URANIUM EXPLORATION COMPANY

Similar documents
URANIUM EXPLORATION COMPANY

URANIUM EXPLORATION COMPANY

CHAMPION BEAR RESOURCES

DENISON ANNOUNCES 2018 EXPLORATION & EVALUATION PROGRAM FOCUSED ON HIGH PRIORITY PROPERTIES

The Discovery of the Phoenix: New High-Grade, Athabasca Basin Unconformity Uranium Deposits Saskatchewan, Canada

A Convenient a Joint Venture Patterson Lake South

Junior Uranium explorer in the Athabasca Basin. Patterson Claims

Alligator Energy Uranium Projects. 6 September 18 NT RESOURCES WEEK Greg Hall, CEO

EXPLOR INTERSECTS MULTIPLE COPPER ZONES GRADES UP TO 3.65% CU OVER 5.35 METERS ON THE CHESTER COPPER PROPERTY

REGULUS DISCOVERS NEW GOLD-RICH, HIGH-GRADE COPPER-GOLD ZONE AT RIO GRANDE

MINERAL MOUNTAIN RESOURCES LTD. MMV.TSX-V

Canadian Gold Miner Grab Sample Returns 29.5 Grams per tonne Gold from South Kirkland Project

Spruce Ridge Resources Ltd Leslie Road West, Puslinch, ON N0B 2J0 Telephone: (519) , Fax: (519)

Parkin Offset Properties. Sudbury, Ontario

Alligator commences drilling of TCC4 uranium prospect in Arnhem Land, NT 4 September 2018

NEWS RELEASE NOVEMBER 15, 2018 HANNAN COMPLETES DRILLING AT BALLYHICKEY, DEFINES SIGNIFICANT ZINC TARGET AT KILMURRY, CO.

DENISON ANNOUNCES SUMMER 2018 EXPLORATION PLANS FOR HIGH-PRIORITY PIPELINE PROJECTS

Discovering Canadian Gold and Diamonds. Oxford Lake Project, Manitoba

COMMANDER RESOURCES LTD SOUTH VOISEY S BAY NI-CU-CO PROJECT LABRADOR

55 Adelaide Street East, Suite St-Charles west, Suite 411, West Tower

URACAN/UEX REPORT URANIUM MINERALIZATION ON THE BLACK LAKE PROJECT; GROUND GEOPHYSICAL SURVEY UNDERWAY

SALAZAR ANNOUNCES AN UPDATED RESOURCE REPORT OF 5.53 MT INDICATED AND 1.46 MT INFERRED AT ITS HIGH GRADE VMS EL DOMO DEPOSIT

A B C PAD A HIGHLIGHTS

ANTLER GOLD EXPLORATION UPDATE, WILDING LAKE GOLD PROJECT, NEWFOUNDLAND

Project 81. Drill Ready Geophysical Targets & Trends. Timmins-Cochrane Northern Ontario Canada

Interval (meters) To (meters)

Namibia Rare Earths Inc. Mobilizes for Airborne Survey Over Kunene Cobalt-Copper Project as Exploration Ramps Up

CARACARA SILVER INC. PLANNING DRILL PROGRAM AT PILUNANI ZINC-LEAD PROJECT IN PERU

Kelly Creek Basin. EXPLORATION UPDATE June 23, Reno Office 10 Greg Street, Suite 170 Sparks, Nevada

Cordoba Minerals Provides an Update on Exploration Activities at the San Matias Copper-Gold Project in Colombia

Timberline Completes Technical Reports on the Elder Creek and Paiute Porphyry Copper-Gold Projects, Nevada

BOREAL EXPANDS DISCOVERY ZONE OF HIGH-GRADE ZINC, SILVER AND LEAD MINERALIZATION AT GUMSBERG PROJECT IN SWEDEN

For personal use only

Discovery Driven Uranium Focused Clearwater Project Corporate Presentation

PRESS RELEASE. DUBUISSON NORTH DRILLING CUTS g/t AU OVER 5.0 METRES NEW S50 EAST DISCOVERY, 3.39 g/t AU OVER 25.9 METRES

Timberline Resources Announces Gold and Copper Assay Results for the Elder Creek Project, Battle Mountain District, Nevada

DRAKE IDENTIFIES NEW TARGETS NEAR FALUN, SWEDEN

GOLDPLAY ANNOUNCES FURTHER SAMPLING RESULTS FROM SAN MARCIAL HISTORICAL CORE; CONFIRMS OPEN PIT TARGET NEAR SURFACE WITH gpt AgEq.

Transition Metals Acquires Advanced Stage Ni-Cu-PGM Projects

LH Property Update: Magnum Goldcorp Hits High Grade Gold 16.9 m of g/t, including 10.9 m of g/t, and as well, 11 m of 20.

NGEX ANNOUNCES COPPER GOLD DISCOVERY AT NACIMIENTOS PROJECT

Fathom Minerals Ltd. Corporate Presentation October 2016

North American Palladium Announces Positive Exploration Results from Lac des Iles Mine

Dalradian Reports Regional Gold and Base Metal Targets for the Tyrone Project. Drill Rig 6 Arrives to Start Scout Drilling Program

Transition Continues to Intersect Significant Platinum-rich PGM Mineralization at Sunday Lake

NORTHERN SUPERIOR RESOURCES INC. 1351C Kelly Lake Road, Unit 7 Sudbury, Ontario, Canada P3E 5P5 Tel: (705) Fax: (705)

CanAlaska Uranium Details Extensive Rare Earth Mineralization at NE Wollaston

Atico Mining Provides Exploration Update

BALMORAL CONTINUES TO EXPAND GRASSET NI-CU-PGE DISCOVERY

Namibia Critical Metals Drilling Confirms Cobalt and Copper Mineralization in First Two Targets at Kunene

Commencement of Targeted RC Drilling Nabarlek Project

EL CONDOR IN-FILL DRILLING INTERSECTS 26.9 METERS 2.19% CU & 0.58% NI

Fission s Initial Resource Totals at PLS: 79.6M lbs Indicated and 25.9M lbs Inferred

CanAlaska Ventures Ltd

DENISON ANNOUNCES INTERSECTION OF HIGH-GRADE URANIUM MINERALIZATION NEAR THE GRYPHON DEPOSIT

ASX Code: ORN Compelling Nickel-Copper Targets Defined at Fraser Range Project

CROCODILE GOLD INTERSECTS 7.1 G/T AU OVER 4.5 METERS INCLUDING 11.2 G/T AU OVER 2.6 METERS AT THE UNION REEFS PROJECT, PROSPECT DEPOSIT

Orford Completes Phase 1 Exploration Program and Generates High-Quality Drill Targets on its Carolina Gold Properties

Toronto, Ontario, Canada Listed: RUP - TSX-V R05 - FSE September 25, 2017

HANNAN SEISMIC SURVEY IDENTIFIES MULTIPLE NEW DRILL TARGETS IN IRELAND

ANTLER GOLD HIGHLIGHTS NEW GOLD-IN-SOIL ANOMALIES, CENTRAL NEWFOUNDLAND

TSX.V: TR. Drilling in the Shadow of World-Class Deposits. TR: TSX.V January 2019

A Premier Uranium Explorer in Canada s Athabasca Basin. JAN.2017 TSXV: AL FSE: 6LLN OTC: ALXEF alxuranium.com

Quarterly Report Quarter ended 30 June 2010

GRAPHITE ONE DRILLS 165.3M of 4.23% GRAPHITE INCLUDING 46.4M OF 6.6%, 14.3M of 10.1% and 21M of 10.1% GRAPHITE

NEWS RELEASE For immediate distribution

Highlights from the four holes announced in this news release include:

(TSXV: GPLY, OTCQB: GLYXF

AUGUSTINE VENTURES ANNOUNCES HIGH GRADE GOLD BEARING TENSION VEINS IN THE HANGING WALL OF THE SURLUGA DEPOSIT

NEWS RELEASE. Mountain Province Diamonds Reports Additional Kimberlite Identified in Gahcho Kué Exploration Program

NEWS RELEASE Ocean Park Ventures Identifies Large Multi-Structure Sulfide Mineralized System Trapper Gold Project, British Columbia

Three High Priority Targets Identified Through Modeling of Electromagnetic Data From 2011 SkyTEM Survey

Fission Increases Indicated Resource; Doubles Inferred Resource

Colt Resources intersects 17.4% Cu over 0.42 metres (0.32 m true width) at Miguel Vacas Copper Project in its Borba exploration concession in Portugal

Salazar intersects metres (13.07m true) averaging 2.65 g/t gold, g/t silver, 1.32% copper, 6.63% zinc at its Curipamba Project.

Silver City Minerals

Burchell Lake, A Copper, Gold and Molybdenum Property In Ontario. Corporate Presentation September, 2013

True Width (m) Carneritos to

Fission Hits Largest Composite Off-Scale Recorded at PLS 36.72m Total Composite Off-Scale (Line 600E)

COMPASS GOLD: FIELDWORK CONTINUES ON OUASSADA & SANKARANI PERMITS TO AID BEDROCK DRILLING TARGETING

EXPLORATION UPDATE: BODDINGTON SOUTH GOLD PROJECT AND DOOLGUNNA STATION PROJECT

Plateau Extends Falchani East Lithium Deposit Community Agreements Executed and Three Drill Rigs Active at Falchani West

Sherlock drilling returns best intercept to date of 0.63% Cu and 7.45 g/t Ag over m

Elephant Mountain, Alaska Intrusive Related Gold Project July Option to Earn 100%

Saville Resources Inc. Completes Review of Work on the Niobium Claim Group, Quebec

A Premier Uranium Explorer in Canada s Athabasca Basin. OCT.2016 TSXv: AL FSE: 6LLN OTCQX: ALXEF alxuranium.com

Suite West Georgia Street Vancouver, B.C. V6E 4M3 NEWS RELEASE

Large Epithermal Quartz Veins Found in Outcrop at Shot Rock, Nova Scotia; Dozens of Large Angular Boulders Suggest Extensive System

McVicar Lake Gold Property Lang Lake Greenstone Belt Ontario. Argo Gold Inc. (ARQ)

Mineral Discoveries Using Big Data Analytics: Azimut s Exploration Edge

AbraPlata defines gold-rich zone with up to 16.7g/t Au over 10.6m in the basement at its Diablillos property in Argentina

INV METALS ANNOUNCES DRILL RESULTS AT LOMA LARGA AND INITIAL PROSPECTING RESULTS ON NEW REGIONAL PROPERTIES

ANTLER GOLD DRILLS GRAMS PER TONNE GOLD OVER 5.35 METRES AT THE WILDING LAKE GOLD PROJECT, NEWFOUNDLAND

Blox, Inc. Announces New Drilling Target Defined at Mansounia Gold Project.

Transition Metals and Implats Make Platinum Discovery at Sunday Lake, Intersecting 20.2 meters grading 3.22 Combined PGM s HIGHLIGHTS

Drilling Extending Mineralization in La Mina North Zone

Sudbury Platinum intersects near surface Ni-Cu-Co-PGM mineralization at Aer-Kidd

EXPLORING NEW GOLD FRONTIERS IN CANADA

West Georgia Street, Vancouver, BC, V6E 3V7 Phone: / Fax: NEWS RELEASE September 5, 2017

Uranium Exploration in North West Manitoba

Transcription:

URANIUM EXPLORATION COMPANY EXPLORATION FOR HIGH-GRADE URANIUM DEPOSITS IN SANDSTONE BASINS GETTING TO DISCOVERY QUICKER AND MORE COST EFFECTIVELY USING APPLIED RESEARCH SUCCESSFUL EXPLORATION THROUGH SCIENCE

FORWARD LOOKING STATEMENTS This presentation may contain forward looking statements including those describing Uravan s future plans and the expectations of management that a stated result or condition will occur. Any statement addressing future events or conditions necessarily involves inherent risk and uncertainty. Actual results can differ materially from those anticipated by management at the time of writing due to many factors, the majority of which are beyond the control of Uravan and its management. Readers are cautioned that the foregoing list of risk factors should not be construed as exhaustive. These statements speak only as of the date of this release or as of the date specified in the documents accompanying this release, as the case may be. Uravan undertakes no obligation to publicly update or revise any forward-looking statements except as expressly required by applicable securities laws.

URAVAN MINERALS INC. Uravan is searching for partners to fund $10 - $15 Million in exploration over the next 3 to 5 years in the Athabasca Basin, Saskatchewan Canada Uravan is a uranium exploration company that engages in applied research. Uravan has develop new surface geochemical technologies to identify buried uranium deposits in under-explored areas. Uravan has a technical group made up of highly experienced mineral explorers and seasoned upper management. Capital Structure Shares Issued: 37,599,346 Insider holdings: 9,934,605 (29%) Options Granted: 2,476,667@ $0.27 Warrants Granted: 5,951,366 @ $0.38 Working Capital: $2.0 Million Uravan trades on the TSX Venture Exchange: Symbol UVN

URAVAN S KEY BUSINESS STRATEGY Explore for high-grade uranium deposits in sandstone basin environments. Target size uranium deposits grading >1% containing >100,000,000 pounds U 3 O 8 Drill an economic uranium intersection on one-in-three projects explored. Reduce the number of drill holes to discovery by two-thirds. Develop new exploration technologies using applied research successful exploration through science.

RATIONALE FOR APPLIED RESEARCH To find the next generation of uranium deposits, a cost effective way to identify buried uranium mineralization in under-explored terrain is essential

EXPLORATION THROUGH APPLIED RESEARCH To accomplish this, understanding the process by which elements move from buried uranium mineralization to near surface environments (soils and plants) where they can be geochemically measured is critical

FINDING DEPOSITS USING APPLIED RESEARCH Microbial activity at the surface of buried uranium mineralization promotes the migration of elements and gaseous compounds upward to surface environments This process traps and concentrates metal complexes and distinctive isotopic signatures in certain soil components and vegetation resulting in unique anomalies over the deposit. By sampling and analyzing soil and plant material, bedrock sources of buried mineralization can be identified. 7

CIGAR WEST URANIUM DEPOSIT STUDY In 2009, under a collaborative agreement with Areva and Cameco, Uravan and QFIR conducted a pilot study over the known high-grade Cigar West uranium deposit 1. The study included sampling and analyzing drill core, soil horizons, vegetation and tree cores over a known high-grade uranium deposit. Objective: trace the movement of elements and unique isotopic signatures from the deposit to surface environments. Cigar West Study area showing locations of surface samples & drill holes 1 The Cigar Lake deposit is on the Waterbury/Cigar uranium property; a joint venture partnership between Cameco Corporation, AREVA, Idemitsu Kosan Co. Ltd., and Tokyo Electric Power Co. [TEPCO]) located in the Athabasca Basin, Saskatchewan. Uravan thanks both AREVA and Cameco for their research collaboration and gracious support for the Cigar West Study; and the support provided by the Cigar Lake facility during our field operations.

CIGAR WEST URANIUM DEPOSIT STUDY TSX-V : UVN The results of the study clearly identified distinctive elements and isotopic compositions that have been mobilized from the Cigar West deposit to the surface media through > 450 meters of sandstone.

WHY WE USE LEAD ISOTOPES IN URANIUM EXPLORATION As a result of the Cigar West Study, Uravan has developed new technologies and specific indicators that identify the most probable location of buried uranium mineralization versus drilling blind conductors. Lead (Pb) is the natural end product of uranium (U) decay and can therefore be used as a vectoring tool to uranium deposits. Uranium has 2 main isotopes: U235 and U238. 99% occurs as U238, while ~0.7% occurs as U235. Importantly each isotope naturally decays over time to a different isotope of lead U238 Pb206 U235 Pb207 We use the ratio between these two Pb isotopes to identify possible U deposits

WHY WE USE LEAD ISOTOPES IN URANIUM EXPLORATION 207/206 isotope ratio values measured in soil, water or vegetation is ~0.90 (common lead); not anomalous At a uranium deposit this 207/206 ratio is ~0.10 (radiogenic lead); very anomalous As radiogenic lead migrates away from a deposit it mixes with common lead, producing 207/206 ratios at <0.65. It is this subtle change in lead isotopic composition that Uravan s geochemical analyses can measure to vector drilling.

URAVAN S RESEARCH PARTNERS Queen s Facility for Isotope Research (QFIR) at Queen s University, Ontario. Under the direction of Dr. Kurt Kyser, QFIR is a group of highly experienced research geochemists QFIR lab is a state-of-the-art research facility. The QFIR research team works collaboratively with Uravan s technical group to develop new exploration technologies. Dr. Colin Dunn, an independent specialist in biogeochemistry, is working closely with Uravan s technical group and QFIR to advance the interpretation of biogeochemical results. Dr. Kurt Kyser and Dr. Colin Dunn are key technical advisors for Uravan

DEEP EXPLORATION GEOCHEMISTRY FOR URANIUM DEPOSITS TSX-V : UVN Uravan and QFIR have entered into a three (3) year collaborative applied research grant; a government sponsored NSERC CRD approved project. Goals of the study: (1) Apply recently developed geochemical protocols for remote sensing undercover deposits (from the Cigar Lake Study) to the Outer Ring and other Uravan Athabasca Basin projects. (2) Develop new protocols for more reliable and definitive indicators of mineralization at depth in these prospective but underexplored areas. Budget: $100,000 per year for 3 years from Uravan with matching funds by the Federal Government.

URAVAN PROPERTY PORTFOLIO Uravan s property portfolio consists of 8 strategically located uranium projects plus the Rottenstone Ni- Cu-PGE project. Successful drilling on the OR-MATH project, completed in 2011, will be followed in 2012 with several more drill-holes planned. Strong surface geochemical patterns that correlates with a major EM conductor on the Halliday project will be drill tested in 2012; 5 drill-holes planned. Stewardson, Johannsen and Poplar projects are in pre-drilling stages. Data analysis on surface geochemistry is pending.

Outer Ring Project (OR) 100% Uravan - acquired in December 2009. Surface geochemical program completed in July 2010. Surface geochemical targets developed Initial drilling completed in June 2011; follow up drilling in 2012 ATHABASCA BASIN URANIUM PROPERTY PORTFOLIO Johannsen Lake Project (JL) 100% Uravan - acquired in August 2010. Surface geochemical program completed in August 2010. Data analysis outlines potential drill targets. Drilling planned for 2012; Math Option (MATH) 100% Uravan Purchase Option VTEM survey outlines strong conductor on Math and OR Surface geochemical survey completed in2011 One drill-hole competed in 2011; follow up in 2012, TSX-V : UVN Poplar Point Project (PP) Uraniferous boulder train on property Multiple untested EM targets Historic drilling indicates anomalous uranium values

ATHABASCA BASIN URANIUM PROPERTY PORTFOLIO Stewardson Lake Project (SL) 100% Uravan - acquired in December 2010. Located along the Virgin River structural corridor. Multiple anomalous geophysical and surface geochemical targets identified Surface geochemical program completed in 2011. Data analysis pending. Halliday Lake Project (HL) 100% Uravan - acquired in December 2010. Geophysical surveys identified 15 Km anomalous EM, gravity and resistivity Historic drilling intersected 0.1 meters grading 0.12% U3O8 in altered sandstone Surface geochemical program completed in 2011. Five drill-holes planned for 2012 TSX-V : UVN Thluicho Lake Project Shallow basement hosted u mineralization Multiple untested conductors Anomalous pathfinder elements in outcrop. Looking for partner.

POSITIVE RESULTS OR/MATH SURFACE GEOCHEMISTRY AND DRILLING RESULTS TSX-V : UVN Surface geochemical program completed in July 2010 and June 2011, respectively Geochemical program completed using new surface geochemistry technology developed from the Cigar West Study. Positive lead (Pb) isotope ratios and associated pathfinder element geochemistry in the C-soil horizon clays, vegetation and treecores. Surface geochemistry defines trends coincident with geophysics and other structural features. Seven (7) drill-holes competed targeting surface geochemistry. Follow up drill program planned for 2012 consisting of several drill-holes.

Positive Surface Geochemistry at Halliday Surface geochemical program competed in June 2011 Strong correlation between radiogenic Pb 207/206 in soils and tree-cores and other pathfinder elements; key to identifying U mineralization at depth. Surface geochemistry coincident with major EM conductive trend Five drill-hole program and additional geophysical survey planned for summer 2012. TSX-V : UVN

THELON BASIN PROPERTY PORTFOLIO Garry Lake Uranium Project 100% Uravan; seeking JV partner Airborne geophysical surveys completed Surface discovery: well defined glacial boulder train consisting of 19 uranium mineralized cobbles assaying 0.87% to 27.12% U 3 O 8. Status: On hold pending LUP Issues: Caribou protection concerns in NE Thelon Basin Pending funding, in 2012 Uravan will begin to engage land use regulators to develop a path forward to obtain an LUP in 2013.

ROTTENSTONE NICKEL COPPER PGE + AU PROJECT Advanced drill ready project Comprehensive database: airborne/ground geophysical surveys plus surface soil and tree top geochemical surveys. Rottenstone 1960 s deposit produced 40 thousand tons of high-grade ore grading 3.28% Ni, 1.83% Cu and 9.63 g/t PGE+Au in an ultramafic intrusive. Recent interpretive work on the new geophysics has defined new drill targets Ten (10) diamond drill holes have been selected to test several favorable areas.

ROTTENSTONE NICKEL COPPER PGE + AU PROJECT Proposed drill holes to test a series of strong sub-vertical conductors These strong conductors coincide with other favorable geological, structural and geochemical features. TSX-V : UVN

ROTTENSTONE NICKEL COPPER PGE + AU PROJECT These strong steeply dipping conductors are believed to represent meaningful concentrations of sulphide mineralization. TSX-V : UVN

EXPLORATION ACTIVITIES FOR 2012 $2.5 MILLION 2012 BUDGET TSX-V : UVN Initial 5 drill-hole program plus TDEM geophysical survey on Halliday property Follow up minimum 2 drill-hole program on OR-Math uranium projects Potential drill program on Johannsen Lake or Stewardson uranium project late summer 2012 Continue Athabasca Basin land acquisitions in highly prospective corridors Continue collaborative applied research with QFIR, Dr. Kurt Kyser and Dr. Colin Dunn on Halliday, Outer Ring, Johannsen and Stewardson projects.

FOR MORE INFORMATION CONTACT Larry Lahusen, CEO llahusen@uravanminerals.com www.uravanminerals.com Suite 204, 2526 Battleford Avenue S.W., Calgary, Alberta T3E 7J4 Phone : 403.264.2630 Fax : 403.264.629