James Webb Space Telescope (JWST) Program Status. Mark Clampin JWST Observatory Project Scientist NASA/Goddard Space Flight Center
|
|
- Warren Oscar Gordon
- 6 years ago
- Views:
Transcription
1 James Webb Space Telescope (JWST) Program Status Mark Clampin JWST Observatory Project Scientist NASA/Goddard Space Flight Center
2 James Webb Space Telescope (JWST) Organization Mission Lead: Goddard Space Flight Center Project Scientist: Dr John Mather (Nobel Laureate) International collaboration: ESA & CSA Prime Contractor: Northrop Grumman Space Technology Instruments: Near Infrared Camera (NIRCam) Univ. of Arizona Near Infrared Spectrograph (NIRSpec) ESA Mid-Infrared Instrument (MIRI) JPL/ESA Fine Guidance Sensor (FGS) CSA Operations: Space Telescope Science Institute Description Deployable infrared telescope with 6.5 meter diameter segmented adjustable primary mirror JWST Science Themes Cryogenic temperature telescope and instruments for infrared performance Launch June 2013 on an ESA-supplied Ariane 5 rocket to Sun-Earth L2 5-year science mission (10-year goal) End of the dark ages: First light and reionization The assembly of galaxies Birth of stars and proto-planetary systems Planetary systems and the origin of life 2
3 JWST Sunshield: I UPS Bipod Launch Lock Attachment Points Fixed Spreader Bars at all Locations Momentum Trim Flap Core Region 3
4 JWST Sunshield: II Aft UPS Bipod Launch Lock Attachment Points Momentum Trim Flap Unitized Pallet Structure (UPS) Unitized Pallet Structure (UPS) Telescopic Side Booms 4
5 Sunshield: Deployment Sunshield membrane deployment is now fully managed: sunshield is released and extended one pallet section at a time Each pallet color represents a sunshield section. They are released one at a time during deployment 5
6 Sunshield: Membrane Development 6
7 JWST Mirror Development Flight PM/SM segments are all being figured at Tinsley Primary Mirror Tertiary and Fine Steering mirror ready for delivery to Tinsley 31% B wk 34% C wk 40% B6 19 wk 0% TM 3.2 wk 31% C wk 36% A wk 36% A5 19 wk 37% C4 19 wk 0% B wk 47% A wk 0% SM 3.2 wk 38% A4 19 wk 37% B5 19 wk 39% C1 19 wk 45% A wk 38% A wk 43% C wk 63% EDU / A-PF -L 44.4 wk to PF 0% <1 wk to A1 C7/C-PF -L 49% B wk 44% C wk 44% B wk 0% FSM 40.2 wk 16 wk % COMPLETE RELATIVE TO L3-TINSLEY OPERATIONS SLACK IN WEEKS AGAINST NEED DATE PER M/E AUGUST 2007 MASTER SCHEDULE AT BATC / AXSYS IN HOUSE / L3 EVEN SLICE FIGURE GRIND, FINE SMOOTH OUT POLISH 1% SM/PF -L 48.4 wk COATING (DENTON) FINAL AI&T (BATC) -TINSLEY Secondary Mirror Tertiary Mirror Fine Steering Mirror Mirror sizes to scale 7
8 JWST Mirror Status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light (SM1 / SM2 / SM2) TM Flight (TM1 / TM1 / TM1) 8
9 JWST Mirror Status: III SM Back Surface SM Front Surface ATPL in Preparation of Polishing SM Pathfinder Light and Flight segments have completed machining at Axsys Technologies. Processing is beginning at Tinsley Laboratories. Helium Shroud in Fabrication The helium shroud and regeneration system has been delivered to BATC and tested down to 6K. The Aspheric Test Plate Lens and Illumination Lens is nearing completion at Tinsley Laboratories. Illumination Lens in Optical Test Helium Shroud Installation The SMA Optical GSE Mount and associated hardware has been built and assembled at BATC. (Proof Load Shown) 9
10 EDU Mirror EDU mirror is on schedule for completion of fine polishing this March Cryo-Polish cycle will follow 10
11 Primary Mirror Backplane Pathfinder fabrication: 118 of 153 billets completed through acceptance Piece part fabrication at 46% complete Billets fabricated include V1 and drop tubes, flat plates and two T300 latch plane V1 tubes Flight fabrication: 34 of the 184 total flight center section billets are through cure Overall center section piece part fabrication at 3% C4 A4 11
12 NIRCam ETU Hardware ZnSe Collimator BaF 2 Camera Bench panel after anodizing Filter Wheel Drive Board Focus Mech Drive Board Instrument Control Electronics 12
13 NIRSpec ETU/Qual Model Hardware Fore Optics Focal Plane Assembly Optical Bench 13
14 FGS Hardware Demo Unit Focal Plane Primary Mirror Blank ETU Guider Optical Bench Prototype Etalon ETU Guider Secondary Mirror 14
15 MIRI Verification Model Performing gravity sag test at the Rutherford Appelton Lab, UK 15
16 ISIM Subsystems ISIM Electronics Compartment Demo Model ICDH ETU SpaceWire Card ISIM Structure Thermal Distortion Test Article 16
17 ISIM Structure Harness Mockup Currently in Bldg 29 17
Hubble Science Briefing April 7, 2011
Studying the First Galaxies with the Hubble and the Webb Space Telescopes Hubble Science Briefing April 7, 2011 Massimo Stiavelli Space Telescope Science Institute Modern Cosmology 2 COBE satellite The
More informationThe James Webb Space Telescope Overview
The James Webb Space Telescope Overview Jonathan P. Gardner NASA s Goddard Space Flight Center http://jwst.nasa.gov Space Science Reviews, 2006, 123/4, 485 1 James Webb Space Telescope 6.6m Telescope Successor
More informationJames Webb Space Telescope Townhall: Preparing for Launch!
James Webb Space Telescope Townhall: Preparing for Launch! Stefanie Milam #JWST @SNMilam JWST Deputy Project Scien?st for Planetary Science John Stansberry Solar System Lead STScI James Webb Space Telescope
More informationJames Webb Space Telescope Cycle 1 Call for Proposals
James Webb Space Telescope Cycle 1 Call for Proposals Stefanie Milam JWST Deputy Project Scientist for Planetary John Stansberry Solar System Lead, STScI Bryan Holler Solar System Scientist, STScI Getting
More informationJAMES WEBB SPACE TELESCOPE (JWST) - FINE GUIDENCE SENSOR AND TUNABLE FILTER IMAGER OPTICAL DESIGN OVERVIEW AND STATUS
JAMES WEBB SPACE TELESCOPE (JWST) - FINE GUIDENCE SENSOR AND TUNABLE FILTER IMAGER OPTICAL DESIGN OVERVIEW AND STATUS M.Maszkiewicz Canadian Space Agency, 6767 route de L Aéroport, Saint Hubert, Canada,
More informationJames Webb Space Telescope Cycle 1 Call for Proposals and Update on WFIRST
James Webb Space Telescope Cycle 1 Call for Proposals and Update on WFIRST #JWST @SNMilam Stefanie Milam JWST Deputy Project Scientist for Planetary Science James Webb Space Telescope (JWST) Organization
More informationDavid Chaney Space Symposium Radius of Curvature Actuation for the James Webb Space Telescope
2018 Space Symposium Radius of Curvature Actuation for the James Webb Space Telescope David Chaney Optical Engineering Staff Consultant Ball Aerospace 4/2/18 1 JWST Overview James Webb Space Telescope
More informationNovember 3, 2014 Eric P. Smith JWST Program Office
November 3, 014 Eric P. Smith JWST Program Office 1 SINCE LAST CAA MEETING... Completed of 3 recommended GAO schedule risk analyses for this year. Mutually agreed to drop 3 rd. Will perform cost-risk study
More informationStatus of the James Webb Space Telescope (JWST) Observatory
Status of the James Webb Space Telescope () Observatory ESTEC Mark Clampin Observatory Project Scientist mark.clampin@nasa.gov Goddard Space Flight Center HUBBLE and its Precursors SPITZER 2.4-meter T
More informationMarch 4, 2013 Eric P. Smith JWST Program Office
March 4, 2013 Eric P. Smith JWST Program Office 1 SIMPLIFIED SCHEDULE OTE = Optical Telescope Element OTIS = Optical Telescope + ISIM k months of project funded critical path (mission pacing) schedule
More informationMIRI The Mid-InfraRed Instrument for JWST The James Webb Space Telescope
MIRI The Mid-InfraRed Instrument for JWST The James Webb Space Telescope Prof. Gillian Wright, MBE Science and Technology Facilities Council UK-Astronomy Technology Centre JWST MIRI European PI Talk Overview
More informationVerification approach for large, complex optical systems: lessons from the James Webb Space Telescope
Verification approach for large, complex optical systems: lessons from the James Webb Space Telescope Allison A. Barto* a, Charlie Atkinson b, J. Scott Knight a, Paul A. Lightsey a a Ball Aerospace & Technologies
More informationScientific Capability of the James Webb Space Telescope and the Mid-InfraRed Instrument
Scientific Capability of the James Webb Space Telescope and the Mid-InfraRed Instrument Oliver Krause (Max Planck Institute for Astronomy, Heidelberg) on behalf of Gillian Wright (Royal Observatory Edinburgh)
More informationJames Webb Space Telescope (JWST) 1: Project Status and Moving Targets
James Webb Space Telescope (JWST) 1: Project Status and Moving Targets IAC Winter School Tenerife November 2016 J. Stansberry (STScI) 2016-10-10 James Webb Space Telescope (JWST) Organization Mission Lead:
More information#JWSTnearbygalaxies @JWSTObserver #jwst @KISS_Caltech Welcome WebEx Participants To ask a question or contribute to the discussion: Select send to moderator and type your question/comment into the chat
More informationSpace Telescopes as Time Machines: Hubble s Legacy and the Future Through the James Webb Space Telescope
# 84 Space Telescopes as Time Machines: Hubble s Legacy and the Future Through the James Webb Space Telescope Dr. Jason Kalirai March 6, 2013 Produced by and for Hot Science - Cool Talks by the Environmental
More informationHubble Science Briefing
Hubble Science Briefing Delivering JWST Science, from Exoplanets to First Light: The Near-InfraRed Imager and Slitless Spectrograph (NIRISS) March 6, 2014 Alex Fullerton (STScI) 1 Agenda for Today The
More informationThe JWST mission: status and overview
The JWST mission: status and overview P. Ferruit (ESA JWST project scientist) MIRI NIRSpec FGS/NIRISS NIRCam Slide #1 Acknowledgements All along this presentation you will see the results of work conducted
More informationJames Webb Space Telescope Thermal Pathfinder Test Development
46th 10-14 July 2016, Vienna, Austria ICES-2016-429 James Webb Space Telescope Thermal Pathfinder Test Development Angelique Davis 1 Edge Space Systems, Glenelg, MD 21737 Wes Ousley 2 and William Burt
More informationOpportunities with the James Webb Space Telescope
Opportunities with the James Webb Space Telescope Nancy A. Levenson Space Telescope Science Institute image credit: J.Dore JWST NASA, ESA, and CSA 6.5m mirror cooled instruments cover nearthrough mid-infrared
More informationRADIUS OF CURVATURE MATCHING SYSTEM FOR A SPACE BASED SEGMENTED TELESCOPE
RADIUS OF CURVATURE MATCHING SYSTEM FOR A SPACE BASED SEGMENTED TELESCOPE David Chaney Ball Aerospace, 1600 Commerce St., Boulder, CO 80301 dchaney@ball.com ABSTRACT As space based telescopes continue
More informationJames Webb Space Telescope (JWST)
James Webb Space Telescope (JWST) Background Instruments System Description Development Integration & Testing TBD Select Image Reference Information 1 1 Background The James Webb Space Telescope (JWST)
More informationThe James Webb Space Telescope!
The James Webb Space Telescope! Dean C. Hines (STScI) George Sonneborn (GSFC) John Stansberry (STScI) JWST Town Hall 45 th Meeting of the Division for Planetary Sciences October 10, 2013 JWST Imaging Modes!
More informationStatus of the JWST Science Instrument Payload
Status of the JWST Science Instrument Payload Ma9 Greenhouse JWST Project Office NASA Goddard Space Flight Center 12 October 2015 @NASAWebbTelescp #JWST 12 October 2015 PresentaBon to: 49th ESLAB Symposium:
More informationThe JWST mission. P. Ferruit (ESA project scientist) MIRI. NIRSpec FGS/NIRISS. NIRCam. Slide #1
The JWST mission P. Ferruit (ESA project scientist) MIRI NIRSpec FGS/NIRISS NIRCam Slide #1 Aknowledgements All along this presentation you will see the results of work conducted by a large number of teams
More informationDynamics of High Redshift Galaxies M. Stiavelli, STScI Baltimore
Lecture plan: Dynamics of High Redshift Galaxies M. Stiavelli, STScI Baltimore 1. Introduction. Galaxy kinematics at high redshift. 2. Dynamics of elliptical galaxies at high redshift and evolution of
More informationJames Webb Space Telescope (JWST)
James Webb Space Telescope (JWST) Engineering the Beginning US Frontiers of Engineering Conference Amy S. Lo JWST System Engineering Space-Based observation has enabled giant leaps in our understanding
More informationMarch 31, 2015 Eric P. Smith JWST Program Director
March 1, 2015 Eric P. Smith JWST Program Director 1 SINCE LAST CAA MEETING... Acted on FY2014 GAO recommendations (cost-risk study, performance evaluation plan change). Completed GAO entrance conference
More informationMETHODOLOGY AND RESULTS OF JAMES WEBB SPACE TELESCOPE THERMAL VACUUM OPTICAL SYSTEM ALIGNMENT TESTING AND ANALYSIS. Koby Z. Smith
METHODOLOGY AND RESULTS OF JAMES WEBB SPACE TELESCOPE THERMAL VACUUM OPTICAL SYSTEM ALIGNMENT TESTING AND ANALYSIS Koby Z. Smith Ball Aerospace, ksmith@ball.com D. Scott Acton, Laura E. Coyle, Taylor S.
More informationSun Shield. Solar Paddle
The Institute of Space and Astronautical Science Report SP No.14, December 2000 Current Status of ASTRO-F By Hiroshi Murakami Λ (November 1, 2000) Abstract: The ASTRO-F is the second infrared astronomy
More informationThe Near-Infrared Spectrograph on JWST: Killer Science Enabled by Amazing Technology. Jason Tumlinson STScI Hubble Science Briefing Nov.
The Near-Infrared Spectrograph on JWST: Killer Science Enabled by Amazing Technology Jason Tumlinson STScI Hubble Science Briefing Nov. 21, 2013 1.) Seek the first stars and galaxies that formed in the
More informationThe components of the James Webb Space Telescope undergo tests at many levels as they are
ISIM Cryo-Vacuum Test #1 Scott D. Friedman, friedman@stsci.edu, & Randy A. Kimble, randy.a.kimble@nasa.gov The components of the James Webb Space Telescope undergo tests at many levels as they are assembled
More informationThe James Webb Space Telescope
The Session: ENGINEERING THE SEARCH FOR EARTH-LIKE EXOPLANETS Author: Amy Lo, Northrop Grumman Aerospace Systems Abstract NASA s is the premier space telescope of its time. Set to launch in Oct. 2018,
More informationStefanie Milam Deputy Project Scientist for Planetary Science NASA GSFC January 12, 2017
James Webb Space Telescope Stefanie Milam Deputy Project Scientist for Planetary Science NASA GSFC January 12, 2017 JWST Vital Stats General Observatory: 5 years required; 10 years goal Primary mirror:
More informationGoals of the meeting. Catch up with JWST news and developments: ERS and GO call for proposals are coming!!
Welcome Goals of the meeting Catch up with JWST news and developments: ERS and GO call for proposals are coming!! What is JWST capable of (focus on H 2 spectroscopy)? What do we need to do (models, lab)
More informationThe James Webb Space Telescope: Capabilities for Transiting Exoplanet Observations
The James Webb Space Telescope: Capabilities for Transiting Exoplanet Observations Mark Clampin Observatory Project Scientist mark.clampin@nasa.gov Goddard Space Flight Center : How It Works Integrated
More informationCASE STUDY. Keeping the James Webb Space Telescope on Track
CASE STUDY Keeping the James Webb Space Telescope on Track In October 2018, NASA, the Canadian Space Agency (CSA), and the European Space Agency are set to launch the James Webb Space Telescope. Billed
More informationSynergy between the Thirty Meter Telescope and the James Webb Space Telescope: When > 2.
Synergy between the Thirty Meter Telescope and the James Webb Space Telescope: When 1 + 1 > 2. Rogier Windhorst (Arizona State University) (Interdisciplinary Scientist for the JWST) Science in the Era
More informationCompact, lightweight, and athermalized mirror and mount for use on JWST's NIRCam instrument
Compact, lightweight, and athermalized mirror and mount for use on JWST's NIRCam instrument Derek Edinger, Paul Mammini*, Liz Osborne Lockheed Martin Advanced Technology Center, 3251 Hanover St., Palo
More informationSTAR CLUSTERS. Lecture 1 Introduction. Nora Lützgendorf (ESA)
STAR CLUSTERS Lecture 1 Introduction Nora Lützgendorf (ESA) Its a school, so????????? ASK QUESTIONS!!! If you don t understand the content If you don t understand the language TAKE NOTES This is the most
More informationFirst Light and Reionization with the James Webb Space Telescope
First Light and Reionization with the James Webb Space Telescope Plan: - What is JWST - Expectations - Detecting the First Stars - Pair instability supernovae - Detecting the First Star Clusters - Detecting
More informationHST and JWST: The Present and the Future ESLAB 2007, 1 June 2007
Space Telescope Science Institute HST and JWST: The Present and the Future ESLAB 2007, 1 June 2007 Michael Hauser Hubble 2006 Science Year in Review The Space Telescope will help solve many astronomical
More informationSpace Cryogenics at the Rutherford Appleton Laboratory
Space Cryogenics at the Rutherford Appleton Laboratory Tom Bradshaw Martin Crook Bryan Shaughnessy Cryogenic Cluster Day STFC, Rutherford Appleton Laboratory 22 nd September 2010 Introduction Rutherford
More informationFlipping Bits in the James Webb Space Telescope s Cameras
Flipping Bits in the James Webb Space Telescope s Cameras Lance Simms IEEE Life Members Talk 05/16/2018 LLNL-PRES-735208 This work was performed under the auspices of the U.S. Department of Energy by Lawrence
More informationFrom the Big Bang to the Nobel Prize: Cosmic Background Explorer (COBE) and Beyond
From the Big Bang to the Nobel Prize: Cosmic Background Explorer (COBE) and Beyond John C. Mather NASA s Goddard Space Flight Center Dec. 8, 2006 Dec. 8, 2006 John Mather Nobel Lecture 2006 1 Nobel Prize
More informationJWST Fine Guidance Sensor Calibration
The 2010 STScI Calibration Workshop Space Telescope Science Institute, 2010 Susana Deustua and Cristina Oliveira, eds. JWST Fine Guidance Sensor Calibration P. Chayer, S. Holfeltz, E. Nelan Space Telescope
More informationStatus / Progress of the erosita X ray Observatory:
Status / Progress of the erosita X ray Observatory: Vadim Burwitz, Max Planck Institut für extraterrestrische Physik On behalf of the erosita Team IACHEC #9, May 13, 2014, Airlie Center, Warrenton, Virginia,
More informationJames Webb Space Telescope Handbook
Contents 1. Introduction 2 2. Design 3 2.1 Development timeline 3 2.2 Testing 4 2.3 Sunshield 4 2.4 Mirror 6 2.5 Instruments 7 3. Mission 9 3.1 Infrared light 9 3.2 First light 10 3.3 Formation and evolution
More informationThe James Webb Space Telescope
The James Webb Space Telescope Jonathan P. Gardner NASA s Goddard Space Flight Center http://jwst.nasa.gov Space Science Reviews, 2006, 123/4, 485 1 Agenda Jonathan Gardner Deputy Senior Project Scientist
More informationThe James Webb Telescope (NGST) to replace HST
PROLOGUE The James Webb Telescope (NGST) to replace HST Source: http://www.jwst.nasa.gov/ Key elements: 6.5m primary mirror (18 sections), lightweight, deployable (launch date 2013?) 1 Large sunshield
More informationStatus of the James Webb Space Telescope Integrated Science Instrument Module System
The 2010 STScI Calibration Workshop Space Telescope Science Institute, 2010 Susana Deustua and Cristina Oliveira, eds. Status of the James Webb Space Telescope Integrated Science Instrument Module System
More informationPicometre metrology. The Gaia mission will create an ultra-precise three-dimensional map of about one billion stars
Picometre metrology in space The Gaia mission will create an ultra-precise three-dimensional map of about one billion stars in our Galaxy. Part of ESA s Cosmic Vision program, the Gaia spacecraft is being
More informationAperture Door. Model Wrappers. Aft Bulkhead. Page 1
Page 1 Aperture Door Model Wrappers The wrappers show the Hubble Space Telescope s exterior features and the locations of its science instruments. On Page 7 you ll find a list of the abbreviations that
More informationFIVE FUNDED* RESEARCH POSITIONS
OBSERVATION Sub-GROUP: 1. Masters (MSc, 1 year): Exploring extreme star-forming galaxies for SALT in the Sloan Digital Sky Survey 2. Masters (MSc,1 year): HI masses of extreme star-forming galaxies in
More informationGiant Magellan Telescope Project Byeong-Gon Park Korea Astronomy and Space Science Institute
Giant Magellan Telescope Project Byeong-Gon Park Korea Astronomy and Space Science Institute 1 GMT Status for SSG Workshop @ High 1, Jan. 15-17, 2018. Telescope Design Overview Doubly segmented M1 8.4m
More informationWhat s Up in Space? Dean W McCall, Ed.D.
What s Up in Space? Dean W McCall, Ed.D. In no particular order Brief aerospace CV Systems Engineering Space mission types Examples Gotchas Terminology & Slang Please ask questions McCall Background Hughes
More informationcheops Assemble your own planet watcher cheops Paper Model Scale 1:15
cheops cheops Assemble your own planet watcher Paper Model Scale 1:15 About CHEOPS The CHaracterising ExOPlanet Satellite, or CHEOPS, is a space science mission dedicated to the study of known exoplanets
More informationPICTURE sounding rocket telescope
PICTURE sounding rocket telescope D. Content, S. Antonille, D. Rabin, T. Wallace NASA GSFC 1 Overview of talk Two {ambitious} sounding rocket concepts sharing a telescope OTA overview PM development program
More informationUSING THE ISS TO ASSEMBLE A VERY LARGE TELESCOPE
USING THE ISS TO ASSEMBLE A VERY LARGE TELESCOPE Holland C. Ford (JHU) and James H. Crocker (Lockheed Martin) Presented by Warren Moos (JHU) 4/15/2003 1 A 30-m Very Large Space Telescope (VLST) : Assumptions
More informationSubaru GLAO: Comparisons with Space Missions. I. Iwata (Subaru Telescope) 2011/08/ /05/28 small revisions 2013/06/04 include JWST/NIRISS
Subaru GLAO: Comparisons with Space Missions I. Iwata (Subaru Telescope) 2011/08/25 2013/05/28 small revisions 2013/06/04 include JWST/NIRISS Space Missions in Near-Future JWST 6.5m Deployable Mirror,
More informationFoundations of Astronomy 13e Seeds. Chapter 6. Light and Telescopes
Foundations of Astronomy 13e Seeds Chapter 6 Light and Telescopes Guidepost In this chapter, you will consider the techniques astronomers use to study the Universe What is light? How do telescopes work?
More informationJames Webb Space Telescope Mission Status
James Webb Space Telescope Mission Status Bill Ochs JWST Project Manager NASA Goddard Space Flight Center GSFC Contractors Association Nov. 5, 2014 29 July 2011 1 Whose Doing What James Webb Space Telescope
More informationPAIRITEL's Telescopes and Cameras: A History...
PAIRITEL's Telescopes and Cameras: A History... Design, development, and operation of 2MASS The 2MASS Clearance Sale: Trash or Treasure? The Future The Telescope that Almost Wasn't: Part I 2MASS had to
More informationPanel Session III - Astronomical Search for Origins Program
The Space Congress Proceedings 2004 (41st) Space Congress Proceedings Apr 27th, 8:00 AM Panel Session - Astronomical Search for Origins Program Eric P. Smith Origins Theme Scientist, James Webb Space Telescope
More informationAST 101 Intro to Astronomy: Stars & Galaxies
AST 101 Intro to Astronomy: Stars & Galaxies Telescopes Mauna Kea Observatories, Big Island, HI Imaging with our Eyes pupil allows light to enter the eye lens focuses light to create an image retina detects
More informationSPITZER SPACE TELESCOPE
SPITZER SPACE TELESCOPE The Rationale for Infrared Astronomy reveal cool states of matter explore the hidden Universe provide access to many spectral features probe the early life of the cosmos WANT TO
More informationUncovering the Early Stages of Galaxy Evolution: Multi-Object Spectrometry with JWST/NIRSpec
Multi-Object Spectroscopy in the Next Decade: Big Questions, Large Surveys, and Wide Fields ASP Conference Series, Vol. 507 I. Skillen, M. Balcells, and S. C. Trager, eds. c 2016 Astronomical Society of
More informationObserving the gravitational universe from space
Observing the gravitational universe from space Peter Wass Tim Sumner, Daniel Hollington, Jonathon Baird High Energy Physics Group Imperial Space Lab 29 September 2015 Gravitational Waves Gravitational
More informationGaia ESA's billion star telescope
Gaia ESA's billion star telescope Gaia is an unmanned space observatory of the European Space Agency (ESA) designed for astrometry. The mission aims to compile a 3D space catalogue of approximately 1 billion
More informationHigh Performance Cryogenic Radiators for James Webb Space Telescope
46th 10-14 July 2016, Vienna, Austria ICES-2016-141 High Performance Cryogenic Radiators for James Webb Space Telescope Randy A. Franck 1 and Anthony P. Gurule 2 and Pamela A. Brinckerhoff 3 and Thomas
More informationStatus and Calibration of the erosita X ray Telescope
Status and Calibration of the erosita X ray Telescope Vadim Burwitz Max Planck Institut für extraterrestrische Physik on behalf of the erosita Team IACHEC, Lake Arrowhead, USA, 29 Mar 2017 Spektr Rentgen
More information4. Future telescopes & IFU facilities. Next generation IFUs Adaptive optics Extremely large telescopes Next space telescope: JWST
4. Future telescopes & IFU facilities Next generation IFUs Adaptive optics Extremely large telescopes Next space telescope: JWST Next generation IFUs At ESO: KMOS (infrared) MUSE (optical) XSHOOTER & SPHERE
More informationDESIGN AND QUALIFICATION OF THE CRYOGENIC COVER MECHANISM FOR THE MID-INFRARED INSTRUMENT ON THE JAMES WEBB SPACE TELESCOPE
DESIGN AND QUALIFICATION OF THE CRYOGENIC COVER MECHANISM FOR THE MID-INFRARED INSTRUMENT ON THE JAMES WEBB SPACE TELESCOPE U. Langer (1), A. Neukom (1), R. Romano (1), A. Vuilleumier (1) (1) RUAG Aerospace,
More informationThe First Billion Year of History - Galaxies in the Early Universe. Stephen Wilkins, Silvio Lorenzoni, Joseph Caruana, Holly Elbert, Matt Jarvis
The First Billion Year of History - Galaxies in the Early Universe Stephen Wilkins, Silvio Lorenzoni, Joseph Caruana, Holly Elbert, Matt Jarvis X recent z=8.3 GRB CCDs HST Keck Subaru Picture credit:
More informationMechanical and Thermal Design of XMM
r bulletin 100 december 1999 Mechanical and Thermal Design of XMM K. van Katwijk, T. van der Laan & D. Stramaccioni XMM Project, ESA Directorate for Scientific Programmes, ESTEC, Noordwijk, The Netherlands
More informationSouthern African Large Telescope. Prime Focus Imaging Spectrograph. Instrument Acceptance Testing Plan
Southern African Large Telescope Prime Focus Imaging Spectrograph Instrument Acceptance Testing Plan Eric B. Burgh University of Wisconsin Document Number: SALT-3160AP0003 Revision 1.0 18 February 2003
More informationFY15 President s Budget Request for NASA Astrophysics
FY15 President s Budget Request for NASA Astrophysics Paul Hertz Director, Astrophysics Division Science Mission Directorate 2 Science Mission Directorate Outyears are notional ($M) 2013 2014 2015 2016
More informationHow Light Beams Behave. Light and Telescopes Guiding Questions. Telescopes A refracting telescope uses a lens to concentrate incoming light at a focus
Light and Telescopes Guiding Questions 1. Why is it important that telescopes be large? 2. Why do most modern telescopes use a large mirror rather than a large lens? 3. Why are observatories in such remote
More informationHubble Space Telescope Users Committee (STUC)
Hubble Space Telescope Users Committee (STUC) May 8, 2014 Michael Garcia HST Program Scientist Michael.R.Garcia@NASA.GOV 1 Water Vapor Plumes on Europa Request For Information: Released April 2014 Instrument
More informationThe next-generation Infrared astronomy mission SPICA Space Infrared Telescope for Cosmology & Astrophysics
The next-generation Infrared astronomy mission SPICA Space Infrared Telescope for Cosmology & Astrophysics 3.5m cooled telescope mission for mid- and far-infrared astronomy Takao Nakagawa (ISAS/JAXA) for
More informationWhat do we do with the image?
Astro 150 Spring 2018: Lecture 7 page 1 Reading: Chapter 6, Sect. 6.4; Chapter 14 + assignment posted on Astro 150 website Homework: questions on special reading - answers due in lecture Thursday Exam
More informationWhat are the most important properties of a telescope? Chapter 6 Telescopes: Portals of Discovery. What are the two basic designs of telescopes?
Chapter 6 Telescopes: Portals of Discovery What are the most important properties of a telescope? 1. Light-collecting area: Telescopes with a larger collecting area can gather a greater amount of light
More informationGaia Status & Early Releases Plan
Gaia Status & Early Releases Plan F. Mignard Univ. Nice Sophia-Antipolis & Observatory of the Côte de Azur Gaia launch: 20 November 2013 The big news @ 08:57:30 UTC 2 Gaia: a many-sided mission Driven
More informationCIRiS: Compact Infrared Radiometer in Space LCPM, August 16, 2017 David Osterman PI, CIRiS Mission
1 CIRiS: Compact Infrared Radiometer in Space LCPM, August 16, 2017 David Osterman PI, CIRiS Mission 8/15/201 7 Overview of the CIRiS instrument and mission The CIRiS instrument is a radiometric thermal
More informationNext Generation Space Telescope (NGST) Observatory Architecture and Performance
Next Generation Space Telescope (NGST) Observatory Architecture and Performance John Nella 1a, Paul Atcheson b, Charles Atkinson a, Doug Au a, Mark Blair b, Allen Bronowicki a, Debra Fitzgerald a, Jeff
More informationATHENA Mission Design and ESA Status. David Lumb ESA Study Scientist MPE Jan 13 th 2012
ATHENA Mission Design and ESA Status David Lumb ESA Study Scientist MPE Jan 13 th 2012 Topics covered ESA L class mission reformulation Current status & programmatics Athena Mission Design Spacecraft Optics
More informationFGS-TF GROUND TESTING PRIOR TO LONG-TERM OPERATION IN ORBIT ABOUT L2
FGS-TF GROUND TESTING PRIOR TO LONG-TERM OPERATION IN ORBIT ABOUT L Johanne C. Heald (1) and Mark O Grady () (1) Canadian Space Agency, Space Technologies Directorate, 6767 route de l'aeroport, St-Hubert,
More informationCASE/ARIEL & FINESSE Briefing
CASE/ARIEL & FINESSE Briefing Presentation to NRC Committee for Exoplanet Science Strategy including material from the ARIEL consortium Mark Swain - JPL 19 April 2019 2018 California Institute of Technology.
More informationScientific Role of the James Webb Space Telescope in New Worlds, New Horizons
Scientific Role of the James Webb Space Telescope in New Worlds, New Horizons H. B. Hammel, G. Rieke, and the James Webb Space Telescope Science Working Group 1 September 2010 Abstract: The sixth decadal
More informationPS2 Status Report. Nick Kaiser Pan-STARRS, Institute for Astronomy, U. Hawaii. Durham Workshop 2013/01/08. Monday, January 7, 13
PS2 Status Report Nick Kaiser Pan-STARRS, Institute for Astronomy, U. Hawaii Durham Workshop 2013/01/08 The near term future for Pan-STARRS: PS1+2 PS1 survey mission to end 12/2013 PS2 telescope delivery
More informationTELESCOPES POWERFUL. Beyond the Book. FOCUS Book
FOCUS Book POWERFUL TELESCOPES Why do we need telescopes in order to observe stars that are very far away? Why do stars look bright in the sky while most galaxies, which have billions of stars, are too
More informationProbing the First Sources of Light with the James Webb Space Telescope. M. Stiavelli STScI, Baltimore
Probing the First Sources of Light with the James Webb Space Telescope M. Stiavelli STScI, Baltimore 1 Probing the First Sources of Light with the James Webb Space Telescope Plan: - What is JWST - Detecting
More informationAn Astrophysics Mission of Opportunity on the International Space Station
GSFC 1 An Astrophysics Mission of Opportunity on the International Space Station Science: Understanding ultra-dense matter through observations of neutron stars in the soft X-ray band Launch: October 2016,
More informationHST & Servicing Mission 4
HST & Servicing Mission 4 This briefing will provide an overview of the present condition of the Hubble observatory and describe the upcoming servicing mission Ambitious mission with three major objectives
More informationLunar, L1 and L2 A Communications guide based on the James Webb Space Telescope experience
SpaceOps 2006 Conference AIAA 2006-5787 Lunar, L1 and L2 A Communications guide based on the James Webb Space Telescope experience Jonathan Gal-Edd * and Bonnie Seaton GSFC/NASA, Greenbelt, Maryland, 20771,
More informationAstronomy. Optics and Telescopes
Astronomy A. Dayle Hancock adhancock@wm.edu Small 239 Office hours: MTWR 10-11am Optics and Telescopes - Refraction, lenses and refracting telescopes - Mirrors and reflecting telescopes - Diffraction limit,
More informationWideband Infrared Spectrometer for Characterization of Transiting Exoplanets with Space Telescopes
Wideband Infrared Spectrometer for Characterization of Transiting Exoplanets with Space Telescopes Keigo Enya Institute of Space and Astronautical Science, Japan Aerospace Exploration Agency 3-1-1 Chuou-ku,
More informationIntegrated Test Facility for Nanosat Assessment and Verification
Integrated Test Facility for Nanosat Assessment and Verification Steve Wassom, Quinn Young, Bryan Bingham, Rees Fullmer, Mitch Whiteley, Robert Burt, Mike Watson, Tom Ortiz, Joe Richards, Sam Wilcox Utah
More informationTelescopes Team (INS/TEL) Overview and Highlights. Roeland van der Marel (TIPS, November 21, 2013)
Telescopes Team (INS/TEL) Overview and Highlights Roeland van der Marel (TIPS, November 21, 2013) Overview JWST OTE (I&T,WFS&C, PSF, SIAF) ISIM (Coronagraphy, FGS, Pointing, I&T) HST OTA (Focus, SIAF)
More informationAstrophysics. Paul Hertz Director, Astrophysics Division Science Mission
National Aeronautics and Space Administration Astrophysics NAC Science Committee NASA Headquarters March 10, 2016 Paul Hertz Director, Astrophysics Division Science Mission Directorate @PHertzNASA Astrophysics
More information