Sanct Barbara Hydropower Project: Pre-Feasibility Data Report. Tunnelling Contracts Risk Management

Similar documents
Empirical Design in Geotechnical Engineering

Open Pit Rockslide Runout

EOSC433: Geotechnical Engineering Practice & Design

1 of 57 Erik Eberhardt UBC Geological Engineering EOSC 433 (2017) 1. Yes, review of stress and strain but also

Building on Past Experiences Worker Safety

Weak Rock - Controlling Ground Deformations

ROCK MASS CHARACTERISATION IN ENGINEERING PRACTICE

Lecture 2: Site Investigation & Data Confidence

An introduction to the Rock Mass index (RMi) and its applications

Geotechnical data from optical and acoustic televiewer surveys

Estimates of rock mass strength and deformation modulus

Session 3: Geology and Rock Mechanics Fundamentals

Analysis in Geotechnical Engineering

Underground Excavation Design Classification

Estimation of Rock Mass Parameters using Intact Rock Parameters

1 of 46 Erik Eberhardt UBC Geological Engineering ISRM Edition

Table of Contents Development of rock engineering 2 When is a rock engineering design acceptable 3 Rock mass classification

Application of rock mass classification systems as a tool for rock mass strength determination

COMPARING THE RMR, Q, AND RMi CLASSIFICATION SYSTEMS

MEMORANDUM SUBJECT: CERTIFICATE IN ROCK MECHANICS PAPER 1 : THEORY SUBJECT CODE: COMRMC MODERATOR: H YILMAZ EXAMINATION DATE: OCTOBER 2017 TIME:

A brief history of the development of the Hoek-Brown failure criterion

ROCK MASS PROPERTIES FOR TUNNELLING

NEW DEVELOPMENTS FOR THE DESIGN AND CONSTRUCTION OF TUNNELS IN COMPLEX ROCK MASSES

Flin Flon Mining Belt

Excavation method in Goushfill mine

A brief history of the development of the Hoek-Brown failure criterion

BLOCK SIZE AND BLOCK SIZE DISTRIBUTION

Calculation of periodic roof weighting interval in longwall mining using finite element method

10. GEOTECHNICAL EXPLORATION PROGRAM

Quantitative Classification of Rock Mass

Instructional Objectives. Why use mass classification? What is rock mass classification? 3 Pillars of empirical design and rock mass classification

NEW PROPOSED GSI CLASSIFICATION CHARTS FOR WEAK OR COMPLEX ROCK MASSES

Some Aspects on the Design of Near Surface. Tunnels - Theory and Practice. Thomas Marcher¹, Taner Aydogmus²

A PROBABILISTIC APPROACH FOR CHARACTERIZING THE COMPLEX GEOLOGIC ENVIRONMENT FOR DESIGN OF THE NEW METRO DO PORTO

Rock parameters for blasting on the highway Split-Dubrovnik

Huaman A., Cabrera J. and Samaniego A. SRK Consulting (Peru) Introduction ABSTRACT

Influence of Rock Mass Anisotropy on Tunnel Stability

Ground Support in Mining and Underground Construction

Analysis in Geotechnical Engineering

ENGINEERING GEOLOGY AND ROCK ENGINEERING

ON THE FACE STABILITY OF TUNNELS IN WEAK ROCKS

Predicting rock conditions ahead of the face

Kinematic Analysis Underground Wedges

Geotechnical project work flow

Geotechnical Models and Data Confidence in Mining Geotechnical Design

Numerical analysis of K0 to tunnels in rock masses exhibiting strain-softening behaviour (Case study in Sardasht dam tunnel, NW Iran)

In situ fracturing mechanics stress measurements to improve underground quarry stability analyses

LICENTIATE THESIS. Evaluation of rock mass strength criteria. Catrin Edelbro

Stability Analysis of A Railway Trench By Using Stereographical Projection

Correlation of Revised BQ System in China and the International Rock Mass Classification Systems

Flin Flon Mining Belt

Role of the Geotechnical Consultant in Design Build Projects a General Contractors Geotechnical Engineer s Perspective

Application of Core Logging Data to generate a 3D Geotechnical Block Model

Received 9 February 2015; accepted 6 March 2015; published 12 March 2015

Estimation of rock cavability in jointed roof in longwall mining

H.Öztürk & E.Ünal Department of Mining Engineering, Middle East Technical University, Ankara, Turkey

Rock slope rock wedge stability

NNN99. Rock Engineering for the Next Very Large Underground Detector. D. Lee Petersen CNA Consulting Engineers

ROCK MASS CHARATERISATION: A COMPARISON OF THE MRMR AND IRMR CLASSIFICATION SYSTEMS. G P Dyke AngloGold Ashanti 1

SYLLABUS AND REFERENCES FOR THE STRATA CONTROL CERTIFICATE. METALLIFEROUS MINING OPTION Updated November 1998

Three-Dimensional Failure Criteria Based on the Hoek Brown Criterion

Behaviour of Blast-Induced Damaged Zone Around Underground Excavations in Hard Rock Mass Problem statement Objectives

Introduction and Background

7. Foundation and Slope Stability

Uniaxial Compressive Strength Variation for Multi-point Support Design and Discontinuity..

Estimation of support requirement for large diameter ventilation shaft at Chuquicamata underground mine in Chile

1. Rock Mechanics and mining engineering

Influence of foliation on excavation stability at Rampura Agucha underground mine

Collection and use of geological data in rock engineering

GUIDELINES FOR OPEN PIT SLOPE DESIGN EDITORS: JOHN READ, PETER STACEY # & CSIRO. J x PUBLISHING

RMR and SMR as Slope Stability Preliminary Studies of Rajamandala Limestone Mine Area

Rock slope failure along non persistent joints insights from fracture mechanics approach

Correlation between Rock mass rating, Q-system and Rock mass index based on field data

Analysis of Blocky Rock Slopes with Finite Element Shear Strength Reduction Analysis

Rock Material. Chapter 3 ROCK MATERIAL HOMOGENEITY AND INHOMOGENEITY CLASSIFICATION OF ROCK MATERIAL

EXAMINATION PAPER MEMORANDUM

SYLLABUS AND REFERENCES FOR THE STRATA CONTROL CERTIFICATE COAL MINING OPTION

Determination of Rock Mass Behaviour Types - a Case Study

Simple Correlations between Rock Abrasion and Other Significant Rock Properties for Rock Mass and Intact Quartzite

GROUND RESPONSE AND SUPPORT MEASURES FOR PIR PANJAL TUNNEL IN THE HIMALAYAS

Geotechnical Models and Data Confidence in Mining Geotechnical Design

Characterization and engineering properties of tectonically undisturbed but lithologically varied sedimentary rock masses

1 of 64 Erik Eberhardt UBC Geological Engineering EOSC 433 (2017)

MAD345 - Mining II INTRODUCTION. 10 October Hacettepe University. Introduction Prospecting Mining Dilution Resource and Reserve Estimation

A PARAMETER STUDY OF THE DAMAGED ROCK ZONE AROUND SHALLOW TUNNELS IN BRITTLE ROCK MASS

ISRM Congress 2015 Proceedings - Int l Symposium on Rock Mechanics - ISBN:

Deformability Modulus of Jointed Rocks, Limitation of Empirical Methods and Introducing a New Analytical Approach

EOSC Lecture Bibliography

Rock-Quality Study at Tunnel Site in the Kameng Hydro-Electric Project, Bichom, Arunachal Pradesh, India

Geotechnical Monitoring for Safe Excavation of Large Rock Cavern: A Case Study

Open Stoping at Golden Grove Under High Stress Conditions

Role of defects in rock mass classification

Determination of stope geometry in jointed rock mass at Pongkor Underground Gold Mine

Geotechnical & Mining Engineering Services

Practical guidelines for strain burst hazard awareness for development miners

NUMERICAL MODELING OF BRITTLE ROCK FAILURE UNDER DYNAMIC STRESS LOADING. N. Golchinfar and M. Cai

Relationship between RMR b and GSI based on in situ data

Ground vibrations level characterization through the geological strength index (GSI)

Challenges and Innovations in Site investigation, Ground Behaviour Prediction and Risk Assessment for Deep Hard Rock Tunnels

Underground Risk Management Course Marina Del Rey, California November, Geotechnical Data Reports. Greg Raines, PE

Transcription:

EOSC547: Geotechnical Engineering Practice & Design Sanct Barbara Hydropower Project: Pre-Feasibility Data Report 1 of 61 Tunnelling Grad Class (2016/17) Dr. Erik Eberhardt Tunnelling Contracts Risk Management In 1872, armed with the development of new drilling machines and explosives, Swiss engineer Louis Favre undertook to construct, what was once thought of as impossible: the 15 km St. Gotthard tunnel through solid rock to link Zurich with Milan. Competition for the contract was high and Favre agreed to a fixed price of 1,898,845 to complete the works, a figure that allowed for no contingencies whatsoever. Favre also agreed to complete the works in 8 years, for which he put up a 320,000 bond. The contract allowed for a bonus of 200/day for finishing ahead of schedule and a similar penalty for every day late, forfeiting the entire bond if not completed within a year of the scheduled completion date. 2 of 61 Tunnelling Grad Class (2016/17) Dr. Erik Eberhardt 1

Tunnelling Contracts Risk Management For 7 years Favre, continually threatened by the deadline, worked his men without thought for their health or lives. Pressured to the point of desperation, he would spend days on end in the choking atmosphere of the tunnel. Broken physically as well as financially, Favre succumbed in the tunnel to a heart attack, struggling up to his last breath to advance the work. By the time the tunnel was completed (approximately 2 years late), Favre s firm had exceeded the contract price by 590,000 in addition to having forfeited the bond of 300,000. The cost in lives was 310 men, with 877 seriously invalided. 3 of 61 Tunnelling Grad Class (2016/17) Dr. Erik Eberhardt Tunnelling Contracts Construction Delivery Design-Bid-Build (design/tender) Is a project delivery method in which the Owner s engineer carries out the design, which is then put out to bid. In this arrangement, the design team is impartial and looks out for the interests of the Owner. Design-Build Incorporates the contractors means and methods into the design stage, contracted for with a single entity known as the design-builder. This system is used to minimize the project risk for an owner and to reduce the delivery schedule by overlapping the design phase and construction phase of a project. Where the design-builder is the contractor, the design professionals are typically retained directly by the contractor. Build Operate Transfer (BOT) Allows the builder concession to operate and derive revenue over the concession period before transferring it back to the government authority. 4 of 61 Tunnelling Grad Class (2016/17) Dr. Erik Eberhardt 2

Tunnelling Contracts Construction Delivery Public-Private Partnerships (P3s) Describes a venture which is funded and operated through a partnership of government and one or more private sector companies. Typically, a private sector consortium is contracted to develop, build, maintain and operate the asset for a given period. The public sector usually retains ownership of the facility. Government takes on a role of actively controlling some of the risks with involvement of statutory authorities who eventually take operational control. Early tunnels were financed by individuals/private investors. As countries became industrialized, projects were paid for by taxation. However, governments found taxation to be inadequate for the huge infrastructure needs and project financing became a mix of private investment and public financing. 5 of 61 Tunnelling Grad Class (2016/17) Dr. Erik Eberhardt Geotechnical Reporting Hoek (2012) Geological Data Report - compilation of all of the results of the site investigation process. - generally restricted to factual information and does not include very much interpretation. - contractor is left to assess the factual information and draw conclusions on the probable groundwater and rock mass behaviour; tasks that may be very difficult to accommodate during the bidding process. Geotechnical Baseline Report - interpretative report in which all the factual data collected during the site investigation stages are analysed in terms of potential groundwater and rock mass behaviour and other issues that could cause problems during construction. - interpretations form a behavioural baseline which can be used in setting contractual limits. - contractor cannot make claims for ground behaviour which falls at or above the baseline while the owner has to accept responsibility for problems resulting from rock mass behaviour which is worse than that predicted in the baseline report. 6 of 61 Tunnelling Grad Class (2016/17) Dr. Erik Eberhardt 3

Geotechnical Baseline Reports Geotechnical Baseline Reports (GBRs) are charged with portraying a realistic interpretation of the subsurface conditions that are anticipated in the proposed construction. They should include not only the mean conditions of ground behaviour and groundwater conditions anticipated, but the report should also address the range of variances that is expected. - Aims to establish a contractual understanding of the subsurface site conditions. - Risks associated with conditions consistent with or less adverse than the baseline are allocated to the contractor and those significantly more adverse than the baseline are accepted by the owner. Thus, the purpose of the GBR is to establish a realistic, common basis for evaluating any contractor claims for differing site conditions that develop during construction. The GBR is the basis for equitable contractual risk sharing and risk allocation between the project owner and their selected contractor. 7 of 61 Tunnelling Grad Class (2016/17) Dr. Erik Eberhardt Costing Stages Scoping study (± 30 to 50% accuracy) Consider past experience and similar facilities. Estimate an excavation cost and support cost. Pre-feasibility study (± 20 to 25% accuracy) General layout is needed. Ground conditions evaluated. Excavation technique outlined (consider overbreak). Total support (bolts, liners etc) considered. Feasibility study (± 10 to 20% accuracy) Detailed design needed. Excavation sequence detailed including ventilation, temporary and permanent support. Prepare QA systems. Critical path schedule. Personnel requirement and costs. Consumables and services provisions (temporary pumping). Project safety. 8 of 61 Tunnelling Grad Class (2016/17) Dr. Erik Eberhardt 4

Uncertainty in Ground Characterization Investigation Monitoring Increasing level of geological knowledge and confidence therein JORC Inferred Indicated Measured Geotechnical Model Assumed Substantiated Measured Behaviour Model Hypothesized Simulated Observed 9 of 61 Tunnelling Grad Class (2016/17) Dr. Erik Eberhardt Project Deliverables You are requested to assist in the preparation of a Geotechnical Baseline Report (GBR) and pre-feasibility design, providing the following components: 1. To review the Geotechnical Data Report and advise with respect to the designation of geotechnical domains, providing both Mohr-Coulomb and Hoek-Brown rock mass properties for each of the geotechnical domains defined. 2. To advise the Design Team in assessing the potential for squeezing ground and provide guidance with the preliminary design of tunnel support where severe squeezing is expected. 3. To advise the Design Team in assessing the potential for spalling and rock bursting, and to provide guidance with the preliminary design of tunnel support where severe brittle failure is expected. 10 of 61 Tunnelling Grad Class (2016/17) Dr. Erik Eberhardt 5

Site Investigation: Boreholes 11 of 61 Tunnelling Grad Class (2016/17) Dr. Erik Eberhardt Site Investigation: Simply Drilling Boreholes? 12 of 61 Tunnelling Grad Class (2016/17) Dr. Erik Eberhardt 6

Site Investigation: Simply Drilling Boreholes? 13 of 61 Tunnelling Grad Class (2016/17) Dr. Erik Eberhardt Laboratory Testing of Rock/Soil Behaviour Granite Limestone Shale 14 of 61 Tunnelling Grad Class (2016/17) Dr. Erik Eberhardt 7

Rock/Soil Behaviour Scale Effects 15 of 61 Tunnelling Grad Class (2016/17) Dr. Erik Eberhardt General Data Requirements Data should be measured and recorded in systematic ways using standardized procedures. Much time and effort can be wasted by collecting data which may be irrelevant or inadequate. The nature of the data will also become more specialized as measurements transition from surface boreholes to construction. The quality of the data is critical to the reliability of the interpretation...... POOR QUALITY OR INACCURATE DATA CAN BE MISLEADING AND IS WORSE THAN NO DATA. 16 of 61 Tunnelling Grad Class (2016/17) Dr. Erik Eberhardt 8

Borehole Imaging and Characterisation Type Advantages Disadvantages Acoustic Televiewer Optical Televiewer Provides a continuous record of borehole wall (3-D virtual core); provides high accuracy and confidence in data; can be used in highly fractured rock. Provides a continuous record of borehole wall (3-D virtual core); provides high accuracy and confidence in data; can be used in highly fractured rock. Requires a stable borehole; requires water or mud in borehole to operate. Requires a stable borehole; requires air or clear water to operate. Eberhardt & Stead (2011) 17 of 61 Tunnelling Grad Class (2016/17) Dr. Erik Eberhardt Borehole Imaging and Characterisation Televiewers are chosen for: Defining dip, dip-direction and aperture of fractures, bedding and contacts Obtaining critical information from areas with missing core or low core recovery (low RQD) Detailing fracture and fault zones regarding depth, size, frequency and attitude Depicting the in-situ stress field orientation Willenberg et al. (2008) 18 of 61 Tunnelling Grad Class (2016/17) Dr. Erik Eberhardt 9

Limitations of Borehole Drilling 19 of 61 Tunnelling Grad Class (2016/17) Dr. Erik Eberhardt Spacing & Persistence spacing persistence rock bridge increasing persistence 20 of 61 Tunnelling Grad Class (2016/17) Dr. Erik Eberhardt 10

Surface Mapping 21 of 61 Tunnelling Grad Class (2016/17) Dr. Erik Eberhardt Surface Mapping - Limitations 22 of 61 Tunnelling Grad Class (2016/17) Dr. Erik Eberhardt 11

Rock Mass Classification: RMR The Rock Mass Rating (RMR) system was developed in 1973 in South Africa by Prof. Z.T. Bieniawski. The advantage of his system was that only a few basic parameters relating to the geometry and mechanical conditions of the rock mass were required. Rating adjustments are included to account for the adverse nature discontinuity angles may have with respect to the excavation or slope direction. Bieniawski (1989) 23 of 61 Tunnelling Grad Class (2016/17) Dr. Erik Eberhardt Rock Mass Classification: Q-System The Q-system of rock mass classification was developed in 1974 in Norway by Prof. N. Barton. The system was proposed on the basis of an analysis of 212 tunnel case histories from Scandinavia. the motivation of presenting the Q-value in this form is to provide some method of interpretation for the 3 constituent quotients. 24 of 61 Tunnelling Grad Class (2016/17) Dr. Erik Eberhardt 12

Rock Mass Classification: Q-System The first quotient is related to the rock mass geometry. Since RQD generally increases with decreasing number of discontinuity sets, the numerator and denominator of the quotient mutually reinforce one another. The second quotient relates to inter-block shear strength with high values representing better mechanical quality of the rock mass. The third quotient is an environment factor incorporating water pressures and flows, the presence of shear zones, squeezing and swelling rocks and the in situ stress state. The quotient increases with decreasing water pressure and favourable in situ stress ratios. 25 of 61 Tunnelling Grad Class (2016/17) Dr. Erik Eberhardt Rock Mass Classification Examples blocky rock low stress regime minimal but systematic ground support RMR = 70 (good rock) Q = 15 (good rock) Courtesy - Golder Associates 26 of 61 Tunnelling Grad Class (2016/17) Dr. Erik Eberhardt 13

Rock Mass Classification Examples blocky rock high stress regime RMR = 40 (poor to fair rock) Q = 0.8 (very poor rock) Courtesy - Golder Associates 27 of 61 Tunnelling Grad Class (2016/17) Dr. Erik Eberhardt Application of Classification Systems Both of the classification systems described were developed for estimating the support necessary for tunnels excavated for civil engineering schemes.for example, the database for the RMR has involved over 351 case histories throughout its development. Bieniawski (1989) 28 of 61 Tunnelling Grad Class (2016/17) Dr. Erik Eberhardt 14

Experience-Based Design: Empirical Approaches 38 different support categories have been suggested by Barton (1974) based on the relationship between the Q index and the equivalent dimension of the excavation. 29 of 61 Tunnelling Grad Class (2016/17) Dr. Erik Eberhardt Experience-Based Design: Empirical Approaches Kaiser et al. (2000) 30 of 61 Tunnelling Grad Class (2016/17) Dr. Erik Eberhardt 15

Subjectivity in Empirical Design - Undersampling It must be remembered though, that such guidelines are drawn from previous experiences (i.e. case histories) and are therefore limited by the range of conditions under which these experiences were generated. Bieniawski (1989) 31 of 61 Tunnelling Grad Class (2016/17) Dr. Erik Eberhardt Rock Mass Characterization vs. Classification 32 of 61 Tunnelling Grad Class (2016/17) Dr. Erik Eberhardt 16

Rock Mass Properties - Strength Remember!! we re now talking about rock mass failure, not structurally controlled failures. Wyllie & Mah (2004) 33 of 61 Tunnelling Grad Class (2016/17) Dr. Erik Eberhardt Mohr-Coulomb Failure Criterion The Mohr-Coulomb failure criterion expresses the relationship between the shear stress and the normal stress at failure along a shear surface. Hudson & Harrison (1997) 34 of 61 Tunnelling Grad Class (2016/17) Dr. Erik Eberhardt 17

Problems with Mohr-Coulomb Although the Mohr-Coulomb failure criterion remains one of the most commonly applied failure criterion, and is especially significant and valid for discontinuities and discontinuous rock masses, several key limitations apply to rock slope stability analyses. linear non-linear Non-linear failure envelopes. Scale effects. 35 of 61 Tunnelling Grad Class (2016/17) Dr. Erik Eberhardt Hoek-Brown Failure Criterion Generalized Hoek-Brown failure criterion: 1 Intact rock strength: m = lab-determined s = 1 Hoek et al. (1995) m & s are derived from empirical charts that are related to rock mass quality c Rock mass strength 3 m ~ Friction s~ Cohesion 36 of 61 Tunnelling Grad Class (2016/17) Dr. Erik Eberhardt 18

Rock Mass Properties - Strength Mohr-Coulomb Generalized Hoek-Brown 37 of 61 Tunnelling Grad Class (2016/17) Dr. Erik Eberhardt Hoek-Brown Failure Criterion 1 Intact rock strength: mi = lab-determined s = 1 c 3 Hoek & Brown (1997) 38 of 61 Tunnelling Grad Class (2016/17) Dr. Erik Eberhardt 19

Geological Strength Index (GSI) The GSI provides a system for estimating the reduction in rock mass strength for different geological conditions. Values of GSI are related to both the degree of fracturing and the condition of the fracture surfaces. mainly jointing mainly faulting 39 of 61 Tunnelling Grad Class (2016/17) Dr. Erik Eberhardt GSI (for those familiar with rock mass classification) Bieniawski (1989) Not a rock mass characteristic! For RMR 89 * > 23: GSI = RMR 89 * -5 Hoek et al. (1995) Where For RMR 89 * < 23: GSI = 9 Log e Q + 44 Note that the Q-system quotient terms Jw/SRF are dropped as these, likewise, are not rock mass characteristics! 40 of 61 Tunnelling Grad Class (2016/17) Dr. Erik Eberhardt 20

Hoek-Brown Simplified Procedure A simplified procedure to determine the Hoek-Brown rock mass strength parameters: First, calculate m b : 41 of 61 Tunnelling Grad Class (2016/17) Dr. Erik Eberhardt Hoek-Brown Failure Criterion for GSI >25: 1 Intact rock strength: mi = lab-determined s = 1 for GSI <25: c Rock mass strength: mb = rock mass adjusted s = <1 (rock mass varied) 3 s is a rock mass constant based on how fractured the rock mass is (where s=1 for intact rock). 42 of 61 Tunnelling Grad Class (2016/17) Dr. Erik Eberhardt 21

GSI Disturbance Factor Wyllie & Mah (2004) A disturbance factor, D, may also be applied to the Hoek-Brown parameters to account for the degree to which a rock mass may have been subjected to blast damage and stress relaxation. disturbance factor 43 of 61 Tunnelling Grad Class (2016/17) Dr. Erik Eberhardt Hoek-Brown & GSI Systems Hoek et al. (2013) 44 of 61 Tunnelling Grad Class (2016/17) Dr. Erik Eberhardt 22

GSI, Hoek-Brown & Mohr-Coulomb Where Mohr-Coulomb properties are required (or preferred because we have more experience and an intuitive feel for c and ), these can be derived by fitting a linear failure envelope across the non-linear H-B envelope: 45 of 61 Tunnelling Grad Class (2016/17) Dr. Erik Eberhardt GSI, Hoek-Brown & Mohr-Coulomb Where Mohr-Coulomb properties are required (or preferred because we have more experience and an intuitive feel for c and ), these can be derived by fitting a linear failure envelope across the non-linear H-B envelope: Note change in sig3max for increased slope height, and corresponding change in fit of linear M-C envelope. 46 of 61 Tunnelling Grad Class (2016/17) Dr. Erik Eberhardt 23

Rock Mass Characterization & Design 47 of 61 Tunnelling Grad Class (2016/17) Dr. Erik Eberhardt Applicability of the GSI? Hoek s GSI Classification rock mass ground response intact rock fractured rock foliated rock 48 of 61 Tunnelling Grad Class (2016/17) Dr. Erik Eberhardt 24

Empirical & Analytical Design 49 of 61 Tunnelling Grad Class (2016/17) Dr. Erik Eberhardt Lecture References Barton, N (1974). Engineering classification of rock masses for the design of tunnel support. Rock Mechanics 6(4): 189-236. Bieniawski, ZT (1974). Geomechanics classification of rock masses and its application in tunnelling. In Proceedings of the Congress of the International Society for Rock Mechanics, Denver. National Academy of Sciences: Washington, pp. 27-32. Bieniawski, ZT (1989). Engineering Rock Mass Classifications: A Complete Manual for Engineers and Geologists in Mining, Civil, and Petroleum Engineering. Wiley: New York. Hoek, E & Brown, ET (1980). Underground Excavations in Rock. Institution of Mining and Metallurgy: London. Hoek, E, Kaiser, PK & Bawden, WF (1995). Support of Underground Excavations in Hard Rock. Balkema: Rotterdam. Eberhardt, E & Stead, D (2011). Geotechnical Instrumentation. In SME Mining Engineering Handbook (3rd Edition). Edited by P. Darling, Society for Mining, Metallurgy & Exploration, vol. 1, pp. 551-572. Gaich, A, Pötsch, M & Schubert, W (2006). Basics and application of 3D imaging systems with conventional and high-resolution cameras. In Tonon & Kottenstette (eds.), Laser and Photogrammetric Methods for Rock Face Characterization Workshop, Golden, pp. 33-48. Hoek, E, Carter, TG & Diederichs, MS (2013). Quantification of the Geological Strength Index Chart. In 47th US Rock Mechanics/Geomechanics Symposium, San Francisco, ARMA 13-672. 50 of 61 Tunnelling Grad Class (2016/17) Dr. Erik Eberhardt 25

Lecture References Hudson, JA & Harrison, JP (1997). Engineering Rock Mechanics An Introduction to the Principles. Elsevier Science: Oxford. Kaiser, PK, Diederichs, MS, Martin, D, Sharpe, J & Steiner, W (2000). Underground works in hard rock tunnelling and mining. In Proceedings, GeoEng2000, Melbourne. Technomic Publishing: Lancaster, pp. 841-926. Willenberg, H, Loew, S, Eberhardt, E, Evans, KF, Spillmann, T, Heincke, B, Maurer, H & Green, AG (2008). Internal structure and deformation of an unstable crystalline rock mass above Randa (Switzerland): Part I - Internal structure from integrated geological and geophysical investigations. Engineering Geology 101(1-2): 1-32. Wyllie, DC & Mah, CW (2004). Rock Slope Engineering (4 th edition). Spon Press: London. 51 of 61 Tunnelling Grad Class (2016/17) Dr. Erik Eberhardt 26