For personal use only

Similar documents
SESE MEASURED RESOURCE EXCEEDS 650MT COAL

KATINGAN RIA COAL RESOURCE UPGRADE

VISTA COAL PROJECT RESOURCE INCREASES BY 297.1MT TOTAL COAL RESOURCE INCREASES TO 1.37BT

For personal use only

For personal use only

For personal use only

MAIDEN JORC RESOURCE CONFIRMS SIGNIFICANT COAL DEPOSIT AT MARIOLA COAL PROJECT, POLAND

For personal use only

Ovoot Coking Coal Project (100%)

For personal use only

African Energy Resources Limited

JV PROJECT UPDATE JORC COAL RESOURCE

STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE AT SYNDICATED S 100% BARBARA SOUTH LODE

ASX/MEDIA RELEASE 25 November EMERGENT CONFIRMS MAJOR JORC RESOURCE UPGRADE TO 561Mt FROM PREVIOUS 127Mt AT BEYONDIE IRON PROJECT

ASX RELEASE REVIEW OF GLANDORE DATA TO DEFINE DRILL PROGRAM

SECOND ADVANCED GOLD PROJECT IDENTIFIED AT THREE RIVERS PROJECT

For personal use only

For personal use only

New Drilling Program Commences at Mutiny s Deflector Deposit

STRONG GOLD IN SOIL ANOMALY OUTLINED AT MARY HARRISON PROJECT HIGHLIGHTS

For personal use only

Helix Resources Limited A.C.N Incorporated in Western Australia

Acquisition agreement to move to 100% ownership of the Ashford Coking Coal Project

Nimrodel Resources Limited Takatokwane Project Resource Estimation J_1265

P ROJ EC T UPDATE PANDA HILL NIOBIUM PROJ ECT

For personal use only

Trouser Legs Mine Strong Drilling Results - including g/t Au Potential for Further Mine Development

8.1Mt Maiden JORC Coal Resource estimate at Titiribi Project

NCONDEZI COAL COMPANY LTD ("Ncondezi" or the "Company") Ncondezi Project South Block Resource Update

ASX RELEASE / MEDIA RELEASE 2,810 ppb gold in shallow auger samples Four new parallel zones defined up to 1500m in strike

For personal use only

Ausgold awarded EIS grant for Jinkas deep drilling

New High Grade Gold-Copper Extensions At Mutiny s Deflector Deposit Highlight Project s Significant Growth Potential

Mt Cannindah IP Data Reprocessing & 3D Geological Modelling Identifies Potential Resource Extensions

For personal use only

Additional Significant Gold Intercepts Obtained in Sweden

High Grade Gold Intercepts at Bangaba

Diversification into the exciting South Africa Platinum Industry

Deep Yellow Revises Resource Estimate at INCA Uranium Deposit in Namibia

COMPLETION OF PHASE 1 DRILLING AT TITIRIBI PROJECT IDENTIFIES ADDITIONAL SIGNIFICANT COAL INTERCEPTS

ASX Release and Media Announcement 27 September Central Eyre Iron Project 2011 Stage VI Drilling Programme Completion

Annual Report Amended Additional Information

INFERRED MINERAL RESOURCE AND CONCEPTUAL EXPLORATION TARGET UPDATE Mt FORREST IRON

For personal use only

704,000 OUNCE MIYABI GOLD PROJECT UPDATE

For personal use only

TANDARRA GOLD PROJECT DRILLING COMMENCES AND FOUR EAGLES GOLD PROJECT DRILLING UPDATE

24 October Dear Shareholders, 2014 ANNUAL REPORT

RC DRILLING TO RESUME THIS WEEK AT CARLISLE REEFS

For personal use only

Drilling program commences on Cloncurry and Mount Isa projects

QUEEN SHEBA - RESOURCE TABLE: AUGUST 2011 RESOURCE CATEGORY. Tonnes Au Ag Cu (000) g/t g/t % GLOBAL RESOURCE TABLE: CONTAINED METAL

High Grade Gold Drill Results Extend Buccaneer

Sepola Project Area in Mali Extended

$2.5 Million Resource Drilling Program Commences at Siberia Mining Centre

For personal use only

Auger Drilling Progress Report - Moktedu Trend Prospect 5km Gold Trend Confirmed Along Strike from 3.5Moz Deposit

TWO HIGH-GRADE GOLD ZONES DISCOVERED AT HERMES GOLD PROJECT

SHAY GAP DETRITAL IRON ORE PROJECT RECONNAISSANCE SAMPLING SHOWS HIGHGRADE POTENTIAL

COKAL CONFIRMS PREMIUM QUALITY METALLURGICAL COAL AT BUMI BARITO MINERAL PROJECT (BBM)

Norwest successfully lists on ASX, Drilling commenced at Warriedar Gold Project

ASX Release. 14 th September Corporate Update Divestment of Gold, Copper and Nickel Projects

Savannah Resources Plc

CANYON TO ACQUIRE TWO GOLD PROJECTS IN BURKINA FASO Highlights

For personal use only


ASX ANNOUNCEMENT 21 MARCH 2011

Co-O MINE MINERAL RESOURCE UPDATE

The Manager Companies ASX Limited 20 Bridge Street

Haoma Mining NL DALTONS-MT WEBBER DEPOSIT; UPGRADE TO INDICATED RESOURCE CATEGORY FOR MAIN SOUTHERN ZONE

The Company was admitted to the Official List on 12 November 2010 and its shares commenced trading

New High Grade Lode Discovered at Wagtail South

For personal use only

MAIDEN URANIUM RESOURCE PROOF OF CONCEPT

More High Grade Gold Intercepts from the Netiana Lodes at Balogo, Burkina Faso

Auger Drilling Progress Report - Meguet Trend Prospect Multiple Highly Anomalous Gold Discoveries within 8km Mineralised Corridor

For personal use only

76,000 Ounce Gold Resource at Akoko North

A1 GOLD MINE 14 LEVEL STOCK WORKS TARGET FURTHER HIGH GRADE DRILL INTERCEPTS

For personal use only

For personal use only

New Zone of High Grade Gold Mineralisation Discovered at Balogo, Burkina Faso

For personal use only

JORC COAL RESOURCE MILESTONE

2017 as at 30 June 2017 Project Tonnes HM HM SL OS HM Assemblage Tonnes HM HM SL OS HM Assemblage

GEOPACIFIC REPORTS HIGH GOLD VALUES IN AUGER SOIL SAMPLES FROM THE QALAU AND TATAIYA PROSPECTS, RAKI RAKI PROJECT,

For personal use only

Bass Metals records further positive drill results & progress at 3 prospects.

NEW ZINC/LEAD/COPPER ANOMALY DELINEATED NE OF KIHABE DEPOSIT

FIVE RIGS DRILLING AT KARLAWINDA

Additional significant gold and copper intercepts obtained in Sweden

LATEST DRILL RESULTS REVEALS MINERALISATION OPEN AT STRIKE AND DEPTH AT KATANNING GOLD DEPOSIT

60% upgrade of Flying Doctor Resource to 104,600 tonnes of contained zinc and lead.

Malachite Resources Limited ABN

ROE HILLS COBALT AND GOLD DRILLING ADVANCES

ASX Announcement 24 December Drilling results confirm depth potential of Lamboo Project

For personal use only

For personal use only

Carrapateena Mineral Resources Explanatory Notes April OZ Minerals Limited. Carrapateena Mineral Resources Statement April

EXCELLENT FIRST DRILL RESULTS FROM WELD RANGE

Transcription:

ASX ANNOUNCEMENT 13 August 2012 INFERRED RESOURCE UPGRADE AT TAKATOKWANE IN BOTSWANA 2.6 BILLION TONNES ADDITIONAL INFERRED RESOURCE DEFINED Key Points: 2.6 Billion Tonnes classified over the initial Phase 1 target area of Takatokwane South Consolidated of 6.9 Billion Tonnes at Takatokwane Project Coal washability tests confirm potential for suitable thermal coal export product from Takatokwane Phase 2 drilling to define Indicated completed, awaiting washability results Drilling confirms shallow coal seams suitable for open cast mine development Nimrodel s Limited (ASX: NMR) is pleased to announce the inclusion of 2.6 billion tonnes of classification at Takatokwane South in the Kweneng district of Botswana. This classification is at the Takatokwane South tenements (NMR earning 65%) in a zone previously identified as containing shallow coal with lower sulphur and is contiguous with, and in addition to, the previously announced 4.2 billion tonnes classified as s at the adjacent Takatokwane licence (NMR 70%). (Refer to Figure 1) Commenting on the release of the 2.6 billion tonne inferred resource at Takatokwane South, Nimrodel s Managing Director Allan Mulligan said: This combined shallow resource of 6.9 billion tonnes at Takatokwane and the amenability of the deposit to be upgraded to export quality thermal coal, places Nimrodel as the leading coal asset holder in the emerging Botswana coal industry. INFERRED RESOURCE UPGRADE AT TAKATOKWANE IN BOTSWANA 1

Background: Nimrodel s Limited (ASX: NMR) is exploring at the Takatokwane coal deposit in the Kweneng District of Botswana. Nimrodel is currently the operator of two Joint Ventures on contiguous lease areas, PL35/2007 (NMR 70%) and PL 159/2009 (NMR earning 65%). In 2011, Nimrodel announced an at PL35/2007 of 4.2 billion tonnes of raw thermal coal. Nimrodel has subsequently completed a drill program on PL 159/2009 on that portion of PL 159/2009 where the coal intervals are closest to the surface and have lower sulphur content (Refer Figure 2). This drilling has resulted in defining an additional 2.6 billion tonnes of coal. Figure 1. Plan showing drilling on two tenements at Takatokwane Project. The resource was calculated using six cored drill holes spaced about 4km apart and covering an area of 75km². definition was calculated by independent resource consultant Analytika Holdings in Botswana. Coal analysis and washability test work was carried out by Advanced Coal Technology in Johannesburg. INFERRED RESOURCE UPGRADE AT TAKATOKWANE IN BOTSWANA 2

Definition: Table 1. Summary of Coal within Takatokwane South PL159/2009 Seam Density (t/m3) Raw Coal S CV Moisture (MJ/kg) Yield Float 1.7 SG Coal S CV (MJ/kg) 1 241 1.79 35.5 3.19 16.3 7.9 45.0 108 22.9 3.46 20.6 2 1,887 1.79 38.9 1.89 15.2 7.2 45.2 852 20.2 1.45 21.2 3 256 1.81 40.8 2.24 14.8 6.7 47.4 121 21.1 2.25 21.9 4 84 1.83 41.6 1.04 14.1 7.5 59.7 50 19.9 0.60 21.0 5 186 1.90 44.9 1.18 13.6 5.6 48.8 91 19.5 0.42 21.3 Total 2,654 1.80 39.0 1.97 15.2 7.2 46.1 1,223 20.5 1.59 21.2 The calculated from within PL 159/2009 represents only a small portion of the area under exploration licence. This area was selected as that most amenable to form the technical basis of a start-up mining operation. The combined at the Takatokwane Project is now the largest reported in Botswana. Table 2. Summary of Total Coal for Takatokwane Project Seam Density (t/m3) Raw Coal S CV Moisture (MJ/kg) Tenement Holding Float Yield Washed s S CV (MJ/kg) Total 6,884 1.71 34.9 2.48 16.7 8.0 PL 35/2007 1.6 57.0 2,395 16.5 1.69 23.0 PL 159/2009 1.7 46.1 1,223 20.5 1.59 21.2 Nimrodel has just completed a program of closer spaced infill drilling that will result in a further resource upgrade. The 1km x 1km spacing is sufficient to categorize coal resources at an Indicated standard. Phase 2 drilling was designed to increase the confidence levels of the resource and to outline an initial target of 200 300 Mt of the overall 6.9 Bt. INFERRED RESOURCE UPGRADE AT TAKATOKWANE IN BOTSWANA 3

Coal Quality: Basic coal quality tests indicate that the coal delineated by the inferred resource for PL 159/2009 can be upgraded to a calorific value of 21.2 MJ/kg which represents feedstock quality for most coal fuelled power stations in southern Africa and Asia. As yet no optimisation test work has been carried out for targeted CV s or for targeted sulphur levels. Figure 2. Zone of low sulphur in shallower areas of PL 035/2007 and PL 159/2009 Seam Depth: Nimrodel s focus at this stage is on a staged program to quantify shallow and accessible coal for further targeted study work. Seam 2, the widest seam of the 5 seam package at Takatokwane, indicates top of seam elevations from 66m on PL 159/2009 and 70m on PL 035/2007 with average thicknesses of 14m and 19m respectively in these target areas. These seam widths and relatively shallow depths should be suitable for open cut mining operations and will form the technical basis for further studies for a start-up mining operation. Allan Mulligan Managing Director Nimrodel s INFERRED RESOURCE UPGRADE AT TAKATOKWANE IN BOTSWANA 4

About Nimrodel s Perth-based Nimrodel s (ASX: NMR) is a mineral exploration company with exploration projects in Africa and Australia. Nimrodel s current focus is on two adjacent thermal coal projects in Botswana, Takatokwane and Takatokwane South, located approximately 195km west of the capital Gaborone, in Botswana. In November 2011, the Company announced a maiden of 4.2 Bt of thermal coal at a 57% yield giving a washed resource of 2.4 Bt (1.6 SG, washed coal). The Takatokwane Project consists of five tenements: PL35/2007, PL157/2009, PL159/2009, PL160/2009 and PL161/2009. PL35/2007 is 100% held by Wizard Investments and Nimrodel owns 70% of Wizard while the other four tenements are 100% owned by Triprop Energy Pty Ltd. Nimrodel has a 20% interest and is earning 65% of Triprop by completing a two-phase drilling program and scoping study prior to October 2014. Nimrodel s other projects include the Lindi and Makete projects in Tanzania, and three Australian projects Specimen Reef and Avoca in Tasmania; and Buckaroo in New South Wales. Details of Nimrodel s projects are available at the Company s website, Competent Person Mr Alan Golding The information in this announcement that relates to exploration results at Takatokwane South is based on data compiled by Mr Alan Golding who is a member of the South African Geological Society, the South African Institute of Engineering Geologists and a Fellow of the Geological Society of London. Mr Golding has sufficient experience relevant to the style of mineralisation and the type of deposit under consideration to qualify as a competent person as defined in the 2004 edition of the Australasian Code for the Reporting of Exploration Results, Mineral s and Ore Reserves. Mr Golding consents to the inclusion in this announcement of the matters based on his information in the form and context in which they appear. Competent Person Dr Ian D. Blayden Information in this announcement above relating to Coal s at Takatokwane is based on information compiled by Dr Ian D. Blayden of Geological and Management s Pty Ltd which provides geological consulting services to Optiro Pty Ltd. Dr Blayden is a Member of the Australasian Institute of Mining and Metallurgy and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined by the 2004 edition of the Australasian Code for Reporting of Exploration Results, Mineral s and Ore Reserves. Dr Blayden consents to the inclusion in the document of the information in the form and context in which it appears. INFERRED RESOURCE UPGRADE AT TAKATOKWANE IN BOTSWANA 5