Goldsource Coal Intercepts in Saskatchewan

Similar documents
Goldsource Completes Winter Drill Program At Border; 34 Holes Contain Aggregate Coal Intercepts Ranging From 10 to 100 Meters

SilverCrest Expands Babicanora High Grade Footprint to 600 metres; New High Grade Vein Discoveries Highlight District Scale Potential

NEWS RELEASE. Mountain Province Diamonds Completes the Kennady North Winter Exploration Program

GRAPHITE ONE DRILLS 165.3M of 4.23% GRAPHITE INCLUDING 46.4M OF 6.6%, 14.3M of 10.1% and 21M of 10.1% GRAPHITE

NEWS RELEASE. Mountain Province Diamonds Reports Additional Kimberlite Identified in Gahcho Kué Exploration Program

V Sample from C.O.D vein 15 metres southwest of V

FALCO PACIFIC COMPLETES INITIAL MODEL FOR THE HORNE 5 GOLD/SILVER/ZINC/COPPER DEPOSIT

Suite West Georgia Street Vancouver, B.C. V6E 4M3 NEWS RELEASE

NEWS RELEASE NOVEMBER 15, 2018 HANNAN COMPLETES DRILLING AT BALLYHICKEY, DEFINES SIGNIFICANT ZINC TARGET AT KILMURRY, CO.

A B C PAD A HIGHLIGHTS

West Pender Street Vancouver, BC V6C 2V6 Tel: Fax: TSX-V: GBR NEWS RELEASE

Probe Metals Continues to Expand Gold Zones At Val-d Or East

Probe Metals Continues to Intersect Significant Gold Mineralization in Expansion Drilling at Val-d Or East, including 4.1 g/t Gold Over 15.

Detour Gold Reports Drilling Results from Lower Detour

Diamond Drilling confirms depth potential for mineralisation at Mrima Hill.

April Exploring for Canadian Gold in the Rainy River District of Ontario

DRILLING AT ASCOT S PREMIER PROPERTY EXTENDS GOLD MINERALIZATION 150 METRES WEST TOWARDS UNDERGROUND PORTAL

NEWS RELEASE ORCA GOLD REPORTS CONTINUED SUCCESS AT GSS

555 Burrard Street, Suite 375, Vancouver, B.C. V7X 1M June 13, 2017 SBB NR SBB TSX

NEWS RELEASE ORCA GOLD INDICATED AND INFERRED RESOURCES AT BLOCK 14 INCREASE BY 24% AND 48% RESPECTIVELY

Probe Metals Intersects 3.2 g/t Gold Over 45.5 Metres At Val-d Or East

Arctic Star Commences Exploration at the Timantti Diamond Project, Finland Home 2017 Arctic Star Commences Exploration at

NEWS RELEASE. Tigray Intersects 28.2 metres at 8.50 grams per tonne gold at Mato Bula, Adyabo Project, Northern Ethiopia

Bellhaven Announces Updated NI Mineral Resource for La Mina Project, Colombia

NEWS RELEASE LATEST EXPLORATION PROGRAM CONTINUES TO DEMONSTRATE NARANJILLO AS A HIGH GRADE SILVER HOST

MCEWEN MINING ANNOUNCES EXPLORATION UPDATE FOR EL GALLO 1, MEXICO

TRENCHING AT LAS DOLORES EXTENDS STRIKE LENGTH TO OVER 1,000 METRES, INTERSECTING

Assay Results Highlights (as of November 16, 2017) representing approximately 4,500 metres ( m ) of drilling:

Probe Metals Confirms Continuity of Gold Mineralization on its Val-d Or East Project And Increases 2017 Drill Program to 75,000 metres

NEWS RELEASE. March 22, 2017

OSISKO METALS INTERSECTS 10.49% ZINC+LEAD OVER METRES AND 12.15% ZINC+LEAD OVER METRES AT PINE POINT

NEWS RELEASE August 10, 2017

NEWS RELEASE FULLER PROPERTY CONTINUES TO DELIVER GOOD RESULTS 2.53 GRAMS PER TONNE GOLD OVER METRES

VR ACQUIRES NEW LARGE-SCALE COPPER-GOLD TARGET IN ONTARIO

Probe Metals Discovers New High Grade Gold Zone on Val-d Or East Project: Intersects 12.6 g/t Gold Over 7.3 Metres

Form F3 MATERIAL CHANGE REPORT

Spruce Ridge Resources Ltd Leslie Road West, Puslinch, ON N0B 2J0 Telephone: (519) , Fax: (519)

NEWS RELEASE TSX-V Ticker: SWA 23 April 2013 SWA.WT SARAMA RESOURCES EXTENDS HIGH-GRADE MINERALISATION AT MM PROSPECT IN BURKINA FASO

Probe Metals Intersects 1,122 g/t Gold Over 0.7 Metres in New Zone at Val-d Or East

Revelo Defines Porphyry Copper Targets at its Calvario Project

For personal use only

Pacific Empire Minerals Provides Copper King RC Drilling Results

MINERA ALAMOS TO COMMENCE DRILLING AIMED AT EXPANDING AREAS OF DEFINED GOLD MINERALIZATION AT SANTANA/LOS VERDES PROPERTY, SONORA, MEXICO

NORTHERN SUPERIOR RESOURCES INC. 1351C Kelly Lake Road, Unit 7 Sudbury, Ontario, Canada P3E 5P5 Tel: (705) Fax: (705)

Vendetta Reports Initial Results from 2017 Pegmont Program with High Grade Zone 3 Step Out Drilling

Vendetta Reports Additional High Grade Drilling Results from Zones 2 and 3 at Pegmont Lead-Zinc Project

- 2 - TABLE 1. INDICATED AND INFERRED GOLD AND SILVER RESOURCES. All Indicated

July 15, 2015 News Release Valley of the Kings Underground Infill Drilling Progresses

U3O8 Corp. reports results of infill drilling at Aricheng C in the Kurupung Project, Guyana

July Exploring for Canadian Gold in the Rainy River District of Ontario

Highlights include: Hole TTD050: 6.12 g/t Au over 7.00 metres from metres o Including g/t Au over 1.18 metres

U3O8 Corp. intersects 36.5 metres at 0.09% (1.8 pounds per short ton) U 3 O 8 in a new target in the Kurupung Project, Guyana

Plateau Extends Falchani East Lithium Deposit Community Agreements Executed and Three Drill Rigs Active at Falchani West

SALAZAR ANNOUNCES AN UPDATED RESOURCE REPORT OF 5.53 MT INDICATED AND 1.46 MT INFERRED AT ITS HIGH GRADE VMS EL DOMO DEPOSIT

Press Release Thunder Bay: August 2, 2018

Sabina Gold & Silver Reports 2018 Drilling has Commenced at Back River Gold Project

CanAlaska Uranium Details Extensive Rare Earth Mineralization at NE Wollaston

555 Burrard Street, Suite 1800, Vancouver, B.C. V7X 1M Nov 20, 2017 SBB NR SBB TSX

BK Copper Project Strong Copper Results Confirm and Extend BKM

News Release. Infill Drilling Program

Underground Exploration Drilling Complete; Brucejack Mineralization Extends to the East

August 20, 2018 SBB NR SBB TSX

NEWS RELEASE August 8, 2018

Details of the NI compliant mineral resource estimate are as follows. Total Inferred 7,603,

HANNAN SEISMIC SURVEY IDENTIFIES MULTIPLE NEW DRILL TARGETS IN IRELAND

SABINA GOLD &SILVER REPORTS COMPLETION OF DRILLING AT ECHO DEPOSIT, BACK RIVER, NUNAVUT.

NEWS RELEASE Ocean Park Ventures Identifies Large Multi-Structure Sulfide Mineralized System Trapper Gold Project, British Columbia

BALMORAL INTERSECTS g/t GOLD OVER 7.99 METRES, BUG LAKE SOUTH, DETOUR GOLD TREND PROJECT, QUEBEC

West Georgia Street, Vancouver, BC, V6E 3V7 Phone: / Fax: NEWS RELEASE October 11, 2017

VR COMMENCES 2018 SURFACE EXPLORATION AT JUNCTION; GRAVITY ANOMALY CONFIRMS THE DOWN-DIP POTENTIAL OF COPPER-SILVER VEINS

POSITIVE RESULTS FROM FIRST PHASE OF CORE DRILLING AT JEFFERSON PROJECT, SOUTH CAROLINA FOR NEAR-SURFACE GOLD MINERALIZATION

June 4, 2015 News Release Valley of the Kings Underground Infill Drilling Underway

NEWS RELEASE TSX: ELD NYSE: EGO September 6, Eldorado Announces Drilling Results from KMC Project, Serbia

For Immediate Release ASCOT DRLLING AT UNICORN INTERSECTS MORE HIGH-GRADE GOLD

Northern Dynasty Minerals Ltd.

Minsud to recommence resource outline diamond drilling at the Chita Valley Cu- Au-Ag-Mo Project, San Juan, Argentina

BOREAL EXPANDS DISCOVERY ZONE OF HIGH-GRADE ZINC, SILVER AND LEAD MINERALIZATION AT GUMSBERG PROJECT IN SWEDEN

June 4, 2014 News Release Valley of the Kings Exploration Program Underway; Project Update

VISTA COAL PROJECT RESOURCE INCREASES BY 297.1MT TOTAL COAL RESOURCE INCREASES TO 1.37BT

AZUCAR MINERALS COMMENCES DRILLING AT THE EL COBRE PROJECT, MEXICO

NEWS RELEASE July 26, 2018

NGEX ANNOUNCES COPPER GOLD DISCOVERY AT NACIMIENTOS PROJECT

Suite 1800 Two Bentall Centre 555 Burrard Street Vancouver, BC V7X 1M9 Tel: (604) Tel: (888) April 8, 2018 SBB NR SBB TSX

In addition, the survey has defined:

Junior Uranium explorer in the Athabasca Basin. Patterson Claims

MANN SILVER-COBALT MINE. PORE: TSXV PowerOre.com

NEWS RELEASE. Foran Intersects Over 28 Metres of Copper Mineralization

Cordoba Minerals Provides an Update on Exploration Activities at the San Matias Copper-Gold Project in Colombia

Saville Resources Inc. Completes Review of Work on the Niobium Claim Group, Quebec

Update on Columbus Gold's Eastside Gold Discovery in Nevada

DUNNEDIN VENTURES INC.

Interval (meters) To (meters)

URACAN/UEX REPORT URANIUM MINERALIZATION ON THE BLACK LAKE PROJECT; GROUND GEOPHYSICAL SURVEY UNDERWAY

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

MINERAL MOUNTAIN RESOURCES LTD. MMV.TSX-V

Canadian Gold Miner Grab Sample Returns 29.5 Grams per tonne Gold from South Kirkland Project

NEWS RELEASE. Foran Completes Winter Program with High-Grade Copper and/or Zinc in All Holes Drilled at Bigstone

FILO MINING DRILLS 50 METRES OF G/T SILVER, 0.56% COPPER, 0.50 G/T GOLD AND 36 METRES OF 1.45% COPPER AT FILO DEL SOL

Blox, Inc. Announces New Drilling Target Defined at Mansounia Gold Project.

True Width (m) Carneritos to

Transcription:

Goldsource Coal Intercepts in Saskatchewan For Immediate Release VANCOUVER, B.C. April 28, 2008 Goldsource Mines Inc. (the Company ) wishes to make the following statements regarding the intercepts of coal disclosed in its news release dated April 22, 2008. The Company cautions against placing undue reliance on the visual observations set out below with respect to the coal until the results of the analytical work underway have been announced. The coal intercepts were encountered in two core holes that were drilled as part of the Company s ongoing exploration program for diamondiferous kimberlites. The holes are located on the Border property approximately 50 kilometres north of Hudson Bay, Saskatchewan. The property is accessible by highway and railway which transverse the area of interest. The Company believes that the coal encountered in the drill holes is of Cretaceous age. The coal is black and moderately hard and therefore judged by visual characteristics to be either sub-bituminous or bituminous in rank rather than lignite. The Company knows of no record of occurrences of lignite coal in Cretaceous aged rock formations in Saskatchewan. A picture of a portion of one of the coal intercepts and representative photos of select samples are attached. The top 22.6 metres of the coal seam appears consistent in both holes with few visible partings (less than 0.1metres). The lower 4.5 to 11.6 metres is mixed coal and sandy/silty partings. The stratigraphy over-lying (glacial till and mudstones) the top of the seam is also consistent between drill holes and there is only about 1.6 metres difference in the elevations of the tops of the seam although the holes are 1.64 kilometres apart. The depth from surface to the top of coal seam is approximately 80 metres. It is initially assumed that the coal seam is the same in both holes and although the deposit appears to be of low complexity as defined by Paper 88-21 of the Geological Survey of Canada for the standardized reporting of coal reserves and resources in Canada, additional drilling will be needed to confirm this. The proximate analyses (ash, fixed carbon, moisture, thermal energy, etc.), rank of the coal, sulphur content and the coal s coking characteristics, if any, will be determined by the analysis of 47 core samples submitted to a certified laboratory in Calgary, Alberta. The results are expected prior to the end of the week and will be released by the Company once they have been compiled and integrated with all other data available to the Company. The Company has retained half of the sampled core for future work. The Company has made application for coal permits covering the area of interest in accordance with the Coal Disposition Act of Saskatchewan. The time frame for granting of the permits is dependent upon regulatory requirements to process the applications. The Company has engaged Fugro Airborne Services who completed an airborne geophysical survey of the area in 2006 for diamond exploration to re-process the 5,700 line kilometres of EM geophysical data that is available to the Company in an effort to delineate the aerial extent and the thickness of the coal seam. Depending on the results of the coal analysis and systematic compilation of all available data, the Company plans on further drilling at the Border property after spring breakup and road restrictions are lifted in the area of interest. Mr. Drever, President of Goldsource Mines Inc. and Mr. Fier, CPG, P.Eng., who is a consultant and Qualified Person for the Company, both have extensive experience in the exploration and evaluation of coal deposits in Canada, USA and South America. The Qualified Person for Goldsource is N. Eric Fier, CPG, P.Eng. who has reviewed and approved this news release.

This news release contains forward-looking statements, which address future events and conditions, which are subject to various risks and uncertainties. The Company s actual results, programs and financial position could differ materially from those anticipated in such forward-looking statements as a result of numerous factors, some of which may be beyond the Company s control. These factors include: the availability of funds; the timing and content of work programs; results of exploration activities and development of mineral properties, the interpretation of drilling results and other geological data, the uncertainties of resource and reserve estimations, receipt and security of coal permits and mineral property titles; project cost overruns or unanticipated costs and expenses, fluctuations in product prices; currency fluctuations; and general market and industry conditions. Forward-looking statements are based on the expectations and opinions of the Company s management on the date the statements are made. The assumptions used in the preparation of such statements, although considered reasonable at the time of preparation, may prove to be imprecise and, as such, undue reliance should not be placed on forward-looking statements. On Behalf of the Board of Directors of Goldsource Mines Inc. J. Scott Drever J. Scott Drever, President For further information, please contact: Fred Cooper Telephone: (604) 691-1760 Fax: (604) 691-1761 Email: info@goldsourcemines.com Website: www.goldsourcemines.com 405-1311 Howe Street Vancouver, BC V6Z 2P3 The TSX-Venture Exchange has not reviewed and does not accept responsibility for the accuracy or adequacy of this release. 2

Drill Hole BD08-03, ~14 metres of Coal (partial intercept), April 2008

Drill Hole BD08-03, Coal core sample no. 00038 @ 91.5m, April 2008

Select Coal Photos April 2008