FAST-PULSED SUPERCONDUCTING MAGNETS

Similar documents
Analysis of Coupled Electromagnetic-Thermal Effects in Superconducting Accelerator Magnets

Schroeder, C., Walter, F., Marzouki, F., Stafiniac, A., Floch, E., Schnizer, P., Moritz, G., Xiang, Y., Kauschke, M., Meier, J., Hess, G.

COLD TESTING OF RAPIDLY-CYCLING MODEL MAGNETS FOR SIS 100 AND SIS 300 METHODS AND RESULTS*

Gesellschaft für Schwerionenforschung mbh (GSI), Planckstrasse 1, D Darmstadt, Germany

MAGNET DESIGN ISSUES & CONCEPTS FOR THE NEW INJECTOR

Superconducting Magnets for Future Electron-Ion Collider. Yuhong Zhang Thomas Jefferson National Accelerator Facility, USA

The SIS100 Superconducting Magnets

DEVELOPMENT AND PRODUCTION OF SUPERCONDUCTING AND CRYOGENIC EQUIPMENT AND SYSTEMS FOR ACCELERATORS BY IHEP

Optimization of the SIS100 Lattice and a Dedicated Collimation System for Ionisation Losses

SUPERCONDUCTIVITY APPLIED TO PARTICLE ACCELERATOR MAGNETS

Journal of Physics: Conference Series. Related content. To cite this article: E Fischer et al 2010 J. Phys.: Conf. Ser

The Superconducting SIS100 Synchrotron for High Intensity Proton and Heavy Ion Beams

Trends in Magnet Technologies

FAIR AT GSI. P. Spiller, GSI, Darmstadt, Germany

Field Quality Measurements in a Single-Aperture 11 T Nb 3 Sn Demonstrator Dipole for LHC Upgrades

Chapter 1 Introduction

SC magnets for Future HEHIHB Colliders

Design Aspects of High-Field Block-Coil Superconducting Dipole Magnets

Lecture 2: Training, fine filaments & cables

SUPERFERRIC RAPIDLY CYCLING MAGNETS OPTIMIZED FIELD DESIGN AND MEASUREMENT

Accelerators. Table Quadrupole magnet

HTS Magnets for Accelerator Applications

THE GSI FUTURE PROJECT: AN INTERNATIONAL ACCELERATOR FACILITY FOR BEAMS OF IONS AND ANTIPROTONS

3 rd ILSF Advanced School on Synchrotron Radiation and Its Applications

Field Errors Decay and Snap-Back in LHC Model Dipoles

CURRENT LEADS FOR THE LHC MAGNET SYSTEM

Design of a Sector Magnet for High Temperature Superconducting Injector Cyclotron

3.2.2 Magnets. The properties of the quadrupoles, sextupoles and correctors are listed in tables t322_b,_c and _d.

Accelerators. Lecture V. Oliver Brüning. school/lecture5

HB Magnet Quench Calculation. R. Rajput-Ghoshal P. Ghoshal R. Fair

Innovative fabrication method of superconducting magnets using high T c superconductors with joints

EuCARD-2 Enhanced European Coordination for Accelerator Research & Development. Journal Publication

Heat generation by eddy currents in a shell of superconducting bus-bars for SIS100 particle accelerator at FAIR

Advanced Design of the FAIR Storage Ring Complex

Introduction. LHC High bending field is required for High energy Compact machine.

Lecture #2 Design Guide to Superconducting Magnet

100 TeV Collider Magnets

Challenges of the FAIR Vacuum System

HiLumi LHC FP7 High Luminosity Large Hadron Collider Design Study. Milestone Report. Cryogenic Scenarios for the Cold Powering System

Magnet Power Converters and Accelerators

SUPERCONDUCTING MAGNETS

Design and Modelling of LTS Superconducting Magnets. Magnetic design

New European Accelerator Project EuCARD: Work Package on High Field Magnets

The Design and Fabrication of a 6 Tesla EBIT Solenoid

Self Field Measurements by Hall Sensors on the SeCRETS Long Sample CICCs in SULTAN

PUBLICATION. Thermal Design of an Nb3Sn High Field Accelerator Magnet

20 T Block Dipole: Features and Challenges

A high intensity p-linac and the FAIR Project

Superconductivity in High-Energy Particle Accelerators

High Field Dipoles for GTeV Experiment at the Tevatron

Analysis of capacitance of a cryogenic by-pass line for SIS100 particle accelerator at FAIR

EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH Laboratory for Particle Physics

Report CERN-ACC Considerations for a QD0 with Hybrid Technology in ILC

Statusreport. Status of the GSI accelerators for FRS operation. Jens Stadlmann (FAIR Synchrotrons)

Superconducting Magnet with a Minimal Steel Yoke for the Future Circular Collider Detector

SPPC Study and R&D Planning. Jingyu Tang for the SPPC study group IAS Program for High Energy Physics January 18-21, 2016, HKUST

Superconductivity in High-Energy Particle Accelerators

Material, Design, and Cost Modeling for High Performance Coils. L. Bromberg, P. Titus MIT Plasma Science and Fusion Center ARIES meeting

State-of-the Art Superconducting Accelerator Magnets

Honghai Song. Yawei Wang, Kent Holland, Ken Schrock, Saravan Chandrasekaran FRIB/MSU & SJTU June 2015, SJTU Xuhui Campus

Impact of the forces due to CLIQ discharges on the MQXF Beam Screen. Marco Morrone, Cedric Garion TE-VSC-DLM

STATE-OF-THE ART SUPERCONDUCTING ACCELERATOR MAGNETS

The FAIR Accelerator Facility

MAGNETS AND INSERTION DEVICES FOR THE ESRF II

JOINTS FOR SUPERCONDUCTING MAGNETS

Magnet and Cryostat Configurations For a Multi-port Quadrupole Array*

Lattice Cell/Girder Assembly

REVIEW OF SUPERCONDUCTING STORAGE-RING DIPOLE AND QUADRUPOLE MAGNETS

R&D ON FUTURE CIRCULAR COLLIDERS

Basic design and engineering of normalconducting, iron dominated electro magnets

Evaluation of the Current Sharing Temperature of the ITER Toroidal Field Model Coil

SC QUADRUPOLE AND DIPOLE

D- Charge Exchange Ionizer for the JINR Polarized Ion Source POLARIS

Lawrence Berkeley National Laboratory Lawrence Berkeley National Laboratory

Antiproton Decelerator at CERN, another advanced CCC for the FAIR project at GSI is under construction and will be installed in CRYRING. This

Insertion Devices Lecture 6 The Application of Superconductors. Jim Clarke ASTeC Daresbury Laboratory

USING TEVATRON MAGNETS FOR HE-LHC OR NEW RING IN LHC TUNNEL*

A Method for Greatly Reduced Edge Effects and Crosstalk in CCT Magnets

Protecting a Full-Scale Nb3Sn Magnet with CLIQ, the New Coupling-Loss Induced Quench System

Design of Superconducting Magnet System for SuperKEKB Interaction Region

Superconducting racetrack booster for the ion complex of MEIC

From FRS to Super-FRS. Martin Winkler

Plans for the LHC Luminosity Upgrade Summary of the CARE-HHHAPD-LUMI-05 workshop

IEEE TRANSACTIONS ON APPLIED SUPERCONDUCTIVITY, VOL. 14, NO. 2, JUNE A. Nijhuis, Yu. Ilyin, W. Abbas, B. ten Haken, and H. H. J.

13000 A HTS CURRENT LEADS FOR THE LHC ACCELERATOR: FROM CONCEPTUAL DESIGN TO PROTOTYPE VALIDATION

Towards the High Intensity Limit in the FAIR Project - Present Status and Future Challenges. Peter Spiller HB

To be published in the Proceedings of ICEC-22, Seoul Korea, July 2008 MICE Note 232 1

HIMARC Simulations Divergent Thinking, Convergent Engineering

Multistrand cables and magnets

HIGH CURRENT PROTON BEAM INVESTIGATIONS AT THE SILHI-LEBT AT CEA/SACLAY

Feasibility of HTS DC Cables on Board a Ship

Longitudinal stacking and electron cooling of ion beams in the ESR as a proof of principle for FAIR. C. Dimopoulou

The Booster has three magnet systems for extraction: Kicker Ke, comprising two identical magnets and power supplies Septum Se

Light ion recoil detector

The ZEPTO project: Tuneable permanent magnets for the next generation of high energy accelerators.

Beam Diagnostics and Instrumentation JUAS, Archamps Peter Forck Gesellschaft für Schwerionenforschnung (GSI)

Current Leads, Links and Buses

Accelerators and Superconductivity: LHC and Near Future in Europe

Polarization of a stored beam by spin filtering

High Field HTS SMES Coil

Transcription:

FAST-PULSED SUPERCONDUCTING MAGNETS Abstract Up to now only one synchrotron (Nuclotron at JINR, Dubna) has been equipped with fast-pulsed superconducting magnets. The demand for high beam intensities leads to the requirement of fast-pulsed, periodically cycling magnets for synchrotrons and fastpulsed magnets for storage rings. An example is FAIR (Facility for Antiproton and Ion Research) at GSI, which will consist of two synchrotrons in one tunnel and several storage rings. The fast field ramp rate and repetition frequency introduce many magnet design problems and constraints in the operation of the accelerator. Persistent currents in the superconductor and eddy currents in wire, cable, iron and vacuum chamber reduce the field quality and generate cryogenic losses. A magnet lifetime of 20 years is anticipated, resulting in up to 10 8 magnet cycles. Therefore special attention has to be paid to magnet material fatigue problems. R&D work is being done in collaboration with many institutions, to reach the requirements mentioned above. Model dipoles were built and tested. The results of the R&D are reported. The advantages of the use of low field, fast pulsed superconducting, compared to resistive, magnets will be discussed. C. Muehle, GSI, Darmstadt, Germany superconducting accelerator magnets needed for FAIR. R&D policy was to restrict the activities at GSI to design and coordination work and to the operation of a test facility for model and prototype magnets. Collaborations were established with institutes having experience with magnets similar to those of FAIR, concentrating at the beginning on dipole R&D and transferring the results to quadrupoles, afterwards. At the earliest possibility, industry should be involved in the R&D. INTRODUCTION GSI plans to construct a new accelerator complex, the international ''Facility for Antiproton and Ion Research" (FAIR) [1], which will provide high intensity primary and secondary beams of ions and antiprotons for experiments in nuclear, atomic and plasma physics. It will consist mainly of 2 synchrotrons, SIS100 (100 Tm rigidity) and SIS300 (300 Tm rigidity), in one tunnel, and several storage rings. Figure 1 gives an overview of the facility. The SIS100 is the heart of the facility. It will accelerate ions and protons at a high repetition rate and either send them to the targets for Radioactive Ion Beam (RIB) or Antiproton Beam production or to the SIS300 for further acceleration to higher energies. The CR storage ring complex will cool the secondary beams and accumulate the antiprotons. HESR and NESR are the experimental storage rings for antiprotons and ions, respectively. In order to reach the required high intensities, the magnets of the synchrotrons have to be rapidly pulsed at a high repetition frequency (AC-operation). The required dipole ramp rate is 4 T/s for SIS100 (at about 1 Hz) and 1T/s for SIS300, with a duty cycle of 50%. All storage rings except the NESR/RESR will be operated as DC rings. The NESR/RESR maximum dipole ramp rate will be 1 T/s, because of the short life time of the decelerated radioactive ions. This paper deals only with rapidly-cycling C.Muehle@gsi.de Number of magnets Aperture (mm) Magnet length (m) field / gradient ramp rate Figure 1: Topology of FAIR. As SIS100 and SIS300 are to be installed in the same tunnel, their different rigidities lead to different requirements for the magnets, which are compiled in table 1. Consequently, different design approaches are necessary. These are described later on. Table 1: Main superconducting magnets of the synchrotrons. SIS100 SIS300 Type Dipole Quadru- Dipole Quadru- pole pole 108 168 108 156 130 60 (gap height 66) 135 65 86(circ.) (coil ID: 100) 2.8 1.1 2.9 0.9 86 (circ.) (coil ID: 100) 2.1 T 32 T/m 6 T 90 T/m 4T/s 61T/m/s 1T/s 15T/m/s 324 F. FFAG and other advanced acclerators and technologies

THAY06 R&D TOPICS Fast cycling of magnets in the Hz-range leads to special problems, which are to be adressed by the R&D. The R&D is directed towards the most critical issues. These are: Eddy and persistent currents Mechanical structure and lifetime of the magnets. Further R&D is compiled under other topics. Eddy and persistent currents Due to the changing magnetic field, eddy currents are created in the coil, yoke, structural elements, and the beam pipe. These eddy currents affect the field quality and create large steady-state AC losses. First, it is necessary to minimize these effects. Second, good heat removal is necessary, to remove the non-avoidable losses. The SIS100 main magnet losses are dominated by the dynamic load, which amounts to approximately 75% of the total load. The following magnet parts contribute to the losses: Yoke (hysteresis and eddy current loss), Structural elements (hysteresis and eddy current loss), Beam pipe (eddy current loss), strand o hysteresis loss ~ filament diameter d reduce filament size o filament coupling loss ~ tp 2 /ρ reduce twist pitch tp, increase matrix resistivity ρ cable ( Rutherford or similar) o strand coupling loss due to adjacent o resistance R a increase R a (coating) strand coupling loss due to cross over resistance R c increase R c (cored cable). Besides reducing the ac losses in the conductor and the cable, one has to provide appropriate cooling and allow for local current redistribution in the cable. All 3 measures together must allow an appropriate temperature margin, under AC operating conditions. The R&D is therefore directed at development of small filament size wires (2-3µm) and a cored cable. Mechanical structure and lifetime of the magnets The fast cycling requirement leads to an enormous number of cycles during the planned lifetime of 20 years. 200 million cycles are expected for SIS100, 1 million cycles for SIS300. Therefore, the movement of any magnet part during cycling is to be minimized. R&D on material fatigue and crack propagation for critical parts is to be performed. Other topics Magnet quench protection requires special measures because of the high ramp rate, which requires a high charging voltage of the magnet strings. Therefore, stacks of diodes or warm bypass elements are necessary. Because the iron yoke of the magnet is at cryogenic temperature, one has to look for a yoke material with the best compromise between a high saturation flux density and low hysteresis losses. Since field quality is ramp rate dependent, measurements of the field quality during ramping are needed. SUPERCONDUCTING MAGNETS FOR SIS 100 These superferric magnets are very similar to those of the Nuclotron ring at JINR, Dubna [2]. The conductor ('Nuclotron-cable') was especially designed to cool large steady-state head loads of rapidly cycling magnets through the use of two phase helium, flowing through a copper-nickel-tube with low hydraulic resistance. The strands, wound around the outside of the tube, are indirectly cooled. R&D goals are: Improvement of DC field quality (2D / 3D ) Guarantee of long term mechanical stability (2 10 8 cycles) Reduction of eddy / persistent current effects (may affect field quality, losses) Since these magnets are iron dominated, no influence of the eddy/persistent currents on field quality was observed. However, large cryogenic losses occurred in the original Nuclotron magnets (dipole coil 30%, dipole yoke 70%). The yoke losses consist of hysteresis losses in the iron and eddy current losses in iron and structural support elements of the magnet. Figure 2 shows the reduction of the losses during the R&D phase [3]. Qcycle, J 50 40 30 20 10 0 Nuclotron modifications => Heat release in test dipoles 4KDP1 (SS end plates) PDP1s (SMP) PDP2s1 PDP2s2 (6 slits, (reduced reduced coil ends) brackets) PDP2s3 (only 3 slits) PDP3s (EAS wire) total yoke: sum yoke: Qcycle_e yoke: Qcycle_h coil itself transfere to coil 4KDP6 (SS) 4KDP6a (SS+6 slits) Figure 2: Loss reduction during R&D phase for the triangular cycle 1Hz, 2T. Detailed investigations were made in order to guarantee the 20 year lifetime of the magnet. The use of a conductor support structure (under development) will reduce the previously existing high point-to point loads between F. FFAG and other advanced acclerators and technologies 325

adjacent conductors, due to Lorentz forces, and allow accurate positioning of the conductors (Figure 3) [4]. Figure 3: Coil support structure of SIS 100 dipole Figure 4 shows the lamination cross section of the SIS100 quadrupole. The slits improve field quality and at the same time reduce the eddy currents due to longitudinal field components of the fringe field. Cost estimations for the dipoles of both solutions were made. Already from the production point of view the superconducting solution is slightly in favour, as the magnets can be more compact. During the 20 years of operation a tremendous amount of energy can be saved (Table 2). Table 2:Results of the cost estimation for 120 SIS100 dipoles [5]. (* Only the extra costs of the vacuum system and the power supplies for the normal conducting magnets are listed.) Costs sc / k nc / k Production R&D 1690 Prototype 870 347 Series production 8090 10000 Quench detection 769 Magnet tests 1548 542 Vacuum system (relative)* 1300 Power supply (relative)* 7940 Compensator unit 5000 Water cooling and air cond. 2350 Cryosystem 12200 production total 25167 27479 Operation (20 years) Electrical power 4400 24140 Water cooling and air cond. 1553 Operation total 4400 25693 TOTAL 29567 53172 Figure 4: Lamination cross section of SIS100 quadrupole. The load line in figure 5 demonstrates that these superferric magnets operate at a high saturation level, which is not a problem from the power consumption point of view as it is for a resistive magnet. However, the operating margin is reduced to about 80% of the critical current. Figure 5: Load line of the SIS100 quadrupole. Due to the moderate fields of the SIS100 magnets a normal conducting solution is in principle feasible, too. SUPERCONDUCTING MAGNETS FOR SIS200/300 Dipole GSI 001 R&D was started at BNL with the construction of a 4T, 1 T/s dipole, called GSI001, built very similarly to the RHIC dipole. It was designed to demonstrate the feasibility of a rapidly cycling cosθ dipole and to investigate related topics such as quench behaviour, AC field quality, and cryogenic losses [6, 7]. Table 3 shows the differences between the RHIC dipole and GSI 001. Table 3: Parameter of RHIC dipole and GSI 001 RHIC dipole RHIC type dipole GSI001 Superconducting wire NbTi-Cu (1:2.25) NbTi-Cu (1:2.25) Filament 6µm 6µm diameter Twist pitch 13mm 4mm Coating no Stabrite Cable type Rutherford without core Rutherford with 2 x 25µm stain-less steel core 326 F. FFAG and other advanced acclerators and technologies

THAY06 Coil restrain phenolic stainless steel spacer collar (G-11CR keys) Wedges Cu G-11CR Yoke iron Hc= 145 A/m Hc= 33 A/m, 3.5% Silicon Laminations 6.35 mm 0.5 mm, glued Ramp rate limitation of the quench current: Figure 6 shows only a small degradation of the quench current in the region of interest (1 T/s), due to moderate AC heating. This is because of good heat removal. Obviously, current redistribution is possible due to the low adjacent resistance of the cored Rutherford cable. Quench Current Iq(kA) 8 7.6 7.2 6.8 actual quench temperature calculation Figure 8: Transient behaviour of the normal sextupole harmonic of GSI 001. ROXIE and VF Opera 2D code were extended to implement AC effects. Figure 9 shows good agreement between the measured and calculated sextupole component B3 [9]. 4,E-04 3,E-04 Measurement DC Roxie DC Opera DC Measurement 2T/s Roxie 2T/s Opera 2T/s 6.4 0 2 4 6 Ramp Rate db/dt (T/s) B3 (Tesla) 2,E-04 Figure 6: Measured ramp rate dependence of GSI 001. Cryogenic losses: Cryogenic losses at the 4K level were measured with the V-I method as a function of the ramp rate and the maximum field during a triangular cycle (Figure 7). The lines show calculated losses, using experimental values of wire and cable resistances, effective filament diameter and iron hysteresis [8]. The hysteresis part is in good agreement, while the measured eddy current contribution (slope) is higher than calculated, especially at higher field levels. Most probably we have here an unknown eddy current contribution. Loss/cycle J 160 120 80 40 0 1T expt 2T expt 3.08T expt 4T expt 1T theo 2T theo 3.08T theo 4T theo 0 1 2 3 4 Ramp rate T/s Figure 7: Cryogenic losses of GSI 001 for a triangular cycle AC field quality: BNL has developed a stationary harmonic coil system, which allowed a measurement of the field harmonics during the ramp. Figure 8 shows the allowed harmonic b3 (difference between down and up) as a function of the ramp rate up to 4 T/s. 1,E-04 0,E+00 0 1000 2000 3000 4000 5000 6000 7000 Current (A) Figure 9: Comparison of measured and calculated b3 at radius of 25 mm. DC skew terms are small. However, large AC skew terms a2 and a4 were measured, indicating a top-down asymmetry. Simulations are underway to explain this effect. The magnet GSI 001 will be tested next month in the new test facility at GSI, cooled with forced flow single phase helium. SIS300 dipole A conceptual design study was made at IHEP, Protvino based on the design of the UNK dipole. The main assumptions / results were: cooling: one phase supercritical Helium @4.4 K, with internal recooling foreseen temperature margin: 1.0 K with the option of lowering the helium temperature collared coil supported by iron shell (taking part of the load) strand diameter: 0.825 mm filament size: 3.5µm Rutherford cable: 36 strands with core (LHC dipole outer layer cable dimensions) F. FFAG and other advanced acclerators and technologies 327

quench protection: magnet not self-protecting, needs heaters Meanwhile, the technical design (2D/3D magnetic design, FEM mechanical analysis, thermal analysis, quench analysis) is almost finished. Figure 10 shows the 2D coil design and the FEM model for mechanical analysis. The maximum operating temperature of the conductor of the dipole magnet can be deduced (from Figure 11) to be 4.76 K. The minimum critical temperature (at 6T) of the turn closest to the pole is 5.7K. Thus, the temperature margin is about 0.9 K. Quadrupole: Work packages and milestones have been defined within a project 'SupraPulse' by CEA Saclay. SUMMARY Rapidly cycling sc magnets are foreseen for the synchrotrons of FAIR. The R&D to develop these magnets, including low loss conductor, is under way. First dipole models have been built and tested. R&D continues on quadrupoles and full size magnets. ACKNOWLEDGEMENTS I am greatly indebted to all members of the collaborations, to our consultants, and to the members of the GSI magnet group for their dedicated work. Figure10: 2D coil design (upper) and FEM model for mechanical analysis of SIS300 dipole (lower). 1-coil, 2- inter-turn spacers (wedges), 3-key, 4-collars, 5-yoke, 6- outer cylinder. Figure 11: Highest temperature in a magnet of SIS300 dipoles during ramping. Further work for SIS300 magnets Dipole: tooling design and production winding test of a short model coil construction and test of model dipoles (cold masses) prototype construction and test (project 'Disco- Rap', INFN) REFERENCES [1] FAIR- Facility for Antiprotons and Ion Research, www.gsi.de [2] A.M.Baldin, et al. "Superconducting fast cycling magnets of the Nuclotron", IEEE Trans. on Appl. Superconductivity, v.5, 1995, pp.875-877. [3] Alexander Kovalenko et.al., "New Results on Minimizing AC Power Losses in a Fast Cycling 2T Superferric Dipole with a Cold Yoke", Proceedings of MT19, Genova, Italy, Sep. 2005 [4] EU FP6 'DIRAC secondary Beams', 1st Annual Report, Annex 3: Design report on structural analysis (Deliverable 53 of task 22) [5] E. Fischer, "Costs study for SIS100 Dipoles", Internal note: MT-INT-EF-2005-002 [6] P. Wanderer et al., "Initial Test of a Fast Ramped Superconducting Model Dipole for GSI s Proposed SIS 200 Accelerator", Proc. 2003 Part. Accel. Conf. [7] A.K. Ghosh, "Cable Design for Fast Ramped Superconducting Magnets (Cos-θ Design)", WAMS2004, Archamps [8] M.N. Wilson et al., "Measured and Calculated Losses in Model Dipole for GSI s Heavy Ion Synchrotron," IEEE Trans. Appl. Superconductivity, 14 (2004) 306 [9] G. Moritz et al, "Recent Test Results of the Fast- Pulsed 4 T Cosθ Dipole GSI 001", in Proceedings of the 2005 Particle Accelerator Conference. [10] I. Bogdanov et al., "Final Report on the Research and Development Contract: Design of 6 T Superconducting Dipoles for the SIS 300", Internal note: MT-INT-Bogdanov-2003-001 328 F. FFAG and other advanced acclerators and technologies