MCINTOSH FLAKE GRAPHITE PROJECT TARGET 6

Similar documents
For personal use only

For personal use only

STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE AT SYNDICATED S 100% BARBARA SOUTH LODE

Exploration targets identified to increase Browns Range Project s mine life

DIAMOND AND AIR CORE DRILLING TO COMMENCE ON WHITELAW GOLD BELT

For personal use only

For personal use only

HIGH-GRADE GOLD MINERALISATION CONTINUES ALONG STRIKE AT THE BODDINGTON SOUTH GOLD PROJECT

High Grade Gold Intercepts at Bangaba

For personal use only

For personal use only

******************* *******************

QUARTERLY ACTIVITIES REPORT ENDING 30 SEPTEMBER 2010 HIGHLIGHTS

New Zone of High Grade Gold Discovered at Balogo

For personal use only

THUNDELARRA EXPLORATION

SIGNIFICANT GOLD MINERALISATION INTERSECTED AT MANIEMA PROJECT, DRC 21.7m at 3.58g/t Au HIGHLIGHTS

ASX Announcement 24 December Drilling results confirm depth potential of Lamboo Project

Encouraging drill results from Paroo Range

ASX Announcements & Media Release

RC DRILLING TO RESUME THIS WEEK AT CARLISLE REEFS

Aurora Tank Gold Drilling Update

Malachite Resources Limited ABN

For personal use only

GRAPHITE OVER 50% AT JOLLY TAR PROSPECT, CROYDON PROJECT QLD

For personal use only

Spectacular uranium assays from rock sampling. at FYI s Yarlarweelor project in Western Australia

December 2017 Quarter Activities Report

Norwest successfully lists on ASX, Drilling commenced at Warriedar Gold Project

For personal use only

New High Grade Lode Discovered at Wagtail South

ASX RELEASE REVIEW OF GLANDORE DATA TO DEFINE DRILL PROGRAM

For personal use only

High Grade Gold Drill Results Extend Buccaneer

ASX ANNOUNCEMENT. Spectacular radiometric results at Mad Gap Project and East Kimberley Joint Venture

A1 GOLD MINE 14 LEVEL STOCK WORKS TARGET FURTHER HIGH GRADE DRILL INTERCEPTS

High Grade Gold Results from RAB Drilling at the Central Bore Prospect

24 September Best results achieved at U40 Prospect (West Arnhem JV with Cameco Australia): o 1.34% eu 3 O 8

Hampton Hill Mining NL

For personal use only

DRILLING CONFIRMS STRONG FLAKE GRAPHITE SCHIST AND HIGHLIGHTS THE POTENTIAL FOR COPPER / NICKEL SULPHIDE MINERALISATION AT TARGET 4.

Co-O MINE MINERAL RESOURCE UPDATE

P ROJ EC T UPDATE PANDA HILL NIOBIUM PROJ ECT

TANDARRA GOLD PROJECT DRILLING COMMENCES AND FOUR EAGLES GOLD PROJECT DRILLING UPDATE

For personal use only

High Grade Gold Intersections at Harry Smith Prospect

Exploration Update: RC Drilling Commenced at Lucky Strike

For personal use only

For personal use only

Diamond Drilling Extends the Netiana Lodes at Depth

PENINSULA MINES- SUCCESSFUL APPLICATIONS FOR JANGGOHANG GRAPHITE MINE

Caravel commences major new drilling program at Calingiri copper-molybdenum project 8,500-9,000m of RC drilling planned across multiple targets

DECEMBER QUARTERLY REPORT

Drilling Commences at Telfer West Gold Project

MINCOR /GOLDEN RIM FIJI JOINT VENTURE SIGNIFICANT NEW EXPLORATION RESULTS

For personal use only

Market Release October

Further Extensions to the Netiana Lodes at Balogo, Burkina Faso

Highlights. Wa Project. Kandia Prospect. South Wa. Julie West Jang Trend. Corporate

Hits of up to 123gpt show Chesterfield emerging as a high grade gold project

Lake Resources N L, Quarterly Report, January - March 2013 LAKE RESOURCES NL QUARTERLY REPORT JANUARY MARCH 2013

102 metres strike length averaging 32.62g/t Gold extends overall surface vein sampling to date to 726 metres strike length averaging 24.

HIGH GRADE GOLD-BEARING QUARTZ VEIN DISCOVERED AT MIAREE, KARRATHA AREA WESTERN AUSTRALIA

For personal use only

Consolidated Tin Mines Limited

ATLAS GOLD LIMITED ABN QUARTERLY REPORT FOR THE PERIOD ENDED 31 MARCH 2005

MARCH 2012 QUARTERLY REPORT. Highlights. Exploration Activities. Wyloo Iron Ore & Gold Project. Fast Facts

ASX announcement. Mylo-Frontier Pilbara Gold Project acquisition. 27 November Summary

Silver City Minerals

EXPLORATION SUCCESS AT COYOTE GOLD MINE

HIGHLIGHTS. Drilling intersects wt% recovered DTR concentrate grading 69.8% Fe, including 27 metres in excess of 21% DTR.

For personal use only. Copper, Zinc and Uranium Projects in NT and SA ASX CODE: CXO

Bass Metals records further positive drill results & progress at 3 prospects.

ASX RELEASE ACTIVITY UPDATE SPARGOVILLE PROJECT WA MINING AND EXPLORATION

For personal use only

CRATER MOUNTAIN MAJOR MULTIPLE MINERALISATION EVENTS POTENTIAL ASSOCIATED WITH PORPHYRY SYSTEM NOW IDENTIFIED

RC drilling begins at Akoko Project marking commencement of 2010/11 exploration field season

ROE HILLS COBALT AND GOLD DRILLING ADVANCES

HIGH PURITY AND RECOVERY FROM TESTWORK ON THE ESMERALDA GRAPHITE PROJECT IN NORTH QLD

Airborne EM Survey Confirms Multiple VMS Targets at Collerina

APOLLO SOUTH AUSTRALIAN EXPLORATION UPDATE

African Energy Resources Limited

For personal use only

COPPER MOUNTAIN COMPLETES PHASE 2 DRILL PROGRAM AT NEW INGERBELLE WITH CONTINUED POSITIVE RESULTS

Maximising Gold Resources in Senegal

FIVE RIGS DRILLING AT KARLAWINDA

For personal use only

NEW PHASE OF RESOURCE EXTENSION AND UPGRADE DRILLING COMMENCES AT BARDOC GOLD PROJECT, WA

Rock chip sampling confirms high grade quartz vein 500m long and up to 20m wide

FOUR EAGLES MINERALISATION REPORT ACCEPTED AND DRILLING TO RECOMMENCE

GEOPACIFIC REPORTS HIGH GOLD VALUES IN AUGER SOIL SAMPLES FROM THE QALAU AND TATAIYA PROSPECTS, RAKI RAKI PROJECT,

Sepola Project Area in Mali Extended

Initial Gold Resource at Sissingue Tengrela Project (Ivory Coast)

Further High Grade Gold Mineralisation Intersected in Bonanza Zones at Mt Kare Gold/Silver Deposit PNG

For personal use only

For personal use only

AGM Presentation 12 November 2013

ASX RELEASE. Maiden graphite drill program commences at Monax s Waddikee Project in South Australia

LATEST DRILL RESULTS REVEALS MINERALISATION OPEN AT STRIKE AND DEPTH AT KATANNING GOLD DEPOSIT

DIAMOND DRILLING TO COMMENCE AT WODGER AND FORREST PROSPECTS

Transcription:

29 October 2015 LAMBOO RESOURCES Limited ABN 27 099 098 192 ASX: LMB CORPORATE OFFICE Level 16, 344 Queen Street Brisbane QLD 4000 OPERATIONS OFFICE Level 1, 5 Kingscote Street Kewdale WA 6105 Telephone: +61 427 349 451 CONTACT Tony Cormack CEO / Head of Operations tony@lambooresources.com 0427 349 451 Ken Banks Investor Relations kbanks@bigpond.net.au 0402 079 999 QUARTERLY ACTIVITIES REPORT PERIOD ENDING 30 SEPTEMBER 2015 HIGHLIGHTS: McIntosh Flake Graphite Project: Diamond core assay results from from Target 6 highlight broad intersections of commercially viable flake graphite, significant results include: T6GDD164: 44m @ 4.4% TGC from 47m, including 7m @ 7.1% TGC from 47m T6GDD168: 59m @ 4.7% TGC from 44m, including 6m @ 9.8% TGC from 78m & 12m @ 7.1% TGC from 132m (refer ASX announcement dated 16 September 2015) T6GDD167: 47 metres @ 5.0% TGC from 126m, including 13 metres @ 6.3% TGC from 143m and 10 metres @ 6.3% TGC from 158m T6GDD176: (upper zone) 16 metres @ 5.3% TGC from 87m, including 5 metres @ 6.9% TGC from 87m and 4 metres @ 6.0% TGC from 99m plus (lower zone) 29m @ 4.3% TGC from 156m including 13m @ 5.7% TGC from 143m (combined intercept of 45 metres @ 4.7% TGC) (refer ASX announcement dated 14 October 2015) *These diamond core assays add to T6GRC159 previously released, 72m @ 4.7% TGC including 15m @ 9.3% TGC and 3m @ 16.4% TGC (refer ASX announcement dated 3 June 2014) Initial metallurgical testwork results from Target's 4 and 6 show that commercial grades of flake graphite concentrate at >93% TGC can be produced using simple flotation and gravity methods with high recoveries Large scale antiformal structure confirmed at Target 6, large scale synformal structure confirmed at Target 4 Excellent correlation between the strong flake graphite schist logged in drill core and the VTEM model plates Jumbo flake graphite (>300 μm) recorded in thin section analysis First pass flotation testwork from Target 6 has recorded 25% of the flake graphite in the Large to Jumbo categories Bulk scale metallurgical testwork underway for distribution to current offtake partners and potential new end users Corporate: Successful pro rata non-renounceable entitlement issue raising $2,054,554 for diamond drilling at McIntosh, working capital and work on other projects

-2- MCINTOSH FLAKE GRAPHITE PROJECT TARGET 6 Figure 1: Target 6 plan view of diamond drill holes and assays completed to date Assays have been received for 8 of the 14 diamond drill holes completed to date at the Target 6 prospect (see Figure 1). The results highlight broad intersections of flake graphite mineralisation confirmed over a strike length in excess of 240m, of the total 1,500m strike length potential modelled from the VTEM survey at Target 6. The mineralised antiformal structure at Target 6 remains open in both directions along strike as well as at depth (see Figure 2). Figure 1 also highlights the further potential of Target 6 prospect with numerous VTEM model plates in the north and the south remaining untested by drilling to date.

-3- Figure 2: Oblique view of the Target 6 interpretation showing the large scale anticline and thickening of the graphitic schist unit along the fold hinge. The folded graphitic schist is at surface in the north with a slight plunge to the south. A cross cutting fault has offset the anticline as highlighted above. Table 1 is a summary of the diamond drill holes completed to date at the Target 6 prospect, Table 2 is a summary of the significant intercepts from assays returned to date at the Target 6 prospect. Table 1: Summary of completed diamond drill holes at the Target 6 prospect. Hole ID Easting Northing R.L. (m) Dip ( ) Azimuth ( ) Depth EOH (m) T6GDD164 389965 8052595 410-60 83 130.7 T6GDD165 389910 8052582 421-60 83 138.2 T6GDD166 390035 8052446 424-60 77 81.2 T6GDD167 389996 8052438 423-60 77 183.3 T6GDD168 390121 8052457 425-60 257 155.5 T6GDD169 390066 8052284 407-60 77 104.5 T6GDD170 389944 8052750 401-60 77 99.2 T6GDD171 389953 8052668 409-60 77 95.1 T6GDD172 389921 8052663 416-60 77 90.3 T6GDD173 389883 8052654 418-60 77 141.2 T6GDD174 390056 8052688 403-60 257 135.2 T6GDD175 389986 8052513 414-60 77 114.2 T6GDD176 389946 8052507 412-60 77 171.2 T6GDD191 390014 8052356 408-60 77 129.2 Total (m): 1,769

-4- Table 2: Significant graphite mineralised intersections from diamond core at the Target 6 prospect. Hole ID Depth (From) Depth (To) Intersection (m) Grade (%TGC) T6GDD164 47 91 44 4.4 T6GDD164 47 54 7 7.1 T6GDD164 62 67 5 5 T6GDD164 84 91 7 5 T6GDD164 110 115 5 5.4 T6GDD165 47 56 9 4.7 T6GDD165 78 87 9 4.4 T6GDD167 107 111 4 4.9 T6GDD167 126 173 47 4.7 T6GDD167 143 156 13 6.3 T6GDD167 158 168 10 6.3 T6GDD167 178 181 3 4.6 T6GDD168 96 155 59 4.7 T6GDD168 110 116 6 5.7 T6GDD168 132 144 12 7 T6GDD168 138 144 6 9.8 T6GDD171 27 41 14 4.5 T6GDD171 35 41 6 5.5 T6GDD171 67 71 4 7.7 T6GDD172 43 53 10 4.3 T6GDD172 45 48 3 5.3 T6GDD172 60 63 3 5.2 T6GDD173 73 91 18 4.5 T6GDD173 84 90 6 6.4 T6GDD173 104 126 22 4.7 T6GDD173 104 111 7 5.1 T6GDD173 120 124 4 6.4 T6GDD176 87 103 16 5.3 T6GDD176 87 92 5 6.9 T6GDD176 99 103 4 6 T6GDD176 142 171 29 4.3 T6GDD176 156 169 13 5.7 T6GDD176 156 161 5 7.3

-5- TARGET 4 A total of 11 diamond drill holes have been completed at the Target 4 prospect at McIntosh (see Figure 3). Drilling has intercepted broad zones of flake graphite mineralisation hosted in a high grade metamorphic schist. Figure 3: Plan view of Target 4 drill holes, VTEM anomaly / model plates and location of cross-section (A-B) Flake graphite mineralisation has shown a very strong correlation with the VTEM model plates, Figure 3 highlights the further potential that exists at Target 4 with numerous model plates to the west of the current drilling requiring follow up work in the future. The geometry of the Target 4 prospect is well suited to an open pit operation with a low strip ratio (see Figure 4).

-6- Figure 4: Cross section of diamond drill holes T4GDD177-179 at Target 4 Structural logging has confirmed Target 4 to be a large scale synform (convex down), with outcropping flake graphite schist and base of logged mineralisation approximately 100m below surface (see Figures 4 and 7). Thin section testwork completed on diamond drill core samples from Target 4 has reported large to jumbo flake graphite (See Figures 5 and 6). Initial metallurgical testwork has on diamond core samples from Target 4 has produced concentrates of >94% TC using simple floatation and gravity methods.

-7- Figure 5: Photomicrograph of T4GDD177 (84-85m) showing large to jumbo flake graphite Figure 6: Photomicrograph of T4GDD177 (99-100m) showing large to jumbo flake graphite

-8- Figure 7: Target 4 interpretation, oblique view looking south COMMERCIALISATION Metallurgical results achieved to date show that a commercial flake graphite product can be produced from both Targets 4 and 6. The testwork will produce marketing samples for distribution to our existing and potential offtake partners and will also allow for testwork on downstream applications including spherical, expandable, micronised and purified graphite to be conducted by the end users. The metallurgical testwork was carried out by ALS Australia at its Adelaide laboratory. OTHER AUSTRALIAN PROJECTS Limited work programs were undertaken in the quarter on the Mabel, Halls Creek and Valla Projects.

-9- LAMBOO TENEMENTS - AUSTRALIA Project Tenement Type Status Acquired/Disposed McIntosh, WA Melon Patch E E80/3864 100% Lamboo McIntosh Hills E E80/3928 100% Lamboo Melon North E E80/3906 100% Lamboo Melon South E E80/3907 100% Lamboo Black Granite E E80/4396 100% Lamboo White Rock South EL E80/4688 100% Lamboo Panton West EL E80/4734 100% Lamboo Black Rock Creek EL E80/4739 100% Lamboo Togo EL E80/4732 100% Lamboo Edle Creek EL E80/4825 100% Lamboo Alice Downs EL E80/4842 100% Lamboo White Rock EL E80/4841 100% Lamboo Carolyn Hills South P P80/1821 100% Lamboo Panton North E E80/4733 100% Lamboo Mabel Hill ELA E80/4879 100% Lamboo Wills Creek ELA E80/4931 100% Lamboo Mabel, WA Mabel Downs E E80/4385 100% Lamboo Spring Creek E E80/4797 100% Lamboo Six Mile Bore E E80/4814 100% Lamboo Halls Creek, WA Golden Crown South E E80/4794 100% Lamboo Highway E E80/4793 100% Lamboo Granite E E80/4795 100% Lamboo Granite P P80/1816 100% Lamboo Granite P P80/1817 100% Lamboo Granite P P80/1815 100% Lamboo Granite P P80/1818 100% Lamboo Granite P P80/1414 100% Lamboo Granite P P80/1799 100% Lamboo Granite P P80/1801 100% Lamboo Granite P P80/1800 100% Lamboo Valla, NSW Valla EL EL6702 100% Lamboo

-10- GEUMAM FLAKE GRAPHITE PROJECT During the quarter Lamboo Resource did not complete any field work, or advance any studies or testwork on the Geumam Flake Graphite Project in South Korea. LAMBOO TENEMENTS - SOUTH KOREA Geumam Flake Graphite Project Tenement Registration Area (ha) Registered Holder Grant Date Expiry Date Dangjin 54-4 200432 44 Won Kwang Mines Inc 30 July 2014 31 July 2021 Dangjin 56-3 200433 68 Won Kwang Mines Inc 30 July 2014 31 July 2021 Dangjin 66-1 200434 68 Won Kwang Mines Inc 30 July 2014 31 July 2021 Dangjin 55-3 80077 68 Won Kwang Mines Inc 7 February 2012 6 February 2032 Dangjin 65-1 80014 68 Won Kwang Mines Inc 8 December 2011 7 December 2031 Dangjin 65-2 78355 68 Won Kwang Mines Inc 17 December 2009 16 December 2029 Dangjin-54-2 200258 135 Won Kwang Mines Inc 23 May 2013 22 May 2020 Dangjin-55-4 200259 64 Won Kwang Mines Inc 23 May 2013 22 May 2020 Taehwa Flake Graphite Project Tenement Registration Area (ha) Registered Holder Grant Date Expiration Date Hongcheon 91-2 079948 68 Won Kwang Mines Inc 15 November 2011 14 November 2031 Samcheok Flake Graphite Project Tenement Registration Area (ha) Registered Holder Grant Date Expiration Date Samcheok-09-2 200216 68 Won Kwang Mines Inc 10 January 2013 9 January 2020

-11- CORPORATE PRO RATA NON-RENOUNCEABLE ENTITLEMENT ISSUE During the quarter the Company had a 1 for 5 non-renounceable rights issue which was fully allotted with the issue of 34,242,560 fully paid ordinary shares raising $2,054,554 before issue costs. UPDATED SECURITIES TRADING POLICY Following a review of the company's governance policies and procedures, the Securities Trading Policy has been updated. A copy of the policy has been uploaded to Lamboo s website: http://www.lambooresources.com.au/company_corp_governance.htm Tony Cormack CEO / Head of Operations Competent Persons Statement The information in this report relating to Exploration, Drilling, Assay Results and Geological Data at the McIntosh Project is based on information previously compiled and / or reviewed by Mr. Tony Cormack, Member of the Australasian Institute of Mining and Metallurgy and a full-time employee of Lamboo Resources Limited. Mr. Cormack has sufficient experience which is relevant to the activity being undertaken to qualify as a Competent Person as defined in the 2012 edition of the 'Australasian Code of Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Mr Cormack consents to the inclusion in this report of the matters based on his information in the form and context in which it appears.