ISSUED FOR CONSTRUCTION

Similar documents
NRCS - THUNDER ROAD #2, TRIBUTARY TO QUILEUTE RIVER CULVERT REMOVAL AND REPLACEMENT PLAN CLALLAM COUNTY, WA., WRIA: 20, SITE:

12"CMP DIA. ELEV. PVC CI DI CMP VCP RCP RCAP LRCP LCPP STA. LA LB BM-2 ROW PI POT LF TH PVC

B805 TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES - OPSS 805

NRCS - THUNDER ROAD #3, TRIBUTARY TO QUILEUTE RIVER CULVERT REMOVAL AND REPLACEMENT PLAN CLALLAM COUNTY, WA., WRIA: 20, SITE:

Construction Exits Rock pads

APPENDIX B WORKSHEETS & EXHIBITS

Materials. Use materials meeting the following.

Construction Exits Vibration grids

Central Queensland Coal Project Appendix 4b Geotechnical Assessment. Environmental Impact Statement

SECTION AGGREGATE OR GRANULAR SUBBASE

Rock & Aggregate Drop Inlet Protection

December 11, 2006 File:

AGENDA ITEM 6 APPENDIX /0151/DET GROUND WATER & SURFACE WATER MANAGEMENT PLAN

3.12 Geology and Topography Affected Environment

THE MINISTRY OF ENERGY AND ENERGY INDUSTRIES MINERALS DIVISION MINE DESIGN TEMPLATE OPERATOR NAME: OPERATOR ADDRESS: PHONE NUMBER: FACSIMILE:

Bipole III Transmission Project Construction Environmental Protection Plan Construction Section N2 Environmentally Sensitive Site Locations Map 81

Orica Australia Pty Ltd Ammonium Nitrate Facility Upgrade

Fish Passage at Road Crossings

Background. Valley fills Sites in the Area. Construction over Mine Spoil Fills

Coarse Sediment Traps

[1] Performance of the sediment trap depends on the type of outlet structure and the settling pond surface area.

U-Shaped Sediment Traps

January 12, 2006 File:

RIPRAP ASSESSMENT VARIOUS SITES HWY 40 NEAR GRANDE CACHE, AB

FOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP

APPENDIX B DESIGN CRITERIA FOR TEMPORARY WATER QUALITY BMPS USED DURING CONSTRUCTION

Bipole III Transmission Project Construction Environmental Protection Plan Construction Section N1 Environmentally Sensitive Site Locations Map 25

Pierce County Department of Planning and Land Services Development Engineering Section

Provide sediment tubes for ditch check and Type A inlet structure filter applications that meet the minimum performance requirements of Table 1.

Case Study 14. Rocky Creek Vented Box Culvert Ford

GEOSYNTHETICS ENGINEERING: IN THEORY AND PRACTICE

Appendix F Channel Grade Control Structures

Stone Outlet Sediment Trap

Stormwater Inlet Sediment Traps

How & Where does infiltration work? Summary of Geologic History Constraints/benefits for different geologic units

1.0 INSPECTION ANNUAL INSPECTION, JUNE 29, 2011 CARMACKS COPPER PROJECT, CARMACKS, YUKON. Dear Mr. West-Sells,

February 18, 2003 File: NORTH CENTRAL REGION LANDSLIDE ASSESSMENT HWY 43:16 WHITECOURT EAST HILL (NC1) 2002 ANNUAL INSPECTION REPORT

ALUMINUM STRUCTURAL PLATE HEADWALLS AASHTO LRFD BASIS OF DESIGN

Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services

Flood and Stream Restoration

Chutes Part 5: Rock linings

Sediment Weirs (Instream)

¾À 280. ESS Features Heritage. Points of Access* !( Proposed Access Point. !( Archaeological Water. Major Stream Crossing Abandoned Rail Crossing # #

CHAPTER GEOLOGICALLY HAZARDOUS AREAS Applicability Regulations.

3.18 GEOLOGY AND SOILS

PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 3-0

This Specification is for the supply of sands, crushed rock and crushed scoria to Melbourne Water work sites.

Stream Simulation: A Simple Example

Woodford County Erosion Prevention Plan and Permit. Application #

Design and Construction

Black Gore Creek 2013 Sediment Source Monitoring and TMDL Sediment Budget

ROCK EXCAVATION (GRADING) OPSS 206 INDEX

NORTHUMBERLAND COUNTY, PA

Template for Sediment and Erosion Control Plan General Instructions. Section Instructions

Addressing the Impact of Road-Stream Crossing Structures on the Movement of Aquatic Organisms

Hydraulic conductivity of granular materials

REPORT ON THE ASSESSMENT OF TRENCHING INTHE ROAD RESERVE OF THE ROAD BETWEEN BEAUFORT WEST AND CARNAVON.

R.M.HARW & ASSOCIATES LTD. GEOTECHNICAL INVESTIGATION PROPOSED BRIDGE SITE. HELAVA CREEKl MILE MACKENZIE HIGHWAY E-2510 OCTOBER 16, 1973

ON CONCAVE SLOPES, landslides usually initiate just above the slope break, where seepage is common.

Track design and management

This report was prepared by Klohn Crippen Consultants Ltd. for Alberta Transportation Central Region under Contract No. CE053/2000.

LOGAN

SIEVE ANALYSIS. Introduction

@Copyright 2016 SKAPS Industries.

2012 Road School Light Weight Deflectometer (LWD)

Geology, Soils, and Seismicity

Updated Subsurface Investigation Block A Heritage Hills Development 124 Battersea Crescent Ottawa, Ontario

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON

TABLE OF CONTENTS LIST OF TABLES. Page

Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow Clayey Soils Type 3 System [1] Supplementary Trap Dispersive Soils

Selected Site BMPs: Why s the Water Muddy? John C. Hayes, Ph.D., P. E. Biosystems Engineering Clemson University

North Slope Tundra Travel and Ice Road Construction By Alaska Department of Natural Resources. Wyn Menefee & Gary Schultz

Preliminary Geotechnical Evaluation Gooseberry Point Pedestrian Improvements Whatcom County, Washington SITE AND PROJECT DESCRIPTION

RAILWAYS AND FISH: HOW TO PROTECT AND ENHANCE FISH HABITAT VALUES AT STREAM CROSSINGS THROUGH PROJECT DESIGN AND CONSTRUCTION

Geosynthetics Applications and Performance Reviews Select Case Histories

Re: Steep Slope Assessment for 2465 Waverly Drive, Blind Bay, BC; Legal Address: Lot 39, Section 18, Township 22, Range 10, Plan 25579, W6M, KDYD.

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii)

NHBRA SOIL LABORATORY SECTION INTERIM REVISED TEST RATES FOR THE MATERIALS LABORATORY

TSEGI WASH 50% DESIGN REPORT

APPENDIX E. GEOMORPHOLOGICAL MONTORING REPORT Prepared by Steve Vrooman, Keystone Restoration Ecology September 2013

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1]

February 22, 2016 AG File No

CR AAO Bridge. Dead River Flood & Natural Channel Design. Mitch Koetje Water Resources Division UP District

Wellsgate Terrace SPECIFICATIONS.

Rock Sizing for Waterway & Gully Chutes

ALBERTA TRANSPORTATION PEACE REGION (PEACE RIVER / HIGH LEVEL) INSTRUMENTATION MONITORING RESULTS

STRUCTURAL STABILITY ASSESSMENT

25th International Conference on Ground Control in Mining

The last three sections of the main body of this report consist of:

January 17, 2008 File:

1. PROJECT BACKGROUND. July 18, Alberta Infrastructure & Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8

SLOPE STABILITY EVALUATION AND ACCEPTANCE STANDARDS

20217 CLEAR STONE TON $14.20 $5, $ $ $ %

Template for Sediment and Erosion Control Plan General Instructions

September 3, 2009 File: NORTH CENTRAL REGION GEOHAZARD ASSESSMENT HWY 40:28 NORTH OF CADOMIN (NC50) 2009 ANNUAL INSPECTION REPORT

East Branch Grand Calumet River Great Lakes Legacy Act Sediment Remediation and Restoration Project

Field Indicators of Inlet Controlled Road Stream Crossing Capacity

CCR Rule Annual Inspection Report (cont.) 2

Erosion and Sediment Control Measures 2.7 Silt Fences

HYDROLOGY AND HYDRAULICS MUSKEG RIVER BRIDGE

Transcription:

PAGE No. DESCRIPTION 1 Cover Page 2 Overview Map 3 Western Road Plan View 4 Eastern Road Plan View West Road Profiles & Cross Sections 6-7 East Road Profiles 8- East Road Cross Sections 11-14 Campsite Profiles 1 Boat Launch Parking 16 Volume Tables 17 General Notes & Materials Location: Northing 4614 Easting 324767 UTM Zn 9 Survey Date: Oct., 217 Approval Date: Jan. 24, 218 Drawing Number: 177 Page: 1 of 17

EXISTING PLAN 1:1 1 1:1 7m N Refer to page 16 for Boat Launch Parking Refer to page 3 for Western Road Site 1 Site 6 Site 7 Site Site 2 Site 3 Site 8 Site 4 Sign Pit Toilets Site 9 Site 1 Refer to page 4 for Eastern Road Site 16 Sign Pit Toilet Site 27 Site 19 Site 26 Pit Toilet Site 47 Site 2 Site 23 Site 21 Site 46 Site 24 Site 22 +4 Site 44 Seepage Site 2 Pit Toilets +6 +42 Site 48 +8 +4 Site 42 Site 49 + +38 +12 Site 4 Site 29 +36 +14 +34 +16 Site 28 Site 38 +32 +18 Site 3 +3 +2 Site 36 Site 31 +28 Site 34 +26 +22 +24 Site 37 Site 32 Site 33 Site 3 +44 Site 13 +73 Site Site 11 +3 +2 + +48 +46 Site 43 Site 41 Site 39 +7 +6 Pit Toilet Site 4 +4 Ditch Treeline Overhead Power Lines (13 kv) Overhead Power Lines (23 kv) Power Poles Treeline Overhead Power Lines (13 kv) Location: Northing 4614 Easting 324767 UTM Zn 9 Survey Date: Oct., 217 Approval Date: Jan. 24, 218 Drawing Number: 177 Page: 2 of 17

Ditch BC Hydro Dock Upgrades N Remove Alders from Beach Refer to page 16 for Dock Parking Lot Details Existing 3mm Ø Pipe 16.7m 1.m Site 49 +13 +14 +1 Campbell Lake Site 8 Site 7 Site Site 2 Site 6 Site 1 Site 3 Site 1 Site 16 Existing 6mm Ø CMP Stake 27F Pit Toilet Site 27 Site 19 Site 26 Site 2 Site 21 Site 22 +4 Seepage Pit Toilets Stake 2F 6.m + +6 Site 48 +7 +8 +9 + +1.m +12 Existing 6mm Ø CMP Site 9 Site 4 Pit Toilets Sign Sign Stake 27B Existing mm Ø Pipe Pit Toilet Site 23 Site 24 Site 2 Stake 2B Site 42 Site 4 +34 Site 47 Site 46 Site 44 +42 +4 +4 +39 +38 +37 +36 +3 Site 13 Site Site 11 Remove Rotten Guide Logs. Re-work Fill-Slope with Kg Class Angular Rock at a 1.2:1. (HD:VD) Widen Road to.m +3 +32 +2 + + +49 +48 +47 +46 +4 +44 +43 Site 43 Site 41 +73 +7 Pit Toilet Site 4 L=16m R=16m +6 Install Cross Ditch and Berm to Limit Access on Service Road + +4 Existing 8mm Ø CMP Treeline Treeline Existing 3mm Ø CMP Existing 3mm Ø CMP L=21m R=13m Overhead Power Lines (13 kv) Overhead Power Lines (13 kv) TO BE PRINTED ON 36"X22" PAPER TO RETAIN PROPER SCALE Overhead Power Lines (23 kv) Power Poles DESIGN WESTERN PLAN 1:. 1: 2m LEGEND DITCH DESIGN ROAD EDGE DESIGN CENTERLINE FLAGGED CENTERLINE TOE OF FILL TOP OF CUT TOP OF BANK TREELINE CUT FILL RE-VEGETATION RIPRAP Location: Northing 4614 Easting 324767 UTM Zn 9 Survey Date: Oct., 217 Approval Date: Jan. 24, 218 Drawing Number: 177 Page: 3 of 17

g 3mm Ø Pipe Site 1 N Site 16 Existing 6mm Ø CMP Stake 27F Pit Toilet Site 27 Site 19 Site 26 Site 2 Re-Vegetate with Native Shrubs and Trees Site 21 Site 22 +4 Seepage 16.7m Pit Toilets Stake 2F 6.m + +6 1.m Site 48 +7 +8 Road Width 6.m from +4 to +6 (Widen 2.m on the Inside of Turn) +9 Site 49 + +1.m +12 Site 29 +13 +14 +1 +16 Site 28 Site 38 +17.m +18 Site 3 Site 36 +3 Site 31 +19 Site 34 +29 +28 +2 New Stake 34B +27 +26 +2 +2 +22 +24 Site 32 +23 New Stake 34F Install 7x14x9.1m Armtec Min-Span I Road Width 6.m from +17 to +24 (Widen 2.m on the Inside of Turn) Site 33 Site 3 Stake 27B.m Sign Existing mm Ø Pipe Site 47 Pit Toilet Site 23 Site 46 Site 24 Site 44 Site 2 Stake 2B +4 +4 Site 42 +39 +38 Site 4 +37 +36 +3 +34 +33 +32 +3 +42 Site 37 +43 Widen Road to.m +2 + + +49 +48 +47 +46 +4 +44 Site 43 Site 41 Site 39 +3 +32 TO BE PRINTED ON 36"X22" PAPER TO RETAIN PROPER SCALE Existing 8mm Ø CMP Road Width 6.m from + to +32 (Widen 2.m on the Inside of Turn) Treeline Existing 3mm Ø CMP Overhead Power Lines (13 kv) Site 4 Survey Date: Oct., 217 Approval Date: Jan. 24, 218 LEGEND DITCH DESIGN ROAD EDGE DESIGN CENTERLINE FLAGGED CENTERLINE TOE OF FILL TOP OF CUT TOP OF BANK TREELINE CUT FILL RE-VEGETATION RIPRAP DESIGN EASTERN PLAN 1:. 1: 2m Location: Northing 4614 Easting 324767 UTM Zn 9 Drawing Number: 177 Page: 4 of 17

6.. 4. 3. 2. 1.. 99.. 6.. 4. 3. 2. 1.. 99.. 6.. 4. 3. 2. 1.. 99.. - - ELE: 1.3m OFFSET: -6.m - - ELE: 99.m OFFSET: -3.8m ELE: 99.m OFFSET: -2.m ELE: 99.9m OFFSET: 2.1m ELE: 99.9m OFFSET: 2.1m ELE: 99.7m OFFSET: 3.4m 6.. 4. 3. 2. 1.. 99.. 6.. 4. 3. 2. 1.. 99.. 6.. 4. 3. 2. 1.. 99.. - - - - ELE: 99.6m OFFSET: -2.3m ELE: 99.4m OFFSET: -2.m ELE: 99.4m OFFSET: -2.1m +4 + ELE:.9m OFFSET: 3.4m ELE: 99.m OFFSET: 3.2m ELE:.8m OFFSET: 3.m 97 % Start Overhead Power Lines -% End Overhead Power Lines DESIGN WEST ROAD PROFILE 1: Horizontal Scale 1: Vertical Scale - 8% -8% +4 K:4. LVC:23.1 Install 6mm Ø x 8.m CMP + -% -9%. 1: 2m +6 -% Install 6mm Ø x 1.m CMP - +7 +8 6.. 4. 3. 2. 1.. 99.. 2. 1.. 99.. 97.. 9.. - - - - - - ELE: 99.2m OFFSET: -2.9m +2 +7 ELE: 99.3m OFFSET: 2.8m Install 6mm Ø x 8.m CMP - 6.. 4. 3. 2. 1.. 99... 2. 1.. 99.. 97.. 9.. - - WEST ROAD CROSS SECTIONS 1:3 - - - ELE:.8m OFFSET: -2.2m +6 +72 ELE:.m OFFSET: 4.m Install 6mm Ø x 1.m CMP 3. 1:3 1m LOOKING NORTH AT WEST ROAD Location: Northing 4614 Easting 324767 UTM Zn 9 Survey Date: Oct., 217 Approval Date: Jan. 24, 218 Drawing Number: 177 Page: of 17

. 1: 2m K:4. LVC:4.3 DESIGN EAST ROAD PROFILE 1: Horizontal Scale 1: Vertical Scale K:3. LVC:6.2 K:3. LVC:4.8 - - -% Site 23 Site 21 Site 24 Site 22 +4 Site 2 + Install 6mm Ø x 8.m CMP +6 +7 Site 48 +8 +9 + Install 7mm x 14mm x 12.2m Armtec Mini-Span I +1 +12 Site 49 +13 +14 Site 28 +1 Site 29 +16 +17 Site 3 +18 Site 31 +19 +2 K:14.64 LVC:22.4 K:17.4 LVC:13.3 K:19.71 LVC:8.7 % % +19 +2 +2 Site 32 +22 Site 33 +23 +24 Site 34 +2 Site 3 +26 Site 36 +27 +28 +29 Install 7mm x 14mm x 9.1m Armtec Mini-Span I +3 +3 +32 Site 37 +33 +34 Site 38 +3 +36 Site 39 Survey Date: Oct., 217 +37 Approval Date: Jan. 24, 218 Site 4 +38 Location: Northing 4614 Easting 324767 UTM Zn 9 +39 Drawing Number: 177 Page: 6 of 17

DESIGN EAST ROAD PROFILE 1: Horizontal Scale 1: Vertical Scale. 1: 2m K:19.7 LVC:8.7 K:3. LVC:19.2 K:3. LVC:2.2 % K:3. LVC:.4 6% Install 6mm Ø x 8.m CMP % Install 6mm Ø x 8.m CMP +38 +39 Site 41 +4 Site 42 +4 +42 Site 43 +43 +44 Site 44 +4 Site 4 +46 +47 Site 46 +48 +49 + + Site 47 +2 +3 LOOKING EAST FROM ON EAST ROAD LOOKING DOWNSTREAM AT CROSSING +1 ON EAST ROAD WET AREA AT +4 ON EAST ROAD Location: Northing 4614 Easting 324767 UTM Zn 9 Survey Date: Oct., 217 Approval Date: Jan. 24, 218 Drawing Number: 177 Page: 7 of 17

. 97.. 9.... 91. 9. 89. 88.. 97.. 9.... 91. 9. 89. 88. + Install 6mm Ø x 8.m CMP. 97.. 9.... 91. 9. 89. 88. +9. 97.. 9.... 91. 9. 89. 88. +12. 97.. 9.... 91. 9. 89. 88. +16 - -. 97.. 9.... 91. 9. 89. 88. - -. 97.. 9.... 91. 9. 89. 88. - - - -. 97.. 9.... 91. 9. 89. 88. +6 - -. 97.. 9.... 91. 9. 89. 88. +7 - - - -. 97.. 9.... 91. 9. 89. 88. + - - - -. 97.. 9.... 91. 9. 89. 88. +13 - -. 97.. 9.... 91. 9. 89. 88. +14 - - - -. 97.. 9.... 91. 9. 89. 88. +17 - -. 97.. 9.... 91. 9. 89. 88. +2 Install 7x14x12.2 Armtec Mini-Span I (Shown on skew). 97.. 9.... 91. 9. 89. 88. +18 - - - -. 97.. 9.... 91. 9. 89. 88. - - +4. 97.. 9.... 91. 9. 89. 88. - - EAST ROAD SECTION VIEWS 1:3 +8. 97.. 9.... 91. 9. 89. 88. - 3. 1:3 1m - +1. 97.. 9.... 91. 9. 89. 88. - - +1. 97.. 9.... 91. 9. 89. 88. - - Survey Date: Oct., 217 Approval Date: Jan. 24, 218 +19 Location: Northing 4614 Easting 324767 UTM Zn 9 Drawing Number: 177 Page: 8 of 17

. 97.. 9.... 91. 9. 89. 88. +2. 97.. 9.... 91. 9. 89. 88. +24. 97.. 9.... 91. 9. 89. 88. +28. 97.. 9.... 91. 9. 89. 88. +3. 99.. 97.. 9.... 91. 9. +3 - -. 97.. 9.... 91. 9. 89. 88. +2 - -. 97.. 9.... 91. 9. 89. 88. +22 - - - -. 97.. 9.... 91. 9. 89. 88. +2 - -. 99.. 97.. 9.... 91. 9. +26 - - - -. 97.. 9.... 91. 9. 89. 88. +29 - - - -. 99.. 97.. 9.... 91. 9. +32 - -. 99.. 97.. 9.... 91. 9. +33 - - - -. 97.. 9.... 91. 9. 89. 88. +288 Install 7x14x12.2 Armtec Mini-Span I (Shown on skew). 99.. 97.. 9.... 91. 9. +36 - -. 99.. 97.. 9.... 91. 9. +37 - - - -. 97.. 9.... 91. 9. 89. 88. - - +23. 99.. 97.. 9.... 91. 9. - - EAST ROAD SECTION VIEWS 1:3 +27. 97.. 9.... 91. 9. 89. 88. - 3. 1:3 1m - +3. 99.. 97.. 9.... 91. 9. - - +34. 99.. 97.. 9.... 91. 9. - - Survey Date: Oct., 217 Approval Date: Jan. 24, 218 +38 Location: Northing 4614 Easting 324767 UTM Zn 9 Drawing Number: 177 Page: 9 of 17

. 99.. 97.. 9.... 91. 9. +39. 99.. 97.. 9.... 91. 9. +42 2. 1.. 99.. 97.. 9.... +46 2. 1.. 99.. 97.. 9.... + - -. 99.. 97.. 9.... 91. 9. +4 - -. 99.. 97.. 9.... 91. 9. +4 - - - -. 99.. 97.. 9.... 91. 9. +43 - -. 99.. 97.. 9.... 91. 9. +44 - - - - 2. 1.. 99.. 97.. 9.... +47 - - 2. 1.. 99.. 97.. 9.... +48 - - - - Install 6mm Ø x 8.m CMP 2. 1.. 99.. 97.. 9.... + - - 2. 1.. 99.. 97.. 9.... +2 - -. 99.. 97.. 9.... 91. 9. - - +41 Install 6mm Ø x 8.m CMP. 99.. 97.. 9.... 91. 9. - EAST ROAD SECTION VIEWS 1:3 - +4 2. 1.. 99.. 97.. 9.... - 3. 1:3 1m - +49 2. 1.. 99.. 97.. 9.... - - +24 1 2 Location: Northing 4614 Easting 324767 UTM Zn 9 Survey Date: Oct., 217 Approval Date: Jan. 24, 218 Drawing Number: 177 Page: of 17

#4 1 % 67% -27% % #21 - - -%- - - - -% - - -1 #23 % % % 6% 9% #2 7% 8% % 19% -- -7% -6% 1 # - % % 6% #22 - -- - -9% - - - % -% #24 % -% % #27 % 48% 67% - % % 29% -8% -7% EAST ROAD SECTION VIEWS 1: Horizontal Scale 1: Vertical Scale. 1: 2m Survey Date: Oct., 217 Location: Northing 4614 Easting 324767 UTM Zn 9 Approval Date: Jan. 24, 218 Drawing Number: 177 Page: 11 of 17

#28 #3 #32 #34-8% -% -% - -9% - 7%8% % -2 --%9% -1 % % % -7% - - -% -1-3 - 7% % % - - - - % #29 #31 #33 #3 -- -% -9% -9% 8% 8% -3-8% - -7% - - -1 - - -% - - - -3 % -% -18% -% 1-2 91-3 -1 EAST ROAD SECTION VIEWS 1: Horizontal Scale 1: Vertical Scale. 1: 2m --1 8% Survey Date: Oct., 217 Location: Northing 4614 Easting 324767 UTM Zn 9 Approval Date: Jan. 24, 218 Drawing Number: 177 Page: 12 of 17

-8% #36 #38 #4 #42 - - - -6% - % % - % % 7% -% -% - - -7% - - -1 -% -% - - -% - - - -8% -8% -% -7% - - -- -- #37 #39 #41 #43-8%% 6% 9% 1 - - % 6% - - -8% 6% - --1-1 -3 - - % % % - - 6% 6% % % % - -% 2 % EAST ROAD SECTION VIEWS 1: Horizontal Scale 1: Vertical Scale. 1: 2m Survey Date: Oct., 217 Location: Northing 4614 Easting 324767 UTM Zn 9 Approval Date: Jan. 24, 218 Drawing Number: 177 Page: 13 of 17

#44 - - #46 - - -16% - #48-6% 18% - 1-19% - % -1 19% -3-2 -3 2 - - - -6% 1 - % -9% 7% -1 - -% -% - -% - #4 7% 7% % 6% - #47 - - - #49-9% - 28% - - -6% -3-8% -% - - -16% -2 -% - -% 9 9 EAST ROAD SECTION VIEWS 1: Horizontal Scale 1: Vertical Scale. 1: 2m -% Location: Northing 4614 Easting 324767 UTM Zn 9 Survey Date: Oct., 217 Approval Date: Jan. 24, 218 Drawing Number: 177 Page: 14 of 17

N BC Hydro Dock Upgrades Remove Alder and Re-Contour Beach Existing 3 Ø Pipe 7% K:1. LVC:.7 9% 7% DOCK ROAD PROFILE #1 1:Horizontal Scale 1: Vertical Scale Install Parking Curbs at 3.23m c/c Pre-Cast Curb Stops to be in accordance with Provincial Parks - Facility Standards Drawing No. E-2-2A 8% 3.23 8% Remove Stump Embedded in Road Grade +4 + +6 +6 Remove Vegetation to Provide Continuous Parking Lot Existing 6 Ø Pipe - - K:1.8 LVC:2. +66 L=m R=1m DOCK ROAD #2 Install One Way Traffic, Do Not Enter Sign + LEGEND DITCH DESIGN ROAD EDGE DESIGN CENTERLINE FLAGGED CENTERLINE TREELINE CUT FILL RE-VEGETATION RIPRAP L=7m R=1m +4 L=19m Sign R=9m Install Two Way Traffic Sign +4 DESIGN PLAN - BOAT LAUNCH PARKING 1:3 3. 1:3 1m DOCK ROAD #1 L=17m R=1m + Widen Turn Install One Way Traffic Sign +6 8% 8% 7% +4 + +6 Survey Date: Oct., 217 +6 Location: Northing 4614 Easting 324767 UTM Zn 9 Approval Date: Jan. 24, 218 DOCK ROAD PROFILE #2 1:Horizontal Scale 1: Vertical Scale Drawing Number: 177 Page: 1 of 17

Station Station East Road Estimated Total Volume Table Fill Volume (m³) In Place West Road Estimated Total Volume Table Fill Volume (m³) In Place Cut Volume (m³) In Bank Cut Volume (m³) In Bank Cumulative Fill Vol (m³) In Place 4 2 4 2 7 11 2 +4 1 2 2 + 33 9 2 +6 24 2 83 4 +7 1 6 84 11 +8 4 4 87 1 +9 18 6 1 + 43 149 1 +2 12 161 1 +1 31 191 1 +12 16 1 27 16 +13 4 211 26 +14 8 9 219 3 +1 12 231 3 +16 14 244 3 +17 13 24 48 +18 36 2 83 +19 42 2 12 +2 34 2 19 +2 2 2 18 +22 8 6 263 186 +23 8 1 27 187 +24 14 1 28 188 +2 1 2 3 189 +26 1 8 31 197 +27 31 27 +28 28 3 329 2 +288 3 381 2 +29 11 3 2 +3 8 4 2 +3 34 484 2 +32 16 1 1 211 +33 217 Cumulative Fill Vol (m³) In Place 6.63 2. 6.63 2. +2 12.49 19.12 2. 18.29 37.41 2. +4 28.2 6.67 2. + 22.8 88.24 2. +6 1.73 3.97 2. Cumulative Cut Vol (m³) In Bank Cumulative Cut Vol (m³) In Bank Campsite Volume Table Area (m2) Total Cut (m3) Total Fill (m3) Net (m3) Campsite 4 13.7 28.23 28.23<Cut> Campsite 137.7.6 4.47 6.13<Cut> Campsite 21 14.16 13.19 13.19<Cut> Campsite 22 172.2 21.3 2.9 18.44<Cut> Campsite 23 141.36 14.2.13 14.7<Cut> Campsite 24 172.72 21.88 1.73 2.1<Cut> Campsite 2 16.2 9.26 9.79.4<Fill> Campsite 27 187.33 1.43 79.1 77.9<Fill> Campsite 28 123.9 21.6.43 2.63<Cut> Campsite 29 199.89.19 122 121.81<Fill> Campsite 3 1.78 6.99.11 6.88<Cut> Campsite 31 169. 32.6 34.83 2.18<Fill> Campsite 32 161.41 39.24 12.33 26.91<Cut> Campsite 33 134.8 12.81.3 2.47<Cut> Campsite 34 176.38 2.3 8.9 43.8<Cut> Campsite 3 163.87 8.78 32.13 23.3<Fill> Campsite 36 16.2 49.83 1.13 48.7<Cut> Campsite 37 11.7 12.27 4.77 7.<Cut> Campsite 38 14.87 13.74 1.77 11.<Cut> Campsite 39 18.7 4.4 3.34.2<Cut> Campsite 4 17.12 7.6 7.6<Fill> Campsite 41 132.4.84 33.6 32.22<Fill> Campsite 42 136.33. 16.9 16.<Fill> Campsite 43 21.36 19.8 8.48 6.68<Fill> Campsite 44 29.2 19.6 19.6<Fill> Campsite 4 17.7 27.12 33.19 6.8<Fill> Campsite 46 187.33 1.43 79.1 77.9<Fill> Campsite 47 29.6 111. 111.<Fill> Campsite 48 131.19 7.88 6.42 1.46<Cut> Campsite 49 147.8 2.87 3.89 21.<Cut> Total 2.39 7.71 Area Aggregate Volume Requirements (m3) 7 Minus Pit Run 19 Minus Road Crush 2 Minus Road Crush Bulk Fill (Sourced Locally) Kg Class Angular Rock East Road 2.. 147. 1. 6. West Road 36.. 18. 82. 2. Dock Parking Area 13.. 67. 32.. Road Widening (BM67 to BM9) 2.. 3. 62.. Culvert Re-Work (Between Sites 8 & 9)..... Campsite 4. 8.... Campsite. 8.6..6. Campsite 21. 8.8... Campsite 22..8. 3.2. Campsite 23. 8.8..2. Campsite 24..8. 2.2. Campsite 2... 12.2. Campsite 27. 11.7..8. Campsite 28. 7.7... Campsite 29. 12.. 12.. Campsite 3. 9.4..1. Campsite 31..6. 43.. Campsite 32..1. 1.4. Campsite 33. 8.4. 12.9. Campsite 34. 11.. 11.2. Campsite 3..2. 4.2. Campsite 36..3. 1.4. Campsite 37. 9.4. 6.. Campsite 38. 8.8. 2.2. Campsite 39. 11.6. 44.2. Campsite 4. 9.8. 72.1. Campsite 41. 8.3. 41.3. Campsite 42. 8.. 2.7. Campsite 43. 12.6. 6.9. Campsite 44. 13.1. 1.8. Campsite 4..6. 41.. Campsite 46. 11.7..8. Campsite 47. 13.1. 139.4. Campsite 48. 8.2. 8.. Campsite 49. 9.2. 4.9. Pit Toilets. 12.... Total 49. 31.2 267. 1649.6 77. Location: Northing 4614 Easting 324767 UTM Zn 9 Survey Date: Oct., 217 Approval Date: Jan. 24, 218 Drawing Number: 177 Page: 16 of 17

General Notes 1. Call BC One Call prior to any works. works are within the vicinity of BC Hydro overhead powerlines. BC Hydro approval is required prior to commencing works. 2. Refer to Summary of Watercouse Assessments at the, by Jacob Blanchard, RPTech, conducted on October, 217 for details on Creek assessments. Construction is to be in accordance with all applicable legislative regulations while working within the riparian areas. 3. road construction is to be constructed in accordance with the Ministry of Tourism, Sport and the Arts single campsite standard drawing number RST 481-SR-1 unless otherwise noted in the design. 4. campsites extents are shown in the drawings and are to be constructed in accordance with the Ministry of Tourism, Sport and the Arts single campsite standard drawing numbers RST 481-C-1 and RST 481-C-3. Trees are to be felled and removed within the proposed footprint. Where trees are adjacent to proposed fill slopes, the project manager is to give direction on whether to retain or remove the tree. Trees larger than 1cm (6 ) are to felled by a certified faller. Where the felled tree has the potential to damage infrastructure, use machine assist and or ropes to mitigate risk. Complete a hazard tree assessment in accordance with Worksafe BC and remove as required.. Clear and strip all organic and overburden materials within the proposed campsite footprint down to a firm bearing on undisturbed soil. All removed overburden material is to be removed and spoiled off site as determined by the project manager. A 3cm deep overburden layer has been assumed for volume determinations; however, final bearing soils are to be approved by the project manager prior to placing aggregate. 6. All placed aggregate is to be placed in 1mm lifts and compacted with a minimum lb plate compactor. If aggregate is too dry, add water as required to achieve optimal moisture content and allow for adequate compaction. Pit Run, and Gravel is to be well graded granular material, substantially free of clay lumps, organic material and other extraneous material, screened to remove all particles in excess of maximum diameter specified in the material description below. 7 Minus Pit Run Gradation Sieve Designation 19 Minus Road Crushed Grave Percent Passing 7mm > mm 7 2mm 4.7mm 22 2.36mm 8.7mm 2-8 Sieve Designation Percent Passing 19mm > 12.mm 7 9.mm 6 9 4.7mm 4 7 2.36mm 27 1.18mm 16-42.6mm 8 3.3mm 2.7mm 2-8 2 Minus Road Crushed Gravel (HFSA) Sieve Designation Percent Passing 2mm > 19mm 8 9.mm 6 8 4.7mm 4 7 1.18mm 2-.3mm -3.7mm -1 7. Where proposed campsite surface is not raised above the forest floor, ditches should be dug to intercept seepages and provide a minimum 2mm ditch depth with positive drainage away from the site. 8. Prior to placing Corrugated Steel Pipes, remove all organics or incompetent soils. All culverts are to be placed on a level compacted fill to allow positive drainage of the ditch-line or creek between 1- % gradient as required for each site. Bedding material within 3mm of the culverts shall consist of 19mm Minus Road Crush. Fill around the pipe is to be well compacted with a minimum lb plate compactor in 2mm lifts. Ensure a minimum 3mm depth of cover over top of the pipe. Armor both the inlet and outlet of each culvert with a 3mm nominal thickness of screened Kg Class angular rock Riprap. Kg Class Riprap Angular Rock Gradation Class (Kg) Quantity 4 6 Dia. x 8.m Corrugated Steel Pipes Item 1 6 Dia. x 1.m Corrugated Steel Pipe C/W Coupler 1 7 x 14 x 12.2m Armtec Mini Span I Arch 1 7 x 14 x 9.1m Armtec Mini Span I Arch 1 Roll Armtec 2 Non-Woven Geotextile (Or Approved Equivalent) 8 Pre-Cast Curb Stops (To Provincial Standard DWG No. E-2-2A) 31.2m³ 19mm Minus Road Crush Gravel 267m³ 2mm Minus Road Crush Gravel (HFSA) 49m³ 7mm Minus Pit Run Gravel 1649.6m³ Locally Sourced Sub Base Material 77m³ Kg Class Riprap m³ Topsoil Approx. Average Dimension (mm) % 8% 9 19 28 9. Armtec Mini-Span I Arches are to be installed as shown in the design and in accordance with installation procedures identified within the Mini-Span Bridges Technical Brochure. Steel Plate footings are to placed directly on a compacted Kg Class Angular Rock Pads 6mm deep x mm wide along its length overlaid by a mm depth levelling gravel. The Angular Rock Pad is to be embedded below scour such that it is a minimum 3mm deeper than the creek bed. The levelling gravel is to be spread such that there are no voids or pivoting along the entire length of the Arch footing plates. Levelling gravel is to consist of 2mm Minus Road Crushed Gravel and is to be wrapped in Non-Woven Geotextile. Materials Note: Bulking factor of used to determine the required Volumes. Location: Northing 4614 Easting 324767 UTM Zn 9 Survey Date: Oct., 217 Approval Date: Jan. 24, 218 Drawing Number: 177 Page: 17 of 17