Co-O MINE MINERAL RESOURCE UPDATE

Similar documents
For personal use only

BANANGHILIG GOLD DEPOSIT: STERILISATION DRILLING UPDATE

A1 GOLD MINE 14 LEVEL STOCK WORKS TARGET FURTHER HIGH GRADE DRILL INTERCEPTS

DISCOVERY OF MINERALISED PORPHYRY & MAGNETITE-COPPER-GOLD AT KAMARANGAN

For personal use only

STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE AT SYNDICATED S 100% BARBARA SOUTH LODE

Developing the +1.2Moz Pilbara Gold Project

The Manager Companies ASX Limited 20 Bridge Street

Trouser Legs Mine Strong Drilling Results - including g/t Au Potential for Further Mine Development

For personal use only

High Grade Gold Intercepts at Bangaba

TWO HIGH-GRADE GOLD ZONES DISCOVERED AT HERMES GOLD PROJECT

For personal use only

TANDARRA GOLD PROJECT DRILLING COMMENCES AND FOUR EAGLES GOLD PROJECT DRILLING UPDATE

FIVE RIGS DRILLING AT KARLAWINDA

New Drilling Program Commences at Mutiny s Deflector Deposit

NEW DISCOVERIES AT THE RED OCTOBER MINE

FOUR EAGLES MINERALISATION REPORT ACCEPTED AND DRILLING TO RECOMMENCE

BAROBO MINERALISED CORRIDOR

ROE HILLS COBALT AND GOLD DRILLING ADVANCES

DIAMOND AND AIR CORE DRILLING TO COMMENCE ON WHITELAW GOLD BELT

High Grade Gold Drill Results Extend Buccaneer

For personal use only

ASX ANNOUNCEMENT 21 MARCH 2011

For personal use only

For personal use only

ASX/Media Announcement 14 July 2010

ASX/Media Announcement

HIGH-GRADE GOLD MINERALISATION CONTINUES ALONG STRIKE AT THE BODDINGTON SOUTH GOLD PROJECT

EXPLORATION SUCCESS AT COYOTE GOLD MINE

KINGSTON RESOURCES LIMITED

BUNDARRA RESOURCE UPDATE

GEOPACIFIC REPORTS HIGH GOLD VALUES IN AUGER SOIL SAMPLES FROM THE QALAU AND TATAIYA PROSPECTS, RAKI RAKI PROJECT,

High Grade Gold Results from RAB Drilling at the Central Bore Prospect

More growth at Wa Gold Project as Julie-Collette resource increases to 410,700 ounces

Hits of up to 123gpt show Chesterfield emerging as a high grade gold project

Hampton Hill Mining NL

For personal use only

Ausgold awarded EIS grant for Jinkas deep drilling

$2.5 Million Resource Drilling Program Commences at Siberia Mining Centre

ASX Announcement 24 December Drilling results confirm depth potential of Lamboo Project

MARCH 2010 QUARTERLY REPORT

Ovoot Coking Coal Project (100%)

Further Extensions to the Netiana Lodes at Balogo, Burkina Faso

For personal use only

For personal use only

For personal use only

New High Grade Gold-Copper Extensions At Mutiny s Deflector Deposit Highlight Project s Significant Growth Potential

ASX RELEASE ACTIVITY UPDATE SPARGOVILLE PROJECT WA MINING AND EXPLORATION

RC DRILLING TO RESUME THIS WEEK AT CARLISLE REEFS

Market Release October

New Zone of High Grade Gold Mineralisation Discovered at Balogo, Burkina Faso

For personal use only

Norwest successfully lists on ASX, Drilling commenced at Warriedar Gold Project

EXPLORATION UPDATE: BODDINGTON SOUTH GOLD PROJECT AND DOOLGUNNA STATION PROJECT

LINGIG PORPHYRY COPPER DISCOVERY

Helix Resources Limited A.C.N Incorporated in Western Australia

Diamond Drilling Extends the Netiana Lodes at Depth

New High Grade Lode Discovered at Wagtail South

For personal use only

New Zone of High Grade Gold Discovered at Balogo

NEW PHASE OF RESOURCE EXTENSION AND UPGRADE DRILLING COMMENCES AT BARDOC GOLD PROJECT, WA

For personal use only

ASX Announcement. New economic gold results confirm Dave East as an exciting new discovery. Highlights. 4 July 2011

For personal use only

High-grade Copper and Gold Discovered at Productora

High-grade Gold in First Drilling Undertaken at Productora South

FURTHER DRILLING SUCCESS AT BARLEE GOLD PROSPECT

Kalman Mineral Resource Update

For personal use only

Hann Prospect New Gold Discovery Confirmed

ASX Release and Media Announcement 27 September Central Eyre Iron Project 2011 Stage VI Drilling Programme Completion

ASX Announcement NAKRU DRILLING AND TRENCHING INTERSECTS 11 METRES AT 2.84 G/T GOLD AND 28.4 METRES AT 1.1% COPPER

For personal use only

LATEST RESULTS FROM RC DRILLING

Haoma Mining NL DALTONS-MT WEBBER DEPOSIT; UPGRADE TO INDICATED RESOURCE CATEGORY FOR MAIN SOUTHERN ZONE

JV PROJECT UPDATE JORC COAL RESOURCE

For personal use only

MINCOR /GOLDEN RIM FIJI JOINT VENTURE SIGNIFICANT NEW EXPLORATION RESULTS

For personal use only

For personal use only

FOCUS MINERALS REPORTS ENCOURAGING FIRST ROUND RESULTS FROM COOLGARDIE NEAR MILL PROGRAMME

CORPORATE UPDATE. Feasibility Study being finalised for completion towards the end of April.

704,000 OUNCE MIYABI GOLD PROJECT UPDATE

SIGNIFICANT GOLD MINERALISATION INTERSECTED AT MANIEMA PROJECT, DRC 21.7m at 3.58g/t Au HIGHLIGHTS

DECEMBER QUARTERLY REPORT

Additional significant gold and copper intercepts obtained in Sweden

FIRST ASSAYS FROM FALUN DRILLING CONFIRM HIGH GRADE GOLD MINERALISATION

SECOND ADVANCED GOLD PROJECT IDENTIFIED AT THREE RIVERS PROJECT

Option agreement with Randgold set to commercialise Massigui Gold Project

Highlights. Wa Project. Kandia Prospect. South Wa. Julie West Jang Trend. Corporate

For personal use only

Initial Gold Resource at Sissingue Tengrela Project (Ivory Coast)

FINANCIERS MANDATED FOR THE DALGARANGA GOLD PROJECT

LATEST DRILL RESULTS REVEALS MINERALISATION OPEN AT STRIKE AND DEPTH AT KATANNING GOLD DEPOSIT

RC Drilling Confirms Zeus Gold Prospect

New Gold Anomalies Outlined at Yako, Burkina Faso

ASX Announcements & Media Release

ASX ANNOUNCEMENT Date: 03 October 2018 Number: 604/031018

Malachite Resources Limited ABN

Transcription:

MEDUSA MINING LIMITED ABN: 60 099 377 849 Unit 7, 11 Preston Street Como WA 6152 PO Box 860 Canning Bridge WA 6153 Telephone: +618-9367 0601 Facsimile: +618-9367 0602 Email: admin@medusamining.com.au Internet: www.medusamining.com.au ANNOUNCEMENT 06 August 2012 Co-O MINE MINERAL RESOURCE UPDATE (ASX & LSE: MML) Medusa Mining Limited ( Medusa or the Company ), through its Philippines operating company, Philsaga Mining Corporation ( Philsaga ), advises that it has completed the annual resource estimate for the Co-O Mine. In line with the mine expansion, the FY 2012 drilling has focused on infill drilling to increase confidence levels in key mining areas as well as stepout drilling along strike and at depth to demonstrate the excellent upside of the deposit. Whilst, the strike length has been increased by 400 metres to 2,000 metres, and is still open in all directions continuing to demonstrate excellent potential to add more resources in future years, many drill intersections undertaken in the FY 2012 drilling campaign are not incorporated into the resource model as the spacing of the drilling is still too wide along strike and down dip. A 3 g/t gold lower cut-off has been applied to the resource (previously a 0 g/t gold cut-off), resulting in total resources of 6,215,000 tonnes containing 2,019,000 ounces at a grade of 10.1 g/t gold (compared to 1,960,000 ounces at 9.6 g/t gold in FY2011 and after taking into account gold produced of 60,595 ounces since 30 June 2011). The Indicated Resource has increased by 16% to 715,000 ounces at 11.8 g/t gold (from 616,000 ounces at 12.0 g/t gold). Table I. Co-O Mine mineral resource estimate at 30 June 2012 > 3 g/t gold Category tonnes g/t gold ounces Indicated resources 1,890,000 11.8 715,000 Inferred resources 4,325,000 9.4 1,304,000 TOTAL RESOURCES 6,215,000 10.1 2,019,000 Peter Hepburn-Brown, Managing Director of Medusa, commented: This increase in Indicated Resources is pleasing as confidence levels have been significantly improved in key areas of the mine. The step-out drilling strongly supports future resource additions as the mineralised system remains open in all directions including at depth where the deepest ore grade intersection achieved to date is at 1,073 metres below surface. The current wide spacing of many step-out surface drill holes prevents incorporation of their corresponding intersections into the resource model. Drilling is planned to continue with 6 surface and 3 underground rigs during FY 2013 with the aim of raising the resource level to approximately 2,500,000 ounces following which the ongoing drilling programmes will be tailored to replace at a minimum, mined ounces each year to maintain the resource base.

MINERAL RESOURCE MODEL Discussion Drilling has continued since the 27 July 2011 resource model update and this new resource model is based on data available as at 30 June 2012. In line with the mine expansion, surface and underground diamond drilling has focused on infilling in key mining areas to increase confidence levels for detailed mine planning and expanded production. It has also demonstrated considerable upside to the Co-O vein system at the eastern end of the mine, at depth and recently to the west of the Tinago Fault. The step-out drilling along strike has increased the strike length of mineralisation by 400 metres from 1,600 metres to 2,000 metres which is still open east and west and at depth. It should be emphasised that a significant number of step-out drill hole intersections reported since 7 July 2011 cannot be incorporated into the resource estimate as the spacing of drilling is still too wide along strike and down dip. The number of veins in the Co-O Vein system is expanding and, due to the increasing diversity of vein types and grade variability between veins, a 3 g/t lower gold cut-off has been introduced (compared to FY 2011 where a 0 g/t gold cut-off was used). This has increased the global resource grade to 10.1 g/t gold from 9.6 g/t gold. The ounces below the 3 g/t gold cut-off total 60,000 ounces. In addition, level and stope development on some veins during the year showed less continuity of grades than predicted which required some changes to previously estimated grades, and faulting has affected some veins until the offsets are re-located. Table II is a summary of the resources for the major veins. A total of 66 veins have been modelled. Table II. Co-O Mine mineral resource estimates for the major veins at 30 June 2012 with 50,000 ounces > 3 g/t gold Vein name Category tonnes g/t gold contained ounces Central Vein Indicated 324,000 10.3 106,800 Inferred 150,000 3.9 19,000 Jeremy Vein Indicated 122,000 12.4 48,700 Inferred 10,000 4.3 1,400 Great Hamish Indicated 251,000 17.5 140,900 Inferred 258,000 14.6 120,800 Great Hamish East FW Indicated 39,000 12.3 15,400 Inferred 241,000 8.6 66,600 Great Hamish FW2 Indicated 293,000 13.7 128,800 Inferred 432,000 10.5 145,100 Catto 1 Indicated 59,000 12.6 23,800 Inferred 75,000 24.5 59,400 Roysan Indicated 66,000 21.6 46,100 Inferred 88,000 14.1 39,900 East Agsao 1 Inferred 206,000 11.2 73,900 East Agsao 2 Indicated 51,000 9.3 15,300 Inferred 197,000 9.2 58,200 East Agsao 7 Indicated 97,000 8.3 25,900 Inferred 274,000 8.7 76,900 East Agsao 14 Indicated 20,000 6.3 4,000 Inferred 411,000 7.4 97,800 East Agsao 15 Indicated 28,000 6.9 6,100 Inferred 596,000 8.5 162,400 East Agsao 3 Inferred 133,000 15.4 65,800 Other veins Indicated 541,000 8.8 153,000 Inferred 1,253,000 7.9 316,500 Total Indicated Resources (rounded) 1,890,000 11.8 715,000 Total Inferred Resources (rounded) 4,325,000 9.4 1,304,000 TOTAL RESOURCES (rounded) 6,215,000 10.1 2,019,000 Notes: - A lower cut-off of 3 g/t gold has been applied - Variable upper cuts up to 300 g/t gold have been applied to different veins - Rounding to the nearest 1,000 may result in some slight discrepancies in totals.

The increase in confidence levels in key mining areas has boosted the Indicated Resource by 16% to 715,000 ounces from 616,000 ounces. The Indicated Resource will now be used to estimate the new Probable Reserve. It should be noted that 1,252,000 ounces or 62% of the resources are located above level 8, the bottom level to be accessed by the Saga Shaft. Figure 1 (attached) shows the updated 3D resource model. The veins are open at depth, to the east and to the west. The resource model now stretches over a strike length of approximately two kilometres demonstrating excellent potential to add more resources in future years. Figure 2 (attached) is the Level 6 map of the Co-O Mine area showing the veins in the 3D resource model at Level 6. Vein modelling Cube Consulting Pty Ltd of Perth, Western Australia was contracted to undertake the resource estimations. A wireframe model of the vein system and the mine depletions were based on all available information as at 30 June 2012. A Specific Gravity value of 2.62 was used in the estimations. A 2D longitudinal modelling approach was used and is based on an accumulation variable incorporating mineralised vein horizontal width and intercept grade. Variography was used to analyse the spatial continuity of the horizontal width and accumulation variables within the mineralised veins and to determine appropriate estimation inputs to the interpolation process. The accumulation variables were interpolated into blocks using Ordinary Kriging. High grade limits were applied to gold prior to the calculation of the accumulation variable. Mineral resources have been reported in accordance with The 2004 Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code). For further information please contact: Australia Medusa Mining Limited +61 8 9367 0601 Peter Hepburn-Brown, Managing Director United Kingdom Fairfax I.S. PLC +44 (0)20 7598 5368 Financial Adviser and Broker Ewan Leggat/Laura Littley Information in this report relating to Exploration Results has been reviewed and is based on information compiled by Mr Geoff Davis, who is a member of The Australian Institute of Geoscientists. Mr Davis is the Chairman of Medusa Mining Limited and has sufficient experience which is relevant to the style of mineralisation and type of deposits under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves and is a Qualified Person. Mr Davis consents to the inclusion in the report of the matters based on his information in the form and context in which it appears. Information in this report relating to Mineral Resources has been estimated and compiled by Mr Mark Zammit of Cube Consulting Pty Ltd of Perth, Western Australia. Mr Zammit is a member of the Australian Institute of Geoscientists and has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Zammit consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

Figure 1. 3D model of the Co-O vein system and underground workings

Figure 2. Co-O Mine Level 6 plan showing the veins and workings