Fission Hits 61.09m total composite >10,000 cps with Metallurgical Drilling at R780E Zone

Similar documents
Fission Hits Largest Composite Off-Scale Recorded at PLS 36.72m Total Composite Off-Scale (Line 600E)

Fission Increases Indicated Resource; Doubles Inferred Resource

Fission s Initial Resource Totals at PLS: 79.6M lbs Indicated and 25.9M lbs Inferred

Fission Drills Anomalous Radioactivity with Four Holes on Three New Conductors

Fission Regional Drilling Hits Anomalous Radioactivity at Forest Lake and Patterson Lake Corridors

Junior Uranium explorer in the Athabasca Basin. Patterson Claims

V Sample from C.O.D vein 15 metres southwest of V

OSISKO METALS INTERSECTS 10.49% ZINC+LEAD OVER METRES AND 12.15% ZINC+LEAD OVER METRES AT PINE POINT

IDM Mining s Underground Drilling Intersects g/t Au and g/t Ag over 6.80 Meters True Width at the Red Mountain Gold Project

DENISON ANNOUNCES SUMMER 2018 EXPLORATION PLANS FOR HIGH-PRIORITY PIPELINE PROJECTS

Probe Metals Intersects 3.2 g/t Gold Over 45.5 Metres At Val-d Or East

North American Palladium Announces Positive Exploration Results from Lac des Iles Mine

Probe Metals Continues to Intersect Significant Gold Mineralization in Expansion Drilling at Val-d Or East, including 4.1 g/t Gold Over 15.

Assay Results Highlights (as of November 16, 2017) representing approximately 4,500 metres ( m ) of drilling:

AUGUSTINE VENTURES ANNOUNCES HIGH GRADE GOLD BEARING TENSION VEINS IN THE HANGING WALL OF THE SURLUGA DEPOSIT

Highlights include: Hole TTD050: 6.12 g/t Au over 7.00 metres from metres o Including g/t Au over 1.18 metres

IAMGOLD PROVIDES UPDATE ON ADVANCED EXPLORATION PROJECT DIAMOND DRILLING RESULTS BOTO PROJECT, SENEGAL

CHAMPION IRON REPORTS EXPLORATION RESULTS AT POWDERHORN PROJECT, NEWFOUNDLAND

GRAPHITE ONE DRILLS 165.3M of 4.23% GRAPHITE INCLUDING 46.4M OF 6.6%, 14.3M of 10.1% and 21M of 10.1% GRAPHITE

INV METALS ANNOUNCES DRILL RESULTS AT LOMA LARGA AND INITIAL PROSPECTING RESULTS ON NEW REGIONAL PROPERTIES

Monument Announces NOA 7/8 Drilling Program Results at Burnakura Gold Project

Probe Metals Continues to Expand Gold Zones At Val-d Or East

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AND g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

URACAN/UEX REPORT URANIUM MINERALIZATION ON THE BLACK LAKE PROJECT; GROUND GEOPHYSICAL SURVEY UNDERWAY

Highlights from the four holes announced in this news release include:

QMX GOLD CONTINUES TO INTERSECT STRONG MINERALIZATION AT BONNEFOND, INTERSECTING 39.5 g/t Au OVER 2.4 METRES AND 31.5 g/t Au OVER 1.

A New Direction. Copper-Gold Deposit at Thor TSX.V:COL. August 11, May 2013

BELO SUN RELEASES RESULTS FROM 65 DRILL HOLES FURTHER EXTENDING THE OURO VERDE DEPOSIT ALONG STRIKE NORTHWEST AND DOWN DIP

NEWS RELEASE August 10, 2017

QMX GOLD INTERSECTS 29.8 G/T AU OVER 3.0 METERS AND 19.3 G/T AU OVER 3.2 METERS AT BONNEFOND

Wallbridge Completes Successful Initial Drill Program at Beschefer

DENISON ANNOUNCES 2018 EXPLORATION & EVALUATION PROGRAM FOCUSED ON HIGH PRIORITY PROPERTIES

AbraPlata defines gold-rich zone with up to 16.7g/t Au over 10.6m in the basement at its Diablillos property in Argentina

San Gold Drills New Mine Horizon Adjacent to Rice Lake Mine, Returns 10.4 Metres Grading 25.7 g/t Au

Summary of Rover Metals Geologic Mapping Program at the Up Town Gold Project, Northwest Territories

NGEX ANNOUNCES COPPER GOLD DISCOVERY AT NACIMIENTOS PROJECT

Strategic Phase 2 Exploration Program Launched at Island Gold High-Grade Resource Potential Identified Laterally and at Depth

DRILLING AT ASCOT S PREMIER PROPERTY EXTENDS GOLD MINERALIZATION 150 METRES WEST TOWARDS UNDERGROUND PORTAL

Monument Announces Significant Intercepts Assay Results at NOA7_8 in Burnakura

PRESS RELEASE WESDOME PLANS AGGRESSIVE DRILLING AND DEVELOPMENT PROGRAM IN 2011

INFILL DRILLING EXPANDS MINERALIZATION IN HIGH-GRADE GOLD-COPPER CORE AT SOUTHWEST DISCOVERY ZONE TURQUOISE HILL PROJECT, MONGOLIA

DENISON DISCOVERS URANIUM MINERALIZATION THREE KILOMETRES NORTHEAST OF THE HUSKIE ZONE, WATERBURY LAKE PROJECT

- 2 - TABLE 1. INDICATED AND INFERRED GOLD AND SILVER RESOURCES. All Indicated

North American Palladium Provides Update on Lac des Iles Exploration Program

July 15, 2015 News Release Valley of the Kings Underground Infill Drilling Progresses

Canadian Gold Miner Grab Sample Returns 29.5 Grams per tonne Gold from South Kirkland Project

Asiamet Drilling Further Extends BKM Mineralisation

PRESS RELEASE. DUBUISSON NORTH DRILLING CUTS g/t AU OVER 5.0 METRES NEW S50 EAST DISCOVERY, 3.39 g/t AU OVER 25.9 METRES

A B C PAD A HIGHLIGHTS

Vendetta Reports Additional High Grade Drilling Results from Zones 2 and 3 at Pegmont Lead-Zinc Project

Detour Gold Reports Drilling Results from Lower Detour

Pershing Gold Extends High-Grade Mineralization through Step-Out Drilling in Phase 1 and Initiates Phase 2 Drilling Program

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

Great Atlantic Rock Samples Return up to 5.8 oz. / ton Gold Golden Promise Property in Central Newfoundland

Novo Resources Corp. Suite West Georgia Street Vancouver, BC V6E 3C9

June 4, 2015 News Release Valley of the Kings Underground Infill Drilling Underway

Vendetta Reports Initial Results from 2017 Pegmont Program with High Grade Zone 3 Step Out Drilling

CAUTIONARY STATEMENT

Marathon Announces Discovery of New High-Grade Gold Zone in Marathon Area and Sprite Zone Drilling Results, Valentine Lake Gold Camp

Probe Metals Confirms Continuity of Gold Mineralization on its Val-d Or East Project And Increases 2017 Drill Program to 75,000 metres

Monument Announces Significant Intercepts Assay Results at Buffalo Reef/Felda

Orsu Metals completes Phase 2 drilling program and announces significant intercepts in drillhole SDH17-15 at Zone 23, Sergeevskoe Gold Project, Russia

A Convenient a Joint Venture Patterson Lake South

MINERAL MOUNTAIN RESOURCES LTD. MMV.TSX-V

Interval (meters) To (meters)

KIRKLAND LAKE GOLD EXPANDS NEW HIGH-GRADE ZONE BELOW TAYLOR MINE, REPORTS MINERALIZED EXTENSIONS ALONG STRIKE AND AT DEPTH

CROCODILE GOLD INTERSECTS 7.1 G/T AU OVER 4.5 METERS INCLUDING 11.2 G/T AU OVER 2.6 METERS AT THE UNION REEFS PROJECT, PROSPECT DEPOSIT

NEWS RELEASE August 8, 2018

At the contact, mineralization is associated with strong tourmalinization of the Bevcon Intrusion.

October 8, 2015 News Release Brucejack Regional Drilling Intersects Over 8,000 Grams Per Tonne Gold

ASANKO GOLD ANNOUNCES ENCOURAGING INITIAL DRILL RESULTS FROM NEW EXPLORATION TARGET

CANARC RESOURCE CORP Howe Street Vancouver, BC V6C 2T6. News Release

SilverCrest Expands Babicanora High Grade Footprint to 600 metres; New High Grade Vein Discoveries Highlight District Scale Potential

Probe Metals Discovers New High Grade Gold Zone on Val-d Or East Project: Intersects 12.6 g/t Gold Over 7.3 Metres

23 January, 2018 CSE: RFR For Immediate Release. Renforth extends Parbec Gold Deposit strike 60m with gold in all 7 drillholes

MEDIA RELEASE OCEANAGOLD ANNOUNCES FURTHER DOWN DIP EXTENSIONS OF MINERALISATION AT PANEL 2: FRASERS UNDERGROUND MINE

Surface Trenching Highlights. Santos Target. To (m) Width (m) Au (g/t) Comment. (m) Santos (1)-includes internal dilution

Rich Saddle North Au-Cu-Ag Porphyry Expands by 275m Along Strike and 250m Down-Dip

Red Pine Releases Inferred Resource Report Improves Grade and Tonnage for Wawa Gold Project

Wallbridge Options 100% of the Beschefer Project near Fenelon Gold

GOLDPLAY ANNOUNCES FURTHER SAMPLING RESULTS FROM SAN MARCIAL HISTORICAL CORE; CONFIRMS OPEN PIT TARGET NEAR SURFACE WITH gpt AgEq.

BK Copper Project Strong Copper Results Confirm and Extend BKM

Drilling highlights include:

BELO SUN INTERSECTS NEW HIGH GRADE ZONE AT GROTA SECA AND EXPANDS GRANDE DEPOSIT

U3O8 Corp. reports results of infill drilling at Aricheng C in the Kurupung Project, Guyana

NEWS RELEASE. March 22, 2017

GOLDPLAY OUTLINES FIVE NEW EXPLORATION TARGETS AT THE SAN MARCIAL PROJECT IN MEXICO

The new sulphide mineralization lies within a 1.4 kilometer long east-west trending

KIRKLAND LAKE GOLD INTERSECTS NEW MINERALIZATION AT TAYLOR MINE, CONTINUES TO EXTEND PORPHYRY DEPOSITS TO DEPTH

Corvus Gold Drills g/t Gold, Extends Mother Lode Sediment Hosted Gold System to at Least 450 Metres Along Strike

IAMGOLD REPORTS HIGH-GRADE DRILL INTERSECTIONS FROM ITS 2017 DRILLING PROGRAM ON THE DIAKHA DEPOSIT, SIRIBAYA PROJECT IN MALI

EL CONDOR IN-FILL DRILLING INTERSECTS 26.9 METERS 2.19% CU & 0.58% NI

Queenston Announces 112% Increase in Indicated Resource (to 1.5 M oz. gold) and 16% Increase in Inferred Resource (to 0.7 M oz. gold) at Upper Beaver

June 4, 2014 News Release Valley of the Kings Exploration Program Underway; Project Update

BELO SUN DISCOVERS NEW MINERALIZED ZONE AT ITS VOLTA GRANDE GOLD PROJECT, BRAZIL

BELO SUN RELEASES RESULTS FOR 74 ADDITIONAL DRILL HOLES AT ITS VOLTA GRANDE PROJECT

NEWS RELEASE FULLER PROPERTY CONTINUES TO DELIVER GOOD RESULTS 2.53 GRAMS PER TONNE GOLD OVER METRES

Pahtavaara Drill Program Intersects 32.8 G/T Gold Over 2.0M And 2.1 G/T Gold Over 18.0M In The Karoliina Zone

MANN SILVER-COBALT MINE. PORE: TSXV PowerOre.com

New Drilling Program Commences at Mutiny s Deflector Deposit

Transcription:

Suite 700 1620 Dickson Ave. Kelowna, BC V1Y 9Y2 rich@fissionuranium.com www.fissionuranium.com TSX SYMBOL: FCU OTCQX SYMBOL: FCUUF August 14, 2017 FRANKFURT SYMBOL: 2FU Fission Hits 61.09m total composite >10,000 cps with Metallurgical Drilling at R780E Zone Summer prefeasibility holes completed, including metallurgical and geotechnical drilling FISSION URANIUM CORP. ("Fission" or the Company") is pleased to announce the completion of the summer 2017 portion of the Pre-Feasibility Study PFS drilling, including three large diameter holes for metallurgical sample collection and three geotechnical core holes, to generate rock quality data including strength testing, related to the proposed open pit and underground mining areas of the Triple R deposit. Of particular note is hole PLS17-MET-C (line 660E), which intersected 153.5m total composite mineralization, including 61.09m total composite >10,000 cps. In addition, work related to long-term hydrogeology analysis and detailed baseline environmental studies is on-going. Results of the Phase 2 Metallurgical Study core drilling, designed to collect representative mineralized material from 3 discrete locations within the R780E zone of the Triple R deposit (west, central and east part of the zone), were successful in all measures and, overall, the mineralization met or exceeded expectations based off the resource model with respect to width and strength of mineralization. News Highlights Core drilling for sample collection for a Phase two metallurgical study completed o PLS17-MET-C (line 660E): 153.5m total composite mineralization over a 176.0m section (between 56.0m to 232.0m), including 61.09m total composite >10,000 cps o PLS17-MET-E (line 845E): 113.0m total composite mineralization over a 166.0m section (between 112.5m to 278.5m), including 15.48m total composite >10,000 cps Geotechnical Rock Drilling o Three holes were completed to depth as planned o Focused on providing information for PFS-level design recommendations for open pit and underground excavations

Hole ID Zone Grid Line Lake Depth Sandstone From - To Basement Unconformity Depth Total Drillhole Depth Ross McElroy, President, COO, and Chief Geologist for Fission, commented The results of our metallurgical drilling highlight just how robust our high-grade, near-surface Triple R deposit really is. With the completion of the drilling to collect material for the Phase 2 metallurgical study and also the geotechnical rock holes this summer, we are making excellent progress towards achieving PFS status. A PFS is an important milestone for any deposit - both de-risking the asset for investors and advancing the project towards production. Both the Fission team and our strategic partner, CGN Mining, are very pleased with the work and results of testing to date and we remain on target to have a PFS ready in 2018. Summary of Drilling for Phase 2 Metallurgical Study Phase 1 level of metallurgical, completed for the Preliminary Economic Study PEA, focused on Triple R s ore mineralogy and tested grindability and leachability. As recommended in the PEA report, The Phase 2 program focuses on proving the performance and efficiency of the processing steps post-leach, which involves: solid/liquid separation test work to size the CCD circuit, solvent extraction test work, impurity removal test work, yellowcake precipitation test work and effluent / tailings treatment. The metallurgical work is being conducted and supervised under the direction of Mellis Engineering Ltd., widely recognized as the premiere experts in this field. To collect the appropriate and sufficient amount of mineralized material, three HQ diameter holes totaling 811m of core drilling were completed from various strategic locations within the R780E zone of the Triple R deposit: western, central and eastern parts of the zones respectively. All three holes were designed to intersect a range of representative uranium grades and lithologies expected to be encountered in the proposed open pit and underground mine. Results of mineralized intersections are reported in Table 1. Table 1: R780E Zone Phase 2 Metallurgical Sample Drill Holes Collar Hand-held Scintillometer Results On Mineralized Drillcore (>300 cps / >0.5M minimum) Az Dip From To Width CPS Peak Range PLS17-MET-W R780E 335E 43-89.4 54.5 141.5 87.0 <300 - >65535 6.3 47.1-50.3 50.3 224.0 176.0 177.5 1.5 590-1200 PLS17-MET-C R780E 660E 44-88.2 56.0 167.0 111.0 <300 - >65535 6.1 NA 56.0 258.0 179.5 180.0 0.5 330 182.5 184.0 1.5 740-4700 188.0 216.0 28.0 <300 - >65535 219.5 232.0 12.5 <300-12200 PLS17-MET-E R780E 845E 316-64.9 112.5 215.5 103.0 <300 - >65535 8.7 NA 60.2 329.0 224.0 225.5 1.5 590-5800 230.5 233.5 3.0 <300-15600 259.5 264.5 5.0 880-7900 278.0 278.5 0.5 1800

PLS17-MET-W (line 335E) located in the western area of the R780E zone, this hole was designed to intersect and collect representative sample material from the major graphitic shear zone that hosts the bulk of the Triple R deposit. The metallurgical hole was based off drill-hole PLS13-075 and compares very well with it and nearby holes with respect to interpretation of mineralization and lithology. For comparative purposes, mineralization based on radioactivity is as follows: PLS13-075: o 91.5m total composite mineralization over a 140.0m section (between 57.5m to 197.5m), including 21.8m total composite >10,000 cps o Composite Grade x Thickness of 501.4 including an interval of 9.08% U3O8 over 54.5m PLS17-MET-W: o o 88.5m total composite mineralization over a 123.0m section (between 54.5m to 177.5m), including 9.28m total composite >10,000 cps PLS17-MET-C (line 660E) located in the central area of the R780E zone, this hole was designed to intersect and collect representative sample material from the major graphitic shear zone that hosts the bulk of the Triple R deposit. The metallurgical hole was based off drill-hole PLS14-187 and intersected wider and stronger mineralization. For comparative purposes, mineralization based on radioactivity is as follows: PLS14-187: o 146.0m total composite mineralization over a 173.0m section (between 58.5m to 231.5m), including 53.47m total composite >10,000 cps o Composite Grade x Thickness of 639.7 including an interval of 5.98% U3O8 over 102.5m PLS17-MET-C: o 153.5m total composite mineralization over a 176.0m section (between 56.0m to 232.0m), including o 61.09m total composite >10,000 cps PLS17-MET-E (line 845E) located in the eastern area of the R780E zone, this hole was designed to intersect and collect representative sample material from the quartz-feldsparbiotite-garnet gneiss unit which surrounds the graphitic shear zone noted above. The metallurgical hole was based off drill-hole PLS14-259 and intersected wider and stronger mineralization. For comparative purposes, mineralization based on radioactivity is as follows: PLS14-259: o 100.0m total composite mineralization over a 271.0m section (between 111.5m to 382.5m), including 11.0m total composite >10,000 cps o Composite Grade x Thickness of 226.3 including an interval of 4.21% U3O8 over 38.5m PLS17-MET-C: o 113.0m total composite mineralization over a 166.0m section (between 112.5m to 278.5.0m), including 15.48m total composite >10,000 cps

Summary of Geotechnical Rock Drilling The summer 2017 Geotechnical Rock Drilling program, under the direction and supervision of BGC Engineering, targeted the onshore portion of the proposed open pit and underground mine. The program is designed to provide sufficient information for PFS level design recommendations for open pit and underground excavations proposed in the PEA study for the west end of the R780E and R00E zones. The primary objective of the summer program work is to investigate the pit wall rock wall stability by core drilling into the proposed pit wall and obtaining rock quality parameters and pertinent structures. The investigations include: Triple tube oriented core drilling to obtain structural geologic information and characterize the rock mechanics properties and distribution of the alteration halo around the mineralized zone Collection of rock core and infill samples for testing Core orientation to determine the attitudes of structural discontinuities encountered in the core holes Bore hole televiewer surveys In-situ hydrologic testing (packer testing) to estimate the hydraulic properties of the representative units, discrete structures, structural zones and the crown pillar Point load testing to provide indication of rock strength and to calibrate laboratory strength testing of core samples Installation of vibrating wire piezometers and dataloggers A series of packer tests and vibrating wire piezometers A total of 3 holes in 526.6m were completed to their targeted depth, successfully penetrating the overburden bedrock interface and various recording instruments were installed and thus allowing the detailed geotechnical study to progress. Ground Water Monitoring Holes (Hydrogeology) In 2016, BGC Engineering supervised the drilling and installation of seven monitoring wells at 5 locations. Five monitoring wells (three deep and two shallow) were drilled on land and two deep wells were completed within Patterson Lake. During the summer 2017 program, BGC will complete well development, conduct slug tests and sample all ground water monitoring wells. Natural gamma radiation in drill core that is reported in this news release, with the exception of historic holes PLS13-075 and PLS14-187, was measured in counts per second (cps) using a hand held RS-121 Scintillometer manufactured by Radiation Solutions, which is capable of discriminating readings to 65,535 cps. Holes PLS13-075 and PLS14-187 measured natural gamma radiation using a hand held GR-110 Scintillometer which is capable of discriminating readings to 9,999 cps. Natural gamma radiation is also collected from an in-hole survey that is measured in counts per second (cps) using a Mount Sopris 2GHF-1000 Triple Gamma probe, which allows for more accurate measurements in high grade mineralized zones. The Triple Gamma probe is preferred in zones of high grade mineralization. The reader is cautioned that scintillometer readings are not directly or uniformly related to uranium grades of the rock sample measured, and should be used only as a preliminary indication of the presence of radioactive materials. The degree of radioactivity within the mineralized intervals is highly variable and associated with visible pitchblende mineralization. All intersection measurements are down-hole. All depths reported of core interval and down-hole gamma measurements including radioactivity and mineralization intervals widths are not always representative of true thickness and true thicknesses are yet to be determined in zones outside of the Triple

R deposit. Within the Triple R deposit, individual zone wireframe models constructed from assay data and used in the resource estimate indicate that both the R780E and R00E zones have a complex geometry controlled by and parallel to steeply south-dipping lithological boundaries as well as a preferential sub-horizontal orientation. PLS Mineralized Trend & Triple R Deposit Summary Uranium mineralization at PLS occurs within the Patterson Lake Conductive Corridor and has been traced by core drilling approximately 3.18km of east-west strike length in five separated mineralized "zones". From west to east, these zones are: R1515W, R840W, R00E, R780E and R1620E. Thus far only the R00E and R780E have been included in the Triple R deposit resource estimate, where-as the R840W and R1620E zones and the recent addition of the R1515W zone, fall outside of the current resource estimate window. The discovery hole of what is now referred to as the Triple R uranium deposit was announced on November 05, 2012 with drill hole PLS12-022, from what is considered part of the R00E zone. Through successful exploration programs completed to date, it has evolved into a large, near surface, basement hosted, structurally controlled high-grade uranium deposit. The Triple R deposit consists of the R00E zone on the western side and the much larger R780E zone further on strike to the east. Within the deposit, the R00E and R780E zones have an overall combined strike length validated by a resource estimate of approximately 1.05km with the R00E measuring approximately 105m in strike length and the R780E zones measuring approximately 945m in strike length. A 225m gap separates the R00E zone to the west and the R780E zones to the east, though sporadic narrow, weakly mineralized intervals from drill holes within this gap suggest the potential for further significant mineralization in this area. The R780E zone is located beneath Patterson Lake which is approximately six metres deep in the area of the deposit. The entire Triple R deposit is covered by approximately 50m to 60m of overburden. Mineralization remains open along strike in both the western and eastern directions. Basement rocks within the mineralized trend are identified primarily as mafic volcanic rocks with varying degrees of alteration. Mineralization is both located within and associated with mafic volcanic intrusives with varying degrees of silicification, metasomatic mineral assemblages and hydrothermal graphite. The graphitic sequences are, associated with the PL-3B basement Electro-Magnetic (EM) Conductor. The R840W zone, located 495m west along strike of the Triple R deposit, now has a defined strike length of 465m and is still open. The recent discovery of the high-grade R1515W zone located a further 510m to the west of the R840W zone, now has a defined strike length of 70m and is open in multiple directions. The R840W and R1515W zones have significantly upgraded the prospectivity for further growth on land to the west of the Triple R deposit within the Patterson Lake Corridor. The recently discovered high-grade mineralization in the R1620E zone, located 210m to the east along strike similarly has significantly upgraded the prospectivity for further growth of the PLS resource to the east of the Triple R deposit. Updated maps and files can be found on the Company's website at http://fissionuranium.com/project/pls/.

Patterson Lake South Property The 31,039 hectare PLS project is 100% owned and operated by Fission Uranium Corp. PLS is accessible by road with primary access from all-weather Highway 955, which runs north to the former Cluff Lake mine and passes through the nearby UEX-Areva Shea Creek discoveries located 50km to the north, currently under active exploration and development. The technical information in this news release has been prepared in accordance with the Canadian regulatory requirements set out in National Instrument 43-101 and reviewed on behalf of the company by Ross McElroy, P.Geol., President and COO for Fission Uranium Corp., a qualified person. About Fission Uranium Corp. Fission Uranium Corp. is a Canadian based resource company specializing in the strategic exploration and development of the Patterson Lake South uranium property - host to the class-leading Triple R uranium deposit - and is headquartered in Kelowna, British Columbia. Fission s common shares are listed on the TSX Exchange under the symbol "FCU" and trade on the OTCQX marketplace in the U.S. under the symbol "FCUUF." ON BEHALF OF THE BOARD Investor Relations Rich Matthews "Ross McElroy" TF: 877-868-8140 rich@fissionuranium.com Ross McElroy, President and COO www.fissionuranium.com Cautionary Statement: Certain information contained in this press release constitutes forward-looking information", within the meaning of Canadian legislation. Generally, these forward-looking statements can be identified by the use of forward-looking terminology such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur", "be achieved" or has the potential to. Forward looking statements contained in this press release may include statements regarding the future operating or financial performance of Fission and Fission Uranium which involve known and unknown risks and uncertainties which may not prove to be accurate. Actual results and outcomes may differ materially from what is expressed or forecasted in these forward-looking statements. Such statements are qualified in their entirety by the inherent risks and uncertainties surrounding future expectations. Among those factors which could cause actual results to differ materially are the following: market conditions and other risk factors listed from time to time in our reports filed with Canadian securities regulators on SEDAR at www.sedar.com. The forward-looking statements included in this press release are made as of the date of this press release and the Company and Fission Uranium disclaim any intention or obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise, except as expressly required by applicable securities legislation.