UTILITY REPORT FOR THORNTON SELF STORAGE THORNTON, COLORADO

Similar documents
Villages at Riverdale Thornton, CO

FINAL UTILITY REPORT Creekside Thornton, CO

3301 East 120 th Avenue Assited Living & Memory Care

Eastlake Assited Living & Memory Care

DRAINAGE REPORT FOR THORNTON SELF STORAGE THORNTON, COLORADO

STORMWATER REPORT FRITO LAY SUBDIVISION NO. 3

City of Thornton Attn: Tim Semones Development Engineeering 9500 Civic Center Dr. Thornton, CO 80229

HOTEL KANATA 160 HEARST WAY KANATA, ONTARIO SERVICING REPORT. Prepared for: David Johnston Architect. Prepared By:

Hydrology Study Report

SPRINGVILLE CITY, UTAH PRESSURE IRRIGATION SYSTEM DRAFT. MASTER PLAN & CAPITAL FACILITIES PLAN For the WEST FIELDS. February 11, 2014.

SPRINGVILLE CITY, UTAH

APPLICATION FOR CONDITIONAL ABSOLUTE WATER STORAGE RIGHT

Name of Applicant Mailing Address address Telephone Number

Continuing Education Course #101 Drainage Design with WinTR-55

Water & Wastewater Facility Plan Update

Chapter 5 CALIBRATION AND VERIFICATION

Sewer Area Study. TR No (FOR OUTLET POINTS 1 & 2) January 5, 2016 JN PC11775AS SEWER AREA STUDY APPROVED /08/2016

LOCATED IN INDIAN RIVER COUNTY PREPARED FOR S.J.R.W.M.D. AND F.W.C.D. DECEMBER, 2003 Updated 2007 Updated May 2014 PREPARED BY

73-2 have been satisfied; and

Proclaiming Certain Lands as Reservation for the Confederated Tribes of the

Preliminary Hydraulic Report

APPENDIX B DRAINAGE REPORT

WATER DISTRIBUTION NETWORKS

D. B. G R A Y E N G I N E E R I N G I N C.

PRELIMINARY ENGINEERING REPORT FOR SANITARY SEWER COLLECTION SYSTEM OSKALOOSA, IOWA 2017

Drainage Analysis. Appendix F

2267 N o r t h 1500 W C l i n t o n U T 84015

APPLICATION TO AMEND THE FUTURE LAND USE MAP (FLUM) SMALL SCALE

APPLICATION FOR CHANGE OF WATER RIGHT

Analysis of Hydraulic Impacts on the Schuylkill River

Jp2g Consultants Inc.

STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1. DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT

CITY OF PAPILLION PLANNING COMMISSION STAFF REPORT MAY 27, 2015 AGENDA 2015 ANNEXATION MISC

BACKGROUND AND PROJECT DESCRIPTION

PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 3-0

CONGLETON INDUSTRIAL PARK LT 6 EX W 300' & E 350' LT 7 BLK 1, a subdivision of land in the City of Overland Park, Johnson County, Kansas.

ARTICLE 5 (PART 2) DETENTION VOLUME EXAMPLE PROBLEMS

GeoSpatial Water Distribution, Sanitary Sewer and Stormwater Network Modeling

Section 4: Model Development and Application

Pressure Head: Pressure head is the height of a column of water that would exert a unit pressure equal to the pressure of the water.

Basic Math Concepts for Water and Wastewater Operators. Daniel B. Stephens & Associates, Inc.

Honorable Mayor and Members of the City Council

TOWN OF SEVERANCE, COLORADO. NOTICE OF PUBLIC HEARINGS FOR A PROJECT Hunters Crossing Annexation & Zoning

CONCEPT UTILITY LETTER PROMENADE AT CASTLE ROCK PD (LOTS 2, 3-A AND 4, CASLTE PINES COMMERCIAL FILING 12 & UNPLATTED LAND IN NORTHWEST CASTLE ROCK)

Wellsgate Terrace SPECIFICATIONS.

Exam #1. A. Answer any 1 of the following 2 questions. CEE 371 October 8, Please grade the following questions: 1 or 2

APPLICATION FOR SIMPLE CHANGE IN SURFACE POINT OF DIVERSION PURSUANT TO (3.5), C.R.S.

September 6, City of Thornton 9500 Civic Center Drive Thornton, CO (303) RE: Maverik Thornton, CO - Drainage Report

SERVICING BRIEF & STORMWATER MANAGEMENT REPORT Colonial Road Sarsfield (Ottawa), Ontario. Report No June 15, 2017

WATER MANAGEMENT REPORT FOR PAGE ESTATES

FINAL DRAINAGE REPORT Villages at Riverdale Carriage Homes Thornton, CO

PARADIGM ODP FORT COLLINS, CO 80525

Project No India Basin Shadow Study San Francisco, California, USA

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 4B10

Estimating Sewage System Flows

Climate Adaptation Challenges for Boston s Water and Sewer Systems

2001 ANNUAL REPORT on INTERBASIN TRANSFERS for RTP South and the Towns of Cary, Apex, and Morrisville

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii)

NCEES FS Practice Exam

Stormwater Guidelines and Case Studies. CAHILL ASSOCIATES Environmental Consultants West Chester, PA (610)

NATHAN HALE HIGH SCHOOL PARKING AND TRAFFIC ANALYSIS. Table of Contents

SHADOW STUDY REPORT REGARDING

******************* Project Description ******************* File Name... NAAF Stormwater Improvement Project 11_21_2014.SPF

FOR LEASE ±1,800 SF OUTPARCEL NEW CONSTRUCTION, SINGLE TENANT

For Sale on Bids. Open House By Appointment

Submitted to: St. Johns River Power Park New Berlin Road Jacksonville, FL 32226

Drainage Study for Civic Center Way

Status Report on Polychlorinated Biphenyls in the Western Storm Drain University of California, Richmond Field Station Richmond, California

Request Applicant Owner Zoning Location Attachments Site and Surrounding Area Direction Surrounding Zoning Surrounding Land Use Access

ENGINEER S CERTIFICATION OF FAULT AREA DEMONSTRATION (40 CFR )

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY

VILLAGE OF ORLAND PARK

Chapter 7 Mudflow Analysis

Hydrology and Hydraulics Design Report. Background Summary

z, B1-\T11v10J.\J{TrrE1{ & 1-\~Boc1i~TE33111c. Efl.VIRONMENTAL ENGINEERS AND CONSULTANTS

CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY

Woodford County Erosion Prevention Plan and Permit. Application #

WHITEHEAD 30 (10) (570) (30) (10) & TRACY MILLER.

Information for File # MMJ; Trunk Highway (TH) 7 / Louisiana Ave. Interchange Project

Chapter 1 Homework - Elements of Real Estate Law

2018 North Carolina Residential Code Prescriptive Tables for Selection of Support Elements for Beams, Girders, and Headers: Example Problems

BUILDING AND SAFETY FEE SCHEDULE (Effective July1, 2013)

Appendix A Zoning Ordinance

Analysis Methods for Water Distribution Systems-3 rd Class )طرق تحليل أنظمة توزيع المياه( Dr. Sataa A. Al-Bayati (10-11)

COLLIER COUNTY RESOURCE RECOVERY BUSINESS PARK ENGINEERING REPORT AND CALCULATIONS

Design Data 17. Partial Flow Conditions of Box Culverts

Chapter 10 - Sacramento Method Examples

Big Rivers Electric Corporation Disposal of Coal Combustion Residuals (CCR) from Electric Utilities Final Rule CCR Impoundment Liner Assessment Report

C-62 RELATED ACTS. Priv. Acts 1955, Ch. 275, "An Act to redefine the boundaries of the City of Belle Meade... C-63

REQUEST FOR PROPOSALS CLOSING DATE:

Planning & Zoning Commission

VILLAGE OF ORLAND PARK

MIDDLESEX COUNTY Department of Planning and Community Development P.O. Box 427, Saluda, VA Phone: Fax:

MEMORANDUM. Trip Generation Analysis

APPENDIX B HYDROLOGY

HYDROLOGY REPORT Tentative Tract No. 5978

WATERVIEW EAST PRELIMINARY DRAINAGE REPORT EL PASO COUNTY, COLORADO

BRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT

Groundwater Replenishment In The Coachella Valley, CA. WESTCAS 2018 Annual Conference June 21, 2018 Zoe Rodriguez del Rey, Water Resources

Public Land Survey System Knowledge Remains an Important Skill

Transcription:

UTILITY REPORT FOR THORNTON SELF STORAGE THORNTON, COLORADO Prepared by: Bowman Consulting 63 Park Point Dr. Suite 1 Golden, CO 841 (33)-81-29 June 29, 215 Revised August 14, 215 Revised September 3, 215

CERTIFICATE SHEET DCB Construction hereby certifies that the sewer and water system for the Thornton Self- Storage will be constructed according to the design presented in this report. I understand that the City of Thornton does not and shall not assume liability for the sewer and water system designed and/or certified by my engineer. I understand that the City of Thornton reviews utility plans but cannot, on behalf of Thornton Self-Storage, guarantee that final utility design review will be absolve DCB Construction and/or their successors and/or assigns of future liability for improper design. I further understand that approval of the Plat and/or Development Permit does not imply approval of my engineer s utility design. ATTEST: Name of Responsible Party Notary Public Authorized Signature I hereby certify that this report (plan) for the Final Utility Design of Thornton Self-Storage was prepared by me (or under my direct supervision) in accordance with the provisions of the City of Thornton Standards and Specifications for the Design and Construction of Public and Private Improvements for the Responsible Parties thereof. I understand that the City of Thornton does not and shall not assume liability for utilities designed by others. Charles Edward Weiss Registered Professional Engineer State of Colorado No. 2885

GENERAL LOCATION AND DESCRIPTION The Thornton Self-Storage site is located in the Southeast Quarter of Section 34, Township 1 South, Range 68 West of the 6 th Principal Meridian and takes up approximately 5. acre portion of Lot 1, Block 1, Qwest Thornton Central Office Subdivision on the west side of North Washington Street. The site s surrounding area is made up of commercial and industrial properties. There is a 4 foot right-of-way adjacent to the north property line that contains drainage pipes and will be replatted as an exclusive water & drainage easement. An existing STOR-N-LOCK facility is located directly north of the right-of-way. The west side of the site is bounded by a day care facility and Newcomb Spring of Colorado manufacturing facility which front Pennsylvania Street. Qwest has a commercial building south of the site with a parking lot and detention pond adjacent to the property. The northeast corner of the site contains a gas regulator station that is in a 3 foot by 5 foot easement. Just west of the gas regulator station is a 42 inch storm drain which daylights into a grass lined channel in a 4 foot drainage easement that runs southeast from the north property line to the site s ultimate outfall, an existing 6 x 3 RCB that goes under Washington Street into Brantner Gulch. An existing 24 inch transmission waterline from the Cherokee Tank along I-25, is located in the west side right-of-way of Washington Street from the intersection of Pennsylvania Street to the 4 foot right-of-way near the north property line of the Self-Storage site. Once it enters the 4 foot right-of-way it runs west until it reaches the west property line. From here the line turns south again behind the commercial properties on the east side of Pennsylvania Street. Before the 24 inch line exits the property near the south west corner, a 12 inch line ties into it, teeing back to the east along the south property line, angling southeast about half way across the site to serve the Qwest facility. Existing sanitary sewer runs along the east side of Washington Street. Currently the site is undeveloped and covered with sparse vegetation and native grasses. Proposed for the site is an eight building self-storage facility. The main building will be on the east side of the site near Washington Street. It is planned to be a two story structure with water and sewer services, climate-controlled, storage building, approximately 36,9 square feet with a fire sprinkler system in place. The other seven buildings will be single story structures for storage only ranging from approximately 6, to 12, square feet with driving lanes in between them. A detention and water quality facility is proposed just south of the main building. No irrigation facilities are proposed for this site. BASINS AND PRESSURE ZONES The project area is located in existing water Pressure Zone 3, Sub-Zone 3, receiving its water from the Cherokee Tank s 24 inch transmission line that runs along I-25 to 128 th Avenue, including along two sides of the property.

The proposed Self-Storage facility will fall into the approximately 85 acres of commercial development inside Sanitary Basin G. Basin G terminates into Basin H (Big Dry Creek Basin). The site will be served by an 8 inch sanitary line on the east side of Washington Street. DESIGN CRITERIA The utility plan is designed in accordance to the City of Thornton Standards and Specifications for the Design and Construction of Public Improvements, revised October 212 and Volume 1: Water and Wastewater Systems Master Plan City of Thornton. Basins and Pressure Zones are those described in the manuals above. There were no previous utility reports for this area. The main building of the Self-Storage facility will have a water connection along with a 6 inch fireline connecting to the existing 12 inch waterline running between the site and the Qwest parking lot. 4 fire hydrants are proposed for this site. 2 on the north side of the property will tie into the existing 24 inch transmission line in the 4 foot right-of-way, and 2 on the south connecting to the 12 inch line between the site and the Qwest parking lot. The required fire flow for this site was determined to be 2,25 gallons per minute (gpm), which can be split between 2 hydrants, at a minimum residual pressure of 2 pounds per square inch (psi). This was based on the total fire area of the single largest non-sprinklered building (building B: 9,253 square feet) and type IIB construction. Building A is sprinklered so half the fire flow was accounted for but found to be lower than the fire flow for building B. A WaterCAD scenario was run for the main building maximum daily demand, plus fire sprinkler system demand, plus a hydrant under fire demand. The demand was found by multiplying 15 GPD per person by a low density residential factor of 3.45 for an average 517.5 GPD. This average was multiplied by a peaking factor of 5.76 and a max daily factor of 3.2 per Thornton criteria then converted to GPM for WaterCAD modeling. Fire flow required was found from City of Thornton Standards table 2-2 stating a 6 inch line needs 88 GPM. The results showed that the pressure complied with City of Thornton standards. Sanitary criteria states that q/q for sanitary systems to be less than 5%. For this exercise a conservative stance was taken assuming the pipe is at minimum slope and the existing 8 inch sanitary line, that will serve the Self-Storage site, is already 5% full. Given this assumption the impact on the flow should be negligible. Using the City of Thornton criteria for commercial sites, the peaking factor was found to be 1,92 GPD converted to.17 cfs which translates to a 1.57% increase. CONCULSIONS The utility plan was designed in accordance with City of Thornton Standard and Specifications along with Volume 1: Water and Wastewater Systems Master Plan. Calculations for the determination of sanitary flow increase can be found in the appendix of this report. The calculations were performed in accordance to the City of Thornton Standards.

REFERENCES Standards and Specifications for the Design and Construction of Public Improvements, City of Thornton, 212 Edition Volume 1: Water and Wastewater Systems Master Plan, City of Thornton, 21

APPENDIX

WASHINGTON STREET DEVELOPMENT PERMIT / SPECIFIC USE PERMIT QWEST THORNTON CENTRAL STORAGE A Portion of Lot 1, Block 1, Qwest Thornton Central Office Subdivision 1st Filing City of Thornton, County of Adams, State of Colorado UTILITY PLAN Date Revision 7/1/215 SUBMITTAL #1 8/14/215 SUBMITTAL #2 DCB Design Project Number: 15-92 Drawing Number 12 Copyright DCB Construction Company, Inc.

WATER CAD MODEL 9/15/215 27 Siemon Company Drive Suite 2 W Watertown, CT 6795 USA +1-23-755-1666 [8.11.1.32] You created this PDF from an application that is not licensed to print to novapdf printer (http://www.novapdf.com)

HIGH HGL NO DEMAND FlexTable: Junction Table () Current Time:. hours ID 98 65 6 57 55 89 36 7 26 28 75 8 Label J-1/H-1 J-3 J-5 J-1 J-12/H-4 Elevation 5,335. 5,335. 5,335. 5,335. 5,336. 5,335. 5,335. 5,335. 5,335. 5,335. 5,335. 5,335. Demand (gpm) Hydraulic Grade 5,51. 5,51. 5,51. 5,51. 5,51. 5,51. 5,51. 5,51. 5,51. 5,51. 5,51. 5,51. Pressure (psi) 75.3 9/29/215 27 Siemon Company Drive Suite 2 W Watertown, CT 6795 USA +1-23-755-1666 [8.11.1.32]

HIGH HGL NO DEMAND FlexTable: Pipe Table () Current Time:. hours ID 88 99 66 61 91 92 9 72 71 29 76 81 Hazen-Williams C 15. 15. 15. 15. 15. 15. 15. 15. 15. 15. 15. 15. P-1 P-2 P-3 P-4 P-5 P-6 P-7 P-8 P-9 P-1 P-11 P-12 Label Flow (gpm) Start Node J-1/H-1 J-1 Velocity (ft/s)......1...... Stop Node T-2 J-3 J-5 J-1 J-12/H-4 Headloss Gradient (ft/ft)............ Diameter (in) 24. 6. 12. 6. 12..5 12. 12. 12. 24. 24. 24. Length (User Defined). 99. 296. 296. 5. 294. 8.52 137.38 118. 314. 51.63 445.75 Material 9/29/215 27 Siemon Company Drive Suite 2 W Watertown, CT 6795 USA +1-23-755-1666 [8.11.1.32]

LOW HGL NO DEMAND FlexTable: Junction Table () Current Time:. hours ID 98 65 6 57 55 89 36 7 26 28 75 8 Label J-1/H-1 J-3 J-5 J-1 J-12/H-4 Elevation 5,335. 5,335. 5,335. 5,335. 5,336. 5,335. 5,335. 5,335. 5,335. 5,335. 5,335. 5,335. Demand (gpm) Hydraulic Grade 5,485. 5,485. 5,485. 5,485. 5,485. 5,485. 5,485. 5,485. 5,485. 5,485. 5,485. 5,485. Pressure (psi) 64.5 9/29/215 27 Siemon Company Drive Suite 2 W Watertown, CT 6795 USA +1-23-755-1666 [8.11.1.32]

LOW HGL NO DEMAND FlexTable: Pipe Table () Current Time:. hours ID 88 99 66 61 91 92 9 72 71 29 76 81 Hazen-Williams C 15. 15. 15. 15. 15. 15. 15. 15. 15. 15. 15. 15. P-1 P-2 P-3 P-4 P-5 P-6 P-7 P-8 P-9 P-1 P-11 P-12 Label Flow (gpm) Start Node J-1/H-1 J-1 Velocity (ft/s)......1...... Stop Node T-2 J-3 J-5 J-1 J-12/H-4 Headloss Gradient (ft/ft)............ Diameter (in) 24. 6. 12. 6. 12..5 12. 12. 12. 24. 24. 24. Length (User Defined). 99. 296. 296. 5. 294. 8.52 137.38 118. 314. 51.63 445.75 Material 9/29/215 27 Siemon Company Drive Suite 2 W Watertown, CT 6795 USA +1-23-755-1666 [8.11.1.32]

LOW HGL w/ PHD FlexTable: Junction Table () Current Time:. hours ID 98 65 6 57 55 89 36 7 26 28 75 8 Label J-1/H-1 J-3 J-5 J-1 J-12/H-4 Elevation 5,335. 5,335. 5,335. 5,335. 5,336. 5,335. 5,335. 5,335. 5,335. 5,335. 5,335. 5,335. Demand (gpm) 2 Hydraulic Grade 5,485. 5,485. 5,485. 5,485. 5,452.69 5,485. 5,485. 5,485. 5,485. 5,485. 5,485. 5,485. Pressure (psi) 5.5 9/29/215 27 Siemon Company Drive Suite 2 W Watertown, CT 6795 USA +1-23-755-1666 [8.11.1.32]

LOW HGL w/ PHD FlexTable: Pipe Table () Current Time:. hours ID 88 99 66 61 91 92 9 72 71 29 76 81 Hazen-Williams C 15. 15. 15. 15. 15. 15. 15. 15. 15. 15. 15. 15. P-1 P-2 P-3 P-4 P-5 P-6 P-7 P-8 P-9 P-1 P-11 P-12 Label Flow (gpm) -2 2 2 2 2 Start Node J-1/H-1 J-1 Velocity (ft/s)..... 3.38.1.1.1... Stop Node T-2 J-3 J-5 J-1 J-12/H-4 Headloss Gradient (ft/ft)......11...... Diameter (in) 24. 6. 12. 6. 12..5 12. 12. 12. 24. 24. 24. Length (User Defined). 99. 296. 296. 5. 294. 8.52 137.38 118. 314. 51.63 445.75 Material 9/29/215 27 Siemon Company Drive Suite 2 W Watertown, CT 6795 USA +1-23-755-1666 [8.11.1.32]

LOW HGL w/ FF, FD, MDD FlexTable: Junction Table () Current Time:. hours ID 98 65 6 57 55 89 36 7 26 28 75 8 Label J-1/H-1 J-3 J-5 J-1 J-12/H-4 Elevation 5,335. 5,335. 5,335. 5,335. 5,336. 5,335. 5,335. 5,335. 5,335. 5,335. 5,335. 5,335. Demand (gpm) 1,125 88 1 1,125 Hydraulic Grade 5,473.85 5,48.85 5,468.28 5,481.57 5,47.72 5,481.6 5,481.66 5,482.63 5,484.53 5,484.53 5,484.53 5,484.53 Pressure (psi) 6.1 63.1 57.7 63.4 58.3 63.4 63.5 63.9 64.7 64.7 64.7 64.7 9/29/215 27 Siemon Company Drive Suite 2 W Watertown, CT 6795 USA +1-23-755-1666 [8.11.1.32]

LOW HGL w/ FF, FD, MDD FlexTable: Pipe Table () Current Time:. hours ID 88 99 66 61 91 92 9 72 71 29 76 81 Hazen-Williams C 15. 15. 15. 15. 15. 15. 15. 15. 15. 15. 15. 15. P-1 P-2 P-3 P-4 P-5 P-6 P-7 P-8 P-9 P-1 P-11 P-12 Label Flow (gpm) -3,131-1,125 1,125 88 2,5 1 2,6 2,6 3,131 Start Node J-1/H-1 J-1 Velocity (ft/s) 2.22 12.77 3.19 9.99 5.69 1.88 5.69 5.69 8.88... Stop Node T-2 J-3 J-5 J-1 J-12/H-4 Headloss Gradient (ft/ft).1.71.2.45.7.37.7.7.16... Diameter (in) 24. 6. 12. 6. 12..5 12. 12. 12. 24. 24. 24. Length (User Defined). 99. 296. 296. 5. 294. 8.52 137.38 118. 314. 51.63 445.75 Material 9/29/215 27 Siemon Company Drive Suite 2 W Watertown, CT 6795 USA +1-23-755-1666 [8.11.1.32]

Sanitary Pipe Flow Capacity Manning's Equation q=a(k/n)r 2/3 S 1/2 K = 1.486 n =.1 A = r 2 1.4 ft 2 R = A/P 2.9 ft P = Pipe Perimeter.67 ft S = slope of pipe.4% q = 2.1481 ft 3 /s q.5 = 1.741 Criteria q = 6 gal/ac/day Site Area = 5.2 ac 1 gal =.133681 ft 3 1 day = 864 s Aveage Day Demand (F) 312 GPD.312 MGD Peaking Factor PF=1.72/F.295 PF= 9.325525547 *PF=3.5 max per 33.3 Peak Hour Demand= 192 GPD.16895793 CFS % increase = 1.57%