COMMANDER RESOURCES LTD. October Dome Gold Skarn Mt Polley Core Facility February 2016 1 August 2016
CORPORATE DISCLOSURE Disclaimer The information contained herein, while obtained from sources which we believe are reliable, is not guaranteed as to its accuracy or completeness. The company is an exploration stage mineral resource exploration company and none of its mineral projects have yet to be proven to be economic. The contents of this presentation is for information purposes only and does not constitute an offer to sell or a solicitation to purchase any securities referred to herein. Forward-looking Statements This presentation includes certain forward-looking statements about future events and/or financial results which are forward-looking in nature and subject to risks and uncertainties. Forward-looking statements include without limitation, statements regarding the company s plans, goals or objectives and future exploration, development, potential mineralization, exploration results and future plans and objectives of Commander. Forward-looking statements can generally be identified by the use of forward-looking terminology such as may, will, expect, intend, estimate, anticipate, believe, or continue or the negative thereof or variations thereon or similar terminology. There can be no assurance that such statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from expectations include risks associated with mining generally and exploration stage projects in particular. Potential investors should conduct their own investigations as to the suitability of investing in securities of Commander. Bernard Kahlert P.Eng. is the Qualified Person responsible for the technical content of this presentation. Commander actively explored the Green Bay Project area since first acquiring the property in 1989. A successful exploration campaign culminated in the detailed delineation of the Hammerdown gold deposit which was sold to Richmont Mining. Who actively mined the deposit from 2000 to 2004. PHOTO is the first gold pour from the Hammerdown Mine. 2
October Dome 2013 drilling 1. October Dome Cu Au target 2. Mt Polley Mine extensions 3. Boundary Zone royalty 3
October Dome Project 2013 Drilling in Gold Skarn North end of 4 km target zone Hornfelsed sediments and basalt intruded by alkalic dykes and plugs Anomalous copper and gold mineralization in drill holes OD-6 Propylitic and potassic alteration with pyrite and chalcopyrite hosted by diorite and monzonite Magnetite rich skarn at sediment basalt contact- similar to QR Gold Mine 4
October Dome Gold Project 2013 Drilling Hole From (metres) To (metres) Core Length (metres) Gold (gpt) OD-5 76 80 4 1.1 OD-5 232 250 18 0.5 OD-6 98 100 2 5.2 OD-6 108 110 2 1.1 OD-6 210 219 9 0.7 Incl. 212 215 3 1.3 DDH OD-6 intersected 9 metres of massive magnetite, epidote, pyrite, garnet, skarn similar to skarn at the QR Gold Mine located some 5 km to the northwest 5
October Dome Gold Project, Gold in Soil QR gold mine- 5 km. Skarn in hole OD-6 OD-6,7 sediment/basalt contact zone with skarn OD-5 OD-8,9 OD-10 2013 drill hole Alkalic-style porphyry copper gold target 6
October Dome Gold Project, Gold, IP QR gold mine- 6 km. Skarn sediment/basalt contact zone with skarn 2013 drill hole Alkalic-style porphyry copper gold target 7
QR gold mine- 6 km. October Dome Gold Project, Gold Magnetics Skarn sediment/basalt contact zone with skarn 2013 drill hole Alkalic-style porphyry copper gold target 8
OD-6: pyrite, epidote, magnetite, chlorite, garnet 9
OD-6: massive magnetite with pyrite, epidote 10
OD-9: propylitised basalt with pyrite 11
OD-9: propylitised basalt with pyrite 12
QR Deposit: Midwest Zone Section Calcareous contact At QR the best gold Grades were at the basaltsediment contact near the outer limits of the alteration (the alteration front) 13
QR Gold Deposit History Discovered 1975 by Dome Mines and Fox Geological Consultants 1994-98- mined by Kinross 700 tpd (1.06 million tonnes @ 4.1g/t with 118,004 ounces of gold produced) 2002-2009: exploration and limited mining by Cross Lake Minerals Total Mined since inception: 1,236,070 @ 3.98 g/t 2009- acquired by Barkerville Gold Mines Exploration potential remains in North Zone and below the West Zone 14