I-10 East at Redd closes for 24 hours this Sunday, Feb 11. Then, I-10 West at Resler closes for 27 hours on Feb 25

Similar documents
The Sunland Park flyover ramp is set to close the week of March 19 until early summer

TRAFFIC ALERT FOR WEEK OF February 4 8, 2008

Septem ber 28, 2016 EL PASO, Texas

SHORT NIGHTTIME WATER SHUTDOWN TO OCCUR IN EARLY HOURS OF MAY 29

West Tennessee Construction June 14-21, 2017

Welcome to the Business Owner Task Force. Selma Stockstill SouthGate Constructors Public Information Manager

Monroe County: Key West and Lower Keys

Parking Regulations Dundas Street West, from Bathurst Street to Dovercourt Road

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP)

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP)

A Study of Red Light Cameras in Kansas City, MO

OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS 4/22/2019 4:20:05 AM

Table of Contents Introduction... 4 Study Area... 5

Market Street PDP. Nassau County, Florida. Transportation Impact Analysis. VHB/Vanasse Hangen Brustlin, Inc. Nassau County Growth Management

OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS 4/1/ :20:07 PM

Focused Traffic Analysis for the One Lincoln Park Project

OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS 4/24/2019 5:16:03 PM

CITY OF MINOT SNOW REMOVAL PLAN October 2018

WEBER ROAD RESIDENTIAL DEVELOPMENT Single Family Residential Project

WOODRUFF ROAD CORRIDOR ORIGIN-DESTINATION ANALYSIS

FY 2010 Continuing i Planning Program Product Report. Local Transportation and Traffic Data. Wood-Washington-Wirt Interstate Planning Commission

COUNCIL POLICY MANUAL

CITY OF MINOT SNOW REMOVAL PLAN November 2017

FINAL Traffic Report for the Proposed Golden Valley Road and Newhall Ranch Road Projects in the City of Santa Clarita, California May 5, 2005

TRAFFIC IMPACT STUDY. Platte Canyon Villas Arapahoe County, Colorado (Arapahoe County Case Number: Z16-001) For

SNOW CONTROL OPERATIONS

VHD Daily Totals. Population 14.5% change. VMT Daily Totals Suffolk 24-hour VMT. 49.3% change. 14.4% change VMT

CHAPTER 3 TRANSPORTATION

6711 LEE HIGHWAY TRAFFIC IMPACT STUDY ARLINGTON, VIRGINIA

TMRC 2016 The 27th Magnetic Recording Conference

TMRC 2016 The 27th Magnetic Recording Conference

Traffic Impact Study

I-95/I-85 INTERCHANGE ROADWAY SAFETY ASSESSMENT

April 10, Mr. Curt Van De Walle, City Manager City of Castle Hills 209 Lemonwood Drive Castle Hills, Texas 78213

MEMORANDUM. The study area of the analysis was discussed with City staff and includes the following intersections:

Trip and Parking Generation Study of Orem Fitness Center-Abstract

AASHTO Committee on Maintenance 2018 Annual Meeting July 25, Hurricane Irma- Preparation and Response

Project Level Traffic Forecast Report Business 40 Reconstruction Study Forsyth County

Public Open House Meeting Thursday, February 22, Broken Arrow to Tulsa Mass Transit Feasibility Study

APPENDIX IV MODELLING

541/542 Redmond/Overlake University District

FINAL REPORT. City of Toronto. Contract Project No: B

Subject: Desert Palisades Specific Plan - Tram Way Access Sight Distance

Per your request and authorization, we have prepared this traffic evaluation for the above referenced project.

MAY 5, Noise Barrier Presentation SE Quadrant Noyes Street and Lincoln Street NOISE BARRIER ABUTTER MEETING. Tech Environmental, Inc.

TOWN OF WINDSOR SNOW CONTROL PLAN

Road Controlling Authorities Forum 27 th April Network resilience: update on opening the Gorge

South Western Region Travel Time Monitoring Program Congestion Management Process Spring 2008 Report

Best Practices and Techniques for Clearing Intersection Layouts

Town of Oconomowoc Snow & Ice Control Policy

MODELING FOR FLEXIBILITY AND CONSISTENCY: AN INTEGRATION CAPABILITY FOR MESOSCOPIC DTA AND MICROSCOPIC TRAFFIC SIMULATION MODELS

CVS Derwood. Local Area Transportation Review

2011 South Western Region Travel Time Monitoring Program Congestion Management Process. Executive Summary

OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS 4/13/2019 2:54:03 PM

Appendix BAL Baltimore, Maryland 2003 Annual Report on Freeway Mobility and Reliability

SNOW CONTROL OPERATIONS 2017 PUBLIC SERVICES DEPARTMENT MAINTENANCE DIVISION

OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS 4/8/ :16:05 PM

CITY OF MINOT SNOW REMOVAL PLAN JANUARY 2015

6 th Line Municipal Class Environmental Assessment

PLAZA MEXICO RESIDENCES

US 169/I-70 North Loop Planning & Environmental Linkages Study

City of Laramie, Wyoming SNOW AND ICE POLICY

City of Camrose Winter Road Maintenance Policy

Tier 2 Final Environmental Assessment I-66 Transportation Technical Report. Appendix E. Travel Demand Forecasting Model Validation Memorandum

1600 Prairie Drive , FAX

DISTRICT ATLANTA 3004 BOWIE US STP 2012(053) $ 4,495, NO AWARD

Prepared for. 3D/International, Inc West Loop South, Suite 400 Houston, Texas November 2006

PW 001 SNOW REMOVAL AND SANDING FOR ROADWAYS AND SIDEWALKS October 6, 2014 (#223-14) Original October 19, 2015; October 15, 2018 Public Works

Appendixx C Travel Demand Model Development and Forecasting Lubbock Outer Route Study June 2014

Epic Roanoke, Blacksburg snow day halts work, spurs play

CONTINUING PLANNING PROGRAM LOCAL TRANSPORTATION AND TRAFFIC DATA PRODUCT REPORT [OH Corridors]

HALFF 16196? TRAFFIC MANAGEMENT PLAN. Richardson ISD Aikin Elementary School Dallas, Texas North Bowser Road Richardson, Texas 75081

III. FORECASTED GROWTH

CAMPUS SNOW REMOVAL DARRIN BEAR EDSON AND CREW

TRANSPORTATION IMPACT STUDY WHEELER STREET CLOSURE

COUNCIL POLICY BACKGROUND

Active Traffic & Safety Management System for Interstate 77 in Virginia. Chris McDonald, PE VDOT Southwest Regional Operations Director

TMC Monthly Operational Summary

S.170 th Street Micro-Simulation Seattle-Tacoma International Airport Port of Seattle/Aviation Planning

TRANSPORTATION AND TRAFFIC ANALYSIS REPORT

NATHAN HALE HIGH SCHOOL PARKING AND TRAFFIC ANALYSIS. Table of Contents

Mountain View Community Shuttle Monthly Operations Report

Colorado Front Range Wildfires Situation Report #7 Monday, July 02, :15 AM (MDT)

1. Major streets, Central Business District (CBD) and school bus routes. 2. Local streets 3. Downtown parking lots

KAISER SOUTH NORTHERN VIRGINIA HUB TRAFFIC IMPACT STUDY PRINCE WILLIAM COUNTY, VIRGINIA TABLE OF CONTENTS. Section 2 BACKGROUND INFORMATION 12

OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS 4/10/2019 7:20:01 PM

TMC Monthly Operational Summary

SNOW REMOVAL GUIDE. City Of Orange Township. Public Works Snow Removal Hotline: (973) My Orange Hotline: (973)

UA SURVEY CONTROL MONUMENT UA #1 CLEVELAND STREET GARLAND AVENUE. Northing / Easting / Elevation

Appendix I: Traffic Study

collision analyses...

Jan 7, 2017 Winter Weather Event

1.0 INTRODUCTION AND SUMMARY...

MADISON, WI STONE HOUSE DEVELOPMENT 1000 E. WASHINGTON AVENUE REDEVELOPMENT TRANSPORTATION STUDY DECEMBER 14, 2015

TRAINING DATES FOR 2018

JEP John E. Jack Pflum, P.E. Consulting Engineering 7541 Hosbrook Road, Cincinnati, OH Telephone:

TRAINING DATES FOR 2018

TRAINING DATES FOR 2018

SITUATION REPORT: February 2018 Ohio River Flooding

Appendix C Traffic Study

Transcription:

NEWS RELEASE a TxDOT Project For immediate release EL PASO DISTRICT Jennifer Wright (915) 790-4340 Jennifer.Wright3@txdot.gov February 9, 2018 I-10 East at Redd closes for 24 hours this Sunday, Feb 11 Then, I-10 West at Resler closes for 27 hours on Feb 25 I 10 East @ Redd 24 HOUR CLOSURE Sunday, Feb. 11 5 a.m. to 5 a.m. the next morning I 10 Eastbound will close completely between Redd Road (Exit 9) and the North Mesa Street overpass. The Redd Road entrance ramp to I 10 Eastbound will close. Detour: Drivers on I 10 Eastbound will exit at Redd Road (Exit 9) then take the South Desert Blvd frontage road to the North Mesa Street entrance ramp to I 10 Eastbound. Crews will be moving barrier and re configuring lanes on the I 10 overpass at North Mesa Street (SH 20). [Map 1] Heads Up: This work is in preparation for demolition of the I 10 Westbound overpass at North Mesa Street (SH 20), which is scheduled to happen during a 27 hour closure of I 10 Westbound on Sunday, Feb. 25. Sunland Park Daytime Monday, Feb. 12 9 a.m. to 4 p.m. The Sunland Park entrance ramp to I 10 Westbound will close. Crews are installing a high mast luminaire. [No Map] Daytime Tuesday, Feb. 13 through Friday, Feb. 16 9 a.m. to 4 p.m. daily The right lane on Sunland Park Drive (northbound, moving toward South Mesa Hills Drive) will close for approximately 500 feet starting at Paisano Drive (US 85). Crews will be demolishing sidewalk and curb. [No Map] Paisano (US 85) Monday, Feb. 12 and Tuesday, Feb. 13 9 p.m. each night to 6 a.m. each morning page 1 of 4 The Texas Department of Transportation is responsible for maintaining 80,000 miles of road and for supporting aviation, rail, and public transportation across the state. GO 10 is a $158 million reconstruction of Interstate 10 that spans approximately 6 miles on El Paso s West Side between Executive Center Boulevard and North Mesa Street. GO 10 features the addition of collector-distributor lanes and a new direct connector with Border West Expressway. Maintain a Safe System Address Congestion Best-in-Class State Agency Connect Texas Communities An Equal Opportunity Employer www.go10elpaso.com facebook.com/go10elpaso twitter.com/go10ep

NEWS RELEASE a TxDOT Project For immediate release EL PASO DISTRICT Jennifer Wright (915) 790-4340 Jennifer.Wright3@txdot.gov The Paisano Drive (US 85) entrance ramp to I 10 Eastbound in front of the auto dealerships will close. Crockett Street access to Paisano Drive (US 85) will close. All access points from Sunland Park Drive to Paisano Drive (US 85) will close. I 10 Eastbound will be closed completely between North Mesa St (Exit 11) and Executive Center Blvd. Detour: I 10 Eastbound traffic will exit at North Mesa Street (Exit 11), then take North Mesa Street (SH 20) to Executive Center Boulevard s entrance ramp to I 10 Eastbound. Crews will be paving new eastbound collector distributor (CD) lanes through the Sunland Park area. [Map 2] I 10 East @ N Mesa Monday, Feb. 12 through Thursday, Feb. 15 9 p.m. each night to 6 a.m. each morning I 10 Eastbound will close completely between North Mesa Street (Exit 11) and Sunland Park Drive. The North Mesa Street entrance ramp to I 10 Eastbound will close. The Resler Drive entrance ramp to I 10 Eastbound will close. The Sunland Park Drive flyover entrance ramp to I 10 Eastbound will close. Detours: On Feb. 12 and 13, motorists on I 10 Eastbound will exit at North Mesa Street (Exit 11), then take North Mesa Street to Executive Center Boulevard s entrance ramp to I 10 Eastbound. On Feb. 14 and 15, motorists on I 10 Eastbound will exit at North Mesa St (Exit 11), then take North Mesa St (SH 20) to Doniphan Drive, then take Sunland Park Drive to the I 10 Eastbound entrance ramp. Crews will be repairing potholes. [Map 3] I 10 West @ Executive Thursday, Feb. 15 9 p.m. to 6 a.m. the next morning I 10 Westbound will close completely at Executive Center Boulevard (Exit 16). The Schuster/UTEP entrance ramp to I 10 Westbound will close. Detour: Traffic on I 10 Westbound will exit at Executive Center Blvd (Exit 16), take Executive Center Blvd to North Mesa Street (SH 20), then take North Mesa Street to Sunland Park Drive. Motorists may re enter I 10 Westbound using the Sunland Park Drive entrance ramp. Note: As described in the previous closure, I 10 Eastbound at North Mesa (Exit 11) will close on this night as well. Crews will be conducting full depth pothole repairs. [Map 4] page 2 of 4 The Texas Department of Transportation is responsible for maintaining 80,000 miles of road and for supporting aviation, rail, and public transportation across the state. GO 10 is a $158 million reconstruction of Interstate 10 that spans approximately 6 miles on El Paso s West Side between Executive Center Boulevard and North Mesa Street. GO 10 features the addition of collector-distributor lanes and a new direct connector with Border West Expressway. Maintain a Safe System Address Congestion Best-in-Class State Agency Connect Texas Communities An Equal Opportunity Employer www.go10elpaso.com facebook.com/go10elpaso twitter.com/go10ep

NEWS RELEASE a TxDOT Project For immediate release EL PASO DISTRICT Jennifer Wright (915) 790-4340 Jennifer.Wright3@txdot.gov LONG TERM CLOSURES Paisano (US 85) @ Sunland Ongoing 24/7 Jan. 15 through Sunday, March 4 Paisano Drive (US 85) will remain closed at Sunland Park Drive. Sunland Park Drive will be kept to two lanes starting at Constitution Drive to I 10. Motorists on Sunland Park Drive (coming from Doniphan Drive) will have access to a dedicated right turn lane onto the Paisano Drive (US 85), which is also the entrance ramp to I 10 Eastbound. To help mitigate roadway congestion in this area, motorists should consider using an alternate entrance ramp to I 10 Eastbound. Business Access: Motorists will be able to access area businesses from Sunland Park Drive as well as from Constitution Drive and Crockett Street. Crews are demolishing and re building a section of Paisano Drive (US 85). [No Map] North Mesa Daytime Monday, Feb. 12 through Friday, Feb. 23 9 a.m. to 4 p.m. weekdays only, as needed The right lane on North Mesa Street (SH 20) will close from North Desert Blvd to Osborne Drive. Crews are constructing new roadways that connect to North Mesa Street (SH 20). [No Map] CLOSURE FORECAST The following closures are still developing, meaning details may change. Sunday, Feb. 18 and Monday, Feb. 19 9 p.m. each night to 6 a.m. each morning I 10 Eastbound will close completely between North Mesa Street (Exit 11) and Sunland Park Drive. The North Mesa Street entrance ramp to I 10 Eastbound will close. The Resler Drive entrance ramp to I 10 Eastbound will close. page 3 of 4 The Texas Department of Transportation is responsible for maintaining 80,000 miles of road and for supporting aviation, rail, and public transportation across the state. GO 10 is a $158 million reconstruction of Interstate 10 that spans approximately 6 miles on El Paso s West Side between Executive Center Boulevard and North Mesa Street. GO 10 features the addition of collector-distributor lanes and a new direct connector with Border West Expressway. Maintain a Safe System Address Congestion Best-in-Class State Agency Connect Texas Communities An Equal Opportunity Employer www.go10elpaso.com facebook.com/go10elpaso twitter.com/go10ep

NEWS RELEASE a TxDOT Project For immediate release EL PASO DISTRICT Jennifer Wright (915) 790-4340 Jennifer.Wright3@txdot.gov Tuesday, Feb. 20 through Thursday, Feb. 22 9 p.m. each night to 6 a.m. each morning I 10 Eastbound will close completely at Sunland Park (Exit 13). Both Sunland Park entrance ramps to I 10 Eastbound will close. Crockett Street access to Paisano Drive (US 85) will not be available. The Resler Drive entrance ramp to I 10 Eastbound will close. I 10 Westbound will close completely at Executive Center Blvd (Exit 16). The Schuster/UTEP entrance ramp to I 10 Westbound will close. 27 HOUR CLOSURE Sunday, Feb. 25 3 a.m. to 6 a.m. the next morning I 10 Westbound will close completely at Resler Drive (Exit 12). North Mesa Street (SH 20) will close completely in both directions under the I 10 overpass. The North Mesa westbound exit ramp will close. All other ramps at I 10/North Mesa will be open. Crews will be re configuring the traffic lanes of I 10 Westbound and demolishing the I 10 Westbound overpass at North Mesa Street (SH 20). All closures are subject to change. All closure times are approximate. Exit and entrance ramps may close up to one hour prior to the start time of an I 10 closure. page 4 of 4 The Texas Department of Transportation is responsible for maintaining 80,000 miles of road and for supporting aviation, rail, and public transportation across the state. GO 10 is a $158 million reconstruction of Interstate 10 that spans approximately 6 miles on El Paso s West Side between Executive Center Boulevard and North Mesa Street. GO 10 features the addition of collector-distributor lanes and a new direct connector with Border West Expressway. Maintain a Safe System Address Congestion Best-in-Class State Agency Connect Texas Communities An Equal Opportunity Employer www.go10elpaso.com facebook.com/go10elpaso twitter.com/go10ep

S DESERT BLVD. REDD RD. N DESERT BLVD. 24-HOUR CLOSURE: The following closures will be in place Sunday, Feb. 11, from 5 am to 5 am the next morning: I-10 Eastbound will close completely between Redd Road (Exit 9) and North Mesa Street (SH 20). The Redd Road entrance ramp to I-10 Eastbound will close. Follow the detour signs in place. THORN AVE. RESLER DR. 20 LEGEND GO 10 Closure Detour Route Interstate Local Roads State Line Feb. 2, 2018 I-10 East closes at Redd for 24 hours Map 1 of 4

THORN AVE. : The following closures will be in place Monday, Feb. 12 and Tuesday, Feb. 13 from 9 pm each night to 6 am each morning: RESLER DR. The Paisano Drive (US 85) entrance ramp to I-10 Eastbound will close. Crockett Street access to Paisano Drive (US 85) will close. All access points from Sunland Park Drive to Paisano Drive (US 85) will close. I-10 Eastbound will be close completely at North Mesa Street (Exit 11). Follow the detour signs in place. SUNLAND PARK DR. PAISANO DR. 20 CROCKETT ST. BUENA VISTA LEGEND GO 10 closure Detour Route Long Term Closure Border West Expressway closure Interstate GO 10 New Structures Local Roads State Line Feb. 9, 2018 EXECUTIVE CENTER BLVD. I-10 East and Paisano (US 85) will close Map 2 of 4

THORN AVE. : The following closures will be in place on Feb. 14-15 from 9 pm each night to 6 am each morning: I-10 Eastbound will close completely at North Mesa Street (Exit 11). The North Mesa Street entrance ramp to I-10 Eastbound will close. The Resler Drive entrace ramp to I-10 Eastbound will close. The Sunland Park Drive flyover entrance ramp to I-10 Eastbound will close. Follow the detour signs in place. RESLER DR. 20 SUNLAND PARK DR. LEGEND GO 10 closure Detour Route Long Term Closure Border West Expressway closure Interstate GO 10 New Structures Local Roads State Line Feb. 9, 2018 PAISANO DR. BUENA VISTA I-10 East closes at North Mesa Map 3 of 4

RESLER DR. : The following closures will be in place on Feb. 15 from 9 pm to 6 am the next morning: SUNLAND PARK DR. I-10 Westbound will close completely at Executive Center Boulevard (Exit 16). The Schuster/UTEP entrance ramp to I-10 Westbound will close. Follow the detour signs. PAISANO DR. SUN BOWL DR. BUENA VISTA 1966 SPUR SCHUSTER AVE. YANDELL DR. EXECUTIVE CENTER BLVD. 20 LEGEND GO 10 closure Detour Route Long Term Closure Border West Expressway closure Interstate GO 10 New Structures Local Roads State Line Feb. 9, 2018 I-10 West closes at Executive Map 4 of 4