Helix Resources Limited A.C.N Incorporated in Western Australia

Similar documents
76,000 Ounce Gold Resource at Akoko North

For personal use only

GEOPACIFIC REPORTS HIGH GOLD VALUES IN AUGER SOIL SAMPLES FROM THE QALAU AND TATAIYA PROSPECTS, RAKI RAKI PROJECT,

Haoma Mining NL DALTONS-MT WEBBER DEPOSIT; UPGRADE TO INDICATED RESOURCE CATEGORY FOR MAIN SOUTHERN ZONE

Initial Gold Resource at Sissingue Tengrela Project (Ivory Coast)

EXCELLENT FIRST DRILL RESULTS FROM WELD RANGE

STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE AT SYNDICATED S 100% BARBARA SOUTH LODE

For personal use only

10 BILLION TONNES TOTAL RESOURCES ACHIEVED FROM MAJOR MAIDEN RESOURCE ESTIMATE FOR WESTERN HUB

60% upgrade of Flying Doctor Resource to 104,600 tonnes of contained zinc and lead.

For personal use only

Maiden Kandia Gold Resource of 107,500 Ounces

Deep Yellow Revises Resource Estimate at INCA Uranium Deposit in Namibia

Co-O MINE MINERAL RESOURCE UPDATE

For personal use only

P ROJ EC T UPDATE PANDA HILL NIOBIUM PROJ ECT

INFERRED MINERAL RESOURCE AND CONCEPTUAL EXPLORATION TARGET UPDATE Mt FORREST IRON

MAJOR RESOURCE BOOST FOR QUEENSLAND NICKEL PROJECT

For personal use only

HIGH-GRADE GOLD MINERALISATION CONTINUES ALONG STRIKE AT THE BODDINGTON SOUTH GOLD PROJECT

AGM Geology Presentation. 30th November 2016

New Drilling Program Commences at Mutiny s Deflector Deposit

For personal use only

ROE HILLS COBALT AND GOLD DRILLING ADVANCES

STRONG GOLD IN SOIL ANOMALY OUTLINED AT MARY HARRISON PROJECT HIGHLIGHTS

704,000 OUNCE MIYABI GOLD PROJECT UPDATE

Norwest successfully lists on ASX, Drilling commenced at Warriedar Gold Project

Mount Gibson Iron Limited ABN

ASX ANNOUNCEMENT 21 MARCH 2011

DRILLING CONFIRMS CLEAVERVILLE FORMATION MAGNETITE POTENTIAL ON THE MIAREE MAGNETITE TREND HIGHLIGHTS

BUNDARRA RESOURCE UPDATE

For personal use only

Option agreement with Randgold set to commercialise Massigui Gold Project

Kalman Mineral Resource Update

PEAK HILL IRON PROJECT MAIDEN DSO INFERRED MINERAL RESOURCE

Carrapateena Mineral Resources Explanatory Notes April OZ Minerals Limited. Carrapateena Mineral Resources Statement April

CENTAURUS EXPANDS JAMBREIRO STUDY WORK AS A RESULT OF EXCELLENT RESULTS IN SOUTH EAST EXTENSION ZONE

EXPLORATION SUCCESS AT COYOTE GOLD MINE

HIGHLIGHTS. Drilling intersects wt% recovered DTR concentrate grading 69.8% Fe, including 27 metres in excess of 21% DTR.

New High Grade Gold-Copper Extensions At Mutiny s Deflector Deposit Highlight Project s Significant Growth Potential

Ausgold awarded EIS grant for Jinkas deep drilling

ASX:LEG 18 July 2011 ASX Announcement DRILL ASSAYS UPGRADE IRON RESULTS. Drill assays from Melombo North confirm encouraging iron grades and

Wingina Well Gold Resource Update - 4.1g/t in high grade lodes

For personal use only

ASX/Media Announcement

JV PROJECT UPDATE JORC COAL RESOURCE

ASX Release and Media Announcement 27 September Central Eyre Iron Project 2011 Stage VI Drilling Programme Completion

For personal use only

The Manager Companies ASX Limited 20 Bridge Street

ASX Announcement. Bulletin grows resource base and tenement position

High Grade Gold Intercepts at Bangaba

For personal use only

D N HARLEY MANAGING DIRECTOR Attachment: Amended Consultant Report on MG 14 Mineral Resource Estimation.

For personal use only

For personal use only

Further Extensions to the Netiana Lodes at Balogo, Burkina Faso

SHAY GAP DETRITAL IRON ORE PROJECT RECONNAISSANCE SAMPLING SHOWS HIGHGRADE POTENTIAL

Mt Cannindah IP Data Reprocessing & 3D Geological Modelling Identifies Potential Resource Extensions

New High Grade Lode Discovered at Wagtail South

For personal use only

Mineral Resource for Pilbara Iron Ore Project increased to more than 900 Mt Pilbara Iron Ore Project (PIOP), Western Australia

Annual Report Amended Additional Information

RESOURCE INCREASED BY 75% TO 1.29 BILLION TONNES FOR GINDALBIE S KARARA MAGNETITE PROJECT

ASX/MEDIA RELEASE 25 November EMERGENT CONFIRMS MAJOR JORC RESOURCE UPGRADE TO 561Mt FROM PREVIOUS 127Mt AT BEYONDIE IRON PROJECT

African Energy Resources Limited

TANDARRA GOLD PROJECT DRILLING COMMENCES AND FOUR EAGLES GOLD PROJECT DRILLING UPDATE

Exploration targets identified to increase Browns Range Project s mine life

High Grade Gold Results from RAB Drilling at the Central Bore Prospect

Rock chip sampling confirms high grade quartz vein 500m long and up to 20m wide

MAJOR EXPLORATION SUCCESS AT JACK HILLS IRON ORE PROJECT EXPLORATION TARGET OF ADDITIONAL MILLION TONNES

Auger Drilling Progress Report - Moktedu Trend Prospect 5km Gold Trend Confirmed Along Strike from 3.5Moz Deposit

High Grade Gold Drill Results Extend Buccaneer

Drilling program commences on Cloncurry and Mount Isa projects

ASX and Media Release

ASX Announcement. New economic gold results confirm Dave East as an exciting new discovery. Highlights. 4 July 2011

For personal use only

For personal use only

Resource upgrade at Greater Whitewash Project to 604 ppm Moly Equivalent*

For personal use only

ASX Announcement 24 December Drilling results confirm depth potential of Lamboo Project

Auger Drilling Progress Report - Meguet Trend Prospect Multiple Highly Anomalous Gold Discoveries within 8km Mineralised Corridor

Diamond Drilling Extends the Netiana Lodes at Depth

Drilling Program Commences on Iron Oxide Copper Gold Targets

Hampton Hill Mining NL

TWO HIGH-GRADE GOLD ZONES DISCOVERED AT HERMES GOLD PROJECT

ASX Announcements & Media Release

Significant New Mineralised Zone Paroo Range (RGU:100%)

Trouser Legs Mine Strong Drilling Results - including g/t Au Potential for Further Mine Development

HIGH GRADE GOLD-BEARING QUARTZ VEIN DISCOVERED AT MIAREE, KARRATHA AREA WESTERN AUSTRALIA

$2.5 Million Resource Drilling Program Commences at Siberia Mining Centre

FOUR EAGLES MINERALISATION REPORT ACCEPTED AND DRILLING TO RECOMMENCE

MAIDEN URANIUM RESOURCE PROOF OF CONCEPT

Acquisition agreement to move to 100% ownership of the Ashford Coking Coal Project

For personal use only

For personal use only

For personal use only

ASX RELEASE REVIEW OF GLANDORE DATA TO DEFINE DRILL PROGRAM

******************* *******************

KATINGAN RIA COAL RESOURCE UPGRADE

Malachite Resources Limited ABN

Transcription:

Helix Resources Limited A.C.N. 009 138 738 Incorporated in Western Australia 3 rd June 2008 Australian Stock Exchange Limited Via Electronic Lodgement Dear Sirs INITIAL INFERRED RESOURCE ESTIMATE OF 112 MILLION TONNES FOR YALLEEN IRON ORE JOINT VENTURE Helix Resources Limited ( Helix ) is pleased to announce an initial inferred iron ore resource estimate has been undertaken for the Kumina Creek and Robe Exit Prospects covering zones of channel iron deposits (CID) on the Yalleen Joint Venture Project located in the West Pilbara region of Western Australia. The Yalleen Joint Venture is 70% API Management Pty Ltd (API) and 30% Helix and is managed by API. Helix independently commissioned Runge Limited [ Runge] to prepare the Resource estimate which was based on the information and parameters outlined in Appendix A. The Joint Venture continues exploration drilling of several other identified iron targets and infill drilling on Kumina Creek. Helix considers that this initial resource estimate has scope to be increased with further drilling and inclusion of other identified deposits within the 600km² project area. The Runge Mineral Resource Estimates for the Kumina Creek and the Robe Exit Iron Ore deposits are summarised in Table A. Table A: Yalleen Project May 2008 Inferred Mineral Resource at 50% Fe Cut off Kumina Creek 68.7 56.16 6.60 4.20 0.058 0.02 8.23 0.06 0.14 Robe Exit 43.5 54.65 6.84 4.58 0.065 0.01 9.97 0.08 0.16 Grand Total 112.1 55.57 6.69 4.35 0.060 0.02 8.91 0.07 0.15 The Mineral Resource estimate complies with recommendations in the Australian Code for Reporting of Mineral Resources and Ore Reserves (2004) by the Joint Ore Reserves Committee (JORC). Therefore it is suitable for public reporting. The estimate is based on data from surface Reverse Circulation (RC) and Diamond (DD) drill holes, all of which all were completed by API. At the time of this estimate, results were still pending for a number of holes.

Drilling at the Kumina Creek deposit has been carried out at 100m hole spacings on 200m section spacings and typically extends to 80m depth. Drilling at the Robe Exit deposit is more broadly spaced and is typically at 200m hole spacings on 400m line spacings. Mineralised envelopes were created using the logged channel geology and a 50% Fe cut-off grade. The deposits were estimated using a standard Surpac block model with inverse distance squared (ID2) grade interpolation for all elements. The geological model and grade distribution evident at the Yalleen project conform to well understood CID deposits which are exploited in the region. Drill data is relatively sparse so geological and grade continuity is assumed rather than verified. Consequently the resources have been classified as an Inferred Mineral Resource for each deposit. Further details of this resource estimate are attached as Appendix A. A resource estimate with a higher grade cut of 55% Fe was also calculated to assess the tonnes and grade on tighter parameters, the estimates are summarised in Table B: Table B: Yalleen Project May 2008 Inferred Mineral Resource at 55% Fe Cut off Kumina Creek 51.7 56.97 5.91 3.98 0.059 0.02 8.08 0.05 0.13 Robe Exit 18.1 56.22 5.34 4.16 0.065 0.01 9.81 0.08 0.14 Grand Total 69.8 56.78 5.76 4.02 0.061 0.02 8.53 0.06 0.13 No Al2O3 cut-offs have been applied. Further work is required to be undertaken by the Joint Venture. API Comments Regarding the Resource Statement API has advised that the stated Resource has not been derived using the modeling techniques normally used by API, which has used the ordinary kriging estimation method for Statements issued on behalf of the Red Hill and Mt Stuart Joint Ventures. API has indicated it will release a Resource Statement supported by the techniques currently being utilized by API when appropriate. Yalleen JV Project Background The Yalleen Project is the subject of an iron ore specific exploration and development joint venture with API Management Pty Ltd ("API"). API is a company 50% owned by Aquila Resources Limited ("Aquila") and 50% by AMCI, and dedicated to the development of iron ore resources in the Pilbara. API has earned a 70% interest in the joint venture by sole funding an initial $1.5 million of exploration and the JV Parties are now contributing in their respective interests. The Kumina Creek and Robe Exit deposits are located within the Yalleen Iron Ore JV. The deposits lie approximately 50km southeast of Pannawonica, part of the Robe Valley, Western Australia (See figure in Appendix B). Both deposits are channel iron deposits (CID) that are formed by the alluvial and chemical deposition of Fe after erosion and weathering of banded iron formations.

Further details regarding the Yalleen JV are contained in previous ASX releases and the website at www.helix.net.au. Yours faithfully Greg J Wheeler Chairman The information in this announcement that relates to Mineral Resources is based on information compiled by Mr P Payne who is a member of the Australian Institute of Mining and Metallurgy and an employee of Runge Limited. Mr Payne has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the Australasian Code of Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Payne consents to the inclusion in the report of the matters based on the information in the form and context in which it appears.

Appendix A Resource Statement and Parameters Extracted from the resource report prepared by Runge Limited Yalleen Project May 2008 Inferred Mineral Resource at 50% Fe Cut off Kumina Creek 68.7 56.16 6.60 4.20 0.058 0.02 8.23 0.06 0.14 Robe Exit 43.5 54.65 6.84 4.58 0.065 0.01 9.97 0.08 0.16 Grand Total 112.1 55.57 6.69 4.35 0.060 0.02 8.91 0.07 0.15 Yalleen Project May 2008 Inferred Mineral Resource at 55% Fe Cut off Kumina Creek 51.7 56.97 5.91 3.98 0.059 0.02 8.08 0.05 0.13 Robe Exit 18.1 56.22 5.34 4.16 0.065 0.01 9.81 0.08 0.14 Grand Total 69.8 56.78 5.76 4.02 0.061 0.02 8.53 0.06 0.13 The resource estimate of Kumina Creek was completed using the following parameters: The Kumina Creek resource area extends over a strike length of 2,750m from 476,500E to 479,250E and is up to 1,000m in width from 7,592,500N to 7,593,500N. The vertical extent of the resource is 70m from near surface at 315mRL to 245mRL. The Robe Exit resource area extends over a strike length of 3,200m from 472,200E to 475,400E and is 1,750m in width from 7,585,250N to 7,593,500N. The vertical extent of the resource is 80m from near surface at 310mRL to 230mRL. The database contained 340 drill holes including Reverse Circulation (RC), Diamond (DD) and recent Barber drill holes (BDH) drilled late in 2007. A total of 148 drill holes were used to estimate the resources. No down hole surveys were recorded and all holes are assumed to remain vertical. The average depth of drill holes in the resource estimates is 35m. QAQC data was not reviewed by Runge Limited. However API has a comprehensive QAQC procedure in place for all resource drilling. Fe, SiO2, Al2O3, P, S, Loi1000, Mn, MgO were assayed using the X-ray florescence technique (XRF). Interpretations were based on logged geology and a nominal 50% Fe cut off with a minimum down hole length of 2m. Samples within the Kumina Creek wireframes were composited to even 1m intervals. Samples within the Robe Exit wireframes were composited to even 2m intervals. No high grade cut was applied to Fe or any other elements in the estimates.

Inverse Distance Squared was used to estimate grade within each of the deposits. An ellipsoid search method was used for both deposits. The Kumina Creek estimate used a first pass horizontal search radius of 200m. The vertical search distance was 10m. The Kumina Creek block model used block dimensions of 100m NS by 50 EW by 2m vertical with sub cells of 50m by 25m by 1m respectively. The Robe Exit estimate used a first pass horizontal search radius of 400m with a vertical search distance of 40m. The Robe Exit block model used block dimensions of 100m NS by 100m NS by 2m vertical with sub cells of 25m by 25m by 1m respectively. Bulk density data was not provided for either of the deposits. Review of similar type deposits in the Robe Valley resulted in a density of 2.7t/m 3 being applied to the mineralised material. The geological model and grade distribution evident at the Yalleen project conform to well understood CID deposits which are exploited in the region. Drill data is relatively sparse so geological and grade continuity is assumed rather than verified. Consequently the resources have been classified as an Inferred Mineral Resource for each deposit. Some peripheral mineralisation at the Robe Exit deposit has been estimated but remains unclassified due the sparseness of drilling and grade variability.

Appendix B