End of Life Re-orbiting The Meteosat-5 Experience

Similar documents
RECENT SPACE DEBRIS MITIGATION ACTIVITIES IN FRANCE F.ALBY

INTER-AGENCY SPACE DEBRIS COORDINATION COMMITTEE (IADC) SPACE DEBRIS ISSUES IN THE GEOSTATIONARY ORBIT AND THE GEOSTATIONARY TRANSFER ORBITS

Propellant Gauging Experience with Meteosat Second Generation S/C Fleet

Eutelsat practice & views on long term sustainability. COPUOS/SCST - LTS Workshop Vienna, 14 February 2013

Solid Propellant Autonomous DE-Orbit System [SPADES]

Prof. Richard Crowther Chief Engineer, UK Space Agency. Reflections on Orbital Debris Mitigation Measures

1. (a) Describe the difference between over-expanded, under-expanded and ideallyexpanded

IMPACT OF SPACE DEBRIS MITIGATION REQUIREMENTS ON THE MISSION DESIGN OF ESA SPACECRAFT

The Orbit Control of ERS-1 and ERS-2 for a Very Accurate Tandem Configuration

BravoSat: Optimizing the Delta-V Capability of a CubeSat Mission. with Novel Plasma Propulsion Technology ISSC 2013

Solid Propellant Autonomous DE-Orbit System [SPADES] Co-authors: T. Soares J. Huesing A. Cotuna I. Carnelli L. Innocenti

The Interstellar Boundary Explorer (IBEX) Mission Design: A Pegasus Class Mission to a High Energy Orbit

Information furnished in conformity with the Convention on Registration of Objects Launched into Outer Space

Space Debris Activities in India

COLLISION RISK ASSESSMENT AND MITIGATION STRATEGY FOR THE GSOC GEO SATELLITES

Orbit Design Marcelo Suárez. 6th Science Meeting; Seattle, WA, USA July 2010

11.1 Survey of Spacecraft Propulsion Systems

COUPLED OPTIMIZATION OF LAUNCHER AND ALL-ELECTRIC SATELLITE TRAJECTORIES

USA Space Debris Environment, Operations, and Policy Updates

OUT-OF-PLANE MANOEUVRE CAMPAIGNS FOR METOP-A: PLANNING, MODELLING, CALIBRATION AND RECONSTRUCTION. +49(0) ,

LAUNCHES AND LAUNCH VEHICLES. Dr. Marwah Ahmed

RELATIVE MISSION ANALYSIS FOR PROBA 3: SAFE ORBITS AND CAM

Space Debris Mitigation Activities at ESA in 2013

An Update on EUMETSAT Programmes and Plans. Dieter Klaes on behalf of EUMETSAT teams

Case Studies for Uncertainty Quantification of a High-fidelity Spacecraft Oriented Break-up Tool. Bent Fritsche, HTG Stijn Lemmens, ESA

Hybrid (Ion and Chemical) GEO Stationkeeping Maneuver Planning Software

DE-ORBITATION STUDIES AND OPERATIONS FOR SPIRALE GTO SATELLITES

THE METOP-A ORBIT ACQUISITION STRATEGY AND ITS LEOP OPERATIONAL EXPERIENCE

AN ANALYTICAL SOLUTION TO QUICK-RESPONSE COLLISION AVOIDANCE MANEUVERS IN LOW EARTH ORBIT

EUROSTAR 3000 INCLINED ORBIT MISSION : LIFETIME OPTIMISATION IN CASE OF INJECTION WITH A LOW INCLINATION

Statistical methods to address the compliance of GTO with the French Space Operations Act

The Inter-Agency Space Debris Coordination Committee (IADC)

Space Debris Mitigation Activities at ESA

Design of Attitude Determination and Control Subsystem

CHAPTER 3 PERFORMANCE

RAPID GEOSYNCHRONOUS TRANSFER ORBIT ASCENT PLAN GENERATION. Daniel X. Junker (1) Phone: ,

CNESOC FLIGHT DYNAMICS MONITORING AND COMMAND OPERATIONS DURING GALILEO FOC1 LEOP AND RECOVERY.

MAE 180A: Spacecraft Guidance I, Summer 2009 Homework 4 Due Thursday, July 30.

The Inter-Agency Space Debris Coordination Committee (IADC)

ACTIVITY OF RUSSIAN FEDERATION ON SPACE DEBRIS PROBLEM

Satellite Orbital Maneuvers and Transfers. Dr Ugur GUVEN

Orbital Debris Mitigation

Flight Dynamics Operations solution for full-electric propulsion-based GEO missions

AMSAT Phase IV Propulsion and Attitude Control Systems Conceptual Design Doug May Thiokol Corporation

Prospects for the use of nuclear power sources in outer space. Working document submitted by the Russian Federation

The In-Orbit Commissioning of MSG-1

MULTI PURPOSE MISSION ANALYSIS DEVELOPMENT FRAMEWORK MUPUMA

CHAPTER 3 PERFORMANCE

Sentinel-1B Flight Dynamics Operations during LEOP and Acquisition of its Reference Orbit: Achieving the Sentinel-1 Constellation

Figure 1. View of ALSAT-2A spacecraft

Proton Launch System Mission Planner s Guide SECTION 2. LV Performance

OVERVIEW ON 2012 SPACE DEBRIS ACTIVITIES IN FRANCE

arxiv:gr-qc/ v1 15 Nov 2004

Development of Microwave Engine

The Launch of Gorizont 45 on the First Proton K /Breeze M

AKATSUKI s Second Journey to Venus. 7 October 2015 Chikako Hirose Japan Aerospace Exploration Agency

Clean-up your space: INTEGRAL low cost end-of-life disposal

GEO protected region: ISON capabilities to provide informational support for tasks of spacecraft flight safety and space debris removal

TUNDRA DISPOSAL ORBIT STUDY

Successful Demonstration for Upper Stage Controlled Re-entry Experiment by H-IIB Launch Vehicle

OptElec: an Optimisation Software for Low-Thrust Orbit Transfer Including Satellite and Operation Constraints

Implementation of the Outer Space Treaties in view of Small Satellites

EXTENDED MISSION TRAJECTORY OPTIONS FOR THE VAN ALLEN PROBES MISSION

USA Space Debris Environment, Operations, and Modeling Updates

FEDERAL SPACE AGENCY OF RUSSIA ACTIVITY OF RUSSIAN FEDERATION ON SPACE DEBRIS PROBLEM

SSTD = Standard deviation SMA = Semi Major Axis

Solar Orbiter Ballistic Transfer Mission Analysis Synthesis

Satellite Components & Systems. Dr. Ugur GUVEN Aerospace Engineer (P.hD) Nuclear Science & Technology Engineer (M.Sc)

Accepted Manuscript. Stephen Hobbs. S (10) /j.asr Reference: JASR 10051

PROBA 1. F. Teston ESA/ESTEC D/TEC-EL

Marlene H. Dortch Secretary, Federal Communications Commission th Street, S.W. Washington, D.C

Lecture D30 - Orbit Transfers

CAS-ESA Call for small mission proposals - Technical annex

Space Travel on a Shoestring: CubeSat Beyond LEO

ADVANCED NAVIGATION STRATEGIES FOR AN ASTEROID SAMPLE RETURN MISSION

Ball Aerospace & Technologies Corp. & L Garde Inc.

PERFORMANCE OF THE FIRST ORBIT MANEUVER ON CBERS-1 SATELLITE BY INPE S CONTROL CENTER

Space Systems Space Debris Mitigation

Space Debris Assessment for USA-193

Flight Demonstration of Electrostatic Thruster Under Micro-Gravity

CHAPTER 3 PERFORMANCE

Proton Launch System Mission Planner s Guide APPENDIX F. Proton Launch System Options and Enhancements

SOLID PROPULSION DE-ORBITING AND RE-ORBITING

IAC-16.A Jason A. Reiter a *, David B. Spencer b

Orbit Evolution of the Swarm Mission Detlef Sieg

IADC Re-Entry Prediction Campaigns

INITIAL STUDY ON SMALL DEBRIS IMPACT RISK ASSESSMENT DURING ORBIT TRANSFER TO GEO FOR ALL-ELECTRIC SATELLITE

Eutelsat practice & views on long term sustainability of space activities

Information furnished in conformity with the Convention on Registration of Objects Launched into Outer Space

Exhaustive strategy for optical survey of geosynchronous region using TAROT telescopes

RADIATION OPTIMUM SOLAR-ELECTRIC-PROPULSION TRANSFER FROM GTO TO GEO

GUIDANCE, NAVIGATION, AND CONTROL TECHNIQUES AND TECHNOLOGIES FOR ACTIVE DEBRIS REMOVAL

OVERVIEW ON 2012 SPACE DEBRIS ACTIVITIES IN FRANCE

ACTIVE DEBRIS REMOVAL AND SPACE DEBRIS MITIGATION USING HYBRID PROPULSION SOLUTIONS

SENTINEL-1A FLIGHT DYNAMICS LEOP OPERATIONAL EXPERIENCE

SPACE DEBRIS REMOVAL

OPERATIONAL VALIDATION OF THE FLIGHT DYNAMICS SYSTEM FOR COMS SATELLITE

HYPER Industrial Feasibility Study Final Presentation Orbit Selection

A Passive De-orbiting Strategy for High Altitude CubeSat Missions using a Deployable Reflective Balloon

How Small Can a Launch Vehicle Be?

Transcription:

End of Life Re-orbiting The Meteosat-5 Experience Milan EUMETSAT, Darmstadt, Germany This article illustrates the orbit maneuver sequence performed during Meteosat- 5 End of Life (EOL) re-orbiting operations and the maneuver strategy concept followed to abandon the geostationary ring, depleting all the remaining fuel that was still left in the tanks, after more than 16 years in orbit. The targeted minimum height for the graveyard orbit is calculated, according to the recommendations of the Inter-Agency Space Debris Coordination Committee (IADC), determining the mass of fuel to be allocated for the final re-orbiting maneuvers. A detailed strategy is elaborated to implement a sequence of burns and achieve the required disposal orbit, aiming also to a significant reduction of the satellite spin rate, as part of the satellite passivation and space debris mitigation measures. Nomenclature C r = Solar radiation pressure coefficient H = Height above the geostationary altitude required for re-orbiting v = Velocity increment (delta-v) e = Orbit eccentricity GM = Gravity potential of Earth (398600.440 km 3 /s 2 ) m = Satellite dry-mass M = Initially estimated mass of fuel considered available at start of re-orbiting m c = Consumed mass of fuel in re-orbiting maneuvers r GEO = Geostationary orbit radius (42164.5 km) S = Satellite cross section area = Geostationary orbital velocity (3.075 km/s) v GEO I. Introduction METEOSAT-5 was re-orbited from the geostationary orbit during April 2007. This was the first re-orbiting of a Meteosat satellite carried out from the EUMETSAT control centre in Darmstadt. The previous two Meteosat re-orbiting operations (Meteosat-3 and Meteosat-4) took place in November 1995, and were carried out by the European Space Operations Centre (ESOC), immediately prior to the handover of Meteosat operations to EUMETSAT. The paragraphs below illustrate the details of the implemented maneuver sequence strategy for the Meteosat-5 re-orbiting at its End of Life (EOL). The aim of the re-orbiting operations was to ensure a safe transition into a disposal graveyard orbit, in compliance with the latest recommendations contained in the Space Debris Mitigation Guidelines (IADC-02-01) of the Inter-Agency Space Debris Coordination Committee (IADC). II. Satellite Description Meteosat-5 is a cylindrically-shaped spin stabilized satellite built by Aerospatiale (now Thales Alenia Space) in Cannes. Launched from Kourou, Franch Guyana, by an Ariane 4 launcher in March 1991, Meteosat-5 is the fifth of the first generation of European geostationary weather satellites and the second of the EUMETSAT's Meteosat Operational Programme (MOP) series of satellites. The 282 kg dry-mass satellite is equipped with a hydrazine mono-propellant propulsion system and is initially loaded with 40 kg of fuel for a design lifetime of 5 years. Six thrusters provide the necessary forces and torques for orbit and attitude control maneuvers (see Figure 1). A pair of 10 N axial thrusters (A1 and A2) is located on the top surface of the main spacecraft body. They are directed parallel with the satellite spin axis and are used to change the spacecraft's attitude when used in pulsed mode, and to perform inclination maneuvers when used in continuous thrust mode. A second pair of 10 N thrusters (R1 and R2) is located at the side of the main body and is directed in the spacecraft spin-

plane at a slight offset from the spin axis. These thrusters are called radial thrusters. Fired simultaneously in pulsed mode, they are used principally for longitude control and relocation maneuvers. Two smaller 2 N vernier thrusters (V1 and V2), located near the pair of radial thrusters, provide satellite spin-rate control. Figure 1. Meteosat Thruster Layout The charts in Figures 2A, 2B and 2C summarize the history of Meteosat-5 maneuvers and fuel consumption. A significant extension to the originally foreseen 5-year lifetime was obtained by stopping the inclination control and continuing operations at higher orbit inclination. In April 2007 the orbit inclination of Meteosat-5 reached 9.1 degrees. Fuel Mass 45 40 35 30 Fuel Mass [kg] 25 20 15 10 5 0 Mar-91 Mar-92 Mar-93 Mar-94 Mar-95 Mar-96 Mar-97 Mar-98 Mar-99 Mar-00 Mar-01 Mar-02 Mar-03 Mar-04 Mar-05 Mar-06 Mar-07 Mar-08 Figure 2A. Meteosat-5 History of Fuel Consumption before Re-orbiting 2 Space Operations Communicator 2007

Consumed Fuel Mass 6 1.2 5 1 Consumed Fuel for NSSK [kg] 4 3 2 0.8 0.6 0.4 [kg] 1 0.2 0 0 Mar-91 Mar-92 Mar-93 Mar-94 Mar-95 Mar-96 Mar-97 Mar-98 Mar-99 Mar-00 Mar-01 Mar-02 Mar-03 Mar-04 Mar-05 Mar-06 Mar-07 NSSK EWSK SLEW SPIN Relocation Figure 2B. Meteosat-5 History of Maneuvers before Re-orbiting Fuel Mass Utilisation EOL Re-orbiting RELOC SPIN SLEW NSSK EWSK SLEW SPIN RELOC EOL Re-orbiting NSSK EWSK Figure 2C. Meteosat-5 Fuel Utilization III. Required Minimum Altitude of the Graveyard Orbit The recommendation from the IADC Space Debris Mitigation Guidelines for re-orbiting of Geosynchronous Earth Orbit (GEO) satellites is to reach a minimum perigee altitude above the geostationary altitude according to the following formula: H 235 1000 C S m [km] r [1] 3 Space Operations Communicator 2007

where C r is the radiation pressure coefficient of the satellite and S/m is the cross-section to dry mass ratio (in m 2 /kg). For the first generation Meteosat satellites the value of C r is typically 1.1, while the cross-section area is 3.953 m 2. The dry mass of Meteosat-5 is 281.901 kg. The resulting effective cross-section to mass ratio is therefore: 3.953 S 1.1 0.015 m 281.901 C r [2] The minimum perigee altitude above GEO required for Meteosat-5 re-orbiting was then: H 235 1000 0.015 250 [km] [3] IV. Required Mass of Fuel for EOL Re-orbiting The total velocity increment (delta-v) required to increase the orbit height by H of an initially geostationary orbit can be formulated with the following expression, generally valid for small altitude raising maneuvers of circular orbits using the classical Hohmann transfer: where: and 1 v 2 v H GEO rgeo r 42164.5 [km] [5] GEO GM 398600.440 42164.5 v GEO 3074.648 [m/s] [6] rgeo For the required altitude increase of 250 km, the relation gives then: 1 250 3074.648 9.115 2 42164.5 v [m/s] [7] The velocity increment that can be generated by the propulsion system from a given amount of fuel can be derived from the thruster specific impulse measured during on ground testing. Furthermore, a performance factor calibration is determined after each orbital maneuver, measuring the actual velocity increment provided by the propulsion system. An extrapolated figure for the expected performance factor of the re-orbiting burns led to a specific impulse providing a delta-v of 4.809 m/s per kg of fuel. The required fuel to achieve the minimum target height of 250 km above GEO was then calculated as follows: 9.115 4.809 [ m / s] m/s kg 1.895 kg To take into account the uncertainty on the available mass of propellant in the tanks, one should consider also an additional reserve margin. Taking into account the outcomes of the past Meteosat reorbiting operations (see Table 4), an uncertainty tolerance margin of +/-2.0 kg was assumed to satisfy appropriately any realistic expectation for the error in the determination of the propellant mass onboard. As a result, the latest possible time for re-orbiting Meteosat-5 was given when the estimated remaining propellant mass reached 1.9 kg + 2.0 kg = 3.9 kg. V. Re-orbiting Maneuver Sequence The strategy for the re-orbiting maneuver sequence followed the basic principles listed below: Deplete all the fuel left in the tanks; [4] [8] 4 Space Operations Communicator 2007

Achieve final circular orbit with minimum target height of 250 km above GEO for the worse case error of fuel reserve overestimation; Achieve final circular orbit with maximum possible height above GEO for the nominal case of estimated fuel reserve; Achieve final low eccentricity orbit (e<0.002) with maximum possible height above GEO for all intermediate cases or cases beyond the nominal fuel reserve estimation; Reduce satellite spin rate to mitigate the risks of a satellite break up and protect the GEO ring from particles generated by a hypothetical fragmentation in the disposal orbit; Minimize the time required to complete the re-orbiting sequence and allow sufficient time to complete de-commissioning operations, while still in visibility of the primary ground station. In practice, for an initially estimated propellant mass M (>= 3.9 kg) considered to be available at the start of the sequence, the general strategy concept for the re-orbiting sequence consisted of sizing the individual burns to satisfy the cases in the table below: After Consuming m c [kg] m c = 1.9 Achieved Orbit Circular orbit at least 250 km above GEO 1.9 < m c < M Low eccentricity orbit at maximum possible height above GEO m c = M m c > M Circular orbit at maximum possible height above GEO Low eccentricity orbit at maximum possible height above GEO Table 1. Re-Orbiting Sequence Objectives As already mentioned in the list of basic principles, in addition to the objectives of the above table, a reduction of the spin rate was to be performed as additional space debris mitigation measure. The satellite structure is permanently subjected to the centrifugal forces, which are proportional to the square of the spin rate. The reduction of this load should mitigate the risk of fragmentation over the very long term period. The nominal spin rate for a Meteosat satellite during routine operations is 100 rpm. As part of the satellite passivation at EOL, the options for a spin rate reduction were investigated. A possibility to achieve at the same time the necessary orbit raising and a significant spin rate reduction was given by using the radial thruster R2 alone during most of the planned pulsed orbital burns (see Figure 3). This was an unusual thruster configuration, as all previous in-plane orbital burns had been performed using a balanced pair of radial thrusters R1 and R2. This innovative solution provided the desired spin rate reduction at no additional cost of fuel, without affecting the performance of the orbit raising maneuvers. The EUMETSAT control centre in Darmstadt was originally designed to support only the satellite routine phase in orbit and particular care had to be taken in preparing the satellite control and monitoring system for operations at lower satellite spin rates and to allow the commanding of thruster configurations originally not foreseen for use in maneuvers. A time delay relative to a reference signal, such as the Sun sensor pulse, is used on board the satellite to define the direction of the firing during pulsed maneuvers. The satellite spin period is however required to stay within the maximum delay value that can be stored into the phase count register onboard the satellite. Considering this constraint, it was computed that the spin rate had to stay above 51.1 rpm in order to fire the pulsed burns in all desired directions. A sequence of seven burns was planned and executed, between the 16 th and 19 th of April 2007 (see Figure 4 and Table 2). A spin rate of 54 rpm was achieved after the fourth burn and the sequence continued using the standard paired R1+R2 thruster configuration. The last burn terminated 5 minutes into the planned 13 minute duration, showing that no fuel was left in the tanks. The achieved minimum separation from the GEO ring of the final orbit was 500 km. 5 Space Operations Communicator 2007

R2 R1 Figure 3. R2 Thruster Combined Effect on Orbit and Satellite Spin-Rate Manoeuvre Sequence Concept and Fuel Allocation (April 2007) 3.9 kg 1.9 kg Burn 7 0.500 kg Burn 5 0.500 kg Burn 3 0.725 kg Burn 1 0.475 kg Burn 2 0.950 kg Burn 4 0.500 kg Burn 6 0.500 kg Figure 4. Meteosat-5 Re-orbiting Sequence Concept Burn Maneuver Start Time (UTC) Thruster Pulses Final Spin Rate [rpm] Determined Final Orbit Height [km above GEO] Consumed Fuel Mass [kg] Expected Fuel Reserve [kg] Actual Fuel Reserve [kg] 1 16/04/07 05:50:05 R2 1922 91.03-4x144 0.470 3.456 3.235 2 16/04/07 17:36:49 R2 3760 73.78 137x229 0.905 2.551 2.330 3 17/04/07 05:42:26 R2 2734 62.13 228x324 0.650 1.901 1.680 4 17/04/07 17:50:54 R2 1950 54.04 319x351 0.456 1.445 1.224 5 18/04/07 06:05:45 R1+R2 968 53.90 345x459 0.448 0.997 0.776 6 18/04/07 17:10:08 R1+R2 1425 54.02 456x541 0.651 0.346 0.125 7 19/04/07 05:27:01 R1+R2 275 (*) 53.99 500x540 0.125 0.221 0.000 (*) Estimated pulses with hot firing. The planned number of pulses for Burn 7 was 721. Table 2. Meteosat-5 Executed Re-orbiting Maneuver Sequence An additional spin rate reduction was obtained after the re-orbiting sequence, during the pressurant venting operations, which were carried out mainly via the V1 thruster, generating the largest possible spin-down effect (see Table 3 and Figure 5). This approach required however a longer time to complete the depletion of the gas and had to be carried out over several days. However, since the satellite was initially stationed over the Indian Ocean region, the visibility condition from the primary ground station in Fucino, Italy, for the west-drifting satellite remained favorable for several weeks. Thruster valves were opened in 10 separate venting operations and the last determined satellite spin 6 Space Operations Communicator 2007

rate was 45 rpm. Therefore, compared to the initial nominal spin rate, the centrifugal forces were reduced in total by 80%. Tank Pressurant Venting Thruster Spin Rate Change [rpm] Final Spin Rate [rpm] 1 V1-3.82 50.17 2 V1-0.63 49.54 3 A1+A2-0.01 49.53 4 R1+R2+V1+V2 0.15 49.68 5 V1-1.6 48.08 6 V1-1.11 46.97 7 V1-0.82 46.15 8 V1-0.63 45.52 9 V1-0.39 45.13 10 all -0.01 45.12 Table 3. Spin Rate during Pressurant Venting Operations Meteosat-5 Spin Rate (20/04/2007) 49.80 R1+ R2 + V1 + V2 V1 49.75 49.70 A1+ A2 49.65 49.60 [rpm] 49.55 49.50 49.45 49.40 49.35 49.30 09:05:00 09:06:00 09:07:00 09:08:00 09:09:00 09:10:00 09:11:00 09:12:00 09:13:00 09:14:00 09:15:00 09:16:00 09:17:00 09:18:00 09:19:00 09:20:00 09:21:00 09:22:00 09:23:00 09:24:00 09:25:00 09:26:00 09:27:00 09:28:00 09:29:00 09:30:00 09:31:00 09:32:00 09:33:00 09:34:00 09:35:00 09:36:00 09:37:00 09:38:00 09:39:00 09:40:00 09:41:00 09:42:00 09:43:00 09:44:00 09:45:00 09:46:00 09:47:00 09:48:00 09:49:00 09:50:00 09:51:00 09:52:00 09:53:00 09:54:00 09:55:00 09:56:00 09:57:00 Figure 5. Spin Rate during Pressurant Venting Operations Satellite Re-orbiting from GEO Started on Total Lifetime in GEO Initial Fuel Mass (estim.) Initial Fuel Mass (determ.) Error in Fuel Mass (det.-est.) Spin Rate after Re-orbiting sequence Height from GEO at Perigee Height from GEO at Apogee Meteosat-2 02 Dec 1991 10.5 years 4.2 kg 2.3 kg -1.9 kg 100 rpm 334 km 542 km Meteosat-3 21 Nov 1995 7.4 years 7.0 kg 5.1 kg -1.9 kg 100 rpm 940 km 977 km Meteosat-4 09 Nov 1995 6.7 years 4.7 kg 6.1 kg 1.4 kg 100 rpm 852 km 973 km Meteosat-5 16 April 2007 16.1 years 3.9 kg 3.7 kg -0.2 kg 45 rpm 500 km 540 km Figure 6. Re-orbiting Summary for Meteosat Satellites The re-orbiting approaches illustrated above, implemented for the first time for the case of Meteosat-5, will be reused during future re-orbiting operations of the two remaining first generation Meteosat satellites, while most of the elaborated concepts and principles will remain valid also for the second generation Meteosat series. VI. Conclusions The Meteosat-5 EOL re-orbiting manoeuvre sequence, performed between the 16 th and 19 th of April 2007, placed the satellite into a safe disposal orbit, as planned. A combined effect of orbit rising and 7 Space Operations Communicator 2007

spin rate reduction was successfully achieved by using an unpaired single radial thruster for most of the executed orbital burns. The achieved separation from the geostationary ring of 500 km, two times the required minimum set by the IADC, was mainly the result of the actual availability of almost all of the additional uncertainty margin fuel reserve, considered in the planning. The achieved orbit ensures therefore an even more effective protection of the geostationary ring, also against particles or fragments generated by a hypothetical break up of the re-orbited satellite. The risks associated with such scenarios were also minimized by the spin rate reduction, obtained performing part of the pulsed orbital burns with a single radial thruster (R2). Pressurant venting operations through the V1 thruster at the end of the maneuver sequence also contributed to reduce the spin rate to a final value of 45 rpm, decreasing the load of the centrifugal forces on the satellite structure by a total of 80%. Considering the record total lifetime of the satellite, surpassing more than three times the 5-year design lifetime, and the sometimes completely new approaches followed to implement the sequence of reorbiting operations, involving innovative spin rate reduction techniques and enhancements of the satellite monitoring and control system, the re-orbiting of Meteosat-5 served as an important experience for the planning of similar future operations for the two remaining Meteosat satellites of the first generation series. Moreover, most of the basic strategy concepts remain valid for the second generation series of satellites. 8 Space Operations Communicator 2007