva, Switzerland. Fiducialisation

A high intensity p-linac and the FAIR Project

In vacuum ID beam line shielding commissioning and direct gasbremsstrahlung measurements at Synchrotron SOLEIL

Case Study of Japan: Crustal deformation monitoring with GNSS and InSAR

Study on collimation and shielding of the back-streaming neutrons at the CSNS target

JLEIC forward detector design and performance

Simulation Studies for a Polarimeter at the International Linear Collider (ILC)

ELIC: A High Luminosity And Efficient Spin Manipulation Electron-Light Ion Collider Based At CEBAF

SSA Measurements with Primary Beam at J-PARC

CEBAF-ER: EXTENDING THE FRONTIER OF ENERGY RECOVERY AT JEFFERSON LAB *

The FLUKA study of the secondary particles fluence in the AD-Antiproton Decelerator target area.

Polarised e ± at HERA

LHC operation in 2015 and prospects for the future

Measurement of transverse Emittance

Transcription:

STATUS REPORT ON SURVEY AND ALIGNMENT OF J-PARC AFTER THE EARTHQUAKE N. Tani#, T. Morishita, S. Meigo, M. Harada, H. Stefanus, JAEA/J-PARC, Tokai, Japan M. Shirakata, T. Ishii, Y. Fujii, Y. Shirakabe, KEK/J-PARC, Tukuba, Japan Abstract The accelerator and experimental facilities located in the J-PARC were displaced by the large earthquake on March 11, 2011 in eastern Japan. At J-PARC a surveying network was prepared on the ground to cover the whole facility and GPS survey and leveling of the ground reference points were carried out in order to support recovery works. Also in the accelerator tunnel the device on the beam line was surveyed by using precise digital levels and laser trackers, and its alignment was carried out. J-PARC resumed its beam operation after the earthquake in December 2011. In this paper, we report the survey result in the accelerator tunnel after the earthquake and realignment of the J-PARC. magnets are carried out every two years to observe changes across years. As a survey work immediately after the earthquake, GPS survey which can observe ground deformation around J-PARC without entering the building often was implemented in April and the precise levelling was carried out in July. Also leveling, traverse survey, laser tracker survey was implemented for each facility to understand the situation in the accelerator tunnel and realignment was carried out where it was necessary. GPS SURVEY AFTER EARTHQUAKE INTRODUCTION On March 11, 2011 the 9.0-magnitude Tohoku Region Pacific Coast Earthquake occurred. At K-Net Nakaminato [1] which is located about 10 km south of J-PARC facilities, the maximum acceleration of 546 gal in a horizontal direction and 412 gal in a vertical direction was recorded. According to Geospatial Information Authority of Japan, the coastal ground of Ibaraki Prefecture moved 1m toward the ocean and subsided about 30 cm [2]. Figure 1: Bedrock contour around J-PARC facility. Crustal shape around J-PARC facilities is complicated as shown in Figure 1 so uneven settlement was concerned from the beginning of construction. Main building differs in each facility and the main tunnel of the accelerator facility is held by driving piles into the basement layer (gravel mudstone layer). For each facility survey on the accelerator tunnel floor, reference points on the wall and #tani.norio@jaea.go.jp Figure 2: Observation network of GPS survey.

At J-PARC facility precise traverse survey and leveling are being implemented every two years. The last survey before the earthquake was in August 2010. After the earthquake GPS survey whose result can be quickly obtained was carried out at first in order to make use of it for recovery work of each facility [3]. Figure 2 shows an observation network of GPS survey. This observation network is the same as that of the precise traverse survey in 2010. Red line shows primary reference points and blue line shows the secondary reference points. Survey time is 4 hours and 2 hours respectively. However points set in the building using the secondary reference points were used for traverse survey using Leica TDA5005 and horizontal position was evaluated using the reference data obtained in the GPS survey. Figure 3 shows displacement vector of reference points around Linac and RCS obtained in the GPS survey and changed between August 2010 and April 2011. Red displacement vector shows reference points above ground and on the roof of the building and blue displacement vector shows reference points in the tunnel. Survey accuracy of GPS is ±5 mm. Reference points circled in red shows displacement of reference points set in Linac tunnel and on the 1 st floor of the building. As maximum displacement was 6.81 mm it was found out that the reference points did not move largely due to the earthquake. Reference points circled in blue shows the reference points in RCS tunnel. As maximum displacement was 19.35 mm it was found out that the tunnel expanded in east-west direction. around 3NBT and MLF. 3NBT is transport line of proton beam from RCS to MLF. MLF is an experiment facility of neutrons. Points circled in red show reference points set in 3NBT tunnel. Each point moved about 10mm toward RSC side due to the earthquake and rotated clockwise. Points circled in blue are reference points set on the roof of MLF and show displacement between 22 mm and 33 mm. The building moved about 20mm due to the earthquake and rotates counterclockwise. Figure 4: Result of GPS survey around 3NBT and MLF. Figure 5 shows displacement vector of reference points around Neutrino facility. Points circled in red are reference points of Neutrino beamline. Displacement of reference point was less than 10 mm. Vertical displacement was measured by another survey, which showed the displacement of less than a few mm. These results are acceptable value for the orbit correction. Figure 5: Result of GPS survey around Neutrino facility. Figure 3: Result of GPS survey around Linac and RCS. Figure 4 shows displacement vector of reference points Figure 6 shows displacement vector around MR and Hadron facility. Points circled in red are reference points set in MR tunnel and shows displacement from 11.61 mm to 5.41 mm. MR has 6 reference points. Among these, 2 points circled in a dashed line are the points that cannot be observed using through-holes. Displacement of these 2

points showed the maximum value. As direction of each displacement vector differed, it was figured out the tunnel largely deformed. Figure 7: Horizontal position of the Linac in the straight section. Figure 6: Result of GPS survey around MR and Hadron facility. STATUS OF ACCELERATOR FACILITY Linac The cavities and magnets were measured by using a laser tracker. Horizontal and vertical displacements are shown in Figs. 7 and 8 respectively [4]. There is about 25 mm horizontal deformation at the straight section. The vertical displacement is consistent to the floor elevation. There are local settlements at the DTL/SDTL sections (more than 40 mm) and at the end of the ACS section (about 20 mm). The blue line shows the result of the measurement after the re-alignment line of the straight section. It was necessary to move the DTL cavity by 20 mm or more to align the whole area of the straight section on the ideal straight line toward the dump. However, the range of the DTL movement is a few millimetres without re-wiring DTQs. Therefore aiming at an early restart of the beam operation, it was decided to steer the beam horizontally and vertically at the steering magnets located downstream of the DTL section. Longitudinally the accelerator tunnel of Linac extended about 9 mm at the upstream part of the SDTL section, and 1 mm at the downstream part of the ACS sections. This extension was absorbed smoothly by adjusting the magnets interval at the matching section between SDTL and ACS (about 15 m). Figure 8: Vertical position of the Linac in the straight section. Figure 9 shows the relative position of the magnets after the first arc to the 90 degree dump. Displacements at the expansion joints are as follows: 0.8 mm in transverse, 1.1 mm in vertical, + 1.0 mm in longitudinal, 0.3 mrad in bend at the exit of the first arc. 9 mm in transverse, 3 mm in vertical, + 1.3 mm in longitudinal, -0.4 mrad in bend at the exit of the collimator section. The beam transport section (from the first arc to the injection line to RCS) was adjusted to maintain the proper injection angle and position to RCS.

After that an orbit analysis using the measurement results was implemented. It was confirmed that even with the magnets placement after the earthquake, 300 kw beam operation same as before the earthquake was possible by COD correction. 3GeV RCS restarted its beam operation in December 2011. Figure 9: Relative position of the magnets after the first arc to the 90 degree dump. Rapid- Cycling Synchrotron (RCS) At RCS survey of magnets using a laser tracker was implemented from May 2011 and precise leveling started in July 2011 [5]. The results are shown in Figure 10. Figure 11: Displacements of magnets in horizontal direction which is standardized based on the injection straight. Figure 12: Displacement of magnets in height direction which is standardized based on the height of magnets near collimators (QDL4 and QFL5) Figure 10: Misalignment of RCS magnets before/after the earthquake. Black dots are values taken before and red dots are values taken after the earthquake. The realignment of RCS magnets is planned from summer through fall in 2013. As for realignment, the most difficult part is adjustment of magnets (QDL4 and QFL5) near the injection collimator. Workability of this area is very low due to the shieldings installed to avoid high radiation dose this area caused by beam loss. Therefore for realignment it is planned for vertical direction to adjust QDL4 and QFL5 to the reference and

for horizontal direction to evaluate and adjust displacemenrt of each magnet so that misalignment of magnets at the injection straight section becomes as small as possible. The displacement of each magnet calculated from the result of the measurement in May 2011 is shown in figure 11 and 12. It was necessary to adjust the magnets about nearly 10 mm in horizontal direction. This displacement can be adjusted sufficiently within the range of the magnets movement. Main Ring (MR) At MR survey of magnets using a laser tracker was implemented from May 2011. Figure 13 shows displacement in horizontal and longitudinal direction [6]. As a result of comparison with design values, the displacement range of horizontal direction was maximum 35 mm and longitudinal direction was maximum 13 mm. Leveling of the magnets was carried out in July 2011. Figure 14 shows displacement in height direction from July 2010. It is seen that the whole beam line showed settlement of about 2mm. Around the injection straight line (INS-A) is the highest and the part from slow extraction beam line (INS-B) to QFX099 via Arc-B and the part from the end of Arc-B to the middle of first extraction beam line (INS-C) show large settlement. Compared this part to Figure 1, it is found out that change of height from QFX099 and QFN162 corresponds to the relief of basement layer. Settlement seen at QDN193 corresponds also to the lower part of basement layer located at the slightly upper part of the cross section of 3NBT line. Only the upper part of INS-B seems to be against settlement but this is considered because this part is supported by two buildings from both sides. As there was a large displacement throughout MR, alignment of the all magnets was implemented from August through November 2011. As for height of MR beamline it was decided not to change height of extraction sesptum magnets of First extraction and Slow extraction. Figure 15 shows the result of confirmation survey carried out after the alignment. Figure 13: Displacement of horizontal plane of MR magnet. Figure 15: Survey result after alignment of MR. Figure 14: Displacement of vertical direction of MR magnet. For horizontal direction, displacement of about 8mm occurred regardless of the alignment. When survey data is analyzed, usually through-hole data (6 points) measured by traverse survey is included. However this time through-hole data measured by GPS survey was used and among the 2 points could not be used due to the earthquake. Therefore it was considered that sufficient data accuracy could not be obtained. Effect of aftershock was also considered but the levelling data of the floor reference points implemented before/after the alignment (July and November 2011) showed displacement range of the tunnel of 0.7 mm so it was difficult to think of displacement of several mm in a horizontal direction.

Luckily the result of COD measurement without correction after restart of beam operation was better than that of before the earthquake so it was considered that the alignment status was good enough. The final conclusion of MR alignment will be made based on the result of the survey in summer 2012 carried out after through-holes are recovered. SUMMARY As the main tunnel of the accelerator facility is held by driving piles into the basement layer (gravel mudstone layer), GPS survey found smaller displacement in a horizontal direction than that of reference points on the ground. However deformation in the tunnel and displacement between facilities were well identified. Displacement of the beam line was identified by the survey after earthquake. Displacement of RCS and MR in a vertical direction corresponded to the relief of basement layer. At Beam transport line displacement at expansion joints in a tunnel was large. Based on these results, alignment was carried out for all the facilities except for RCS and the beam operation restarted in December 2011. Precise traverse survey of reference points on the ground is being implemented at this moment and more detailed data is expected to be obtained. ACKNOWLEDGMENT Sincere thanks to Dr. Kenji Mishima and Mr. Naohiro Abe of PASCO Co., Ltd. for their cooperation in recovery works of J-PARC facilities immediately after the earthquake such as GPS measurement, precise levelling and so on. REFERENCES [1] National Research Institute for Earth Science and Disaster Prevention (NIED), K-NET, http://www.knet.bosai.go.jp/k-net/data/. [2] Geospatial Information Authority of Japan (GSI), http://www.gsi.go.jp/chibankansi/chikakukanshi_tohoku2.html. [3] N. Tani et al., Proc. of the 8 th Annual Meeting of Paricle Accelerator Society of Japan, Tsukuba, Japan, MOPL04 (2011). [4] T. Morishita et al., Floor deformation of J-PARC Linac after the Tohoku earthquake in Japan, IPAC2011, San Sebastian, Spain, WEPS049, p.2601 (2011). [5] N. Tani et al, Study on the realignment plan for J- PARC 3GeV RCS after the Tohoku earthquake in Japan, IPAC2012, WEPPP085, p.2909 (2012). [6] M. Shirakata et al, Displacement of J-PARC caused by Megaquake, IPAC2011, San Sebastian, Spain, TUPS057, p.1662 (2011).