Sediment Control Log (SCL)

Similar documents

Sediment Trap. A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff through a stabilized spillway.

B805 TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES - OPSS 805

**Temporary Erosion Control**

Continuing Education Associated with Maintaining CPESC and CESSWI Certification

FOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP

Provide sediment tubes for ditch check and Type A inlet structure filter applications that meet the minimum performance requirements of Table 1.

Materials. Use materials meeting the following.

Sediment Trap. At multiple locations within the project site where sediment control is needed.

Rock & Aggregate Drop Inlet Protection

Suitable Applications Sediment traps should be considered for use:

MIDDLESEX COUNTY Department of Planning and Community Development P.O. Box 427, Saluda, VA Phone: Fax:

Instream Sediment Control Systems

Selected Site BMPs: Why s the Water Muddy? John C. Hayes, Ph.D., P. E. Biosystems Engineering Clemson University

APPENDIX B WORKSHEETS & EXHIBITS

APPENDIX B DESIGN CRITERIA FOR TEMPORARY WATER QUALITY BMPS USED DURING CONSTRUCTION

In-channel coarse sediment trap Best Management Practice

Culvert and Pipe Phasing

U-Shaped Sediment Traps

Long Valley Meadow Restoration Project

NORTH DAKOTA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TEMPORARY EROSION AND SEDIMENT BEST MANAGEMENT PRACTICES

SILT FENCE EFFECTIVENESS

M. Sloat, AAg., CPESC R.J. Redden, R.P.Bio., A.Sc.T., CPESC. EDI Environmental Dynamics Inc Continental Way Prince George, B.C.

What Is Water Erosion? Aren t they the same thing? What Is Sediment? What Is Sedimentation? How can Sediment Yields be Minimized?

Woodford County Erosion Prevention Plan and Permit. Application #

Stone Outlet Sediment Trap

Template for Sediment and Erosion Control Plan General Instructions

TPDES: Soil, Erosion and Sedimentation Methods

Erosion and Sediment Control Measures 2.7 Silt Fences

UGRC 144 Science and Technology in Our Lives/Geohazards

Template for Sediment and Erosion Control Plan General Instructions. Section Instructions

Agenda. INDOT Office of Environmental Services. Describe Results of FHWA QAR. Landscape and Waterway Permitting Unit. Interviews Site Inspections

APPENDIX A: EROSION & SEDIMENT CONTROL FORMS

[1] Performance of the sediment trap depends on the type of outlet structure and the settling pond surface area.

Sediment Weirs (Instream)

Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow Clayey Soils Type 3 System [1] Supplementary Trap Dispersive Soils

Erosion and Sedimentation Basics

Stormwater Inlet Sediment Traps

STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1. DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT

EROSION AND SEDIMENT CONTROL AT CONSTRUCTION SITES GUIDELINES. City of Moncton Engineering and Environmental Services

Specifications Whitcomb Elementary School Demolition January 15, 2016

Coarse Sediment Traps

CR AAO Bridge. Dead River Flood & Natural Channel Design. Mitch Koetje Water Resources Division UP District

Guide to the use of the Erosion and Sediment Control Evaluation Tool

Chutes Part 5: Rock linings

Erosion Surface Water. moving, transporting, and depositing sediment.

Sediment and Erosion Control Techniques on Stream Restoration Projects

CONSTRUCTION EXIT SEDIMENT BARRIER

Black Gore Creek 2013 Sediment Source Monitoring and TMDL Sediment Budget

STREAM SYSTEMS and FLOODS

Precipitation Evaporation Infiltration Earth s Water and the Hydrologic Cycle. Runoff Transpiration

Working with Natural Stream Systems

Local Conditions-NE Minnesota

Standards for Soil Erosion and Sediment Control in New Jersey May 2012

Sediment Basin (SB) Description. Appropriate Uses. Design and Installation

Sediment Control Practices. John Mathews Ohio Dept. of Natural Resources, Division of Soil and Water Resources

Appendix E Guidance for Shallow Flooding Analyses and Mapping

Rock Sizing for Batter Chutes

Which map shows the stream drainage pattern that most likely formed on the surface of this volcano? A) B)

APPENDIX E GREATER SPRINGFIELD RELIABILTIY PROJECT DRAINAGE ANALYSIS FOR THE NEWGATE/PHELPS ROAD AND THE HATCHETT HILL ROAD AREAS

APPENDIX E. GEOMORPHOLOGICAL MONTORING REPORT Prepared by Steve Vrooman, Keystone Restoration Ecology September 2013

Griswold Creek August 22, 2013

Citizens Photo Monitoring Report. Prepared by Sakhalin Environment Watch & Pacific Environment. Sakhalin II Pipeline Route October & December 2007

Four Mile Run Levee Corridor Stream Restoration

STREAM RESTORATION AWRA Summer Specialty Conference, GIS and Water Resources IX

Gully Erosion Part 1 GULLY EROSION AND ITS CAUSES. Introduction. The mechanics of gully erosion

ONE ROCK DAM ORD. capture more sediment. The original ORD becomes the splash apron for the new layer. STEP 4: When ORD fills in, add a new layer

Rock Sizing for Small Dam Spillways

The Hydrologic Cycle STREAM SYSTEMS. Earth s Water and the Hydrologic Cycle. The Hydrologic Cycle. Hydrologic Cycle

Year 6. Geography. Revision

Limited Visual Dam Safety Inspections OA Oahu Reservoir No Oahu, Hawaii

Appendix F Channel Grade Control Structures

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY

Rosgen Classification Unnamed Creek South of Dunka Road

Bachelor of Biosystems Technology Faculty of Technology South Eastern University of Sri Lanka

Stormwater Guidelines and Case Studies. CAHILL ASSOCIATES Environmental Consultants West Chester, PA (610)

Observations on Surface Water in the Seminary Fen in Spring, Prepared 6/4/13 by Sam Wetterlin; updated 7/28/13

Module 5: Channel and Slope Protection Example Assignments

Why Geomorphology for Fish Passage

GEOL 1121 Earth Processes and Environments

Best Management Practices for Coldwater Fisheries Enhancement and Restoration

Lecture Outlines PowerPoint. Chapter 5 Earth Science 11e Tarbuck/Lutgens

Important Copyright Information

WQ Outlet Design Single Orifice Orifice diameter = 24. Perforated riser/orifice Plate Outlet area per perforation row = 4

How Do Human Impacts and Geomorphological Responses Vary with Spatial Scale in the Streams and Rivers of the Illinois Basin?

ATTACHMENT D SNOW REMOVAL AND DE-ICING PROCEDURES

Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services

Orica Australia Pty Ltd Ammonium Nitrate Facility Upgrade

Black Gore Creek Total Maximum Daily Load Sediment Source Monitoring 2007 Vail Pass, Colorado

EROSION CONTROL FIELD GUIDE By Craig Sponholtz & Avery C. Anderson

ARMORED DITCH DEGRADATION AND ISSUES WITH EROSION

Hydrologic hazards can be considered in three categories; An indication of flooding potential for areas located

CUMO INSPECTION REPORT #6 Page 1

Rock Sizing for Waterway & Gully Chutes

Module 4: Overview of the Fundamentals of Runoff and Erosion

GOAL 7 AREAS SUBJECT TO NATURAL DISASTERS AND HAZARDS. To protect life and property from natural disasters and hazards.

SESSION 6: FLUVIAL LANDFORMS

Acronyms. Section 10. Acronyms, Glossary and Bibliography. Following is a list of acronyms used in this Manual:

Subject Name: SOIL AND WATER CONSERVATION ENGINEERING 3(2+1) COURSE OUTLINE

Stormwater Outlet Sediment Traps

Transcription:

Description A sediment control log is a linear roll made of natural materials such as straw, coconut fiber, or other fibrous material trenched into the ground and held with a wooden stake. Sediment control logs are also often referred to as "straw wattles." They are used as a sediment barrier to intercept sheet flow runoff from disturbed areas. Appropriate Uses Sediment control logs can be used in the following applications to trap sediment: As perimeter control for stockpiles and the site. As part of inlet protection designs. As check dams in small drainage ditches. (Sediment control logs are not intended for use in channels with high flow velocities.) On disturbed slopes to shorten flow lengths (as an erosion control). Photographs SCL-1 and SCL-2. Sediment control logs used as 1) a perimeter control around a soil stockpile; and, 2) as a "J-hook" perimeter control at the corner of a construction site. As part of multi-layered perimeter control along a receiving water such as a stream, pond or wetland. Sediment control logs work well in combination with other layers of erosion and sediment controls. Design and Installation Sediment control logs should be installed along the contour to avoid concentrating flows. The maximum allowable tributary drainage area per 100 lineal feet of sediment control log, installed along the contour, is approximately 0.25 acres with a disturbed slope length of up to 150 feet and a tributary slope gradient no steeper than 3:1. Longer and steeper slopes require additional measures. This recommendation only applies to sediment control logs installed along the contour. When installed for other uses, such as perimeter control, it should be installed in a way that will not produce concentrated flows. For example, a "J-hook" Sediment Control Log installation may be appropriate to force runoff to pond and Functions evaporate or infiltrate in multiple areas rather than concentrate Erosion Control Moderate and cause erosive conditions parallel to the BMP. Sediment Control Yes Site/Material Management No November 2010 Urban Drainage and Flood Control District SCL-1

Sediment Control Log (SCL) Although sediment control logs initially allow runoff to flow through the BMP, they can quickly become a barrier and should be installed is if they are impermeable. Design details and notes for sediment control logs are provided in Detail SCL-1. Sediment logs must be properly trenched and staked into the ground to prevent undercutting, bypassing and displacement. When installed on slopes, sediment control logs should be installed along the contours (i.e., perpendicular to flow). Improper installation can lead to poor performance. Be sure that sediment control logs are properly trenched, anchored and tightly jointed. Maintenance and Removal Be aware that sediment control logs will eventually degrade. Remove accumulated sediment before the depth is one-half the height of the sediment log and repair damage to the sediment log, typically by replacing the damaged section. Once the upstream area is stabilized, remove and properly dispose of the logs. Areas disturbed beneath the logs may need to be seeded and mulched. Sediment control logs that are biodegradable may occasionally be left in place (e.g., when logs are used in conjunction with erosion control blankets as permanent slope breaks). However, removal of sediment control logs after final stabilization is typically recommended when used in perimeter control, inlet protection and check dam applications. SCL-2 Urban Drainage and Flood Control District November 2010

November 2010 Urban Drainage and Flood Control District SCL-3

Sediment Control Log (SCL) SCL-4 Urban Drainage and Flood Control District November 2010

November 2010 Urban Drainage and Flood Control District SCL-5