Crows Landing Naval Base Easement

Similar documents
Template for Sediment and Erosion Control Plan General Instructions. Section Instructions

Template for Sediment and Erosion Control Plan General Instructions

FOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP

Continuing Education Associated with Maintaining CPESC and CESSWI Certification

Rock & Aggregate Drop Inlet Protection

1.0 INSPECTION ANNUAL INSPECTION, JUNE 29, 2011 CARMACKS COPPER PROJECT, CARMACKS, YUKON. Dear Mr. West-Sells,

Materials. Use materials meeting the following.

Swift Creek Sediment Management Action Plan (SCSMAP)

In-channel coarse sediment trap Best Management Practice

3.11 Floodplains Existing Conditions

Citizens Photo Monitoring Report. Prepared by Sakhalin Environment Watch & Pacific Environment. Sakhalin II Pipeline Route October & December 2007

[1] Performance of the sediment trap depends on the type of outlet structure and the settling pond surface area.

ARMORED DITCH DEGRADATION AND ISSUES WITH EROSION

How Do Human Impacts and Geomorphological Responses Vary with Spatial Scale in the Streams and Rivers of the Illinois Basin?

WELCOME Lake Wabukayne OPEN HOUSE

Sediment Trap. A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff through a stabilized spillway.

Black Gore Creek 2013 Sediment Source Monitoring and TMDL Sediment Budget

MIDDLESEX COUNTY Department of Planning and Community Development P.O. Box 427, Saluda, VA Phone: Fax:

Wetland & Floodplain Functional Assessments and Mapping To Protect and Restore Riverine Systems in Vermont. Mike Kline and Laura Lapierre Vermont DEC

Science of Natural Disasters: RIVERS& FLOODS! 27 April 2016

Instream Sediment Control Systems

Gully Erosion Part 1 GULLY EROSION AND ITS CAUSES. Introduction. The mechanics of gully erosion

UGRC 144 Science and Technology in Our Lives/Geohazards

GOAL 7 AREAS SUBJECT TO NATURAL DISASTERS AND HAZARDS. To protect life and property from natural disasters and hazards.

Why Geomorphology for Fish Passage

Bipole III Transmission Project Construction Environmental Protection Plan Construction Section N1 Environmentally Sensitive Site Locations Map 25

U-Shaped Sediment Traps

TABLE OF CONTENTS LIST OF TABLES. Page

APPENDIX E. GEOMORPHOLOGICAL MONTORING REPORT Prepared by Steve Vrooman, Keystone Restoration Ecology September 2013

Sediment Trap. At multiple locations within the project site where sediment control is needed.

Catastrophic Events Impact on Ecosystems

Bipole III Transmission Project Construction Environmental Protection Plan Construction Section N2 Environmentally Sensitive Site Locations Map 81

Assessment. Assessment

ENGINEERING HYDROLOGY

Construction Exits Rock pads

Upper Truckee River Restoration Lake Tahoe, California Presented by Brendan Belby Sacramento, California

¾À 280. ESS Features Heritage. Points of Access* !( Proposed Access Point. !( Archaeological Water. Major Stream Crossing Abandoned Rail Crossing # #

Agenda. INDOT Office of Environmental Services. Describe Results of FHWA QAR. Landscape and Waterway Permitting Unit. Interviews Site Inspections

TPDES: Soil, Erosion and Sedimentation Methods

B805 TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES - OPSS 805

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii)

Working with Natural Stream Systems

Modeling Great Britain s Flood Defenses. Flood Defense in Great Britain. By Dr. Yizhong Qu

Waterborne Environmental, Inc., Leesburg, VA, USA 2. Syngenta Crop Protection, LLC, North America 3. Syngenta Crop Protection, Int.

Stream Geomorphology. Leslie A. Morrissey UVM July 25, 2012

Suitable Applications Sediment traps should be considered for use:

The River Restoration Centre therrc.co.uk. Understanding Fluvial Processes: supporting River Restoration. Dr Jenny Mant

CUMO INSPECTION REPORT #6 Page 1

CCR Rule Annual Inspection Report (cont.) 2

Prepared By: John Blair Sean Donahue Celeste Hoffman Kimberly Klinkers Megan Slater

BRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT

January 17, 2008 File:

Selected Site BMPs: Why s the Water Muddy? John C. Hayes, Ph.D., P. E. Biosystems Engineering Clemson University

Black Gore Creek Sediment Source Monitoring and TMDL Sediment Budget

Steven Noble MDEQ - WRD Enbridge Response Unit

Observations on Surface Water in the Seminary Fen in Spring, Prepared 6/4/13 by Sam Wetterlin; updated 7/28/13

STUDY GUIDE FOR CONTENT MASTERY. Surface Water Movement

How Can DOT Operations and Maintenance Prepare for Extreme Weather Events?

Four Mile Run Levee Corridor Stream Restoration

33. Eroding downstream left bank, new bridge, Attlebridge (TG ).

CR AAO Bridge. Dead River Flood & Natural Channel Design. Mitch Koetje Water Resources Division UP District

PRELIMINARY ENGINEERING REPORT FOR SANITARY SEWER COLLECTION SYSTEM OSKALOOSA, IOWA 2017

Flash flood disaster in Bayangol district, Ulaanbaatar

Stream Restoration and Environmental River Mechanics. Objectives. Pierre Y. Julien. 1. Peligre Dam in Haiti (deforestation)

Surface Processes Focus on Mass Wasting (Chapter 10)

PEACE REGION GRANDE PRAIRIE GEOHAZARD RISK ASSESSMENT SITE INSPECTION FORM NAD 83 COORDINATES N 6,178,811 E 403,309

3.12 Geology and Topography Affected Environment

STREAM SEDIMENT MONITORING PROGRAM FOR ILLINOIS. Nani G. Bhowmik and J. Rodger Adams

Learning Objectives: I can identify and interpret river flows and directions.

Griswold Creek August 22, 2013

THREAT CATEGORIES Level 1 Level 1 Level 2 Level 2 Level 3 Level Residential development. Commercial and.

PEACE RIVER EAST HILL - HWY 2:60 (PH2) SELECT PHOTOGRAPHS August 22, 2007 File: Photo E003. Station May 2007

Sediment Weirs (Instream)

Stormwater Outlet Sediment Traps

GEOL 1121 Earth Processes and Environments

Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow Clayey Soils Type 3 System [1] Supplementary Trap Dispersive Soils

Orica Australia Pty Ltd Ammonium Nitrate Facility Upgrade

Appendix E Guidance for Shallow Flooding Analyses and Mapping

Independent Environmental Audit Erosion and Sediment Control

STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1. DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT

Monitoring of suspended sediment concentration in discharge from regulated lakes in glacial deposits

Hydrologic hazards can be considered in three categories; An indication of flooding potential for areas located

APPENDIX A: EROSION & SEDIMENT CONTROL FORMS

October 26, Ms. Aimee Zack Canadian Pacific 120 S. Sixth Street Suite 900 Minneapolis, Minnesota 55402

This report was prepared by Klohn Crippen Consultants Ltd. for Alberta Transportation Central Region under Contract No. CE053/2000.

Instream Erosion Control General

The last three sections of the main body of this report consist of:

Need of Proper Development in Hilly Urban Areas to Avoid

COMMUNITY EMERGENCY RESPONSE TEAM FLOODS INTRODUCTION

Coarse Sediment Traps

SAN JACINTO RIVER / BAUTISTA CREEK LEVEE SYSTEM RIVERSIDE COUNTY, CALIFORNIA NLD ID #

Conceptual Model of Stream Flow Processes for the Russian River Watershed. Chris Farrar

Chutes Part 5: Rock linings

Use of SWAT to Scale Sediment Delivery from Field to Watershed in an Agricultural Landscape with Depressions

SILT FENCE EFFECTIVENESS

Conservation Planning evaluate land management alternatives to reduce soil erosion to acceptable levels. Resource Inventories estimate current and

COLUSA BASIN WATERSHED ASSESSMENT. Final. Prepared by: H. T. Harvey & Associates. In Collaboration With:

Montana s Noxious Weeds: Integrated Weed Management

Review of Riparian Function Riparian Management Riparian Monitoring

CONSTRUCTION EXIT SEDIMENT BARRIER

Transcription:

1 of 15 West Stanislaus Resource Conservation District Crows Landing Naval Base Easement Annual Reserve Monitoring Report Jamie McFarlin 11/112012

2 of 15 West Stanislaus Resource Conservation District P.O. Box 193 Patterson, CA 95363 11/1/2012 As outlined in the Environmental Resource Plan, an annual monitoring event was conducted on the Crows Landing Naval Airstrip (Agricultural Outlease) on August 30, 2012. The most recent prior monitoring event was conducted in November of 2010 by Melanie Fisher. At that time, it was reported that there was significant sediment build-up in creeks, culverts, and drains, and that wells on the property presented a concern for groundwater contamination. Based on my observations, I would like to reiterate the concerns expressed in the monitoring report from November of 2010, and elaborate on the existence of some very significant environmental risks on the property. Creeks, culverts, and drains on the property are severely congested by sediment build-up and vegetation. One example of the problems that are occurring as a result is the condition of the Marshall Drain, adjacent to fields 1 and 2. The Marshall Drain is so elevated above the adjacent fields by sediment build-up that the natural direction of water flow is into the margins offields 1 and 2. This is causing severe ponding, particularly in field 2. While the operator is actively pumping this water to manage the flooding, erosion is almost certainly occurring in those fields. Furthermore, water pumped back into the drain likely contains an increased sediment load and synthetic materials (pesticides, fertilizers). It is necessary that this drainage is restored to improve the water holding capacity andreestablish drain function on the property. Wells on the property are mostly unused and highly exposed, with the exception of well6/8-20g in field 10 which is currently being operated. Although it appears that the operator has capped unused wells on the property, the potential for unwanted contaminants (pesticides, fertilizers) to pollute groundwater directly through these old wells remains high. Well6/8-20C1 in field 8 has the acute problem of surface water surrounding the wellhead draining directly into the well, despite having been capped. On the day of the monitoring event surface water was observed draining directly into the well, most likely through areas of the pipe that have deteriorated. This is a matter affecting groundwater quality that requires further investigation and immediate attention. I would like to impress that these problems will only continue to worsen, and the risk of negative environmental impact to Stanislaus County surface water, groundwater, and soil will only continue to increase without proper management. Observed August 30, 2012 Jamie McFarlin Resource Conservation Technician East Stanislaus Resource Conservation District

3 of 15 Monitoring Methods The Crows Landing Naval Airstrip was toured via a vehicle and on foot. The current operator was contacted prior to the monitoring event, but was not present as an observer. Observers included West Stanislaus Resource Conservation District directors, and Jamie McFarlin, Resource Conservation Technician with the East Stanislaus Resource Conservation District. Monitoring consisted of: 1. Visual observations made on: a. airstrip i. garbage, debris ii. deterioration/ damage b. fields i. irrigation water management ii. weed presence iii. crop residue management c. creeks, culverts, drains i. sediment build-up ii. establishment of vegetation in channels iii. potential for pollutants to enter waterways iv. trash/ debris d. wells i. potential for pollutants to enter groundwater ii. in use/not in use 2. Inspection of equipment being actively operated a. compliance with diesel emissions regulations 3. Photo documentation a. See figures 1-15 Brief Summary of Findings 1. Airstrip Garbage and debris present on airstrip, but no damage observed 2. Fields Operator is responsibly managing fields, with minor weed presence on field margins, and active management of irrigation water. Crop residue is present in fields not currently in production. 3. Creeks, Culverts, Drains Creeks, culverts and drains overall are severely congested by sediment build-up and vegetation, and present a serious environmental risk. 4. Wells While capped, wells remain highly exposed and present an extreme environmental risk. There is evidence that surface water is able to drain into groundwater in at least one unused well on the property. 5. Equipment Equipment complies with air and water quality regulations.

4 of 15 Figure I. Well 618-8], Field 3 Figure 2. In-usc Well in Field 3 Figure 3. Well6/8-20CI in Field 8-Surface water observed draining directly into groundwater through areas where pipe has deteriorated.

5 of 15 Figure 4. Drainage ditch congested by vegetation, trash, debris Figure 5. Well-managed and clean pickup ditch between fi elds Figure 6. Drainage ditch with maj or reduction of water-holding capacity due to vegetation and sediment build-up

6 of 15 Figure 7. Culvert in-flow obstruction Figure 8. Culvert (same as Figure 7) demonstrating severe sediment build-up Figure 9. Operator using a stationary engine to pump irrigation water into pickup ditch from field

7 of 15 Figure 10. Flooding in fields 1 &2, adjacent to Marshall Drain (upslope) Figure 11. Operator pumping water from field 1&2 into the Marshall Drain Figure 12. Marshall Drain, adjacent to fields I & 2-Note elevation of drain due to sediment build-up, as well as the establishment of vegetation.

8 of 15 Figure 13. Marshall Drain, severely congested with vegetation and debris between field 2 and Wildlife Area Figure 14. Marshall Drain, adjacent to Wildlife Area-Note surface of water is almost level with road. Figure 15. Structure and Garbage left on or near airstrip

Annual Reserve Monitoring Report 12012 CORRESPONDENCE NO. 4 9 of 15 Production Areas (YIN) Field Soil Drains Debris/Trash Crop In Noxious Minimum Pesticide and Proper Irrigation Erosion I Excess Obstructed Present Residue Compliance Weeds Tillage Being Nutrient Crop Water Runoff Properly with Air Present Practiced Application Rotation Properly Observed Managed and Water Decisions Schedules Managed Quality Supported by Followed Regulations Licensed PCA 1 N N N y y y y Unknown N/A N 2 N N N y y y y Unknown N/A N 3 N N N y y y y Unknown N/A y 4- N N N y y y y Unknown N/A y 5 N N N y y y y Unknown N/A y 6 N N N y y y y Unknown N/A y 7 N N N y y y y Unknown N/A y 8 N N N y y y y Unknown N/A y 9 N N N y y y y Unknown N/A y 10 N N N y y y y Unknown N/A y -- -- Comments/Suggestions: Production areas are being managed responsibly by tenants. At time of monitoring, fields 3-10 were in production. Fields 1 and 2 had some residue, properly managed. Producer is actively using a pumping system to direct water in the fields into drainage channels. There is major ponding of irrigation/ storm water on fields 1 and 2 entirely due to neglected maintenance of adjacent Marshall Drain, see Sediment Basin/Tailwater Return System below.

Annual Reserve Monitoring Report 12012 CORRESPONDENCE NO. 4 10 of 15 Sediment Basin/Tailwater Return System (Y /N) Bank Erosion Marshall Rd Debris/Trash Noxious General Weeds Sediment Tailwater Buried Excessive Drain present Weeds present and Plant Levels Return Pump Pipelines in Tail water Obstructed or Material Inhibiting in Working Useable Leaving the in Ill-Repair Obstructing Water Holding Condition Condition Property Flow Capabilities of Basin N y y y y y y unknown N --- - - - Comments/Suggestions: Significant sediment build-up has elevated Marshall Drain above adjacent fields and has decreased overall water holding capacity of the drain, and is causing severe flooding on fields 1 and 2 (observed at time of monitoring). Tenant is actively pumping out ponding water from fields and back into the Marshall Drain, but does not appear to have the ability to do so in a way that remediates ponding. Heavy general weed presence apparent in drains/ creek throughout the property further obstructs flow. Debris/trash and weeds are all also present in and around drains.! I I I 2

Annual Reserve Monitoring Report 12012 CORRESPONDENCE NO. 4 11 of 15 Wetland and Wildlife Habitat (Y /N) Site Bank Erosion Culverts Obstructed Debris/Trash Noxious Weeds Waterways Damage to Native (sediment/ plant Present Present Obstructed Vegetation material) (sediment/ plant material) Little Salado Creek N y y y y N Boy Scout Wildlife N y y y y N Area Comments/Suggestions: Marshall Drain/Little Salado Creek and its incorporated culverts are extensively congested by sediment build-up, woody debris, and weeds. Obstructions of flow will certainly result in stream diversion through adjacent fields during rains, as already observed in past winter and spring rains. Flow water that is diverted through the fields will (continue to) cause erosion of the field borders, sediment mass movement, and possible water contamination in Little Salado Creek. 3

Annual Reserve Monitoring Report 12012 CORRESPONDENCE NO. 4 12 of 15 Water Wells (Y /N) Well Number & Field Location Stationary Internal Combustion Surface Water Runoff Able to Reach Mixing, Loading, Rinsing, or Storage Engine(s) Comply with Rule 4702, Wellhead? of Pesticides Occurring Adjacent to Diesel Emissions Wellhead 6/8-8], Field 3 y N N 6/8-20C 1, Field 8 NA y N 6/8:20G, Field 10 y N N --- -- -- - - - Comments/Suggestions: It appears that there are two wells currently being utilized by tenants, one of which is 6/8-20G in field 10. The other is an unidentifiable well in field 3. Both well 6/8-20G and the second hypothesized well are being operated using a stationary diesel engine. Well6/8-8J in field 3 is not in use, and has been capped. Well 6/ 8-20Cl in field 8 is not in use, and has the acute problem of surface water surrounding the wellhead draining directly into the well, despite having been capped. On the day of the monitoring event surface water was observed draining directly into the well, most likely through areas of the pipe that have deteriorated. This is a matter affecting groundwater quality that requires immediate attention. 4

Annual Reserve Monitoring Report 12012 CORRESPONDENCE NO. 4 13 of 15 Restrictive Covenant Area (Y /N) New Well Construction Groundwater from Existing Wells Being Utilized Construction Activities Creating Groundwater Recharge y y N Comments/Suggestions: Pumping is actively occurring on well 6/8-20G, field 10. No other previously identified wells are currently in use. There does, however, appear to be another well in operation on field 3 that could not be identified as well6/8-8j, and is therefore hypothesized to be a new well. Both wells are being operated by a stationary engine. 5

Annual Reserve Monitoring Report 12012 CORRESPONDENCE NO. 4 14 of 15 Pickup Ditches (Y /N) Bank Erosion Culverts Obstructed Debris/Trash Present Noxious Weeds Present Water Flow Obstructed (sediment/ plant material) (sediment/plant material) N y y N y - - Comments/Suggestions: Pickup ditches are in great need of maintenance, particularly in and around culverts. Sediment buildup and plant material are obviously impeding the flow of water through culverts, and in some parts of the ditches. The probability that culverts will not be able to handle any larger volumes of water (i.e. storm events) is very high. 6

Annual Reserve Monitoring Report 12012 CORRESPONDENCE NO. 4 15 of 15 General Maintenance Areas (YIN) Airstrips Damaged from Paved Roads Damaged from Weed Infestations Along Existing Fences in Disrepair Trash and Debris Present on Track-Laying Equi]:>_ment Track-Laying Ectuii>_ment Roadsides and Storage Areas Property N N y N/A y I _j --- -- Comments/Suggestions: A moderate amount of trash and abandoned structures (i.e. a trailer, equipment) can be found on and around the airstrip. Weeds are present along roadsides and the airstrip, but do not appear to be presenting a problem and do not appear to be creeping into agricultural fields. 7