ON CONSTRUCTING T CONTROL CHARTS FOR RETROSPECTIVE EXAMINATION. Gunabushanam Nedumaran Oracle Corporation 1133 Esters Road #602 Irving, TX 75061

Similar documents
On the Distribution of Hotelling s T 2 Statistic Based on the Successive Differences Covariance Matrix Estimator

The Robustness of the Multivariate EWMA Control Chart

A Power Analysis of Variable Deletion Within the MEWMA Control Chart Statistic

Requeijo, José Gomes 1. Souza, Adriano Mendonça , ,

A Simulation Comparison Study for Estimating the Process Capability Index C pm with Asymmetric Tolerances

SIMULTANEOUS CONFIDENCE INTERVALS AMONG k MEAN VECTORS IN REPEATED MEASURES WITH MISSING DATA

A Multivariate Process Variability Monitoring Based on Individual Observations

Control charts are used for monitoring the performance of a quality characteristic. They assist process

MYT decomposition and its invariant attribute

Directionally Sensitive Multivariate Statistical Process Control Methods

T 2 Type Test Statistic and Simultaneous Confidence Intervals for Sub-mean Vectors in k-sample Problem

Multivariate T-Squared Control Chart

Design and Analysis of Control Charts for Standard Deviation with Estimated Parameters

On the conservative multivariate Tukey-Kramer type procedures for multiple comparisons among mean vectors

On the conservative multivariate multiple comparison procedure of correlated mean vectors with a control

An Adaptive Exponentially Weighted Moving Average Control Chart for Monitoring Process Variances

The Effect of Level of Significance (α) on the Performance of Hotelling-T 2 Control Chart

A Multivariate EWMA Control Chart for Skewed Populations using Weighted Variance Method

A New Bootstrap Based Algorithm for Hotelling s T2 Multivariate Control Chart

Multivariate Process Control Chart for Controlling the False Discovery Rate

CONTROL charts are widely used in production processes

Zero-Inflated Models in Statistical Process Control

Change Point Estimation of the Process Fraction Non-conforming with a Linear Trend in Statistical Process Control

Identifying the change time of multivariate binomial processes for step changes and drifts

Methods for Identifying Out-of-Trend Data in Analysis of Stability Measurements Part II: By-Time-Point and Multivariate Control Chart

Testing equality of two mean vectors with unequal sample sizes for populations with correlation

Gage repeatability & reproducibility (R&R) studies are widely used to assess measurement system

HOTELLING S CHARTS USING WINSORIZED MODIFIED ONE STEP M-ESTIMATOR FOR INDIVIDUAL NON NORMAL DATA

Improvement of The Hotelling s T 2 Charts Using Robust Location Winsorized One Step M-Estimator (WMOM)

Bootstrap-Based T 2 Multivariate Control Charts

An exponentially weighted moving average scheme with variable sampling intervals for monitoring linear profiles

A COMPARISON OF PHASE I CONTROL CHARTS. University of Pretoria, South Africa 1 4

A Multivariate Two-Sample Mean Test for Small Sample Size and Missing Data

Nonparametric Multivariate Control Charts Based on. A Linkage Ranking Algorithm

EPMC Estimation in Discriminant Analysis when the Dimension and Sample Sizes are Large

A Study on the Power Functions of the Shewhart X Chart via Monte Carlo Simulation

On Monitoring Shift in the Mean Processes with. Vector Autoregressive Residual Control Charts of. Individual Observation

Approximate interval estimation for EPMC for improved linear discriminant rule under high dimensional frame work

VALUES FOR THE CUMULATIVE DISTRIBUTION FUNCTION OF THE STANDARD MULTIVARIATE NORMAL DISTRIBUTION. Carol Lindee

Research Article Robust Multivariate Control Charts to Detect Small Shifts in Mean

2.830J / 6.780J / ESD.63J Control of Manufacturing Processes (SMA 6303) Spring 2008

Applied Multivariate and Longitudinal Data Analysis

Correction factors for Shewhart and control charts to achieve desired unconditional ARL

Chart for Monitoring Univariate Autocorrelated Processes

Approximation of Average Run Length of Moving Sum Algorithms Using Multivariate Probabilities

A Modified Poisson Exponentially Weighted Moving Average Chart Based on Improved Square Root Transformation

Step change point estimation in the multivariate-attribute process variability using artificial neural networks and maximum likelihood estimation

Multivariate Statistical Analysis

Monitoring Expense Report Errors: Control Charts Under Independence and Dependence. Darren Williams. (Under the direction of Dr.

A New Model-Free CuSum Procedure for Autocorrelated Processes

MCUSUM CONTROL CHART PROCEDURE: MONITORING THE PROCESS MEAN WITH APPLICATION

Hotelling s T 2 charts with variable sample size and control limit

Quality Control & Statistical Process Control (SPC)

Monitoring autocorrelated processes using a distribution-free tabular CUSUM chart with automated variance estimation

Self-Starting Control Chart for Simultaneously Monitoring Process Mean and Variance

Control charting normal variance reflections, curiosities, and recommendations

Multivariate Statistical Analysis

MONITORING BIVARIATE PROCESSES WITH A SYNTHETIC CONTROL CHART BASED ON SAMPLE RANGES

An Investigation of Combinations of Multivariate Shewhart and MEWMA Control Charts for Monitoring the Mean Vector and Covariance Matrix

Supplement to the paper Accurate distributions of Mallows C p and its unbiased modifications with applications to shrinkage estimation

Research Article On the Charting Procedures: T 2 Chart and DD-Diagram

COMPARISON OF FIVE TESTS FOR THE COMMON MEAN OF SEVERAL MULTIVARIATE NORMAL POPULATIONS

COMPARISON OF MCUSUM AND GENERALIZED VARIANCE S MULTIVARIATE CONTROL CHART PROCEDURE WITH INDUSTRIAL APPLICATION

On Selecting Tests for Equality of Two Normal Mean Vectors

Multi-Variate-Attribute Quality Control (MVAQC)

Confirmation Sample Control Charts

Re-weighted Robust Control Charts for Individual Observations

Analysis and Design of One- and Two-Sided Cusum Charts with Known and Estimated Parameters

Monitoring General Linear Profiles Using Multivariate EWMA schemes

1 One-way Analysis of Variance

Monitoring Autocorrelated Processes Using A Distribution-Free Tabular CUSUM Chart With Automated Variance Estimation

Confidence Intervals for the Process Capability Index C p Based on Confidence Intervals for Variance under Non-Normality

Performance of Conventional X-bar Chart for Autocorrelated Data Using Smaller Sample Sizes

Regenerative Likelihood Ratio control schemes

CUSUM Generalized Variance Charts

On ARL-unbiased c-charts for i.i.d. and INAR(1) Poisson counts

Distribution-Free Monitoring of Univariate Processes. Peihua Qiu 1 and Zhonghua Li 1,2. Abstract

Empirical Power of Four Statistical Tests in One Way Layout

A New Demerit Control Chart for Monitoring the Quality of Multivariate Poisson Processes. By Jeh-Nan Pan Chung-I Li Min-Hung Huang

Retrospective Hotelling s T 2 Control Chart for Automotive Stamped Parts: a Case Study

Extending the Robust Means Modeling Framework. Alyssa Counsell, Phil Chalmers, Matt Sigal, Rob Cribbie

A STUDY ON IMPROVING THE PERFORMANCE OF CONTROL CHARTS UNDER NON-NORMAL DISTRIBUTIONS SUN TINGTING

APPLICATION OF Q CHARTS FOR SHORT-RUN AUTOCORRELATED DATA

Multistage Methodologies for Partitioning a Set of Exponential. populations.

Letícia Pereira Pinto 1 and Sueli Aparecida Mingoti 2*

Robustness of the EWMA control chart for individual observations

Monitoring and diagnosing a two-stage production process with attribute characteristics

Monitoring Production Processes Using Multivariate Control Charts

PRODUCT yield plays a critical role in determining the

Proceedings of the 2008 Winter Simulation Conference S. J. Mason, R. R. Hill, L. Mönch, O. Rose, T. Jefferson, J. W. Fowler eds.

TWO-FACTOR AGRICULTURAL EXPERIMENT WITH REPEATED MEASURES ON ONE FACTOR IN A COMPLETE RANDOMIZED DESIGN

Testing Equality of Two Intercepts for the Parallel Regression Model with Non-sample Prior Information

Lecture 2: Basic Concepts and Simple Comparative Experiments Montgomery: Chapter 2

17: INFERENCE FOR MULTIPLE REGRESSION. Inference for Individual Regression Coefficients

Lecture 5: Hypothesis tests for more than one sample

Robust Wilks' Statistic based on RMCD for One-Way Multivariate Analysis of Variance (MANOVA)

Control Charts for Zero-Inflated Poisson Models

Bayesian Inference for the Multivariate Normal

Generalized Variance Chart for Multivariate. Quality Control Process Procedure with. Application

Product Quality Analysis RS CD 10 SY-C9 Using Multivariate Statistical Process Control

Transcription:

ON CONSTRUCTING T CONTROL CHARTS FOR RETROSPECTIVE EXAMINATION Gunabushanam Nedumaran Oracle Corporation 33 Esters Road #60 Irving, TX 7506 Joseph J. Pignatiello, Jr. FAMU-FSU College of Engineering Florida State University Florida A&M University Tallahassee, FL 330-6046 Key Words: statistical process control; multivariate process; χ control charts; Hotelling s T ; Tˆ MAX,D adjustment; Monte Carlo simulation. -type statistic; false alarm; Type I error; Bonferroni ABSTRACT In this paper we consider the issue of constructing retrospective T control chart limits so as to control the overall probability of a false alarm at a specified value. We describe an exact method for constructing the control limits for retrospective examination. We then consider Bonferroni-adjustments to Alt s control limit and to the standard χ control limit as alternatives to the exact limit since it is computationally cumbersome to find the exact limit. We present the results of some simulation experiments that are carried out to compare the performance of these control limits. The results indicate that the Bonferroni-adjusted Alt s control limit performs better than the Bonferroni-adjusted χ control limit. Furthermore, it appears that the Bonferroni-

adjusted Alt s control limit is more than adequate for controlling the overall false alarm probability at a specified value..0 INTRODUCTION Statistical process control (SPC) charts are tools that are used to monitor the state of a process by distinguishing between common causes and special causes of variability. When several characteristics of a manufactured component are to be monitored simultaneously, multivariate Shewhart-type χ or T control charts can be used (Montgomery 996, pp. 36-367). As long as the points plotted on the χ or T control chart fall below the upper control limit (UCL) of the chart, the process is assumed to operate under a stable system of common causes, and hence, in a state of control. When one or more points exceed the UCL, the process is deemed out of control due to one or more special causes and an investigation is carried out to detect these special causes. When the in-control values of the process mean vector and covariance matrix are known, these known parameter values are used for computing the statistic plotted on a χ control chart. The UCL of this chart is based on the chi-square distribution. When initially examining the process, however, these parameter values are not known. To establish a preliminary retrospective control chart, the process parameters are estimated from some m initial subgroups of size n taken when the process is believed to be stable. These parameter estimates are used to calculate Hotelling s statistic for each subgroup, and the subgroup statistic is plotted on a T T control chart.

The UCL of this chart is based on the F distribution. This chart is used to test retrospectively whether the process was in control when the m initial subgroups were drawn. The upper control limits of χ and T controls chart are selected such that if the process is in control, only rarely will a false alarm be given. A control chart issues a false alarm if a subgroup statistic exceeds the UCL when the process is actually in control. The usual practice for constructing a retrospective control chart is to design the chart for a specified false alarm probability for each subgroup plotted. We let α denote the false alarm probability for each subgroup plotted on the chart. In many control chart applications, the user might wish to control the overall probability of a false alarm at some desired level for all m subgroups rather than that of individual subgroups. The overall probability of a false alarm during retrospective testing is considerably greater than α since m points are plotted all at once. In this paper, we consider the issue of constructing T control chart limits so as to control the overall probability of a false alarm during retrospective testing at a specified value. We first consider an exact method for constructing the control limit. We then analyze the performance of Alt s (976) control limit and the standard χ control limit with the appropriate Bonferroni-type adjustments. This paper is organized as follows. In the next section we describe the multivariate process model and review some pertinent literature. In the following section, we describe an exact method for constructing T control chart limits so as to control the overall probability of a false alarm during retrospective testing at a specified 3

value. We then present the results of some simulation experiments that compare the performance of Alt s (976) control limit and the standard χ limit with the appropriate Bonferroni-type adjustments. Finally, we make some recommendations for constructing retrospective control charts based on the simulation study..0 MULTIVARIATE PROCESS MODEL AND LITERATURE REVIEW We let X ij = ( X ij X ij X ijp),,..., denote a p vector that represents the p characteristics of the jth observation in the ith subgroup, i =,,,... and j =,,..., n. We assume that the X ij s are independent and identically distributed normal random variables with mean m and covariance matrix Σ when the process is in control. That is, we assume that the X ij s are iid N p (m, S) when the process is in control. We let X i denote the average vector for the ith subgroup, and we let S i denote the unbiased estimate of the covariance matrix for the ith subgroup. That is, X i = n n j= X ij and n S = i Xij X i X ij X i n. j= 4

When the in-control process parameter values are known, the statistic plotted on the χ control chart for the ith subgroup is X m S X m 0. () χ i = n i 0 0 i When the process is in control this statistic has a chi-square distribution with p degrees of freedom (Montgomery 996, p. 364). It is plotted on the χ control chart with an upper control limit (UCL) given by χ p, α () where χ p, α is the ( α ) th percentile point of the chi-square distribution with p degrees of freedom and α is the probability of a false alarm for each subgroup plotted on the control chart. This stage in control charting process is referred to as Phase II by Alt (985). If the process parameter values are not known, data from m initial subgroups are collected when the process is believed to be in control. Then, pooling data from these m subgroups and assuming that the process was in control, unbiased estimates of the mean vector and the covariance matrix are given by X = m m i= X i m and S = S m i= i (3) respectively. A T control chart is then constructed using these estimated parameters. The control chart is first used to test retrospectively whether the process was in control when the m initial subgroups were drawn. Alt (985) refers to this stage as Phase I, Stage. After the initial control has been established, the control chart can be 5

used to monitor the process on-line, i.e., the subgroup averages are plotted one-at-atime on the chart as each new subgroup is obtained. Alt (985) refers to this stage as Phase I, Stage. We consider Phase I, Stage in this paper. Nedumaran and Pignatiello (999) discuss multivariate control charting during Phase I, Stage. Stage ) is The statistic plotted on the T T control chart for each initial subgroup (Phase I, = n X X S X X. (4) i i i Alt (976) gives the UCL of this control chart as where ( m, n, p), mn m UCL (5) = C F T p p + ( m, n, p) p( m )( n ) ( mn m p + ) C =, F ν, ν, α is the ( α ) th percentile point of the F distribution with ν and ν degrees of freedom, and α is the desired false alarm probability for each subgroup plotted on the T control chart. If the process parameters are estimated from a reasonably large number of initial subgroups, the usual practice for constructing retrospective T control charts is to use UCL instead of the exact UCL χ T. However, according to Montgomery (996, p. 367) we must be careful when following this practice. In this paper, we show that Bonferroni-adjusted χ control limits issue relatively large number of false alarms even when the process parameters are estimated from 50 or more subgroups 6

In the next section, we describe an exact method for constructing retrospective T control chart limits in which the overall false alarm probability for all m initial subgroups is controlled at a specified value. We then study and compare the performances of Bonferroni-type adjustments made on both Alt s control limit and the standard χ control limit. 3.0 CONSTRUCTING RETROSPECTIVE CONTROL CHARTS We suppose that data from m initial in-control subgroups are available. We let X i and X j ( i, j < m ) denote two initial subgroups. Then, it can be shown by direct evaluation that and E [ X i X ] = 0 m [ X ] = S 0 Var i X mn The ( i X, X j X ) = S 0 Cov X. mn T statistic plotted for the ith subgroup is given by T = n X X S X X. i i i We let φ denote the specified overall false alarm probability and we let UCL E denote the exact upper control limit. Then, Pr [ T UCL, i =,,..., m] = φ i E. 7

That is [ ] = φ Pr T max UCL E where T max = max n i ( X i X ) S ( X i X ), i =,,..., m. Here, T max is a Tˆ MAX,D -type statistic discussed by Siotani (959) with Siotani s ( m ) mn γ = and δ = mn. Thus, E point of the distribution of Tˆ MAX,D statistic. UCL is the upper ( φ) th percentile Siotani (959) pointed out that the sampling distribution of Tˆ MAX,D -type statistic is extremely difficult to find. Siotani (959) suggested a two-stage procedure for finding approximations to the upper percentile points of the distribution of Tˆ MAX,D, which was investigated further by Seo and Siotani (993). However, this two-stage procedure involves extensive computations and gives only approximate percentile points. As an alternative, we recommend a much simpler Bonferroniadjustment to Alt s control limit based on the following simulation study. We carried out Monte Carlo simulation experiments to compare the performance of Alt s control limit and the standard χ control limit. Using Bonferroni-adjustment the false alarm probability for each subgroup was set at α = φ m, where φ is the overall false alarm probability for all m initial subgroups. Then, Alt s control limit is given by 8

UCL ( m, n, p), = C F T p mn m p + and the standard χ control limit is given by χ p,α. The performance measure considered was the overall probability of a false alarm. We considered three process dimensions of p = 3, 6 and 0, two overall false alarm probabilities of φ = 0.007 and 0.05, and several values of m. For each combination of p, m and φ, we generated m initial subgroups of size n = 5 from a stable in-control normal distribution with m = 0 and Σ = I using IMSL STAT/LIBRARY (987) FORTRAN routines. The in-control process parameter values were estimated based on these m subgroups. The T statistic for each subgroup was plotted on a chart with a Bonferroni-adjusted Alt s control limit and a chart with a Bonferroni-adjusted standard χ control limit. If a chart issued one or more false alarms, a counter for that chart was increased by one. This procedure was replicated 0,000 times. The overall false alarm probability for each chart was then estimated by dividing the number of replications in which the control chart issued at least one false alarm by the total number of replications. The results are shown in Tables I III. The estimated overall false alarm probability for the Alt s control limit and the standard χ control limit are given as FA-ALT and FA-CHI, respectively. 9

TABLE I. Estimated Overall False Alarm Probability for p = 3 and n = 5 m φ = 0.007 φ = 0.05 FA-ALT FA-CHI FA-ALT FA-CHI 5 0.003 0.049 0.045 0.0795 0 0.008 0.0094 0.0450 0.075 5 0.007 0.0063 0.0487 0.073 0 0.005 0.0059 0.0499 0.07 30 0.00 0.0044 0.0499 0.065 40 0.006 0.004 0.0477 0.064 50 0.005 0.0033 0.0457 0.0574 75 0.00 0.0036 0.0456 0.055 00 0.003 0.0044 0.0476 0.0547 TABLE II. Estimated Overall False Alarm Probability for p = 6 and n = 5 m φ = 0.007 φ = 0.05 FA-ALT FA-CHI FA-ALT FA-CHI 5 0.006 0.0798 0.043 0.390 0 0.008 0.030 0.0470 0.58 5 0.007 0.065 0.044 0.6 0 0.009 0.03 0.0499 0.048 30 0.0034 0.0076 0.0475 0.0860 40 0.000 0.0060 0.044 0.0767 50 0.003 0.0063 0.0487 0.0750 75 0.007 0.0045 0.050 0.0700 00 0.00 0.0049 0.0479 0.063 0

Table III. Estimated Overall False Alarm Probability for p = 0 and n = 5 m φ = 0.007 φ = 0.05 FA-ALT FA-CHI FA-ALT FA-CHI 5 0.003 0.3869 0.0444 0.6435 0 0.0034 0.08 0.0446 0.369 5 0.0036 0.0550 0.0487 0.577 0 0.008 0.03 0.0490 0.983 30 0.004 0.070 0.047 0.4 40 0.0039 0.039 0.055 0.3 50 0.003 0.000 0.0505 0.074 75 0.0034 0.007 0.0497 0.0897 00 0.00 0.0066 0.0463 0.0737 Results in Tables I III show that the Bonferroni-adjusted Alt s control limit performs better than the Bonferroni-adjusted standard χ control limit. The estimated overall false alarm probability for the Bonferroni-adjusted Alt s control limit is relatively close to the specified level for all p, m and φ combinations considered. The simulation study suggests that the use of computationally cumbersome Siotani s twostage procedure may not be warranted in retrospective control charting since Alt s control limits with the appropriate Bonferroni-type adjustments provide overall false alarm probability values that are sufficiently close to the specified value. By contrast, the estimated overall false alarm probability is larger than the specified value for the Bonferroni-adjusted χ control limit. For small p (p = 3), the

estimated overall false alarm probabilities get reasonably close to the specified value for m > 30. But, for larger p (p = 6 and 0) the estimated overall false alarm probabilities are much larger than the specified value even for large m. Thus, the Bonferroni-adjusted χ control limit appears to issue more false alarms than one might anticipate. Hence, we recommend that Bonferroni-adjustment to Alt s control limit be used for constructing retrospective control charts when controlling the overall probability of false alarm is of primary concern. 4.0 SUMMARY In this paper we considered the issue of constructing retrospective T control chart limits so as to control the overall probability of a false alarm at a specified value. We described an exact method for constructing the control limits. We considered Bonferroni-adjustments to Alt s control limit and to the standard χ control limit as alternatives to the exact limit since it is cumbersome to find the exact limit. We then presented the results of some simulation experiments that were carried out to compare the performances of these control limits. The results indicate that the Bonferroniadjusted Alt s control limit performs better than the Bonferroni-adjusted χ control limit. Furthermore, it appears that the Bonferroni-adjusted Alt s control limit is more than adequate for controlling the overall false alarm probability at a specified value.

BIOGRAPHICAL FOOTNOTE Dr. Gunabushanam Nedumaran is a consultant with Oracle Corporation. His research interests are in the area of applied statistics and statistical process control. He is an ASQ certified Quality Engineer. His email address is gnedumar@cs.com. Dr. Joseph J. Pignatiello, Jr. is an Associate Professor in the Department of Industrial Engineering in the FAMU-FSU College of Engineering at Florida State University and Florida A&M University. Dr. Pignatiello's interests are in quality engineering and include statistical process control, process capability, design and analysis of experiments, robust design and engineering statistics. Dr. Pignatiello won the 994 Shewell Award from ASQC's Chemical and Process Industries Division and the 994 Craig Award from ASQC's Automotive Division for his research on process capability. In 990 and 99 he won awards from the Ellis R. Ott Foundation for his research on SPC and the methods of Taguchi. He serves on the editorial boards of IIE Transactions, Journal of Quality Technology and Quality Engineering. His email address is pigna@eng.fsu.edu. ACKNOWLEDGEMENTS This material is based in part upon the work supported by the Texas Advanced Research Program under Grant No. 999903-0. 3

BIBLIOGRAPHY Alt, F. B. (976). Small Sample Probability Limits for the Mean of a Multivariate Normal Process. ASQC Technical Conference Transactions, pp. 70-76. Alt, F. B. (985). Multivariate Quality Control in Encyclopedia of Statistical Sciences 6, edited by S. Kotz and N. L. Johnson, John Wiley & Sons, New York, NY. IMSL STAT/LIBRARY (987). IMSL STAT/LIBRARY User s Manual, Vol. -3, IMSL Inc., Houston, TX. Montgomery, D. C. (996). Introduction to Statistical Quality Control. John Wiley & Sons, New York, NY. Nedumaran, G. and Pignatiello, J. J., Jr. (999). On Constructing T Control Charts for On-line Process Monitoring. IIE Transactions 3, pp. 59-536. Seo, T. and Siotani, S. (993). Approximations to the Upper Percentiles of Tmax - type Statistics in Statistical Science & Data Analysis, edited by K. Matsusita et al., VSP, Tokyo. Siotani, M. (959). The Exact Value of the Generalized Distances of the Individual Points in the Multivariate Normal Sample. Annals of the Institute of Statistical Mathematics 0, pp. 83-03. 4