UPDATE ELECTRICITY STATEMENT OF OPPORTUNITIES FOR THE NATIONAL ELECTRICITY MARKET

Similar documents
SOUTH AUSTRALIAN WIND STUDY REPORT SOUTH AUSTRALIAN ADVISORY FUNCTIONS

FORECAST ACCURACY REPORT 2017 FOR THE 2016 NATIONAL ELECTRICITY FORECASTING REPORT

MEDIUM TERM PASA PROCESS DESCRIPTION

NATIONAL ELECTRICITY FORECASTING REPORT UPDATE FOR THE NATIONAL ELECTRICITY MARKET

POWER SYSTEM OPERATING PROCEDURE LOAD FORECASTING

POWER SYSTEM OPERATING PROCEDURE LOAD FORECASTING

February Industry Communique

RESERVE LEVEL DECLARATION GUIDELINES

SCHEDULING ERROR 3 AND 4 JULY 2011

WIND INTEGRATION IN ELECTRICITY GRIDS WORK PACKAGE 3: SIMULATION USING HISTORICAL WIND DATA

Activation of unscheduled reserves for Victoria and South Australia 19 January 2018 May 2018

August A report for the National Electricity Market

MONTHLY CONSTRAINT REPORT - JULY 2017

CHAPTER 5 - QUEENSLAND FORECASTS

MONTHLY CONSTRAINT REPORT - AUGUST 2017

peak half-hourly New South Wales

peak half-hourly Tasmania

MONTHLY CONSTRAINT REPORT - APRIL 2017

Bringing Renewables to the Grid. John Dumas Director Wholesale Market Operations ERCOT

2017 Settlement Calendar for ASX Cash Market Products ASX SETTLEMENT

Weekly Operational Constraints Update

NEM CONSTRAINT REPORT 2016 FOR THE NATIONAL ELECTRICITY MARKET

Whitepaper. All Currency, One Wallet!

MONTHLY CONSTRAINT REPORT - JUNE 2017

Put the Weather to Work for Your Company

Published by ASX Settlement Pty Limited A.B.N Settlement Calendar for ASX Cash Market Products

RTO Winter Resource Adequacy Assessment Status Report

FIVE MINUTE ELECTRICITY DEMAND FORECASTING: NEURAL NETWORK MODEL DOCUMENTATION

PROJECT ECONOMIC ANALYSIS

Energy and demand projections

Wind power and management of the electric system. EWEA Wind Power Forecasting 2015 Leuven, BELGIUM - 02/10/2015

Effect of wind generation on dispatch INVESTIGATION 2

The Use of EDD for Weather Normalisation

IMPACT & IMPLEMENTATION REPORT SUMMARY SECTION (For AEMO to complete and administer)

Multivariate Regression Model Results

2019 Settlement Calendar for ASX Cash Market Products. ASX Settlement

APPENDIX 7.4 Capacity Value of Wind Resources

Operations Report. Tag B. Short, Director South Region Operations. Entergy Regional State Committee (ERSC) February 14, 2018

VICTORIAN TERMINAL STATION DEMAND FORECASTS 2010/ /20

For personal use only OZ MINERALS CARRAPATEENA COPPER GOLD PROJECT SOUTH AUSTRALIA 27 MARCH 2012

Summary of wool production estimates and forecasts for Australia. 2012/13 4th forecast 78.9

Information Document Calculation of Pool Price and Transmission Constraint Rebalancing Costs During a Constraint Event ID # R

Winter Season Resource Adequacy Analysis Status Report

peak half-hourly South Australia

MINNESOTA DEPARTMENT OF TRANSPORTATION Engineering Services Division Technical Memorandum No MAT-02 October 7, 2014

Approved by: A. Cherrie Epps, Ph.D., President and Chief Executive Officer

Outage Coordination and Business Practices

Fire Weather Drivers, Seasonal Outlook and Climate Change. Steven McGibbony, Severe Weather Manager Victoria Region Friday 9 October 2015

Power System Seminar Presentation Wind Forecasting and Dispatch 7 th July, Wind Power Forecasting tools and methodologies

V Sample from C.O.D vein 15 metres southwest of V

Alberto Troccoli, Head of Weather and Energy Research Unit, CSIRO, Australia ICCS 2013 Jamaica, 5 December 2013 (remotely, unfortunately)

AGM Presentation 12 November 2013

Management of the GB System Overnight

Forecast Postalised Tariff 2015/ /20. Utility Regulator Explanatory Note. August Introduction

Annual General Meeting

BLACK SYSTEM SOUTH AUSTRALIA 28 SEPTEMBER 2016 THIRD PRELIMINARY REPORT

elgian energ imports are managed using forecasting software to increase overall network e 칁 cienc.

OSISKO METALS INTERSECTS 10.49% ZINC+LEAD OVER METRES AND 12.15% ZINC+LEAD OVER METRES AT PINE POINT

$2.5 Million Resource Drilling Program Commences at Siberia Mining Centre

Winter General Outlook Covering December to February

ROLLING RIVER SCHOOL DIVISION POLICY

KEY PETROLEUM COMPANY UPDATE AND PERTH BASIN EXPLORATION STATUS

AGM Presentation 6 November 2012

KIRKLAND LAKE GOLD ANNOUNCES 120 METRE DOWN-PLUNGE EXTENSION OF SWAN ZONE

CROCODILE GOLD FILES TECHNICAL REPORTS FOR FOSTERVILLE AND COSMO GOLD MINES AND PROVIDES ANNUAL GENERAL MEETING INFORMATION

CROCODILE GOLD INTERSECTS 7.1 G/T AU OVER 4.5 METERS INCLUDING 11.2 G/T AU OVER 2.6 METERS AT THE UNION REEFS PROJECT, PROSPECT DEPOSIT

FORECASTING OF WIND GENERATION The wind power of tomorrow on your screen today!

2018 Annual Review of Availability Assessment Hours

Tesorillo Project Presentation Spain. June 2013

AESO Load Forecast Application for Demand Side Participation. Eligibility Working Group September 26, 2017

ASX:TLM. Closing in on world-class copper-gold deposits Annual General Meeting, November 2011

Economic Evaluation of Short- Term Wind Power Forecasts in ERCOT: Preliminary Results

Technical Appendices Appendix H: Dry year and critical period forecasting

NEWS RELEASE NOVEMBER 15, 2018 HANNAN COMPLETES DRILLING AT BALLYHICKEY, DEFINES SIGNIFICANT ZINC TARGET AT KILMURRY, CO.

ASX:TLM. Closing in on world-class copper-gold deposits Resources Rising Stars, September 2011

Capacity Scarcity Condition Monday, September 3, 2018 Two primary factors led to the implementation of OP 4 event Significant generation outages and r

International Studies about the Grid Integration of Wind Generation

Recent US Wind Integration Experience

GoviEx completes acquisition of African Energy s Zambian uranium assets

Battery Energy Storage

Metallurgical Coal Analysis & Forecast

CAISO Participating Intermittent Resource Program for Wind Generation

Strata Scheme Size by State and Territory

LEGAL DISCLAIMER. APG Coin (APG) White Paper (hereinafter 'the White Paper', 'the Document') is presented for informational purposes only

Summary of wool production estimates and forecasts for Australia. 2014/15 Fourth forecast

Ausgold awarded EIS grant for Jinkas deep drilling

2015 Summer Readiness. Bulk Power Operations

Short-Term Demand Forecasting Methodology for Scheduling and Dispatch

International Workshop on Wind Energy Development Cairo, Egypt. ERCOT Wind Experience

High level review of transmission connection point forecasts: Victoria

Acetic Acid Industry Outlook in China to Market Size, Company Share, Price Trends, Capacity Forecasts of All Active and Planned Plants

Use of Normals in Load Forecasting at National Grid

Total Market Demand Wed Jan 02 Thu Jan 03 Fri Jan 04 Sat Jan 05 Sun Jan 06 Mon Jan 07 Tue Jan 08

Debbie Lee, Communications and Public Affairs Officer. Update on Southern California Edison s Capital Improvement Projects

Renewables and the Smart Grid. Trip Doggett President & CEO Electric Reliability Council of Texas

Report on System-Level Estimation of Demand Response Program Impact

TRANSMISSION CONNECTION POINT FORECASTING REPORT FOR NEW SOUTH WALES AND TASMANIA

The World Bank Caribbean Regional Communications Infrastructure Program (P114963)

ADMINISTRATIVE PROCEDURES

EBS IT Meeting July 2016

Transcription:

UPDATE ELECTRICITY STATEMENT OF OPPORTUNITIES FOR THE NATIONAL ELECTRICITY MARKET Published: 26 October 2015

ELECTRICITY STATEMENT OF OPPORTUNITIES IMPORTANT NOTICE Purpose AEMO publishes the Electricity Statement of Opportunities (ESOO) in accordance with clause 3.13.3(q) of the National Electricity Rules, to provide technical and market data and information which can be used to assess the future need for electricity generation or demand management capacity or augmentation of the power system in the National Electricity Market. This ESOO Update is published in accordance with clause 3.13.3(r) to give interested stakeholders updated information about the supply demand balance in South Australia following Alinta Energy s October 2015 announcement about the early withdrawals of the Northern and Playford B power stations. Disclaimer This document or the information in it may be subsequently updated or amended. This document does not constitute legal or business advice, and should not be relied on as a substitute for obtaining detailed advice about the National Electricity Law, the National Electricity Rules, or any other applicable laws, procedures or policies. AEMO has made every effort to ensure the quality of the information in this document but cannot guarantee its accuracy or completeness. Accordingly, to the maximum extent permitted by law, AEMO and its officers, employees and consultants involved in the preparation of this document: make no representation or warranty, express or implied, as to the currency, accuracy, reliability or completeness of the information in this document; and are not liable (whether by reason of negligence or otherwise) for any statements or representations in this document, or any omissions from it, or for any use or reliance on the information in it. Acknowledgement AEMO acknowledges the support, co-operation and contribution of market participants in providing data and information used in this publication. The material in this publication may be used in accordance with the copyright permissions on AEMO s website. Australian Energy Market Operator Ltd ABN 94 072 010 327 www.aemo.com.au info@aemo.com.au NEW SOUTH WALES QUEENSLAND SOUTH AUSTRALIA VICTORIA AUSTRALIAN CAPITAL TERRITORY TASMANIA

ELECTRICITY STATEMENT OF OPPORTUNITIES CHAPTER 1. SOUTH AUSTRALIA The National Electricity Rule (NER) clause 3.13.3 (r) requires AEMO to publish updates to the Electricity Statement of Opportunities (ESOO) as soon as practicable, when significant new information becomes available relating to supply or demand projections, including plant retirements. The recent announcement that Northern Power Station will be withdrawn by 31 March 2016 is considered significant new information, requiring a published update to the 2015 ESOO. This ESOO update focuses on implications for supply demand balance in South Australia over the three-year period to 2017-18. This update to the 2015 ESOO outlines that the earlier withdrawal of Northern Power Station: Is not expected to change the projected extent or timing of the Reliability Standard 1 breaches. The 2015 ESOO, published in August 2015, highlighted that generation capacity reserves are reducing and the Reliability Standard may be breached in the region in 2019 20 and 2024 25, under the medium demand scenario. This projection remains current. Will impact the supply demand balance for South Australia over the next three years, and increase South Australia s reliance on wind generation and imports from Victoria. When high demand coincides with low wind generation, plant outages, or low levels of imports, South Australia may experience supply shortfalls. There is an emerging opportunity for the provision of Frequency Control Ancillary Services (FCAS) in South Australia, especially when there is a credible risk of separation from the National Electricity Market (NEM). During these periods of credible risk, AEMO would need to source FCAS locally within South Australia to manage system security. 1.1 Background In the 2015 ESOO, published in August 2015, AEMO used Alinta Energy s June 2015 announcement about the closure of Northern and Playford B power stations to model: The expected withdrawal of Northern Power Station by summer 2017 18. The permanent withdrawal of Playford B Power Station (mothballed since 2012). On 7 October 2015, Alinta Energy issued a press release announcing that generation would cease at both Northern and Playford B power stations by 31 March 2016. The closure of these power stations removes 786 MW (or 15%) of generation capacity from South Australia. Of this total, 240 MW (the capacity of Playford B) was already modelled as withdrawn in the 2015 ESOO. The 546 MW capacity of Northern Power Station will be removed some 18 months earlier than modelled in the 2015 ESOO. The following generation capacity changes, announced since the 2015 ESOO, have also been included in this update 2 : 102 MW Hornsdale Wind Farm (Stage 1) in South Australia from November 2016. 240 MW Ararat Wind Farm project in Victoria from May 2017. Temporary withdrawal of remaining 239 MW unit at Pelican Point Power Station in winter 2016. Return to service of 58 MW Tamar Valley peaking plant from June 2016 (although this will not impact on supply demand balance in South Australia). 1 The Reliability Standard is a measure of sufficiency of installed capacity to meet demand. The Reliability Standard (National Electricity Rules clause 3.9.3C) requires that a maximum of 0.002% of all operational consumption can go unserved for any region in any financial year. 2 AEMO provides updated generation data at: http://www.aemo.com.au/electricity/planning/related-information/generation-information. AEMO 1

Unserved Energy (%) ELECTRICITY STATEMENT OF OPPORTUNITIES Other assumption changes include: Incorporation of additional Heywood Interconnector constraints post upgrade. New forced outage rate assumptions based on historical performance. These revised assumptions improve the modelled reliability for the remaining South Australian thermal generators. 1.2 Updated supply demand observations 1.2.1 Reliability Standard and unserved energy The revised closing date for Northern Power Station is not expected to result in Reliability Standard breaches in the three years modelled to 2017-18. Figure 1 compares the 2015 ESOO expected unserved energy (USE) with the revised USE. The earlier withdrawal of Northern Power Station increases the expected USE in 2016-17 and 2017-18, but USE is still well below a level that would breach the Reliability Standard. In these two years, the USE increase due to Northern Power Station closure outweighs any reduction resulting from the revised forced outage rates. Figure 1 USE comparison August 2015 ESOO to October 2015 ESOO Update 0.0025 0.0020 0.0015 0.0010 0.0005 0.0000 15-16 16-17 17-18 Financial year USE (August ESOO) USE (October update) Reliability standard 1.2.2 Supply challenges reliance on wind generation and interconnection Although Reliability Standard breaches are not expected in the next three years, the earlier withdrawal of Northern Power Station will impact South Australia s supply demand balance from summer 2016-17 under extreme conditions. For there to be sufficient supply to meet periods of high demand in South Australia, the region will rely (to a greater extent in the next three years than was projected in the 2015 ESOO) on: Availability of wind generation. Imports via interconnection from Victoria. Reliability of existing generating units. AEMO 2

18/10/2015 18/11/2015 18/12/2015 18/01/2016 18/02/2016 18/03/2016 18/04/2016 18/05/2016 18/06/2016 18/07/2016 18/08/2016 18/09/2016 18/10/2016 18/11/2016 18/12/2016 18/01/2017 18/02/2017 18/03/2017 18/04/2017 18/05/2017 18/06/2017 18/07/2017 18/08/2017 18/09/2017 18/10/2017 Availability, net interconnector import, generation and demand (MW) ELECTRICITY STATEMENT OF OPPORTUNITIES Focusing on the next two years, Figure 2, derived from AEMO s Medium Term Projected Assessment of System Adequacy (MT PASA) and ESOO Update analysis, shows how: The withdrawal of Northern Power Station proportionately reduces the availability of scheduled coal, gas and diesel-fired generation capacity in South Australia (that is, aggregate PASA availability). After Northern Power Station is withdrawn, there are times when maximum daily demand (MT PASA 10% probability of exceedance (POE) forecast) 3 is projected to exceed supply from scheduled generation in South Australia. At these times, the region will rely on imports (via interconnection) and wind generation to meet operational demand. Figure 2 Projected supply and demand in South Australia to October 2017 4,500 4,000 Heywood upgrade stage 1 complete Heywood upgrade stage 2 complete 3,500 3,000 2,500 2,000 1,500 1,000 Northern withdrawn Pelican Point capacity reduced Pelican Point returns Generator outage scheduled Torrens Island A withdrawn 500 0 Aggregate PASA Availability Semi-Scheduled Wind Generation Net Interconnector Import Demand (10% POE) The semi-scheduled wind generation and interconnector flows assumed in Figure 2 represent the average contribution from wind and from Victorian imports during the top 10% of summer and winter daily maximum demands, derived from the 2015 ESOO analysis. In summer 2016-17, the modelled average wind contribution at these times is 367 MW (which is 31% of installed semi-scheduled wind capacity in South Australia), with an estimated average 535 MW of imports available from Victoria. Under lower wind conditions (less than 150 MW), there would be supply shortfalls in the state if additional imports from Victoria were not available. The level of imports will be subject to the availability and capacity of the interconnector, and the coincidence of high demand in Victoria. 3 A probability of exceedance refers to the likelihood that a maximum demand forecast will be met or exceeded. A 10% POE MD projection is expected to be exceeded, on average, one year in 10. AEMO 3

08/10/2015 08/10/2015 09/10/2015 09/10/2015 10/10/2015 10/10/2015 11/10/2015 11/10/2015 12/10/2015 12/10/2015 13/10/2015 13/10/2015 14/10/2015 14/10/2015 15/10/2015 15/10/2015 16/10/2015 16/10/2015 17/10/2015 17/10/2015 18/10/2015 18/10/2015 19/10/2015 19/10/2015 South Australia FCAS spot price ($/MWh) ELECTRICITY STATEMENT OF OPPORTUNITIES 1.3 Availability of Frequency Control Ancillary Services in South Australia This ESOO update also reports on an emerging opportunity in the Frequency Control Ancillary Services (FCAS) market in South Australia. Network outages of the Heywood Interconnector in October 2015 resulted in periods where the separation of South Australia from the NEM was a credible risk. A credible separation risk requires AEMO to have arrangements and processes in place to ensure the security of the South Australian power system following separation from the NEM. During these periods of credible risk, AEMO would need to source FCAS locally within South Australia to ensure system security. There are currently only three registered participants in the FCAS market in South Australia, and the closure of Northern Power Station by March 2016 will reduce this participation further. During the October 2015 outage, sourcing FCAS locally within South Australia resulted in sustained high prices for several FCAS services. Figure 3 below shows the price for Regulation FCAS services in South Australia over the ten days from 8 October to 19 October 2015. The Heywood outage started on 11 October, and the impact on FCAS prices is clearly visible. After prolonged high Lower and Raise Regulation FCAS prices between 2100 hours on 11 October 2015 and 0400 hours on 12 October 2015, the administered price of $300/MWh was applied during the entire week for all market ancillary services within the South Australia region. Conditions of credible separation risk have historically existed for 5 10% of the time, normally due to planned maintenance or upgrades along the interconnector. These recent high FCAS prices, coupled with the impending withdrawal of Northern Power Station, signal a potential opportunity for other participants in South Australia to participate in the FCAS market during future periods of credible risk. Figure 3 South Australia FCAS prices: October 8 to October 19, 2015 $10,000 $1,000 $100 $10 $1 $0 SA Raise Regulation SA Lower Regulation Note: logarithmic scale on y-axis. AEMO 4