JUNE 25, 2015 TSX: WDO

Similar documents
PRESS RELEASE. DUBUISSON NORTH DRILLING CUTS g/t AU OVER 5.0 METRES NEW S50 EAST DISCOVERY, 3.39 g/t AU OVER 25.9 METRES

WESDOME ANNOUNCES HIGH GRADE GOLD DISCOVERY AT KIENA COMPLEX IN VAL D OR QUEBEC

Ongoing Drilling of Kiena Deep a Zone Confirms Multiple High Grade Lenses and Extends Zone Down Dip

PRESS RELEASE WESDOME PLANS AGGRESSIVE DRILLING AND DEVELOPMENT PROGRAM IN 2011

Wesdome Announces Interim Mineral Resource Estimate for Kiena Mine Complex and Continued Drilling Extends Kiena Deep A Zone Along Plunge

QMX GOLD CONTINUES TO INTERSECT STRONG MINERALIZATION AT BONNEFOND, INTERSECTING 39.5 g/t Au OVER 2.4 METRES AND 31.5 g/t Au OVER 1.

QMX GOLD INTERSECTS 29.8 G/T AU OVER 3.0 METERS AND 19.3 G/T AU OVER 3.2 METERS AT BONNEFOND

San Gold Drills New Mine Horizon Adjacent to Rice Lake Mine, Returns 10.4 Metres Grading 25.7 g/t Au

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AND g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

Assay Results Highlights (as of November 16, 2017) representing approximately 4,500 metres ( m ) of drilling:

AVION GOLD DJAMBAYE II ZONE, TABAKOTO PROJECT, MALI, RETURNS HIGH GRADE INTERCEPTS OF 7.56 G/T Au OVER 7.0 METRES AND G/T Au OVER 3.

NEWS RELEASE FULLER PROPERTY CONTINUES TO DELIVER GOOD RESULTS 2.53 GRAMS PER TONNE GOLD OVER METRES

OSISKO METALS INTERSECTS 10.49% ZINC+LEAD OVER METRES AND 12.15% ZINC+LEAD OVER METRES AT PINE POINT

Probe Metals Continues to Expand Gold Zones At Val-d Or East

At the contact, mineralization is associated with strong tourmalinization of the Bevcon Intrusion.

NEWS RELEASE. FOR IMMEDIATE RELEASE Shares Outstanding: 35,190,286

55 Adelaide Street East, Suite St-Charles west, Suite 411, West Tower

Strategic Phase 2 Exploration Program Launched at Island Gold High-Grade Resource Potential Identified Laterally and at Depth

Mineral Resource Estimate Comparison at 3 g/t Au cut-off

Probe Metals Discovers New High Grade Gold Zone on Val-d Or East Project: Intersects 12.6 g/t Gold Over 7.3 Metres

Probe Metals Continues to Intersect Significant Gold Mineralization in Expansion Drilling at Val-d Or East, including 4.1 g/t Gold Over 15.

TROILUS GOLD CORP. INITIATES 30,000 METRE DRILL PROGRAM ON TROILUS PROPERTY

IAMGOLD CONTINUES TO INTERSECT HIGH GRADES AT MONSTER LAKE

News Release. Infill Drilling Program

Probe Metals Intersects 3.2 g/t Gold Over 45.5 Metres At Val-d Or East

Pahtavaara Drill Program Intersects 32.8 G/T Gold Over 2.0M And 2.1 G/T Gold Over 18.0M In The Karoliina Zone

June 4, 2015 News Release Valley of the Kings Underground Infill Drilling Underway

July 15, 2015 News Release Valley of the Kings Underground Infill Drilling Progresses

AUGUSTINE VENTURES ANNOUNCES HIGH GRADE GOLD BEARING TENSION VEINS IN THE HANGING WALL OF THE SURLUGA DEPOSIT

Queenston Announces 112% Increase in Indicated Resource (to 1.5 M oz. gold) and 16% Increase in Inferred Resource (to 0.7 M oz. gold) at Upper Beaver

NEWS RELEASE ORCA GOLD INDICATED AND INFERRED RESOURCES AT BLOCK 14 INCREASE BY 24% AND 48% RESPECTIVELY

NEWS RELEASE. Tigray Intersects 28.2 metres at 8.50 grams per tonne gold at Mato Bula, Adyabo Project, Northern Ethiopia

Probe Metals Confirms Continuity of Gold Mineralization on its Val-d Or East Project And Increases 2017 Drill Program to 75,000 metres

MINERAL MOUNTAIN RESOURCES LTD. MMV.TSX-V

Detour Gold Reports Drilling Results from Lower Detour

Probe Metals Intersects 1,122 g/t Gold Over 0.7 Metres in New Zone at Val-d Or East

BALMORAL ANNOUNCES SIGNIFICANT GOLD DISCOVERY ON DETOUR GOLD TREND IN QUEBEC

Highlights include: Hole TTD050: 6.12 g/t Au over 7.00 metres from metres o Including g/t Au over 1.18 metres

BALMORAL INTERSECTS g/t GOLD OVER 7.99 METRES, BUG LAKE SOUTH, DETOUR GOLD TREND PROJECT, QUEBEC

October 8, 2015 News Release Brucejack Regional Drilling Intersects Over 8,000 Grams Per Tonne Gold

NEWS RELEASE August 10, 2017

Underground Exploration Drilling Complete; Brucejack Mineralization Extends to the East

Goldcrest Resources Ltd.

BELO SUN INTERSECTS NEW HIGH GRADE ZONE AT GROTA SECA AND EXPANDS GRANDE DEPOSIT

NEWS RELEASE ORCA GOLD REPORTS CONTINUED SUCCESS AT GSS

Plateau Extends Falchani East Lithium Deposit Community Agreements Executed and Three Drill Rigs Active at Falchani West

MCEWEN MINING ANNOUNCES EXPLORATION UPDATE FOR EL GALLO 1, MEXICO

North American Palladium Announces Positive Exploration Results from Lac des Iles Mine

Press Release Thunder Bay: August 2, 2018

NEWS RELEASE. Evrim announces additional drilling results at Cuale Gold Project in Mexico

IAMGOLD ANNOUNCES RESULTS FROM THE WESTWOOD-MOOSHLA EXPLORATION PROJECT

CROCODILE GOLD INTERSECTS 7.1 G/T AU OVER 4.5 METERS INCLUDING 11.2 G/T AU OVER 2.6 METERS AT THE UNION REEFS PROJECT, PROSPECT DEPOSIT

Toronto, Canada March 4, 2013

OSISKO INTERSECTS 36 g/t Au OVER 6.9 METRES AT LYNX

BELO SUN RELEASES RESULTS FOR 74 ADDITIONAL DRILL HOLES AT ITS VOLTA GRANDE PROJECT

August 20, 2018 SBB NR SBB TSX

July Exploring for Canadian Gold in the Rainy River District of Ontario

OSISKO INFILL 38.9 g/t Au OVER 13.7 METRES AT UNDERDOG Infill Drilling Continues to Intersect High Grade

KIRKLAND LAKE GOLD ANNOUNCES 120 METRE DOWN-PLUNGE EXTENSION OF SWAN ZONE

OSISKO INTERSECTS 37.0 g/t Au OVER 5.4 METRES AT OSBORNE-BELL Infill Drilling Continues to Confirm High-Grade

Toronto, Canada May 7, 2015

DRILLING AT ASCOT S PREMIER PROPERTY EXTENDS GOLD MINERALIZATION 150 METRES WEST TOWARDS UNDERGROUND PORTAL

COPPER MOUNTAIN COMPLETES PHASE 2 DRILL PROGRAM AT NEW INGERBELLE WITH CONTINUED POSITIVE RESULTS

23 January, 2018 CSE: RFR For Immediate Release. Renforth extends Parbec Gold Deposit strike 60m with gold in all 7 drillholes

Eloro Outlines Major New Mineralized Trend on La Victoria Project, Peru; Sample Results Return Values To 33 Grams Gold Per Tonne

NEWS RELEASE. Evrim and Harvest Gold Complete Drilling at Cerro Cascaron

KIRKLAND LAKE GOLD EXPANDS NEW HIGH-GRADE ZONE BELOW TAYLOR MINE, REPORTS MINERALIZED EXTENSIONS ALONG STRIKE AND AT DEPTH

OSISKO INTERSECTS 115 g/t Au OVER 8.4 METRES AT LYNX. Interval (m)

MANN SILVER-COBALT MINE. PORE: TSXV PowerOre.com

BELO SUN DISCOVERS NEW MINERALIZED ZONE AT ITS VOLTA GRANDE GOLD PROJECT, BRAZIL

CAUTIONARY STATEMENT

BELO SUN RELEASES RESULTS FROM 65 DRILL HOLES FURTHER EXTENDING THE OURO VERDE DEPOSIT ALONG STRIKE NORTHWEST AND DOWN DIP

EXCELLON ANNOUNCES LA PLATOSA EXPLORATION RESULTS: HIGH GRADES CONTINUE TO EXTEND MANTO SULPHIDES DRILL HOLE ENCOUNTERS SOURCE ENVIRONMENT INDICATORS

EAST-WEST DRILL PROGRAM RESULTS

MEDIA RELEASE OCEANAGOLD ANNOUNCES FURTHER DOWN DIP EXTENSIONS OF MINERALISATION AT PANEL 2: FRASERS UNDERGROUND MINE

NEWS RELEASE. March 22, 2017

Dalradian Intersects 2.48 metres Grading g/t Gold and 4.87 metres Grading 8.35 g/t Gold With Infill Drilling at Curraghinalt

April Exploring for Canadian Gold in the Rainy River District of Ontario

MEXICAN GOLD INTERSECTS 7.18 G/T GOLD EQUIVALENT (2.00 G/T AU, G/T AG, 3.05 % CU) OVER 14.0 METERS AT LAS MINAS DIKE CONTACT ZONES

Corvus Gold Drills g/t Gold, Extends Mother Lode Sediment Hosted Gold System to at Least 450 Metres Along Strike

IAMGOLD PROVIDES UPDATE ON ADVANCED EXPLORATION PROJECT DIAMOND DRILLING RESULTS BOTO PROJECT, SENEGAL

CROCODILE GOLD CONTINUES POSITIVE EXPLORATION RESULTS INTERSECTS HIGH GRADE GOLD AT UNION REEFS PROJECT

Trading Symbol: ADA TSX-V; C2Z-Frankfurt Press Release No Shares Outstanding: 104,808,584 November 1, 2006

A B C PAD A HIGHLIGHTS

Drilling Extending Mineralization in La Mina North Zone

SABINA GOLD &SILVER REPORTS COMPLETION OF DRILLING AT ECHO DEPOSIT, BACK RIVER, NUNAVUT.

Suite 1800 Two Bentall Centre 555 Burrard Street Vancouver, BC V7X 1M9 Tel: (604) Tel: (888) April 8, 2018 SBB NR SBB TSX

NEWS RELEASE TSX: ELD NYSE: EGO September 6, Eldorado Announces Drilling Results from KMC Project, Serbia

NORTHQUEST LTD. ANNOUNCES DRILLING RESULTS FROM THE PISTOL BAY GOLD PROJECT, NUNAVUT, CANADA

KIRKLAND LAKE GOLD INTERSECTS NEW MINERALIZATION AT TAYLOR MINE, CONTINUES TO EXTEND PORPHYRY DEPOSITS TO DEPTH

CHAMPION IRON REPORTS EXPLORATION RESULTS AT POWDERHORN PROJECT, NEWFOUNDLAND

V Sample from C.O.D vein 15 metres southwest of V

OSISKO INTERSECTS 2223 g/t Au OVER 2.0 METRES AT WINDFALL Infill Drilling Hits Bonanza Grade in Zone 27

KIRKLAND LAKE GOLD EXTENDS HIGH-GRADE GOLD MINERALIZATION AT MACASSA, NEW GOLD SYSTEM DISCOVERED AT DEPTH

Teranga s Golden Hill Drill Program Intersects High-Grade Gold and Expands Mineralized Zones at Peksou and Ma Prospects

Drilling Extending Mineralization in La Mina North Zone

June 4, 2014 News Release Valley of the Kings Exploration Program Underway; Project Update

EXPLOR INTERSECTS MULTIPLE COPPER ZONES GRADES UP TO 3.65% CU OVER 5.35 METERS ON THE CHESTER COPPER PROPERTY

Wallbridge Completes Successful Initial Drill Program at Beschefer

Transcription:

JUNE 25, 2015 TSX: WDO PRESS RELEASE WESDOME CONFIRMS CONTINUITY OF THE S50 EAST AND PRESQU ILE ZONES AT VAL D OR PROPERTIES Hole S783 intersects 89.72 g Au/tonne over 3.1 metres Toronto, Ontario June 25, 2015 Wesdome Gold Mines Ltd (TSX: WDO) is pleased to announce the results of the winter drilling program at its Kiena property in Val d Or, Quebec. The drill program consisted of thirty (30) holes totalling 7,097 metres to explore S50 East zone extension near the Kiena shaft and also to test the continuity of the Presqu ile zone towards the west. (See press releases dated November 19, 2014, and February 27, 2013, available at www.wesdome.com). Twenty-three holes totaling 5,129 metres were drilled to explore the continuity of the S50 East where two (2) holes drilled in 2014 had identified broad intersections of S50 style mineralization at shallow depths. The surface definition drilling of the S50 East spanned 250 metres at 50 metre centres from approximately 250 metres east of the Kiena S50 zone. Additionally, seven holes (7) totaling 1,968 metres were drilled to test the continuity of the Presqu ile area towards the west. Drilling highlights are summarized below. The appended tables and figures provide detailed drill hole location data, average gold grades over drill core intervals, surface plans and longitudinal sections. Mr. Rolly Uloth, President and CEO, commented, The 2015 winter drilling program confirmed continuity of the S50 East zone at shallow depth and confirmed the high grade multi-vein potential of the Presqu ile area. Wesdome has commissioned an independent 43-101 technical study on its extensive and contiguous Val d Or land position. We believe this study will comprehensively inventory our significant resource base, mining and processing infrastructure and outstanding brownfields exploration and development potential. S50 EAST HIGHLIGHTS 5.83 g Au/tonne over 12.6 metres in hole S771 40.55 g Au/tonne over 3.0 metres in hole S775 PRESQU ILE HIGHLIGHTS 26.85 g Au/tonne over 5.9 metres in hole S780 89.72 g Au/tonne over 3.1 metres in hole S783 ABOUT THE VAL D OR PROPERTIES Wesdome s Val d Or land position consists of a contiguous block of mining claims and concessions covering in excess of 7,300 hectares. This 8 kilometre by 9 kilometre block includes 10 shafts, greater than 2.8 million ounces of historic gold production and a central modern mining, 2,000 tonnes per day milling and refining complex currently on care and maintenance. The Company is actively assessing various development scenarios, actively exploring its claims and compiling an updated 43-101 compliant technical report. This rare combination of modern, fully permitted infrastructure and

extensive contiguous property ownership in a proven, world class gold mining camp resulted from a decades long consolidation effort. We consider it a premiere brownfields exploration and development opportunity. The Kiena area currently contains mineral resources of 4,313,000 tonnes at an average grade of 3.7 grams of gold per tonne for 513,000 ounces in the measured and indicated resources category (2014 Wesdome Annual Information Form, www.sedar.com). Approximately three kilometres north of the Kiena shaft, the Wesdome deposit contains an additional 336,000 tonnes at an average grade 7.5 grams of gold per tonne for 80,000 ounces in the measured and indicated resources category, and 2,311,000 tonnes at an average grade of 8.0 grams of gold per tonne for 598,000 ounces in the inferred resource category (43-101 Technical Report, dated Dec 8, 2009, www.sedar.com). S50 EAST ZONE The S50 East zone consists of broad lenticular intervals of typical S50 stockwork and breccia style mineralization hosted within deformed mafic volcanics bounded by ultramafic rocks defined by magnetic surveys (see Figure 1). The 2015 winter drilling program has confirmed continuity of the S50 zone at shallow depths along a southeast trend (see Figure 2). The S50 zone was the mainstay of Kiena s historic production and it remains open at depth. Its historic production amounts to 1.5 million ounces from 10 million tonnes at a recovered grade of 4.75 grams of gold per tonne. Drilling in 2015 confirmed a shallow up plunge extension to the east of the S50 zone with a strike length of 150 metres and extending to 100 metres depth (see figure 2). PRESQU ILE ZONE The Presqu ile zone is located 1.5 kilometres northwest of the Kiena shaft. The Presqu ile zone mineralization consists of an en-echelon array of sub-parallel steep northeasterly dipping quartzcarbonate (+/-chlorite and pyrite) veins with local chalcopyrite and native gold. The mineralized veins are mainly hosted by mafic volcanic tuffs and flows near the contact with komatiite flows along the northwest trending Marbanite shear (see Figure 3). Initially during 2012-2013, two mineralized vein structures were delineated at Presqu ile. The 2015 winter drilling program intersected two additional closely spaced mineralized vein structures towards the northwest. The best 2015 drill intercepts at Presqu ile returned 89.72 g/t Au (uncut) over 3.1 metres from 95.5 to 98.6 metres in hole S783 and 26.85 g/t Au (uncut) over 5.9 meters of core from 64.3 to 70.2 metres in hole S780 (see Figure 4 and Figure 5). Drilling in 2015 confirms potential of the Presqu ile area to host a multi-vein system of above average grade at shallow depth. TECHNICAL DISCLOSURE The technical content of this press release has been compiled and verified by Marc Ducharme, P.Geo. OGQ, Chief Exploration Geologist, Wesdome Gold Mines Ltd. in his capacity as a Qualified Person, as per requirements of National Instrument 43-101. Sample preparation was done at Techni- Lab (ActLabs) in Val d Or (Quebec) and assaying was done by fire assay methods at Techni-Lab (ActLabs) laboratory in Ste-Germaine-Boulé (Quebec). In addition to laboratory internal duplicates, 2

standards and blanks, the geology department inserts blind duplicates, standards and blanks into the sample stream at a frequency of one in twenty to monitor quality control. Mineral Resource estimates incorporated by reference, were completed by the following Qualified Persons, Kiena: Marc Ducharme, P.Geo, Chief Exploration Geologist, Wesdome Gold Mines Ltd. Adjoining Wesdome Project: B.Turcotte, P.Geo and C.Pelletier, P.Geo, InnovExpo Consulting Firm, Independent. ABOUT WESDOME Wesdome Gold Mines Ltd. is in its 28th year of continuous gold mining operations in Canada. The Company is currently producing from its Eagle River and Mishi gold mines near Wawa, Ontario, which have earned consistent free cash flow during times of low gold prices. Wesdome s corporate goal is to build a profitable, long-life, sustainable gold mining Company with modest initial capital costs. This strategy has enabled the Company to acquire strategic property and infrastructure assets in two politically stable and historically proven mining camps. Wesdome has significant upside through ownership of its two other properties, the Val d Or Property in Québec and the Moss Lake gold deposit located 100 kilometres west of Thunder Bay, Ontario. These assets are being explored and evaluated to be developed in the appropriate gold price environment. The Company has approximately 111.1 million shares issued and outstanding and trades on the Toronto Stock Exchange under the symbol WDO. For further information, please contact: Lindsay Dunlop Or George Mannard, P.Geo. Vice President, Investor Relations Vice President, Exploration 416-360-3743 ext 25 416-360-3743 ext 22 ldunlop@wesdome.com 8 King St., Suite 811 Toronto, ON, M5C 1B5 Toll Free: 1-866-4-WDO-TSX Phone: 416-360-3743, Fax: 416-360-7620 Email: invest@wesdome.com, Website: www.wesdome.com This news release contains forward looking information which may include, but is not limited to, statements with respect t the future financial or operating performance of the Company and its projects. Often, but not always, forward-looking statements can be identified by the use of words such as plans, expects, is expected, budget, scheduled, estimates, forecasts, intends, anticipates, or believes or variations (including negative variations) of such words and phrases, or state that certain actions, events or results may, could, would, might or will be taken, occur or be achieved. Forward -looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements. Forward-looking statements contained herein are made as of the date of this press release and the Company disclaims any obligation to update any forward-looking statements, whether as a result of new information, future events or results or otherwise. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. The Company undertakes no obligation to update forward-looking statements if circumstances, management s estimates or opinions should change, except as required by Securities legislation. Accordingly, the reader is cautioned not to place undue reliance on forward-looking statements. 3

Table 1: DRILL HOLE LOCATION AND PARAMETERS DRILL HOLE TARGET EASTING (m) UTM18NAD83 NORTHING (m) UTM18NAD83 ELEVATION (m) AZIMUTH DIP LENGTH DRILLED (m) S770 S50 East 283394 5333440 295 30-51 231 S771 S50 East 283372 5333400 295 28-50 249 S772 S50 East /South Zone East 283371 5333398 295 210-50 420 S773 S50 East 283344 5333359 295 30-50 264 S774 S50 East 283440 5333414 295 31-52 183 S775 S50 East 283354 5333467 295 30-51 228 S776 S50 East 283329 5333426 295 31-50 222 S777 S50 East 283302 5333385 295 31-50 261 S778 S50 East 283382 5333512 295 30-50 157.5 S779 S50 East 283481 5333388 295 30-50 144 S780 Presqu'ile 281589 5334700 296 208-53 291 S781 Presqu'ile 281589 5334700 295 208-73 276 S782 Presqu'ile 281589 5334700 295 208-87 345 S783 Presqu'ile 281590 5334700 296 195-63 285 S784 Presqu'ile 281590 5334700 296 173-73 291 S785 Presqu'ile 281545 5334726 295 210-50 246 S786 Presqu'ile 281545 5334726 295 197-63 234 S787 S50 East 283415 5333372 294 30-50 228 S788 S50 East 283388 5333329 295 30-55 235 S789 S50 East 283362 5333285 295 29-55 222 S790 S50 East 283362 5333285 295 29-80 238 S791 S50 East 283401 5333261 295 30-50 192 S792 S50 East 283446 5333234 295 29-50 210 S793 S50 East 283429 5333303 295 30-50 249 S794 S50 East 283471 5333274 295 30-50 231 S795 S50 East 283455 5333346 295 30-50 187.5 S796 S50 East 283498 5333317 295 29-50 144 S797 S50 East 283463 5333165 295 29-50 261 S798 S50 East 283508 5333333 295 211-50 231 S799 S50 East 283394 5333250 295 30-71 141 Table 2: S50 SE & PRESQU ILE ZONES COMPOSITE ASSAY RESULTS Hole No. Target From To Core length Est. True Width Grade (gau/tonne) Cut Grade (cut to 34.28 gau/tonne) S770 S50 East 13.2 22.3 9.1 8.1 0.86 0.86 S771 S50 East 16.3 55.7 39.4 34.7 2.45 2.22 S771 S50 East (incl.) 37.4 50.0 12.6 11.1 5.83 5.12 S771 S50 East 68.0 71.0 3.0 2.6 2.38 2.38 S772 S50 East 174.0 177.0 3.0 0.7 3.60 3.60 S772 South Zone East 316.4 317.8 1.4 0.4 3.10 3.10 S772 South Zone East 388.5 393.0 4.5 1.1 1.21 1.21 S773 S50 East 50.7 58.2 7.5 6.7 1.21 1.21 S773 S50 East 66.2 75.0 8.8 7.8 0.86 0.86 S774 S50 East NSA NSA S775 S50 East 23.9 36.9 13.0 11.7 1.50 1.50 S775 S50 East 48.0 51.0 3.0 2.7 40.55 13.62 S775 S50 East 56.0 67.0 11.0 9.9 2.45 2.45 S775 S50 East 69.0 77.0 8.0 7.2 1.00 1.00 4

Hole No. Target From To Core length Est. True Width Grade (gau/tonne) Cut Grade (cut to 34.28 gau/tonne) S775 S50 East 81.0 84.3 3.3 3.0 3.07 3.07 S775 S50 East 100.2 106.1 5.9 5.4 0.98 0.98 S776 S50 East 71.0 77.0 6.0 5.4 0.98 0.98 S776 S50 East 77.0 85.0 8.0 7.3 2.82 2.82 S776 S50 East 87.0 99.0 12.0 10.9 2.25 2.25 S776 S50 East 99.0 116.0 17.0 15.5 0.88 0.88 S776 S50 East 134.0 136.0 2.0 1.8 1.46 1.46 S777 S50 East 98.6 99.6 1.0 0.9 1.13 1.13 S777 S50 East 117.7 127.4 9.7 8.5 0.37 0.37 S777 S50 East 130.5 132.0 1.5 1.3 1.83 1.83 S777 S50 East 147.2 155.5 8.3 7.4 0.50 0.50 S777 S50 East 170.3 173.0 2.7 2.4 0.97 0.97 S778 S50 East NSA NSA S779 S50 East NSA NSA S780 Presqu'ile 64.3 70.2 5.9 5.6 26.85 10.59 S780 Presqu'ile 78.0 80.3 2.3 2.2 2.41 2.41 S780 Presqu'ile 276.9 277.6 0.7 0.7 4.54 4.54 S781 Presqu'ile 105.0 107.0 2.0 1.6 0.75 0.75 S782 Presqu'ile 279.4 280.3 0.9 0.5 0.15 0.15 S783 Presqu'ile 88.9 91.5 2.6 2.3 1.77 1.77 S783 Presqu'ile 95.5 98.6 3.1 2.8 89.72 25.54 S783 Presqu'ile 223.8 224.6 0.8 0.6 1.00 1.00 S784 Presqu'ile 102.0 104.9 2.9 2.3 2.27 2.27 S785 Presqu'ile 165.1 167.5 2.4 1.2 0.12 0.12 S786 Presqu'ile 102.6 103.6 1.0 0.9 1.09 1.09 S786 Presqu'ile 153.3 156.3 3.0 2.1 2.41 2.41 S786 Presqu'ile 160.3 163.3 3.0 2.1 0.90 0.90 S787 S50 East 28.5 30.8 2.3 2.0 0.28 0.28 S788 S50 East 57.2 58.2 1.0 0.9 2.55 2.55 S788 S50 East 71.9 72.9 1.0 0.9 0.99 0.99 S789 S50 East 99.5 100.9 1.4 1.2 1.47 1.47 S789 S50 East 110.8 113.9 3.1 2.7 1.03 1.03 S790 S50 East 98.7 103.5 4.8 3.8 0.53 0.53 S790 S50 East 128.7 132.8 4.1 3.2 0.97 0.97 S790 S50 East 180.4 188.1 7.7 6.2 1.19 1.19 S790 S50 East 183.0 186.0 3.0 2.4 2.36 2.36 S791 S50 East 52.3 55.9 3.6 3.2 3.27 3.27 S791 S50 East 67.9 70.0 2.1 1.9 1.58 1.58 S791 S50 East 72.0 75.0 3.0 2.7 2.70 2.70 S791 S50 East 79.4 85.4 6.0 5.3 0.87 0.87 S791 S50 East 103.0 106.0 3.0 2.7 3.13 3.13 S792 S50 East 29.4 30.8 1.4 1.2 0.86 0.86 S792 S50 East 33.5 35.0 1.5 1.3 2.50 2.50 S793 S50 East 58.0 60.0 2.0 1.8 1.30 1.30 S793 S50 East 193.6 194.8 1.2 1.1 1.10 1.10 S794 S50 East NSA NSA S795 S50 East 185.7 186.7 1.0 0.9 0.22 0.22 S796 S50 East NSA NSA S797 S50 East NSA NSA S798 S50 East NSA NSA S799 S50 East 75.3 76.3 1.0 0.8 1.21 1.21 S799 S50 East 86.0 91.3 5.3 4.5 0.63 0.63 S799 S50 East 97.1 99.1 2.0 1.7 1.63 1.63 S799 S50 East 108.1 109.1 1.0 0.9 0.48 0.48 NSA = No significant assay 5

Figure 1: S50 SE DDH Results Highlights Plan 6

Figure 2: S50 SE Longitudinal Section 7

Figure 3: Local Geology Presqu ile 8

Figure 4: Presqu ile Longitudinal 9

Figure 5: Presqu ile Drill Section 10