Vendetta Reports Additional High Grade Drilling Results from Zones 2 and 3 at Pegmont Lead-Zinc Project

Similar documents
Vendetta Reports Initial Results from 2017 Pegmont Program with High Grade Zone 3 Step Out Drilling

Vendetta Mining Discovers New High Grade Zone at Pegmont Lead / Zinc Deposit

Vendetta Mining Intersects Meters of 11.91% Pb+Zn from Zone 5 at the Pegmont Lead-Zinc Deposit

Vendetta Continues to Intersect High Grade Lead-Zinc from Zone 2 Open Pit Target, Pegmont Lead-Zinc Project

FOR IMMEDIATE RELEASE August 9 th, 2018 (VTT2018 NR #7)

Vendetta Mining Announces Maiden Assay Results from the 2014 Zone 5 Drilling Program at the Pegmont Lead-Zinc Project

Vendetta Mining Announces First Assay Results from the 2014 Drilling Program at the Pegmont Lead-Zinc Project

Highlights from the four holes announced in this news release include:

DRILLING AT ASCOT S PREMIER PROPERTY EXTENDS GOLD MINERALIZATION 150 METRES WEST TOWARDS UNDERGROUND PORTAL

GOLDPLAY ANNOUNCES FURTHER SAMPLING RESULTS FROM SAN MARCIAL HISTORICAL CORE; CONFIRMS OPEN PIT TARGET NEAR SURFACE WITH gpt AgEq.

(TSXV: GPLY, OTCQB: GLYXF

FALCO PACIFIC COMPLETES INITIAL MODEL FOR THE HORNE 5 GOLD/SILVER/ZINC/COPPER DEPOSIT

For Immediate Release ASCOT DRLLING AT UNICORN INTERSECTS MORE HIGH-GRADE GOLD

V Sample from C.O.D vein 15 metres southwest of V

OSISKO METALS INTERSECTS 10.49% ZINC+LEAD OVER METRES AND 12.15% ZINC+LEAD OVER METRES AT PINE POINT

Probe Metals Continues to Intersect Significant Gold Mineralization in Expansion Drilling at Val-d Or East, including 4.1 g/t Gold Over 15.

Probe Metals Continues to Expand Gold Zones At Val-d Or East

Skeena Intersects g/t AuEq over metres at Eskay Creek

COPPER MOUNTAIN COMPLETES PHASE 2 DRILL PROGRAM AT NEW INGERBELLE WITH CONTINUED POSITIVE RESULTS

Monument Announces NOA 7/8 Drilling Program Results at Burnakura Gold Project

The new sulphide mineralization lies within a 1.4 kilometer long east-west trending

Probe Metals Intersects 3.2 g/t Gold Over 45.5 Metres At Val-d Or East

True Width (m) Carneritos to

BOREAL EXPANDS DISCOVERY ZONE OF HIGH-GRADE ZINC, SILVER AND LEAD MINERALIZATION AT GUMSBERG PROJECT IN SWEDEN

Probe Metals Intersects 1,122 g/t Gold Over 0.7 Metres in New Zone at Val-d Or East

LH Property Update: Magnum Goldcorp Hits High Grade Gold 16.9 m of g/t, including 10.9 m of g/t, and as well, 11 m of 20.

CROCODILE GOLD CONTINUES POSITIVE EXPLORATION RESULTS INTERSECTS HIGH GRADE GOLD AT UNION REEFS PROJECT

GRAPHITE ONE DRILLS 165.3M of 4.23% GRAPHITE INCLUDING 46.4M OF 6.6%, 14.3M of 10.1% and 21M of 10.1% GRAPHITE

Probe Metals Discovers New High Grade Gold Zone on Val-d Or East Project: Intersects 12.6 g/t Gold Over 7.3 Metres

Surface Trenching Highlights. Santos Target. To (m) Width (m) Au (g/t) Comment. (m) Santos (1)-includes internal dilution

Probe Metals Confirms Continuity of Gold Mineralization on its Val-d Or East Project And Increases 2017 Drill Program to 75,000 metres

A B C PAD A HIGHLIGHTS

CROCODILE GOLD INTERSECTS 7.1 G/T AU OVER 4.5 METERS INCLUDING 11.2 G/T AU OVER 2.6 METERS AT THE UNION REEFS PROJECT, PROSPECT DEPOSIT

NEWS RELEASE NOVEMBER 15, 2018 HANNAN COMPLETES DRILLING AT BALLYHICKEY, DEFINES SIGNIFICANT ZINC TARGET AT KILMURRY, CO.

NEWS RELEASE August 10, 2017

BALMORAL INTERSECTS g/t GOLD OVER 7.99 METRES, BUG LAKE SOUTH, DETOUR GOLD TREND PROJECT, QUEBEC

NEWS RELEASE. March 22, 2017

BK Copper Project Strong Copper Results Confirm and Extend BKM

Colt Resources intersects 17.4% Cu over 0.42 metres (0.32 m true width) at Miguel Vacas Copper Project in its Borba exploration concession in Portugal

NEWS RELEASE November 5, 2018

RED EAGLE MINING INTERCEPTS 35.5 METRES AT 2.28 GRAMS GOLD PER TONNE AT SANTA ROSA

EL CONDOR IN-FILL DRILLING INTERSECTS 26.9 METERS 2.19% CU & 0.58% NI

NEWS RELEASE TSX-V Ticker: SWA 23 April 2013 SWA.WT SARAMA RESOURCES EXTENDS HIGH-GRADE MINERALISATION AT MM PROSPECT IN BURKINA FASO

NEWS RELEASE August 8, 2018

West Pender Street Vancouver, BC V6C 2V6 Tel: Fax: TSX-V: GBR NEWS RELEASE

NEWS RELEASE. Evrim and Harvest Gold Complete Drilling at Cerro Cascaron

Highlights include: Hole TTD050: 6.12 g/t Au over 7.00 metres from metres o Including g/t Au over 1.18 metres

Monument Announces Significant Intercepts Assay Results at NOA7_8 in Burnakura

Salazar intersects metres (13.07m true) averaging 2.65 g/t gold, g/t silver, 1.32% copper, 6.63% zinc at its Curipamba Project.

NEWS RELEASE July 26, 2018

Press Release Thunder Bay: August 2, 2018

60% upgrade of Flying Doctor Resource to 104,600 tonnes of contained zinc and lead.

Sherlock drilling returns best intercept to date of 0.63% Cu and 7.45 g/t Ag over m

CHAMPION IRON REPORTS EXPLORATION RESULTS AT POWDERHORN PROJECT, NEWFOUNDLAND

NEWS RELEASE. Foran Mining Intersects High Grade Zinc at McIlvenna Bay. Results expand area of known mineralization

T Boli Gold Mine Exploration Update

IDM Mining s Underground Drilling Intersects g/t Au and g/t Ag over 6.80 Meters True Width at the Red Mountain Gold Project

NEWS RELEASE. Evrim announces additional drilling results at Cuale Gold Project in Mexico

SALAZAR ANNOUNCES AN UPDATED RESOURCE REPORT OF 5.53 MT INDICATED AND 1.46 MT INFERRED AT ITS HIGH GRADE VMS EL DOMO DEPOSIT

NEWS RELEASE. September 30 th, Trading Symbols: GTP (TSX-V) P01 (FRANKFURT) COLTF (OTC Pink)

Minsud to recommence resource outline diamond drilling at the Chita Valley Cu- Au-Ag-Mo Project, San Juan, Argentina

Hole (93) From (m) To (m) m Au (g/t) Ag (g/t) Cu (%) Pb (%) Zn (%) CMLP

Plateau Extends Falchani East Lithium Deposit Community Agreements Executed and Three Drill Rigs Active at Falchani West

NEWS RELEASE NOVEMBER 28th, 2017 Trading Symbols: TSX-V: AMZ; OTCQX: AXDDF

FOR IMMEDIATE RELEASE:

MANN SILVER-COBALT MINE. PORE: TSXV PowerOre.com

New Drilling Program Commences at Mutiny s Deflector Deposit

May 17, Two holes explored the extension at depth of the historic Sta Rosa vein

July Exploring for Canadian Gold in the Rainy River District of Ontario

Pacific Empire Minerals Provides Copper King RC Drilling Results

Asiamet Drilling Further Extends BKM Mineralisation

KIRKLAND LAKE GOLD ANNOUNCES 120 METRE DOWN-PLUNGE EXTENSION OF SWAN ZONE

Drilling Extending Mineralization in La Mina North Zone

Barsele Expansion drill hole AVA18013 at the Avan Zone intersects 21.0 metres grading 3.68 g/t gold.

Canadian Gold Miner Grab Sample Returns 29.5 Grams per tonne Gold from South Kirkland Project

ET and and and

AZUCAR MINERALS COMMENCES DRILLING AT THE EL COBRE PROJECT, MEXICO

MINAURUM GOLD INC : : News Releases

Drilling Extending Mineralization in La Mina North Zone

Pershing Gold Hits Highest Grade Gold to Date in Relief Canyon with Grams per Tonne (3.618 Ounces per Ton) Intercept

Northern Dynasty Minerals Ltd.

Diamond Drilling confirms depth potential for mineralisation at Mrima Hill.

Assay Results Highlights (as of November 16, 2017) representing approximately 4,500 metres ( m ) of drilling:

June 4, 2014 News Release Valley of the Kings Exploration Program Underway; Project Update

GOLDPLAY ANNOUNCES SIGNIFICANT SILVER VALUES OF UP T0

FILO MINING DRILLS 50 METRES OF G/T SILVER, 0.56% COPPER, 0.50 G/T GOLD AND 36 METRES OF 1.45% COPPER AT FILO DEL SOL

GOLDEN RIDGE RESOURCES DRILLS 60.27m of 2.60 G/T AUEQ AT THE HANK PROJECT IN BC S GOLDEN TRIANGLE

Tickers: XTSX:GYA, FRAA:1ZT, PINX:GYNAF Tags: Mining

Orsu Metals hits 2.62 g/t Au over 22.2 metres and proves higher gold grades at Zone 23, Sergeevskoe Gold Project, Russia

NEW COBAR-STYLE COPPER DISCOVERY IN NSW

Drilling highlights include:

BALMORAL CONTINUES TO EXPAND GRASSET NI-CU-PGE DISCOVERY

NEWS RELEASE ORCA GOLD REPORTS CONTINUED SUCCESS AT GSS

October 8, 2015 News Release Brucejack Regional Drilling Intersects Over 8,000 Grams Per Tonne Gold

Great Atlantic Rock Samples Return up to 5.8 oz. / ton Gold Golden Promise Property in Central Newfoundland

NEWS RELEASE. Evrim drills 1.0 metre grading 20.1 grams per tonne gold at Cerro Cascaron with partner Harvest Gold

Drilling at Perseverance in Arizona, USA Suggests Proximity to Porphyry Copper System

MINERAL MOUNTAIN RESOURCES LTD. MMV.TSX-V

April 26, 2012 SBB NR SBB-T

For Immediate Release MORE HIGH-GRADE GOLD AT ASCOT S GOLDEN TRIANGLE PROPERTY

Transcription:

FOR IMMEDIATE RELEASE August 24 th, 2017 (VTT2017 NR # 9) Vendetta Reports Additional High Grade Drilling Results from Zones 2 and 3 at Pegmont Lead-Zinc Project Vancouver, BC August 24 th, 2017 Vendetta Mining Corp. (the Company ) (VTT-TSX:V) is pleased to announce further drill results from the 2017 program at the Pegmont Lead-Zinc Project in Queensland, Australia. This initial part of the program has been executed in Zone 3 and is now being extended to Zone 2. The goal is to expand and upgrade the Mineral Resource near the base of the open pit shell used to constrain the June 2017 Mineral Resource and to locate additional mineralization within the pit shell (see news release, VTT2017-NR #6) but outside of the resource estimation search parameters. Zones 2 Highlights: PVRD067: 8.4 metres of 11.30 Pb+Zn (8.05 Pb, 3.24 Zn); PVRD074: 6.2 metres of 14.64 Pb+Zn (11.43 Pb, 3.21 Zn); and PVRD079: 9.1 metres of 11.06 Pb+Zn (7.45 Pb, 3.61 Zn) Zones 3 Highlights: PVRD069: 6.2 metres of 9.72 Pb+Zn (6.44 Pb, 3.29 Zn); and PVRD072: 4.6 metres of 11.32 Pb+Zn (8.20 Pb, 3.12 Zn); A full summary of the sulphide lead-zinc results including estimated true widths are provided in Table 1 and the location of the holes is shown on the map in Figure 1. Michael Williams, Vendetta s President and CEO commented These results coupled with the previously announced Zone 3 assays give us reason to be encouraged by the consistently higher grades being intersected in the current program. We will continue to focus on the areas within the pit the shell that have the greatest potential to increase both tonnes and grade while also targeting potential expansion of the resource in areas that may later fall inside an optimized pit shell. We are continuing to develop the underground target in Zone 5 and are commencing testing conceptual exploration targets near the Burke Hinge Zone. Zones 2 and 3 Results Zone 2 is a flat to moderately dipping area, located between 50 and 100 m from surface, with a strike length of 2 km. Holes PVRD067 and 068 are drilled from that same pad, the high grade intersection in PVRD069 is located in a flat dipping portion of Zone 2. Hole PVRD068 was drilled to test a modelled low grade zone in Zone 2 immediately prior to the Z fold, and confirmed the zone is a site of structural attenuation (stretching and thinning) separating the high grade open folds in Zone 2 and the Z fold.

PVRD073, 074, 079 and 075 are drilled from one pad into Zone 2. Hole 073 was drilled into the attenuated fold limb at the base of Zone 1, while the high grade intersections in holes PVRD074, 079 and 075 are located in a moderately dipping open fold structure to the north-east of the Z fold. PVRD074 will be used for metallurgical test work. Zone 3 is located about 50 to 100 m below Zone 2, it is flat to moderately dipping, separated from Zone 2 by a drag fold called the Z fold. It has a modelled strike of 1.2 km. Holes PVRD069, 071 and 072 are drilled from the same pad, the high grade intersections in the moderately dipping Zone 3 are spaced about 20 m apart and are in the same structural position as the previously reported high grade intersections in holes PVRD065, 066 and 063 (see VTT NR #5), located 40-50 m to the NE. Hole PVRD077 was probing the down dip extent of the high grade structure intersected in aforementioned holes, it intersected the host lithology but lacked mineralization. Table 1. Summary of Open Pit Target Zone 2 and 3 Drill Assay Results. Bore Hole Dip / Azimuth From (m) To (m) Vertical Depth Below Surface (m) Interval (m) True Thickness* (m) Pb+Zn Pb Grade # Zn Ag g/t Zone 2 PVRD067-52/316 108.07 116.50 91.4 8.43 6.9 11.30 8.05 3.24 13 Including 108.07 115.51 90.6 7.44 6.1 12.64 9.09 3.56 15 PVRD068-86/330 No Significant Result PVRD073-51/324 129.30 130.55 99.0 1.25 1.0 3.82 1.06 2.76 6 PVRD074-89/305 113.70 119.87 119.8 6.17 5.8 14.64 11.43 3.21 21 PVRD075-81/114 106.83 114.55 112.5 7.72 7.6 9.16 6.52 2.64 11 Including 106.83 112.55 110.5 5.72 5.6 11.82 8.43 3.39 14 PVRD079-85/325 114.56 123.62 122.6 9.06 8.9 11.06 7.45 3.61 8 Including 115.56 121.62 120.1 6.06 5.9 14.08 10.01 4.07 10 Zone 3 PVRD069-80/153 186.68 192.93 185.1 6.25 6.1 9.72 6.44 3.29 9 Including 186.68 190.93 183.2 4.24 4.1 13.35 8.70 4.64 11 PVRD071-71/142 188.10 194.95 181.6 6.85 6.8 9.20 6.17 3.03 9 Including 188.10 192.95 180.3 4.85 4.8 12.35 8.23 4.13 11 PVRD072-65/136 189.09 193.72 174.5 4.63 4.5 11.32 8.20 3.12 16 PVRD077-62/135 No Significant Result *True thickness is estimated using structural measurements and three dimensional geological modeling. #Drill intersections are summarized using a combined 1 lead and zinc grade with maximum 1 m internal dilution.

Ongoing Drilling To date the a total of 52 drill holes have been completed for a total of 13,322 m in Zones 1, 2, 3 and 5. Processing, logging and sampling of the core not discussed in this release is ongoing. The Company will release results as they become available. Drilling continues with two drills, one drill is working in Zone 1 and the other has commenced the exploration program testing conceptual targets near the Burke Hinge Zone. Figure 1. Surface Map Showing 2017 Mineral Resource Block Model Contours, Pit Shell and Location of Current Results and 2017 Completed Holes

Notes on Zone 3 Drilling and Assay QA/QC The drilling at Zone 2 and 3 involved drilling RC pre-collars using a 5.75 inch diameter face sampling bit to depth prior to casing and continuing the hole in NQ2 diamond core. Diamond core samples were taken on nominal 1 m lengths but varied to match geological contacts. Samples of the core are obtained using a diamond saw to half cut the core, if the hole is to be included in metallurgical test work it is then halved again. This is performed to provide sufficient sample for metallurgical test work while retaining a permanent core record. Diamond core samples were taken on nominal 1 m lengths, with a diamond saw being used to half core and then quarter the core. Quarter core samples are dispatched for analysis, so as to provide sufficient sample for metallurgical test work while retaining a permanent core record. Field duplicate samples were taken and blanks and commercially prepared certified reference materials (standards) were added into the sample sequence for every hole submitted. These were analyzed by the Company and no issues were noted with analytical accuracy or precision. Samples used for the results described herein were prepared and analyzed at ALS Laboratory Group in Townsville, Queensland. Analysis was undertaken using a four acid digest and ICP (ALS method: ME- ICP61 for 7 elements) with over limit (>10,000 ppm lead and zinc and >100 ppm silver) high grade samples being read with an atomic absorption spectrometer (AAS), (ALS methods: Pb-OG62, Zn-OG62 and Ag-OG62). Drill hole collars are located using handheld GPS, and the collars will be surveyed by a licensed surveyor prior to undertaking an update of the mineral resource estimate. Down hole surveys were undertaken using a true north seeking gyroscope with stations nominally every 6 m. All NQ2 diamond core is orientated using digital core orientation systems, this data is incorporated into the 3D interpretations. Assay intervals shown in Table 1 are down hole intervals, and the true thickness noted are based on 3D interpretations of the host lithology, structure, and mineralization. About The Pegmont Lead Zinc Project Pegmont is a stratiform, Broken Hill-Type deposit that outcrops with an overall shallow dip to the south east and is hosted in a magnetite-rich banded iron formation within high grade metamorphic rocks. The project consists of three granted mining leases and two exploration permits that cover an area of approximately 3,468 ha. Pegmont is situated in the Mount Isa McArthur Mineral Province, which hosts one of the world s richest endowments of lead-zinc-silver mineralization, including several world-class lead-zinc-silver mines. Pegmont is located 25 km west of South 32 s Cannington silver-lead-zinc operation, one of the world s largest producers of lead and silver and 28 km north of Chinova Resources Osborne copper-gold operations. Pegmont is proximal to existing infrastructure including public roads, mine haul roads, rail, and a natural gas pipe line for power generation. In June 2017 Vendetta updated the Mineral Resource estimate for Pegmont, for details please see Vendetta s news release, VTT2017-NR#6, June 27 th, 2017 and the NI 43-101 technical report Pegmont Resource Update June 2017 available on SEDAR.

About Vendetta Mining Corp. Vendetta Mining Corp. is a Canadian junior exploration company engaged in acquiring, exploring, and developing mineral properties with an emphasis on lead and zinc. It is currently focused on advanced stage exploration projects in Australia, the first of which is the Pegmont Lead Zinc project. Additional information on the Company can be found at www.vendettaminingcorp.com Qualified Person Peter Voulgaris, MAusIMM, MAIG, a Director of Vendetta, is a non-independent qualified person as defined by NI 43-101. Mr. Voulgaris has reviewed the technical content of this press release, and consents to the information provided in the form and context in which it appears. ON BEHALF OF THE BOARD OF DIRECTORS Michael Williams Michael Williams President & CEO The TSX Venture Exchange does not accept responsibility for the adequacy or accuracy of this release. Certain statements within this news release, other than statements of historical fact relating to Vendetta Mining Corp., are to be considered forward-looking statements with respect to the Company s intentions for its Pegmont project in Queensland, Australia. Forward-looking statements include statements that are predictive in nature, are reliant on future events or conditions, or include words such as expects, anticipates, plans, believes, considers, significant, intends, targets, estimates, seeks, attempts, assumes, and other similar expressions. The forward-looking statements are based on a number of assumptions which, while considered reasonable by Vendetta Mining Corp., are, by their nature, subject to inherent risks and uncertainties and are not guarantees of future performance. Factors that could cause actual results to differ materially from those in forward-looking statements include: the interpretation of previous and current results from the 2017 drilling program mentioned in this news release, further results from the 2017 drilling program, the accuracy of exploration results, the accuracy of Mineral Resource Estimates, the anticipated results of future exploration, the forgoing ability to finance further exploration, delays in the completion of exploration, delays in the completion of the updated Mineral Resource Estimate, the future prices of lead, zinc, and other metals, and general economic, market and/or business conditions. There can be no assurances that such statements and assumptions will prove accurate and, therefore, readers of this news release are advised to rely on their own evaluation of the information contained within. In addition to the assumptions herein, these assumptions include the assumptions described in Vendetta Mining Corp. s Management s Discussion and Analysis for the nine months ended, February 29 th, 2017. Although Vendetta Mining Corp. has attempted to identify important risks, uncertainties and other factors that could cause actual performance, achievements, actions, events, results or conditions to differ materially from those expressed in or implied by the forward-looking statements, there may be other risks, uncertainties and other factors that cause future performance to differ from what is anticipated, estimated or intended. Unless otherwise indicated, forward-looking statements contained herein are as of the date hereof and Vendetta Mining Corp. does not assume any obligation to update any forward-looking statements after the date on which such statements were made, except as required by applicable law.