Vegetation Related Transmission Outage Report

Similar documents
Vegetation Related Transmission Outage Report

OPALCO Outage Analysis. December 2017 Board Meeting

Risk Analysis for Assessment of Vegetation Impact on Outages in Electric Power Systems. T. DOKIC, P.-C. CHEN, M. KEZUNOVIC Texas A&M University USA

STORM IMPLEMENTATION PLAN & ANNUAL RELIABILITY PERFORMANCE REPORTS

Review of. Florida s Investor-Owned Electric Utilities Service Reliability reports. State of Florida

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA PACIFICORP. Direct Testimony of Heidemarie C. Caswell

The Saffir-Simpson Hurricane Wind Scale

SRI Enhancement. NERC Performance Analysis Subcommittee. April 9, 2014

Report on El Paso Electric Company Weather-Related Issues in February 2011

Champaign-Urbana 2001 Annual Weather Summary

The Study of Overhead Line Fault Probability Model Based on Fuzzy Theory

Severe Weather Watches, Advisories & Warnings

DISTRIBUTION SYSTEM ELECTRIC INFRASTRUCTURE RELIABILITY PERFORMANCE INDICATORS

Review of. Florida s Investor-Owned Electric Utilities Service Reliability reports. State of Florida

State of Reliability 2013

Review of Florida s Investor-Owned Electric Utilities Service Reliability Reports. September

Review of Florida s Investor-Owned Electric Utilities Service Reliability Reports. November

PUB NLH 185 Island Interconnected System Supply Issues and Power Outages Page 1 of 9

Ch. 3: Weather Patterns

The North American Electric Reliability Corporation hereby submits Informational Filing of the North American Electric Reliability Corporation.

Multi Hazard Evaluation of a High Voltage Transmission Network. John Eidinger 1 and Leon Kempner 2

The Hardening of Utility Lines Implications for Utility Pole Design and Use

Electric Distribution Storm Hardening Initiatives. Paul V. Stergiou Distribution Engineering October 14 th, 2015

Hurricane Basics and Preparedness. Jim Weyman Director, Central Pacific Hurricane Center Phone Office:

Outage Coordination and Business Practices

Storm report: The most damaging storm in BC Hydro s history. Report

Report on Reliability of ComEd Electrical Service within Downers Grove. Prepared September 1, 2013

STORM IMPLEMENTATION PLAN & ANNUAL RELIABILITY PERFORMANCE REPORTS

BVES Annual Reliability Public Presentation 2016 Performance

AUSLEY MCMULLEN ATTORNEYS AND COUNSELORS AT LAW 123 SOUTH CALHOUN STREET. P.O. BOX 391 (zip 32302) TALLAHASSEE, FLORIDA 32301

Air Masses, Fronts and Weather Systems

Report on Reliability of ComEd Electrical Service within Downers Grove. Prepared November 13, 2015

RESILIENCY OF POWER SYSTEMS: EARTHQUAKES, WIND AND FIRE

How Power is Restored After a Severe Storm. Presented by Stacy Shaw, Safety Director & Nolan Hartzler, GIS Mapping Technician

Section 5. TADS Data Reporting Instruction Manual DRAFT Section 5 and Associated Appendices With Proposed Event Type Numbers

Chapter 2. Planning Criteria. Turaj Amraee. Fall 2012 K.N.Toosi University of Technology

Contents. Chapter 1 Introduction Chapter 2 Cyclones Chapter 3 Hurricanes Chapter 4 Tornadoes... 36

Reference: US Department of Energy.

Hurricane Matthew Threats and Impacts Briefing for Eastern NC

Wind Events. Flooding Events. T-Storm Events. Awareness Alerts / Potential Alerts / Action Alerts / Immediate Action Alerts / Emergency Alerts.

Storm and Storm Systems Related Vocabulary and Definitions. Magnitudes are measured differently for different hazard types:

SCHOOL EMERGENCY MANAGEMENT PLAN FOR NATURAL DISASTERS

Winter Preparation for Severe Weather Events

GC Briefing. Weather Sentinel Hurricane Florence. Status at 5 PM EDT (21 UTC) Today (NHC) Discussion. September 13, 2018

CITY OF BEAVER DAM SNOW & ICE REMOVAL POLICY

2014 Annual Mitigation Plan Review Meeting

Kentucky Weather Hazards: What is Your Risk?

The 2015 NWS Spring and Summer Weather Update

Assessment of Previous Severe Winter Weather Reports

Director, Operations Services, Met-Ed

Reven ue Req u i remen t Ap pl icat ion 2004/05 and 2005/06. BC hydro m W. Volume 2. Appendix L. System Performance Indicators

Report on Transmission Facility Outages during the Northeast Snowstorm of October 29 30, 2011

JOINT U.S.-CANADA POWER SYSTEM OUTAGE TASK FORCE

Name Earth Science Pd. Hurricanes. Directions: Read the information, view diagrams and answer the questions in the worksheet.

W I N T E R STORM HAZARD DESCRIPTION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. Interconnection for Wind Energy ) Docket No. RM

Wind field has expanded and is very large. Hurricane Wind field = 100 miles wide, Tropical Storm Wind field = 360 miles wide

ELECTRIC SYSTEM RELIABILITY ANNUAL REPORT

Significant Coastal Storm Today through Thursday, 11/7-8. Weather Briefing

LECTURE #15: Thunderstorms & Lightning Hazards

Contingency Analysis Enhancements

Champaign-Urbana 1998 Annual Weather Summary

Section 12. Winter Storms

A bright flash that is produced due to electrical discharge and occurs during a thunderstorm.

SIGNIFICANT EVENTS Severe Storms November 1994 January 1996 August 1998 and May 2000 March 2002 May 2002 Champaign County

Monitoring Scour Critical Bridges During Floods For Local Bridge Owners. Presented by

DE PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE

California OES Weather Threat Briefing

NOAA s National Weather Service Philadelphia/Mt. Holly NJ

Deep Thunder. Local Area Precision Forecasting for Weather-Sensitive Business Operations (e.g. Electric Utility)

Tornadoes pose a high risk because the low atmospheric pressure, combined with high wind velocity, can:

Analysis & Optimization of Electricity Infrastructure Hardening Measures

MULTI-AGENCY COORDINATION SYSTEM PUBLICATION CALIFORNIA FIRE WEATHER PROGRAM RISK PREPAREDNESS GUIDE MACS 410-3

Snow Measurement Guidelines for National Weather Service Snow Spotters

BEFORE THE CORPORATION COMMISSION OF OKLAHOMA

Tropical Storm Ana. Created 615 AM Sat May 9, 2015 Reid Hawkins, Science Officer

Staging for Utility Personnel and Mutual Aid. 1. Hermine- Meeting dates were August 29th_31 st, 2016 and September 1st, 2016.

We Had No Warning An Overview of Available Forecast Products Before and During Severe Weather Events

Comanche County Emergency Management and local fire/police crews continue to assess damage Wednesday morning.

The hydrologic service area (HSA) for this office covers Central Kentucky and South Central Indiana.

Steps to Reduce the Risk of Tornado Damage in Commercial Structures

FLOOD/SCS EVENT, APRIL 28 MAY 4

& Locations. Dr. Kim D. Coder, Professor of Tree Biology & Health Care, Warnell School, UGA

DRAFT Operating Committee MINUTES October 18, 2018, 11 a.m. 3:00 p.m. GMP Montpelier, VT

CHAPTER 10. TORNADOES AND WINDSTORMS

Weather Responsive Traffic Management. Wyoming DOT Variable Speed Limit (VSL) Project. March 2012

Tornadoes. Tornadoes COMMUNITY EMERGENCY RESPONSE TEAM TORNADOES

A Prepared Marylander Creates a Resilient Maryland

Hurricane Harvey: SE Texas Impacts. 10 PM CDT UPDATE Friday, August 25, 2017 Prepared by: Lance Wood

U.S. WIND, SCS, FLOOD, WINTER WEATHER

Geomagnetic Disturbance Operating Plan

5.2. IDENTIFICATION OF NATURAL HAZARDS OF CONCERN

Advisory #35 Briefing 630 PM EDT Thursday October 06, 2016

History of Natural and Man-Made Disaster within the Region. There have been two aircraft accident resulting in casualties within the past 50 years.

Reliability Based Vegetation Management Through Intelligent System Monitoring

THE COMING STORM. Rosmarie Kelly PhD MPH Public Health Entomologist Georgia Division of Public Health

5.2 IDENTIFICATION OF HAZARDS OF CONCERN

Peterborough Distribution Inc Ashburnham Drive, PO Box 4125, Station Main Peterborough ON K9J 6Z5

Hurricane Matthew. Life Threatening Flash Flooding Likely. National Weather Service Wilmington NC. Josh Weiss, Meteorologist

...TORNADO CONFIRMED NEAR SANFORD...BROADWAY...HOLLY SPRINGS AND RALEIGH IN LEE AND WAKE COUNTIES COUNTY NORTH CAROLINA...

Transcription:

Vegetation Related Transmission Outage Report Third 2013 3353 Peachtree Road NE Suite 600, North Tower Atlanta, GA 30326 404-446-2560 www.nerc.com

Executive Summary The NERC Board of Trustees Compliance Committee has reviewed and accepted this Vegetation Related Transmission Outage Third 2013 Report. The reportable 1 vegetation related transmission outages that occurred in the Third of 2013 are being reported in accordance with Requirement 4 2 of standard FAC 003 1. 3 Specifically, Requirement 3.4 requires each outage to be categorized as one of the following: Grow ins: Outages caused by vegetation growing into lines from vegetation inside and/or outside of the Right of Way (ROW). Fall ins: Outages caused by vegetation falling into lines from inside the ROW. Category 3 Fall ins: Outages caused by vegetation falling into lines from outside the ROW. Table 1 is a summary of the vegetation outages that occurred in the Third of 2013 by voltage class and category. Category RE Designated Critical Lines <200 kv 230 kv 345 kv 500 kv 765 kv Total Grow ins 0 0 0 0 0 0 Fall ins 0 0 0 0 0 0 Category 3 Fall ins 1 4 0 0 0 5 Total 1 4 0 0 0 5 Table 1: Summary of Vegetation Related Outages, by Voltage Class and Outage Category for Third 2013 The five vegetation related transmission outages reported in the Third of 2013 were classified as Category 3. Four outages involved a 230 kv line and one outage involved a designated critical line under 200 kv. All five outage events were weather related due to high wind, localized storm, or heavy rain conditions causing a tree outside the ROW to break off and fall into the line or damage part of the structure. Two outages were due to trees falling in a domino manner into one another; one outage was due to a significant number of trees blown over from well off the ROW. 1 Per R3.2 of Reliability Standard FAC 003 1, the Transmission Owner is not required to report to the Regional Entity certain sustained transmission line outages caused by vegetation such as (1) vegetation related outages that result from vegetation falling into lines from outside the ROW that result from natural disasters or (2) vegetation related outages due to human or animal activity. 2 The Regional Entity shall report the outage information provided to it by Transmission Owners, as required by Requirement 3, quarterly to NERC, as well as any actions taken by the Regional Entity as a result of any of the reported outages. 3 FAC 003 2 was approved on March 21, 2013 by the Federal Energy Regulatory Commission (Commission). The Commission approved the related definitions, violation severity levels, implementation plan, and effective dates proposed by NERC. The Commission also approved the related violation risk factors, except that it directed a revision to the violation risk factor corresponding to one requirement. On September 19, 2013 the Commission issued Order No. 785 that approved version 3 of Standard FAC 003. As a result, version 2 will be superseded by version 3. The enforceability date of July 1, 2014 for Transmission Owners will remain the same. Version 3 also applies to Generation Owners with enforceability starting on January 1, 2015. 1 Third 2013 Vegetation Related Transmission Outage Report

There was one and four Category 3 vegetation related transmission outages reported during the Third of 2012. These outages were on five 230 kv lines within two different Regional Entities footprints. This was the first time since the third quarter of 2010 that a outage (a transmission outage due to vegetation growing into a line) occurred. The Third of 2011 had zero outages, and the Third of 2010 had two and three Category 3 outages. The events that occurred in the Third of 2013 do not cause a concern or pose a significant risk to the reliability of the bulk power system. 2 Third 2013 Vegetation Related Transmission Outage Report

Reported Vegetation Outages for Q3 2013 The following vegetation related transmission line trips were reported to NERC per R4 of FAC 003 1 for the Third of 2013. Grow ins No outage caused by vegetation growing into lines from vegetation inside and/or outside of the ROW was reported during the Third 2013. Fall ins No outage caused by vegetation falling into lines from inside the ROW was reported during the Third 2013. Category 3 Fall ins Five (5) outages caused by vegetation falling into lines from outside the right of way were reported during the Third 2013. Northeast Power Coordinating Council (NPCC) NPCC reported the following one 230 kv vegetation related transmission outage from outside the ROW: Outage on August 31, 2013: During a thunderstorm, an 88 foot black cherry tree located 11 feet outside of the ROW easement uprooted and fell on the transmission line, causing an outage of 26 hours and 46 minutes. The tree showed no outward signs of rot. Other trees in the area were inspected to ensure no additional trees needed to be removed. ReliabilityFirst Corporation (RF) RF reported the following one 230 kv vegetation related transmission outage from outside the ROW: Outage on July 2, 2013: A 98 foot red oak tree located 71 feet off the ROW uprooted and fell into a 120 foot tulip poplar (#1) located 37 feet off the ROW, which fell into another 100 foot tulip poplar (#2) located 16 feet off the ROW, causing an outage of 33 hours and 5 minutes. The base of tulip poplar tree #1 was within a natural pathway (historic watercourse) for the flow of water in times of heavy rain. This saturated the soil at the base of tulip poplar #1, and pressure from the uprooted red oak tree caused tulip poplar tree #1 to uproot into tulip poplar tree #2. Both tulip poplars, which were live, healthy trees, struck the transmission line, breaking two cross arms and interrupting the line. Customers were momentarily interrupted (less than one minute) until the load transferred to an alternate feed. The Transmission Owner (TO) conducted an investigation and removed the other structurally damaged trees in the immediate area. The TO s investigation concluded that the nature of this outage was an anomaly due to the domino effect of trees uprooting into one another. The TO will continue its annual inspection that includes looking for off corridor priority trees. No additional course of action was deemed necessary. SERC Reliability Corporation (SERC) SERC reported the following one 230 kv vegetation related transmission outage from outside the ROW: Outage on August 22, 2013: During a localized thunderstorm, a large red oak tree fell into a smaller maple tree, knocking the smaller tree into the conductors and causing an outage of 2 hours and 25 minutes. The first tree to fall was a 79 foot red oak located 59 feet from the ROW and 81 feet from the conductor. The second tree, which was knocked over by the red oak, was a 48 foot maple tree located 15 feet from the ROW and 38 feet from the 3 Third 2013 Vegetation Related Transmission Outage Report

conductor. Neither tree showed any signs of disease, stress, rot, etc. The maple tree was removed from the line, and no other trees were considered a threat. Western Electricity Coordinating Council (WECC) WECC reported the following two vegetation related transmission outages from outside the ROW for one Regional Entity designated critical line under 200 kv and one 230 kv line: Outage on August 26, 2013: During a violent, localized storm with wind gusts of up to 50 mph, a healthy ponderosa pine tree growing outside the ROW was uprooted and fell into a <200 kv RE designated critical transmission line, causing an outage of 37 hours and 54 minutes. Ongoing patrols for vegetation issues, including danger trees outside the ROW, will be conducted. Outage on August 27, 2013: During an unusual microburst, there were three separate areas of blow down, where trees were completely uprooted or had tops broken off at 40 and 50 feet in the air, causing an outage of 7 hours and 32 minutes. All of the uprooted trees were growing well off the ROW edge (approximately 40 50 feet). These trees were not on the TO s property and were well outside the area where normal pruning and removal could be expected. The trees were of varying size classes but were generally 80 to 100 feet tall. Approximately 80 trees were blown over or broken in these areas. It appeared that possibly only one tree was tall enough to have made contact with the 230 kv transmission line, which had some physical evidence of having made contact with a broken top. Because of the intense localized damage, it appears that the damage can be attributed to a microburst. Second 2013 Supplementary Information Category 3 Additional Fall ins during the second quarter 2013 reported by SERC Outage on May 20, 2013: During a localized thunderstorm, a healthy 58 foot loblolly pine tree located 3.5 feet from the edge of the ROW fell onto the outside phase of the 230 kv line, causing an outage of 3 hours and 43 minutes. The tree was removed, and additional spans were checked on the line to ensure that no other trees in the area were affected by the local storm event. SERC notes that this outage was reported by the registered entity too late to include in the second quarter report and that SERC will investigate and address the cause of the late report with the registered entity. 4

Table 2 summarizes the number of transmission outages by voltage level, region, and category. Region FRCC MRO NPCC RF SERC SPP TRE WECC TOTAL First Category 3 2-230kV 1-345kV 2-230kV 1-345kV Second Third Fourth TOTAL for 2013 Category 3 2-230kV 2-<200kV Category 3 1-230kV 1-230kV 1-230kV Category 3 1-<200kV 1-230kV Category 3 1-230kV 1-230kV 5-230kV 1-345kV 3-<200kV 1-230kV : GROW INS (inside/ outside ROW) : FALL INS (inside ROW) Category 3: FALL INS (outside ROW) Table 2: Summary of Vegetation Related Transmission Outages 4 by Region and by Outage Category for Each in 2013 2-230kV 2-<200kV 1-<200kV 4-230kV 3-<200kV 8-230kV 1-345kV 4 Contains only sustained outages of transmission lines and does not include violations resulting from momentary outages or encroachments into the clearance zone as described in standard FAC 003. 5

Figure 1 illustrates the number of outages caused by vegetation growing into transmission lines from within the right of way that have been reported since 2004. 18 16 14 12 10 8 6 4 2 0 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 1st 2nd 3rd 4th Figure 1: Grow in Outages Caused by Vegetation Growing into Lines from Inside and/or Outside the ROW. 5 Figure 2 provides this information by voltage class for each year. Number of Outages 10 9 8 7 6 5 4 3 2 1 0 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 230kV 4 5 6 9 7 0 0 0 1 0 345kV 3 4 2 5 3 2 1 0 0 0 500kV/765kV 0 6 1 1 1 1 1 0 0 0 Figure 2: Grow In Vegetation Related Outages of 230 kv and Higher 5 Includes one 2007 outage caused by vegetation growing into an RE designated critical line <200 kv. 6