NEWS RELEASE. Mountain Province Diamonds Reports Additional Kimberlite Identified in Gahcho Kué Exploration Program

Similar documents
NEWS RELEASE. Mountain Province Diamonds Completes the Kennady North Winter Exploration Program

CROCODILE GOLD INTERSECTS 7.1 G/T AU OVER 4.5 METERS INCLUDING 11.2 G/T AU OVER 2.6 METERS AT THE UNION REEFS PROJECT, PROSPECT DEPOSIT

CROCODILE GOLD INTERSECTS GRAMS PER TONNE GOLD OVER 2.05 METERS BELOW THE PROSPECT DEPOSIT AT UNION REEFS

Assay Results Highlights (as of November 16, 2017) representing approximately 4,500 metres ( m ) of drilling:

North American Palladium Announces Positive Exploration Results from Lac des Iles Mine

V Sample from C.O.D vein 15 metres southwest of V

DRILLING AT ASCOT S PREMIER PROPERTY EXTENDS GOLD MINERALIZATION 150 METRES WEST TOWARDS UNDERGROUND PORTAL

PRESS RELEASE WESDOME PLANS AGGRESSIVE DRILLING AND DEVELOPMENT PROGRAM IN 2011

The Kennady North Project Investor Presentation Q2 2017

CROCODILE GOLD CONTINUES POSITIVE EXPLORATION RESULTS INTERSECTS HIGH GRADE GOLD AT UNION REEFS PROJECT

NEWS RELEASE ORCA GOLD REPORTS CONTINUED SUCCESS AT GSS

CROCODILE GOLD FILES TECHNICAL REPORTS FOR FOSTERVILLE AND COSMO GOLD MINES AND PROVIDES ANNUAL GENERAL MEETING INFORMATION

News Release. Infill Drilling Program

Plateau Extends Falchani East Lithium Deposit Community Agreements Executed and Three Drill Rigs Active at Falchani West

Sabina Gold & Silver Reports 2018 Drilling has Commenced at Back River Gold Project

Detour Gold Reports Drilling Results from Lower Detour

OSISKO METALS INTERSECTS 10.49% ZINC+LEAD OVER METRES AND 12.15% ZINC+LEAD OVER METRES AT PINE POINT

MARENGO RELEASES RESULTS FOR RECENT SAMPLING AND EXPLORATION DRILLING AT RIMA PROSPECT

June 4, 2015 News Release Valley of the Kings Underground Infill Drilling Underway

23 January, 2018 CSE: RFR For Immediate Release. Renforth extends Parbec Gold Deposit strike 60m with gold in all 7 drillholes

October 8, 2015 News Release Brucejack Regional Drilling Intersects Over 8,000 Grams Per Tonne Gold

SABINA GOLD &SILVER REPORTS COMPLETION OF DRILLING AT ECHO DEPOSIT, BACK RIVER, NUNAVUT.

NEWS RELEASE ORCA GOLD INDICATED AND INFERRED RESOURCES AT BLOCK 14 INCREASE BY 24% AND 48% RESPECTIVELY

Table 1 Updated Mineral Resource Tabulation for the Vertikalny Deposits of the Mangazeisky Property. Contained Metal Ag (koz)

July 15, 2015 News Release Valley of the Kings Underground Infill Drilling Progresses

For Immediate Release ASCOT DRLLING AT UNICORN INTERSECTS MORE HIGH-GRADE GOLD

SilverCrest Expands Babicanora High Grade Footprint to 600 metres; New High Grade Vein Discoveries Highlight District Scale Potential

Spring 2018 Drill Program

555 Burrard Street, Suite 375, Vancouver, B.C. V7X 1M June 13, 2017 SBB NR SBB TSX

KIRKLAND LAKE GOLD ANNOUNCES 120 METRE DOWN-PLUNGE EXTENSION OF SWAN ZONE

Underground Exploration Drilling Complete; Brucejack Mineralization Extends to the East

Interval (meters) To (meters)

June 4, 2014 News Release Valley of the Kings Exploration Program Underway; Project Update

Argonaut Gold announces San Agustín resource of 845,000 gold ounces and 28.3 million silver ounces (1,280,000 gold equivalent ounces)

REGULUS DISCOVERS NEW GOLD-RICH, HIGH-GRADE COPPER-GOLD ZONE AT RIO GRANDE

Junior Uranium explorer in the Athabasca Basin. Patterson Claims

FALCO PACIFIC COMPLETES INITIAL MODEL FOR THE HORNE 5 GOLD/SILVER/ZINC/COPPER DEPOSIT

Pacific Empire Minerals Provides Copper King RC Drilling Results

KIRKLAND LAKE GOLD EXTENDS HIGH-GRADE GOLD MINERALIZATION AT MACASSA, NEW GOLD SYSTEM DISCOVERED AT DEPTH

San Gold Drills New Mine Horizon Adjacent to Rice Lake Mine, Returns 10.4 Metres Grading 25.7 g/t Au

NGEX ANNOUNCES COPPER GOLD DISCOVERY AT NACIMIENTOS PROJECT

North American Palladium Provides Update on Lac des Iles Exploration Program

CAUTIONARY STATEMENT

TROILUS GOLD CORP. INITIATES 30,000 METRE DRILL PROGRAM ON TROILUS PROPERTY

Probe Metals Continues to Intersect Significant Gold Mineralization in Expansion Drilling at Val-d Or East, including 4.1 g/t Gold Over 15.

Highlights from the four holes announced in this news release include:

The Kennady North Project. Corporate Presentation H1 2018

Blox, Inc. Announces New Drilling Target Defined at Mansounia Gold Project.

Goldsource Coal Intercepts in Saskatchewan

MCEWEN MINING ANNOUNCES EXPLORATION UPDATE FOR EL GALLO 1, MEXICO

U3O8 Corp. reports results of infill drilling at Aricheng C in the Kurupung Project, Guyana

PRESS RELEASE. DUBUISSON NORTH DRILLING CUTS g/t AU OVER 5.0 METRES NEW S50 EAST DISCOVERY, 3.39 g/t AU OVER 25.9 METRES

NEWS RELEASE. Tigray Intersects 28.2 metres at 8.50 grams per tonne gold at Mato Bula, Adyabo Project, Northern Ethiopia

MANN SILVER-COBALT MINE. PORE: TSXV PowerOre.com

Renard Diamond Project Mineral Resource Update. Companion Materials to the Stornoway October 14, 2015 Renard Technical Report

GRAPHITE ONE DRILLS 165.3M of 4.23% GRAPHITE INCLUDING 46.4M OF 6.6%, 14.3M of 10.1% and 21M of 10.1% GRAPHITE

August 20, 2018 SBB NR SBB TSX

A B C PAD A HIGHLIGHTS

930 West 1 st Street, Suite 202, North Vancouver, BC V7P 3N4. Tel: (604) Tel:

Goldcrest Resources Ltd.

NEWS RELEASE NOVEMBER 15, 2018 HANNAN COMPLETES DRILLING AT BALLYHICKEY, DEFINES SIGNIFICANT ZINC TARGET AT KILMURRY, CO.

Probe Metals Intersects 3.2 g/t Gold Over 45.5 Metres At Val-d Or East

QMX GOLD INTERSECTS 29.8 G/T AU OVER 3.0 METERS AND 19.3 G/T AU OVER 3.2 METERS AT BONNEFOND

Red Pine Releases Inferred Resource Report Improves Grade and Tonnage for Wawa Gold Project

Suite 1800 Two Bentall Centre 555 Burrard Street Vancouver, BC V7X 1M9 Tel: (604) Tel: (888) April 8, 2018 SBB NR SBB TSX

(416) Highlights include:

MINERAL MOUNTAIN RESOURCES LTD. MMV.TSX-V

FILO EXPANDS OXIDE COPPER AND GOLD ZONES - DRILLING INTERSECTS 0.77% COPPER OVER 102 METRES AND 0.73 G/T GOLD OVER 112 METRES

EXPLORATION NEWS RELEASE MAGISTRAL DISTRICT: MORE GROWTH, MORE GOLD, MORE SILVER

Colt Resources intersects 17.4% Cu over 0.42 metres (0.32 m true width) at Miguel Vacas Copper Project in its Borba exploration concession in Portugal

Minsud to recommence resource outline diamond drilling at the Chita Valley Cu- Au-Ag-Mo Project, San Juan, Argentina

Queenston Announces 112% Increase in Indicated Resource (to 1.5 M oz. gold) and 16% Increase in Inferred Resource (to 0.7 M oz. gold) at Upper Beaver

The new sulphide mineralization lies within a 1.4 kilometer long east-west trending

MEDIA RELEASE OCEANAGOLD ANNOUNCES FURTHER DOWN DIP EXTENSIONS OF MINERALISATION AT PANEL 2: FRASERS UNDERGROUND MINE

Kelly Creek Basin. EXPLORATION UPDATE June 23, Reno Office 10 Greg Street, Suite 170 Sparks, Nevada

A Discovery Company. Exploring for Canadian Diamonds

AVION GOLD DJAMBAYE II ZONE, TABAKOTO PROJECT, MALI, RETURNS HIGH GRADE INTERCEPTS OF 7.56 G/T Au OVER 7.0 METRES AND G/T Au OVER 3.

IAMGOLD PROVIDES EXPLORATION UPDATE ON BOTO PROJECT IN SENEGAL

Goldsource Completes Winter Drill Program At Border; 34 Holes Contain Aggregate Coal Intercepts Ranging From 10 to 100 Meters

Probe Metals Continues to Expand Gold Zones At Val-d Or East

July Exploring for Canadian Gold in the Rainy River District of Ontario

CHAMPION IRON REPORTS EXPLORATION RESULTS AT POWDERHORN PROJECT, NEWFOUNDLAND

Cordoba Minerals Provides an Update on Exploration Activities at the San Matias Copper-Gold Project in Colombia

Exploration Potential

Atacama Pacific Drills 208 Metres Grading 0.60 g/t Gold at Cerro Maricunga. Reports Further Positive Metallurgical Test Results

BELO SUN RELEASES RESULTS FROM 65 DRILL HOLES FURTHER EXTENDING THE OURO VERDE DEPOSIT ALONG STRIKE NORTHWEST AND DOWN DIP

MANDALAY RESOURCES CORPORATION INCREASES MINERAL RESOURCES AND RESERVES AT ITS BJÖRKDAL GOLD MINE

Teranga s Golden Hill Drill Program Intersects High-Grade Gold and Expands Mineralized Zones at Peksou and Ma Prospects

Suite West Georgia Street Vancouver, B.C. V6E 4M3 NEWS RELEASE

Strategic Phase 2 Exploration Program Launched at Island Gold High-Grade Resource Potential Identified Laterally and at Depth

Fura Gems Inc. FURA ANNOUNCES MAIDEN MINERAL RESOURCE ESTIMATE FOR THE COSCUEZ EMERALD MINE, A FIRST FOR THE COLOMBIAN EMERALD SECTOR

Dalradian Intersects 2.48 metres Grading g/t Gold and 4.87 metres Grading 8.35 g/t Gold With Infill Drilling at Curraghinalt

Drilling at Perseverance in Arizona, USA Suggests Proximity to Porphyry Copper System

May 12, 2016 News Release Valley of the Kings Infill Drilling Intersects 37,000 Grams Per Tonne Gold

Probe Metals Confirms Continuity of Gold Mineralization on its Val-d Or East Project And Increases 2017 Drill Program to 75,000 metres

SALAZAR ANNOUNCES AN UPDATED RESOURCE REPORT OF 5.53 MT INDICATED AND 1.46 MT INFERRED AT ITS HIGH GRADE VMS EL DOMO DEPOSIT

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

MCEWEN MINING ANNOUNCES ATTRACTIVE INTERCEPTS AT THE SAN JOSÉ MINE IN ARGENTINA

FILO MINING DRILLS 50 METRES OF G/T SILVER, 0.56% COPPER, 0.50 G/T GOLD AND 36 METRES OF 1.45% COPPER AT FILO DEL SOL

Discovering Canadian Gold and Diamonds. Oxford Lake Project, Manitoba

Transcription:

NEWS RELEASE September 17, 2018 TSX and NASDAQ: MPVD Mountain Province Diamonds Reports Additional Kimberlite Identified in Gahcho Kué Exploration Program Toronto and New York, September 17, 2018 Mountain Province Diamonds Inc. ( Mountain Province, the Company ) (TSX and NASDAQ: MPVD) today provides an update on the exploration program currently under way in the immediate vicinity of the Gahcho Kué mine. The most recent drilling has now identified additional kimberlite in the corridor between 5034 and Tuzo, with true intercepts up to 72 meters in thickness. The Curie target has also been confirmed to have kimberlite intercepts up to 52 meters with the full extent of all the additional kimberlite still to be determined. The detailed exploration program has focused on three objectives; drill test for extensions to the Hearne kimberlite between the north and south lobes, drill test the corridor between 5034 and Tuzo, particularly around the North Pipe kimberlite, and drill test the Curie ground gravity target located between the Tesla and Tuzo kimberlites. Additional kimberlite breccia between the north and south lobes at Hearne was previously confirmed, extending vertically from 40 metres depth from the surface and to at least as deep as 220 metres depth (see news release July 11, 2018). Drill testing of the corridor between 5034 and Tuzo has focused on the zone between the 5034 pipe and the North pipe and an area immediately northeast of the North pipe. Drilling has confirmed kimberlitic material between the north lobe of 5034 and the North Pipe, as well as in the corridor extending northeast of the North Pipe towards Tuzo. This new kimberlitic material extends vertically from 248 meters to 350 meters depth. At the Curie target, kimberlite was intersected at a vertical depth of only 18 meters, with the deepest intercept at 119 meters depth. The Curie kimberlite lies within the proposed open pit mine plan for the Tuzo kimberlite, and midway between Tuzo and the Tesla kimberlite. A summary of results from the drill programs is provided in the table below and in figures appended to this news release.

Drill Hole Azimuth Inclination Intercept 1 (m) From To Length Intercept True Thickness 4 (m) End of Hole (m) 5034 Tuzo Corridor MPV 18 460C 3 137 49 360.36 394.86 34.50 26.80 452.0 MPV 18 465C 4 139 49 329.00 338.10 9.10 6.80 355.65 356.00 0.35 ND 401.0 MPV 18 467C 136 54 389.60 439.90 50.30 32.90 462.2 MPV 18 469C 132 59 329.75 443.82 114.07 72.50 473.0 MPV 18 470C 302 57 189.65 189.66 0.01 ND 212.0 MPV 18 473C 117 66 371.58 383.55 11.97 5.00 629.0 MPV 18 475C 130 51 304.20 389.00 84.80 59.00 419.0 Curie Kimberlite Target MPV 18 463C 310 48 35.98 66.50 30.52 ND 5 93.70 146.40 52.70 ND 195.9 MPV 18 468C 114 47 159.77 163.25 3.48 ND 251.0 MPV 18 471C 309 47 25.10 37.60 12.50 ND 37.6 MPV 18 472C 311 48 33.90 44.60 10.70 ND 257.0 1 Intercepts are true drilled thicknesses. 2 Defined as the horizontal distance between drillhole pierce points, based on the 5034 extension as elongate, striking roughly N45E and with vertical contacts. 3 The 26.8m intercept for MPV-18-460C includes 13% granite and granite breccia. 4 The 6.8m intercept for MPV-18-465C includes 39% kimberlite granite breccia with <50% internal granitic dilution. The intercept for MPV-18-462C is kimberlite granite breccia. Granite breccia is defined as having greater than 50% kimberlite present. ND = Not determined. 5 The geometry of Curie is not sufficiently known to determine true thicknesses. Drillholes MPV-18-459C, MPV-18-461C, MPV-18-464C, MPV-18-466C, and MPV-18-474C did not intersect kimberlite. Said Stuart Brown, the Company s President and Chief Executive Officer, Our continued success in this near-mine exploration program is very encouraging. The earlier work on the additional kimberlite identified on the Southwest Corridor kimberlites is scheduled to be classified in the last quarter of 2018 in time for inclusion for the 2019 mine plan. The ranges for potential addition to the resource (100% basis) are 1.5 to 2.8 million tonnes and 2.2 to 4.2 million carats. Work on developing the model and resource estimates for Hearne and the 5034 North Lobe/North Pipe Extension additional kimberlites is scheduled to be completed in Q1 2019 and will in time potentially be incorporated into a modified mine plan, when completed. These significant kimberlite discoveries are well within the present mine plan area and there is little doubt that, if economic, will contribute tonnage to extend the mine life at Gahcho Kué. The current exploration drill program is nearing completion, with detailed logging and sampling of the core now underway. Updates will be provided as this additional work is completed. All exploration surveys, and drilling and sampling programs are conducted by De Beers Canada, the Company s joint venture partner at Gahcho Kué. ****

Mountain Province Diamonds is a 49% participant with De Beers Canada in the Gahcho Kué diamond mine located in Canada s Northwest Territories. Gahcho Kué is the world s largest new diamond mine, consisting of a cluster of four diamondiferous kimberlites, three of which are being developed and mined under the initial 12 year mine plan. Qualified Person The disclosure in this news release of scientific and technical information regarding Mountain Province s mineral properties has been reviewed and approved by Tom E. McCandless, Ph.D., P.Geo., technical advisor to Mountain Province and a Qualified Person as defined by National Instrument 43-101 Standards of Disclosure for Mineral Projects. FOR FURTHER INFORMATION, PLEASE CONTACT: Mountain Province Diamonds Inc. Stuart Brown, President and CEO 161 Bay Street, Suite 1410 Toronto, Ontario M5J 2S1 Phone: (416) 361-3562 E-mail: info@mountainprovince.com Mountain Province Diamonds Inc. Keyvan Salehi Investor Relations and Engineering Services 161 Bay Street, Suite 1410 Toronto, Ontario M5J 2S1 Phone: (416) 361-3562 E-mail: info@mountainprovince.com Caution Regarding Forward Looking Information This news release contains certain forward-looking statements and forward-looking information under applicable Canadian and United States securities laws concerning the business, operations and financial performance and condition of Mountain Province Diamonds Inc. Forward-looking statements and forward-looking information include, but are not limited to, statements with respect to estimated production and mine life of the project of Mountain Province; the realization of mineral reserve estimates; the timing and amount of estimated future production; costs of production; the future price of diamonds; the estimation of mineral reserves and resources; the ability to manage debt; capital expenditures; the ability to obtain permits for operations; liquidity; tax rates; and currency exchange rate fluctuations. Except for statements of historical fact relating to Mountain Province, certain information contained herein constitutes forward-looking statements. Forward-looking statements are frequently characterized by words such as anticipates, may, can, plans, believes, estimates, expects, projects, targets, intends, likely, will, should, to be, potential and other similar words, or statements that certain events or conditions may, should or will occur. Forward-looking statements are based on the opinions and estimates of management at the date the statements are made, and are based on a number of assumptions and subject to a variety of risks and uncertainties and other factors that could cause actual events or results to differ materially from those projected in the forward-looking statements. Many of these assumptions are based on factors and events that are not within the control of Mountain Province and there is no assurance they will prove to be correct. Factors that could cause actual results to vary materially from results anticipated by such forward-looking statements include variations in ore grade or recovery rates, changes in market conditions, changes in project parameters, mine sequencing; production rates; cash flow; risks relating to the availability and timeliness of permitting and governmental approvals; supply of, and demand for, diamonds;

fluctuating commodity prices and currency exchange rates, the possibility of project cost overruns or unanticipated costs and expenses, labour disputes and other risks of the mining industry, failure of plant, equipment or processes to operate as anticipated. These factors are discussed in greater detail in Mountain Province's most recent Annual Information Form and in the most recent MD&A filed on SEDAR, which also provide additional general assumptions in connection with these statements. Mountain Province cautions that the foregoing list of important factors is not exhaustive. Investors and others who base themselves on forward-looking statements should carefully consider the above factors as well as the uncertainties they represent and the risk they entail. Mountain Province believes that the expectations reflected in those forward-looking statements are reasonable, but no assurance can be given that these expectations will prove to be correct and such forward-looking statements included in this news release should not be unduly relied upon. These statements speak only as of the date of this news release. Although Mountain Province has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be anticipated, estimated or intended. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Mountain Province undertakes no obligation to update forward-looking statements if circumstances or management s estimates or opinions should change except as required by applicable securities laws. The reader is cautioned not to place undue reliance on forward-looking statements. Statements concerning mineral reserve and resource estimates may also be deemed to constitute forward-looking statements to the extent they involve estimates of the mineralization that will be encountered as the property is developed. Further, Mountain Province may make changes to its business plans that could affect its results. The principal assets of Mountain Province are administered pursuant to a joint venture under which Mountain Province is not the operator. Mountain Province is exposed to actions taken or omissions made by the operator within its prerogative and/or determinations made by the joint venture under its terms. Such actions or omissions may impact the future performance of Mountain Province. Under its current note and revolving credit facilities Mountain Province is subject to certain limitations on its ability to pay dividends on common stock. The declaration of dividends is at the discretion of Mountain Province s Board of Directors, subject to the limitations under the Company s debt facilities, and will depend on Mountain Province s financial results, cash requirements, future prospects, and other factors deemed relevant by the Board.

APPENDICES Figure 1: Location of the 5034, Hearne, Tuzo, Tesla and North Pipe kimberlite bodies.

Figure 2: Long-section view of kimberlite intercepts in the 5034 Tuzo Corridor. Plan view of the section is shown in the inset.

Figure 3: Plan view of drilling completed at the Curie kimberlite, wth kimberlite intercepts indicated in red. Inset shows position of the Curie kimberlite relative to the open pit plan at Tuzo.