ENGINEERING GEOLOGY AND ROCK ENGINEERING ASPECTS OF OPERATION AND CLOSURE OF KBS-3

Size: px
Start display at page:

Download "ENGINEERING GEOLOGY AND ROCK ENGINEERING ASPECTS OF OPERATION AND CLOSURE OF KBS-3"

Transcription

1 ENGINEERING GEOLOGY AND ROCK ENGINEERING ASPECTS OF OPERATION AND CLOSURE OF KBS-3 DAVID SAIANG Principal Consultant SRK Consulting Sweden NEIL MARSHALL Corporate Consultant SRK Consulting UK 1 of XX

2 SRK s REVIEW APPROACH FAMILIARISATION: with the Forsmark Project with the purpose and goals of the project with the significance of the project with the concepts of the KBS-3 repository with reference design parameters and production criteria 2 of XX APPROACHED OBJECTIVELY: By having in mind the purpose and functions of each component of KBS-3 repository Sensitivity of each component with respect to the safety of the repository Consequence of impairing the functions of each component What were the significant factors and how were they addressed? RELEVANCY Focused only on the aspects of Engineering Geology and Rock Engineering during operation and closure.

3 FAMILIARISATION KBS-3 CONCEPT 1 Spent nuclear fuel stored in copper canisters and surrounded by compacted bentonite blocks 2 Access tunnels backfilled by a mixture of bentonite and crushed granite or by Friedland clay 3 of XX

4 KBS-3 4 of XX

5 5 of XX REPOSITORY LAYOUT AT FORSMARK

6 6 of XX MAIN PHASES OF WORK AT FORSMARK

7 OPERATIONS AND CLOSURE SRK Consulting was tasked to review sections of safety reports on the OPERATIONS and CLOSURE of the KBS-3 Repository 7 of XX

8 UG EXCAVATION DESIGN STEPS The basis for the design of underground excavation is the geological information gathered from site investigation. SKB has prepared a site descriptive model (SDM) for Forsmark. The geological information are than translated to guidelines and design parameters, by applying rockmass characterisation and classification techniques The underground excavation is then designed based on these guideliness. In general there are no rules! The choice of the method to carry out the excavation depends the rock mass characteristics. 8 of XX

9 ROCK MASS AS NATURAL BARRIER The rockmass is the main natural barrier in the KBS-3 concept Thus, the knowledge of the rockmass characteristics before and after the excavation as well as during the excavation is critical Any excavation of the rock certainly affects the properties of the rock mass immediately around the excavation, creating what is generally referred to as the Excavation Damaged Zone (EDZ) The rock mass will also be disturbed by installation of rock support during the excavation and operation period. 9 of XX

10 FUNDAMENTALS OF ROCK ENGINEERING After Palmström & Stille, 2007 INTERACTION BETWEEN ROCK AND SUPPORT SYSTEM 10 of XX

11 EXCAVATION PROCESS CHART EXCAVATION (I) Excavation method - Drill & Blast - Mechanical (tunnel boring) (ii) Excavation geometry (iii) Safety PHYSICAL CONSEQUENCES - Development of new cracks (excavation and stress induced) - Opening of pre-exsiting cracks (mainly stress induced) INHERENT AND MECHANICAL CONSEQUENCES Reduction in rock strength Indicators: - Reduction in stiffness and general change in rock mechanical properties - Reduction in seismic wave velocity Increase in hydraulic parameters Indicators: - Increase in void ratio - Increase in permeability constant INPUT PARAMETERS - Purpose of the excavation - Rock mass and hydrogelogical conditions - Insitu stress conditions ASSESSMENT (MAINLY QUALITATIVE) - Structural mapping - Core logging - Borehole image processing - Microscopic examination - Displacement measurements ASSESSMENT (MAINLY QUANTITATIVE) - Seismic and sonic wave velocity measurements using geophysical methods - Variation in mechanical properties derived from velocity measurements - Direct stiffness measurements using for example the Goodman jack - Hydraulic conductivity tests - Saturation tests on samples

12 REFERENCE METHOD OF EXCAVATION AT FORSMARK DRILL & BLAST FOR DRIFTS, RAMPS, TUNNELS CORING FOR DEPOSITION HOLES 12 of XX

13 EXCAVATION IMPLICATIONS ON THE SAFETY OF REPOSITORY Rockmass conditions Hydrogeological conditions In-situ stresses EXCAVATION (I) Excavation method Drill and Blast Mechanical (II) Excavation geometry (III) Safety and Support Purpose of the excavation SITE DESCRIPTION MODEL (SDM) PREMISE/REQUIREMENTS

14 PHYSICAL CONSEQUENCES DRILL AND BLAST (reference excavation technique, except deposition holes will be cored) Natural cracks Natural cracks Half-casts or Half-casts half-pipes PHYSICAL CONSEQUENCES New cracks (excavation and stress induced) Opening of pre-existing cracks Irregular tunnel profile Impact on the reference tunnel geometry Stress-induced cracks Blast-induced Stress-induced cracks cracks Blast-induced cracks Half-pipes or half-casts Undamaged rock mass Undamaged rock EDZ Damaged BIDZrock 14 of XX

15 PHYSICAL CONSEQUENCES Impact of drill and blast on reference tunnel geometry Backfilling the disposal tunnels becomes a challenge because of irregular tunnel surface 15 of XX

16 MECHANICAL AND HYDRAULIC CONSEQUENCES (OF EDZ) MECHANICAL AND HYDRAULIC CONSEQUENCES Reduction in rock mechanical properties Indicators: Reduction stiffness Reduction in strength Reduction in seismic wave velocities Increase in hydraulic conductivity Increase in void ratio Increase in permeability constant Undamaged rock rock mass EDZ BIDZ Damaged rock Pre-existing fractures outside the vicinity of the EDZ is also affected 16 of XX Damaged zone

17 BEHAVIOUR OF EDZ ROCK MODULUS DEVIATORIC STRESS TRANSMISSIVITY Distance from excavation boundary EFFECTS: The rock within the EDZ may deform due to low stiffness, thus may impact the functionality of the backfill. High transmissivity may permit circulation of water through the EDZ 17 of XX

18 EXCAVATION PROCESS CHART EXCAVATION (I) Excavation method - Drill & Blast - Mechanical (tunnel boring) (ii) Excavation geometry (iii) Safety PHYSICAL CONSEQUENCES - Development of new cracks (excavation and stress induced) - Opening of pre-exsiting cracks (mainly stress induced) INHERENT AND MECHANICAL CONSEQUENCES Reduction in rock strength Indicators: - Reduction in stiffness and general change in rock mechanical properties - Reduction in seismic wave velocity Increase in hydraulic parameters Indicators: - Increase in void ratio - Increase in permeability constant INPUT PARAMETERS - Purpose of the excavation - Rock mass and hydrogelogical conditions - Insitu stress conditions ASSESSMENT (MAINLY QUALITATIVE) - Structural mapping - Core logging - Borehole image processing - Microscopic examination - Displacement measurements ASSESSMENT (MAINLY QUANTITATIVE) - Seismic and sonic wave velocity measurements using geophysical methods - Variation in mechanical properties derived from velocity measurements - Direct stiffness measurements using for example the Goodman jack - Hydraulic conductivity tests - Saturation tests on samples

19 LIKELY ROCK MECHANICAL PARAMETERS THAT MAY IMPAIR THE FUNCTION DISPOSAL HOLES 1 SPALLING 19 of XX After Andersson, 2007

20 LIKELY ROCK MECHANICAL PARAMETERS THAT MAY IMPAIR THE FUNCTION DISPOSAL HOLES 2 DEFORMATION ZONES OR STRUCTURES INTERSECTING THE DISPOSAL HOLES 20 of XX Disposal holes impaired by the structures are rejected using the Extend Full Perimeter Criterion (EFPC)

21 GROUND SUPPORT In order to assist in the design of the ground support system, SKB has domained the rock mass into different ground types (GT) according to the Q- values: GT 1: Q > 100 GT2: Q = GT3: Q = GT4: Q = of XX

22 GROUND BEHAVIOUR The main ground behaviour (GB) identified for the forsmark area are: GB1: Gravity driven fallout of rock blocks GB2: Stress induced gravity assisted failures GB3: Fractures by water pressure GB 1: has been identified as the main instability in Forsmark. 22 of XX

23 SEALING AND CLOSURE SEALING IS THE BACKFILLING AND PLUGGING OF DEPOSITION HOLES (REVERSIBLE PROCESS) CLOSURE IS THE BACKFILLING AND PLUGGING OF ACCESS, SHAFTS, RAMPS TO THE DISPOSAL SITE TO MAKE IT INACCESSIBLE (IRREVERSIBLE) 23 of XX

24 SEALING AND CLOSURE 24 of XX

25 25 of XX REPOSITORY EXCAVATION AND CANISTER DEPOSITION SEQUENCE DURING OPERATION PHASE

26 26 of XX TRIAL EXCAVATION AND DEPOSITION SEQUENCING

27 SEALING SEALING OF DEPOSITION HOLES & TUNNELS WITH REFERENCE SEALING MATERIALS WHICH ARE SPEFICALLY DEFINED FOR LOW PH AND LOW HYDRAULIC CONDUCTIVITY 27 of XX

28 CLOSURE CLOSURE OF ACCESS DRIFTS, RAMPS, SHAFTS, WITH REFERENCE BACKFILL MATERIALS AND CLAY Specifications of backfill materials vary for top sealing and bottom sealing 28 of XX

29 PLUG PERMENTANTLY SEALS OFF A DEPOSITION TUNNELFROM THE MAIN TUNNEL PLUG ANCHORED IN A ROCK AROUND THE TUNNEL 29 of XX

30 BACKFILL BLOCKS AND PELLETS MANUFACTURED FROM SPECIFIED BENTONITE CLAY (WITH LOW PH AND LOW HYDRAULIC CONDUCTIVITY) 30 of XX

31 BACKFILLING DEPOSITION HOLES 31 of XX

32 MATTERS ARISING It is not entirely clear whether the backfill will purely perform a closure function only or it will also perform some support functions. The interaction between backfill and the surrounding rock could play an important role in defining function of the backfill. Frequent of use of the words such as can be, may be gives an impression that the ideas are still suggestions. Standard reference coordinate system for modeling exercise, perhaps with respect to the orientation of the deposition tunnels Backfilling process is rather tedious with the profiles created by drill and blast. Is there any series for alternatives? Backfilling report (R-08-59, Chapter 8) have raised a number of important issues, which need attention and incorporation into design. No indication of reliability engineering. This branch of engineering takes into account uncertanties in design. ca. in the safety reports means approximately in English. Needs to corrected for non-english readers. 32 of XX

33 CONFIDENCE Learning from others Continuous research and development Monitoring during operation and closure stages Update design as new information becomes available Unlike in mining and some civil engineering projects the site is specifically selected after assessing its suitability. 33 of XX

34 UNCERTAINITIES Rockmass and hydrological parameters have a 3-dimensional and spatial characteristics. Majority of the measurement techniques we use today are 2-dimensional. In that respect there will remain the uncertainty over the accuracy of the measured parameter. The rockmass and hydrological properties we seek to define are generally tensor quantities. Nevertheless, we try to relate them with vector quantities. For example, the mathematics of relating velocity, a vector quantity, to rockmass modulus, a tensor quantity, must be more complicated then what we have today. There is no experience to rely upon for the performance of an engineered system, such as for a repository, over long periods (1000 years or more). However, extensive research and development will give us some confidence over its long term performance. 34 of XX

35 OVERALL REMARK SKB leadership in research and development to ensure the safety of the repositories have clearly led to some of the well driven objective driven work and safety reports with well defined scopes. Such work have also been recognized by international rock mechanics community, in for example, awarding two candidates, Daniel Ask and Christer Andersson, the Rocha Medal by ISRM within the last 5 years for their work in geological engineering with SKB s repository research facilities 35 of XX

36 36 of XX THANK YOU

37 Backfill in disposal tunnel The concept of backfilling of a KBS-3V deposition tunnel is the transport of dissolved matter is by difussion and not by waterflow, which requires that the hydraulic conductivity of the backfill does not exceed e-10m/s The density of backfill is 1,950 kg/m 3. The back should exert an effective pressure of at least 100 kpa on the rock, in order to provide support to the rock to spalling To resist compression caused by upward expansion of the buffer Three methods of backfiling have been stated Block manual method, tedious and will cause unacceptable delays REFERENCE METHOD Robot method is rational but may be difficult to apply PROPOSED FOR FURTHER EVALUATION Module method Superior - PROPOSED Disposition will be 1 canister per day, which means backfilling will be at a rate of 6. of XX 37 to 8 m per day (canister is spaced 6 to 8 m apart) Any interruptions with the procedure will cause problems, especially in areas where water inflow is significant.

Underground nuclear waste storage

Underground nuclear waste storage Underground nuclear waste storage Groundwater flow and radionuclide transport Jan-Olof Selroos Cargese Summer School, July 5, 2018 Contents: Concept for geological disposal of nuclear waste A few words

More information

In-situ Experiments on Excavation Disturbance in JNC s Geoscientific Research Programme

In-situ Experiments on Excavation Disturbance in JNC s Geoscientific Research Programme In-situ Experiments on Excavation Disturbance in JNC s Geoscientific Research Programme H. Matsui, K. Sugihara and T. Sato Japan Nuclear Cycle Development Institute, Japan Summary The HLW disposal program

More information

WITPRESS WIT Press publishes leading books in Science and Technology. Visit our website for the current list of titles.

WITPRESS WIT Press publishes leading books in Science and Technology. Visit our website for the current list of titles. High-Level Radioactive Waste (HLW) Disposal WITPRESS WIT Press publishes leading books in Science and Technology. Visit our website for the current list of titles. www.witpress.com WITeLibrary Home of

More information

Behaviour of Blast-Induced Damaged Zone Around Underground Excavations in Hard Rock Mass Problem statement Objectives

Behaviour of Blast-Induced Damaged Zone Around Underground Excavations in Hard Rock Mass Problem statement Objectives Behaviour of Blast-Induced Damaged Zone Around Underground Excavations in Hard Rock Mass Problem statement Blast-induced damaged zone can affect the affect stability and performance of tunnel. But, we

More information

Experimental program in the URL

Experimental program in the URL Experimental program in the URL Jacques Delay Deputy Scientific Director July 21-24 th 2009 AGENCE NATIONALE POUR LA GESTION DES DÉCHETS RADIOACTIFS URL First construction step (2000 2006) Experimental

More information

Deep Borehole Disposal Performance Assessment and Criteria for Site Selection

Deep Borehole Disposal Performance Assessment and Criteria for Site Selection Deep Borehole Disposal Performance Assessment and Criteria for Site Selection Sandia is a multiprogram laboratory operated by Sandia Corporation, a Lockheed Martin Company, for the United States Department

More information

1. Rock Mechanics and mining engineering

1. Rock Mechanics and mining engineering 1. Rock Mechanics and mining engineering 1.1 General concepts Rock mechanics is the theoretical and applied science of the mechanical behavior of rock and rock masses; it is that branch of mechanics concerned

More information

Presentations at NEA IRT hearing 12 December, 13:30 17:00. Geology, rock mechanics, hydraulic processes, (bio) geochemistry, hydrochemistry

Presentations at NEA IRT hearing 12 December, 13:30 17:00. Geology, rock mechanics, hydraulic processes, (bio) geochemistry, hydrochemistry Presentations at NEA IRT hearing 12 December, 13:30 17:00 Geology, rock mechanics, hydraulic processes, (bio) geochemistry, hydrochemistry NEA IRT hearing 12 December 2 Example question #1 Geology Can

More information

Hydrogeology of Deep Borehole Disposal for High-Level Radioactive Waste

Hydrogeology of Deep Borehole Disposal for High-Level Radioactive Waste SAND2014-18615C Hydrogeology of Deep Borehole Disposal for High-Level Radioactive Waste Geological Society of America Annual Meeting October 20, 2014 Bill W. Arnold, W. Payton Gardner, and Patrick V. Brady

More information

A25 Very High Resolution Hard Rock Seismic Imaging for Excavation Damage Zone Characterisation

A25 Very High Resolution Hard Rock Seismic Imaging for Excavation Damage Zone Characterisation A25 Very High Resolution Hard Rock Seismic Imaging for Excavation Damage Zone Characterisation C. Cosma* (Vibrometric Oy), N. Enescu (Vibrometric Oy) & E. Heikkinen (Pöyry Finland Oy) SUMMARY Seismic and

More information

Clays in Geological Disposal Systems

Clays in Geological Disposal Systems Clays in Natural and Engineered Barriers for Radioactive Waste Confinement Clays in Geological Disposal Systems A brochure edited by ONDRAF/NIRAS (Belgium) and Andra (France), in collaboration with COVRA

More information

ENGINEERING GEOLOGY AND ROCK ENGINEERING

ENGINEERING GEOLOGY AND ROCK ENGINEERING 1 ENGINEERING GEOLOGY AND ROCK ENGINEERING HANDBOOK NO. 2 Norwegian Group for Rock Mechanics (NBG) www.bergmekanikk.com Prepared in co-operation with Norwegian Tunnelling Society (NFF) Issued in 2000 SECRETARIAT:

More information

Haulage Drift Stability Analysis- A Sensitivity Approach

Haulage Drift Stability Analysis- A Sensitivity Approach Haulage Drift Stability Analysis- A Sensitivity Approach W. Abdellah University of Assiut, Assiut, Egypt ABSTRACT Haulage drifts are the primary access to the mining blocks of an ore body in a multi-level

More information

An introduction to the Rock Mass index (RMi) and its applications

An introduction to the Rock Mass index (RMi) and its applications Reference: A. Palmström, www.rockmass.net An introduction to the Rock Mass index (RMi) and its applications by Arild Palmström, Ph.D. 1 Introduction Construction materials commonly used in civil engineering

More information

Ground support modelling involving large ground deformation: Simulation of field observations Part 1

Ground support modelling involving large ground deformation: Simulation of field observations Part 1 Ground Support 2016 E. Nordlund, T.H. Jones and A. Eitzenberger (eds) Ground support modelling involving large ground deformation: Simulation of field observations Part 1 D.Saiang, Luleå University of

More information

Rock Suitability Classification for POPLU

Rock Suitability Classification for POPLU The research leading to these results has received funding from the European Union's European Atomic Energy Community's (Euratom) Seventh Framework Programme FP7/2011-2013, 2013, under Grant Agreement

More information

Collaborating partners: NAGRA (CH), L3S (FR), G3S (FR), KUL (B), EPFL (CH), SOLEXPERTS (CH)

Collaborating partners: NAGRA (CH), L3S (FR), G3S (FR), KUL (B), EPFL (CH), SOLEXPERTS (CH) SELFRAC Fractures and self-healing within the excavationdisturbed zone in clays Type of test: Clay characterisation Collaborating partners: NAGRA (CH), L3S (FR), G3S (FR), KUL (B), EPFL (CH), SOLEXPERTS

More information

Deep Borehole Field Test Overview. Presentation Overview

Deep Borehole Field Test Overview. Presentation Overview Deep Borehole Field Test Overview David C. Sassani Sandia National Laboratories Used Fuel Disposition R&D Campaign The Institute for Nuclear Materials Management 32nd Spent Fuel Management Seminar Washington,

More information

Underground Storage & Disposal - The Salt Concept. Thomas Brasser - GRS

Underground Storage & Disposal - The Salt Concept. Thomas Brasser - GRS Underground Storage & Disposal - The Salt Concept Thomas Brasser - GRS Who is GRS ( Plant & Reactor Safety Ltd. ) Non-profit, independent expert and research organisation Assess and improve safety of technical

More information

Construction Technical Specifications on Rock-Foundation Excavating Engineering of Hydraulic Structures

Construction Technical Specifications on Rock-Foundation Excavating Engineering of Hydraulic Structures DL Electric Power Industry Standard of the People's Republic of China P DL I T 5389-- Construction Technical Specifications on Rock-Foundation Excavating Engineering of Hydraulic Structures DL/T 5389-

More information

IAEA SAFETY STANDARDS Geotechnical Aspects of Site Evaluation and Foundations in NPPs, NS-G-3.6

IAEA SAFETY STANDARDS Geotechnical Aspects of Site Evaluation and Foundations in NPPs, NS-G-3.6 IAEA SAFETY STANDARDS Geotechnical Aspects of Site Evaluation and Foundations in NPPs, NS-G-3.6 Regional Workshop on Volcanic, Seismic, and Tsunami Hazard Assessment Related to NPP Siting Activities and

More information

R T-H-M couplings in rock. Overview of results of importance to the SR-Can safety assessment. Harald Hökmark, Billy Fälth, Clay Technology AB

R T-H-M couplings in rock. Overview of results of importance to the SR-Can safety assessment. Harald Hökmark, Billy Fälth, Clay Technology AB R-6-88 T-H-M couplings in rock Overview of results of importance to the SR-Can safety assessment Harald Hökmark, Billy Fälth, Clay Technology AB Thomas Wallroth, BERGAB September 26 Svensk Kärnbränslehantering

More information

EOSC433: Geotechnical Engineering Practice & Design

EOSC433: Geotechnical Engineering Practice & Design EOSC433: Geotechnical Engineering Practice & Design Lecture 1: Introduction 1 of 31 Dr. Erik Eberhardt EOSC 433 (Term 2, 2005/06) Overview This course will examine different principles, approaches, and

More information

An approach for the host rock assessment methodology. based on URLs site investigation data

An approach for the host rock assessment methodology. based on URLs site investigation data 1 An approach for the host rock assessment methodology development tin JAEA, based on URLs site investigation data Workshop on Assessing the suitability of host rock Yokohama Minato Mirai, Landmark Tower

More information

THE ROLE OF STRUCTURAL RELIABILITY OF GEOTECHNICAL BARRIERS OF AN HLW/SF REPOSITORY IN SALT ROCK WITHIN THE SAFETY CASE

THE ROLE OF STRUCTURAL RELIABILITY OF GEOTECHNICAL BARRIERS OF AN HLW/SF REPOSITORY IN SALT ROCK WITHIN THE SAFETY CASE THE ROLE OF STRUCTURAL RELIABILITY OF GEOTECHNICAL BARRIERS OF AN HLW/SF REPOSITORY IN SALT ROCK WITHIN THE SAFETY CASE N. Müller-Hoeppe, M. Jobmann, M. Polster, H. Schmidt DBE TECHNOLOGY GmbH SAFETY CASES

More information

CNSC Review of the Long-Term Safety Case for a Deep Geologic Repository

CNSC Review of the Long-Term Safety Case for a Deep Geologic Repository CNSC Review of the Long-Term Safety Case for a Deep Geologic Repository T. Son Nguyen Geoscience Specialist Brugg, Switzerland May 13, 2016 e-doc 4972224 nuclearsafety.gc.ca Content Ontario Power Generation

More information

Ground Support in Mining and Underground Construction

Ground Support in Mining and Underground Construction Ground Support in Mining and Underground Construction Proceedings of the Fifth International Symposium on Ground Support 28-30 September 2004, Perth, Western Australia Edited by Ernesto Villaescusa Yves

More information

Thermo-Hydro-Mechanical-Chemical (THMC) Modelling of the Bentonite Barrier in Final Disposal of High Level Nuclear Waste

Thermo-Hydro-Mechanical-Chemical (THMC) Modelling of the Bentonite Barrier in Final Disposal of High Level Nuclear Waste Presented at the COMSOL Conference 2008 Hannover Thermo-Hydro-Mechanical-Chemical (THMC) Modelling of the Bentonite Barrier in Final Disposal of High Level Nuclear Waste, Markus Olin, Veli-Matti Pulkkanen,

More information

Tournemire Underground Laboratory: Geophysical Monitoring of Claystone Desaturation in a Ventilated Borehole.

Tournemire Underground Laboratory: Geophysical Monitoring of Claystone Desaturation in a Ventilated Borehole. Tournemire Underground Laboratory: Geophysical Monitoring of Claystone Desaturation in a Ventilated Borehole. U.Zimmer, A. Genty, T. Rothfuchs, B. Bonin, J. Cabrera 1 Introduction With this paper, we will

More information

SELF-HEALING OF FRACTURES WITHIN THE EDZ AT THE MT. TERRI ROCK LABORATORY : RESULTS AFTER ONE YEAR OF EXPERIMENTAL WORK

SELF-HEALING OF FRACTURES WITHIN THE EDZ AT THE MT. TERRI ROCK LABORATORY : RESULTS AFTER ONE YEAR OF EXPERIMENTAL WORK SELF-HEALING OF FRACTURES WITHIN THE EDZ AT THE MT. TERRI ROCK LABORATORY : RESULTS AFTER ONE YEAR OF EXPERIMENTAL WORK Peter M. Meier (1), Thomas Trick (), Peter Blümling (3) and Geert Vockaert () (1)

More information

Stress measurements a Scandinavian perspective. Jonny Sjöberg Itasca Consultants AB (Sweden)

Stress measurements a Scandinavian perspective. Jonny Sjöberg Itasca Consultants AB (Sweden) Stress measurements a Scandinavian perspective Jonny Sjöberg Itasca Consultants AB (Sweden) Scandinavian experiences Deep overcoring the Borre probe OC experiences & quality control A new LVDT overcoring

More information

1. Introduction. 2. Model Description and Assumptions

1. Introduction. 2. Model Description and Assumptions Excerpt from the Proceedings of the COMSOL Conference 2010 Boston The Dissolution and Transport of Radionuclides from Used Nuclear Fuel in an Underground Repository Y. Beauregard *1, M. Gobien 2, F. Garisto

More information

GUIDELINES FOR OPEN PIT SLOPE DESIGN EDITORS: JOHN READ, PETER STACEY # & CSIRO. J x PUBLISHING

GUIDELINES FOR OPEN PIT SLOPE DESIGN EDITORS: JOHN READ, PETER STACEY # & CSIRO. J x PUBLISHING GUIDELINES FOR OPEN PIT SLOPE DESIGN EDITORS: JOHN READ, PETER STACEY # & CSIRO J x PUBLISHING S Contents Preface and acknowledgments xiii 1 Fundamentals of slope design 1 Peter Stacey 1.1 Introduction

More information

Building on Past Experiences Worker Safety

Building on Past Experiences Worker Safety EOSC433: Geotechnical Engineering Practice & Design Lecture 11: Rock Stabilization Principles 1 of 43 Erik Eberhardt UBC Geological Engineering EOSC 433 (2016) Building on Past Experiences Worker Safety

More information

Geotechnical & Mining Engineering Services

Geotechnical & Mining Engineering Services Geotechnical & Mining Engineering Services Southwest Research Institute San Antonio, Texas A s an independent, nonprofit research and development organization, Southwest Research Institute (SwRI ) uses

More information

Pit Slope Optimization Based on Hydrogeologic Inputs

Pit Slope Optimization Based on Hydrogeologic Inputs Pit Slope Optimization Based on Hydrogeologic Inputs G. Evin, F. Henriquez, V. Ugorets SRK Consulting (U.S.), Inc., Lakewood, Colorado, USA ABSTRACT With the variability of commodity prices and the constant

More information

Assessment of releases from a nuclear waste repository in crystalline rock

Assessment of releases from a nuclear waste repository in crystalline rock Future Groundwater Resources at Risk (Proceedings of the Helsinki Conference, June 1994). IAHS Publ. no. 222, 1994. 37 Assessment of releases from a nuclear waste repository in crystalline rock AIMO HAUTOJÀRVI

More information

Interpretation of Pile Integrity Test (PIT) Results

Interpretation of Pile Integrity Test (PIT) Results Annual Transactions of IESL, pp. 78-84, 26 The Institution of Engineers, Sri Lanka Interpretation of Pile Integrity Test (PIT) Results H. S. Thilakasiri Abstract: A defect present in a pile will severely

More information

Treatment of Colloids in the Safety Case

Treatment of Colloids in the Safety Case Treatment of Colloids in the Safety Case Clay Colloids in Aqueous Systems 3 4 February 2016, Berlin Dr Amy Shelton, Radioactive Waste Management (RWM) KBS-3 Concept Based on the multi- barrier principles

More information

Geotechnical Monitoring for Safe Excavation of Large Rock Cavern: A Case Study

Geotechnical Monitoring for Safe Excavation of Large Rock Cavern: A Case Study The 31st International Symposium on Automation and Robotics in Construction and Mining (ISARC 2014) Geotechnical Monitoring for Safe Excavation of Large Rock Cavern: A Case Study A.Mandal a, C. Kumar b,

More information

Safety assessment for disposal of hazardous waste in abandoned underground mines

Safety assessment for disposal of hazardous waste in abandoned underground mines Safety assessment for disposal of hazardous waste in abandoned underground mines A. Peratta & V. Popov Wessex Institute of Technology, Southampton, UK Abstract Disposal of hazardous chemical waste in abandoned

More information

Geotechnical Engineering and Dams

Geotechnical Engineering and Dams Geotechnical Engineering and Dams Solving Geotechnical Challenges for Hydropower and Water Resources Projects Geological and geotechnical challenges are often very demanding when planning hydraulic structures.

More information

A PARAMETER STUDY OF THE DAMAGED ROCK ZONE AROUND SHALLOW TUNNELS IN BRITTLE ROCK MASS

A PARAMETER STUDY OF THE DAMAGED ROCK ZONE AROUND SHALLOW TUNNELS IN BRITTLE ROCK MASS A PARAMETER STUDY OF THE DAMAGED ROCK ZONE AROUND SHALLOW TUNNELS IN BRITTLE ROCK MASS D. SAIANG 1 and E. NORDLUND 1 1 Division of Rock Mechanics and Rock Engineering, Luleå University of Technology, Sweden.

More information

Implications of Host Rock Selection for a HLW Repository System in Germany - Consequences for Repository Design and Safety - Wilhelm Bollingerfehr

Implications of Host Rock Selection for a HLW Repository System in Germany - Consequences for Repository Design and Safety - Wilhelm Bollingerfehr Implications of Host Rock Selection for a HLW Repository System in Germany - Consequences for Repository Design and Safety - Wilhelm Bollingerfehr 31224 Peine, Germany 1 Outline of Presentation Repository

More information

M035 High Resolution 3D Tunnel Seismic Reflection at Olkiluoto, Finland

M035 High Resolution 3D Tunnel Seismic Reflection at Olkiluoto, Finland M035 High Resolution 3D Tunnel Seismic Reflection at Olkiluoto, Finland C. Cosma* (Vibrometric), N. Enescu (Vibrometric), M. Lahti (Posiva Oy), E. Heikkinen (Poyry Oy) & T. Ahokas (Poyry Oy) SUMMARY ONKALO

More information

In situ fracturing mechanics stress measurements to improve underground quarry stability analyses

In situ fracturing mechanics stress measurements to improve underground quarry stability analyses In situ fracturing mechanics stress measurements to improve underground quarry stability analyses Anna M. Ferrero, Maria R. Migliazza, Andrea Segalini University of Parma, Italy Gian P. Giani University

More information

Abstract. Roland Pusch 1, Sven Knutsson 1, Laith Al-Taie 1

Abstract. Roland Pusch 1, Sven Knutsson 1, Laith Al-Taie 1 Journal of Earth Sciences and Geotechnical Engineering, vol. 2, no. 1, 2012, 89-112 ISSN: 1792-9040(print), 1792-9660 (online) International Scientific Press, 2012 The impact of hydraulic gradients and

More information

P Jon Haycox, Damion Duckworth ASC, Applied Seismology Consultants. June 2009

P Jon Haycox, Damion Duckworth ASC, Applied Seismology Consultants. June 2009 P-11-29 Acoustic emission and ultrasonic monitoring results from deposition hole DA3545G1 in the Prototype Repository between October 28 and March 29 Jon Haycox, Damion Duckworth ASC, Applied Seismology

More information

EXAMINATION PAPER MEMORANDUM

EXAMINATION PAPER MEMORANDUM EXAMINATION PAPER MEMORANDUM SUBJECT: CERTIFICATE IN ROCK MECHANICS PAPER 3.1 : HARD ROCK TABULAR EXAMINER: PJ LE ROUX SUBJECT CODE: COMRMC EXAMINATION DATE: MAY 2015 TIME: MODERATOR: WM BESTER TOTAL MARKS:

More information

Further Research into Methods of Analysing the October 2000 Stability of Deep Open Pit Mines EXECUTIVE SUMMARY

Further Research into Methods of Analysing the October 2000 Stability of Deep Open Pit Mines EXECUTIVE SUMMARY EXECUTIVE SUMMARY This report presents the results of a program of further research into the use of a combined approach of numerical and centrifuge modeling in assessing the stability of deep open pit

More information

BLOCK SIZE AND BLOCK SIZE DISTRIBUTION

BLOCK SIZE AND BLOCK SIZE DISTRIBUTION Paper presented at the Workshop on "Reliablity of classification systems" in connection with the GeoEng000 conference, Melbourne, 8 November 000 BLOCK SIZE AND BLOCK SIZE DISTRIBUTION by Arild Palmström,

More information

Gotechnical Investigations and Sampling

Gotechnical Investigations and Sampling Gotechnical Investigations and Sampling Amit Prashant Indian Institute of Technology Gandhinagar Short Course on Geotechnical Investigations for Structural Engineering 12 14 October, 2017 1 Purpose of

More information

Module 9 : Foundation on rocks. Content

Module 9 : Foundation on rocks. Content FOUNDATION ON ROCKS Content 9.1 INTRODUCTION 9.2 FOUNDATION TYPES ON ROCKS 9.3 BEARING CAPCITY- SHALLOW FOUNDATION 9.3.1 Ultimate bearing capacity 9.3.2 Safe bearing pressure 9.3.3 Estimation of bearing

More information

The volunteer process of site selection for radwaste disposal in Canada:

The volunteer process of site selection for radwaste disposal in Canada: The volunteer process of site selection for radwaste disposal in Canada: why it may be suitable for Canada, but is inappropriate for the UK David Smythe January 2013 V4 2 April 2013 Quick summary Canada

More information

Successful Construction of a Complex 3D Excavation Using 2D and 3D Modelling

Successful Construction of a Complex 3D Excavation Using 2D and 3D Modelling University of Wollongong Research Online Coal Operators' Conference Faculty of Engineering and Information Sciences 2015 Successful Construction of a Complex 3D Excavation Using 2D and 3D Modelling Yvette

More information

NNN99. Rock Engineering for the Next Very Large Underground Detector. D. Lee Petersen CNA Consulting Engineers

NNN99. Rock Engineering for the Next Very Large Underground Detector. D. Lee Petersen CNA Consulting Engineers NNN99 Rock Engineering for the Next Very Large Underground Detector D. Lee Petersen Overview Rock engineering 101 Cavern size & shape Construction methods Feasibility Historical projects Numerical modeling

More information

PROBABILISTIC TRANSPORT PATH ANALYSIS THROUGH THREE-DIMENSIONAL DISCRETE FRACTURE NETWORKS FOR UNDERGROUND RADIOACTIVE WASTE DISPOSAL FACILITIES

PROBABILISTIC TRANSPORT PATH ANALYSIS THROUGH THREE-DIMENSIONAL DISCRETE FRACTURE NETWORKS FOR UNDERGROUND RADIOACTIVE WASTE DISPOSAL FACILITIES th International Conference on Probabilistic Safety Assessment and Management (PSAM ) PROBABILISTIC TRANSPORT PATH ANALYSIS THROUGH THREE-DIMENSIONAL DISCRETE FRACTURE NETWORKS FOR UNDERGROUND RADIOACTIVE

More information

SUMMARY OF DOCTORAL THESIS BY TOPIAS SIREN

SUMMARY OF DOCTORAL THESIS BY TOPIAS SIREN SUMMARY OF DOCTORAL THESIS BY TOPIAS SIREN PREFACE This thesis summary consists of detailed description of the thesis presenting the full impact of the thesis accompanied by selected tables and figures.

More information

Numerical Simulation of Unsaturated Infilled Joints in Shear

Numerical Simulation of Unsaturated Infilled Joints in Shear University of Wollongong Research Online Coal Operators' Conference Faculty of Engineering and Information Sciences 2018 Numerical Simulation of Unsaturated Infilled Joints in Shear Libin Gong University

More information

7. Foundation and Slope Stability

7. Foundation and Slope Stability The Asian Nuclear Safety Network 7. Foundation and Slope Stability (SER 2.5.4 & 2.5.5) Taek-Mo SHIM k147stm@kins.re.kr Korea Institute of Nuclear Safety Structural Systems and Site Evaluation Department

More information

Sandia National Laboratories

Sandia National Laboratories Photos placed in horizontal position with even amount of white space between photos and header The U.S. Deep Borehole Field Test Patrick V. Brady, Kristopher L. Kuhlman, David L. Sassani, Geoffrey A. Freeze,

More information

Introduction and Background

Introduction and Background Introduction and Background Itasca Consulting Group, Inc. (Itasca) has been participating in the geomechanical design of the underground 118-Zone at the Capstone Minto Mine (Minto) in the Yukon, in northwestern

More information

Chapter 12 Subsurface Exploration

Chapter 12 Subsurface Exploration Page 12 1 Chapter 12 Subsurface Exploration 1. The process of identifying the layers of deposits that underlie a proposed structure and their physical characteristics is generally referred to as (a) subsurface

More information

Hydro-Mechanical Modeling of a Shaft Seal in a Deep Geological Repository

Hydro-Mechanical Modeling of a Shaft Seal in a Deep Geological Repository Presented at the COMSOL Conference 2010 Boston Hydro-Mechanical Modeling of a Shaft Seal in a Deep Geological Repository D. G. Priyanto Presented at COMSOL Conference 2010 Boston, 2010 October 7-9 Background

More information

Critical Borehole Orientations Rock Mechanics Aspects

Critical Borehole Orientations Rock Mechanics Aspects Critical Borehole Orientations Rock Mechanics Aspects By R. BRAUN* Abstract This article discusses rock mechanics aspects of the relationship between borehole stability and borehole orientation. Two kinds

More information

Chapter 1 Introduction

Chapter 1 Introduction Chapter 1 Introduction 1.1 Statement of the Problem Engineering properties of geomaterials are very important for civil engineers because almost everything we build - tunnels, bridges, dams and others

More information

GEOTECHNICAL ENGINEERING II. Subject Code : 06CV64 Internal Assessment Marks : 25 PART A UNIT 1

GEOTECHNICAL ENGINEERING II. Subject Code : 06CV64 Internal Assessment Marks : 25 PART A UNIT 1 GEOTECHNICAL ENGINEERING II Subject Code : 06CV64 Internal Assessment Marks : 25 PART A UNIT 1 1. SUBSURFACE EXPLORATION 1.1 Importance, Exploration Program 1.2 Methods of exploration, Boring, Sounding

More information

A new design approach for highway rock slope cuts based on ecological environment protection

A new design approach for highway rock slope cuts based on ecological environment protection A new design approach for highway rock slope cuts based on ecological environment protection T. Lian-jin, Z. Li, W. Yunjie, W. Guang-yuan & Z. Yin-tao College of Architecture and Civil Engineering, Beijing

More information

10. GEOTECHNICAL EXPLORATION PROGRAM

10. GEOTECHNICAL EXPLORATION PROGRAM Geotechnical site investigations should be conducted in multiple phases to obtain data for use during the planning and design of the tunnel system. Geotechnical investigations typically are performed in

More information

Engineer. Engineering. Engineering. (in-ja-neer ) A person trained and skilled in any of the various branches of engineering: a civil engineer

Engineer. Engineering. Engineering. (in-ja-neer ) A person trained and skilled in any of the various branches of engineering: a civil engineer Engineer (in-ja-neer ) A person trained and skilled in any of the various branches of engineering: a civil engineer (Random House Webster s College Dictionary, 1991) CE100 Introduction to Civil Geotechnical

More information

Underground Risk Management Course Marina Del Rey, California November, Geotechnical Data Reports. Greg Raines, PE

Underground Risk Management Course Marina Del Rey, California November, Geotechnical Data Reports. Greg Raines, PE Underground Risk Management Course Marina Del Rey, California November, 2018 Geotechnical Data Reports Greg Raines, PE Gregory.Raines@Stantec.com Introduction What is a Geotechnical Data Report? The GDR

More information

3D simulations of an injection test done into an unsaturated porous and fractured limestone

3D simulations of an injection test done into an unsaturated porous and fractured limestone 3D simulations of an injection test done into an unsaturated porous and fractured limestone A. Thoraval *, Y. Guglielmi, F. Cappa INERIS, Ecole des Mines de Nancy, FRANCE *Corresponding author: Ecole des

More information

Numerical investigation of EDZ development around a deep polymetallic ore mine

Numerical investigation of EDZ development around a deep polymetallic ore mine Paper No. 198 ISMS 2016 Numerical investigation of EDZ development around a deep polymetallic ore mine Mountaka Souley a *, Marwan Al Heib a, Vincent Renaud a a INERIS, c/o Ecole des Mines de Nancy, Campus

More information

Development of the NUMO pre-selection, site-specific safety case

Development of the NUMO pre-selection, site-specific safety case P.0 Development of the NUMO pre-selection, site-specific safety case 24 th November 2016, Vienna, Austria International Conference on the Safety of Radioactive Waste Management, IAEA Nuclear Waste Management

More information

The Mine Geostress Testing Methods and Design

The Mine Geostress Testing Methods and Design Open Journal of Geology, 2014, 4, 622-626 Published Online December 2014 in SciRes. http://www.scirp.org/journal/ojg http://dx.doi.org/10.4236/ojg.2014.412046 The Mine Geostress Testing Methods and Design

More information

TAKING THE MYSTERY OUT OF USACE S ER DRILLING IN EARTH EMBANKMENT DAMS AND LEVEES

TAKING THE MYSTERY OUT OF USACE S ER DRILLING IN EARTH EMBANKMENT DAMS AND LEVEES TAKING THE MYSTERY OUT OF USACE S ER 1110-1-1807 DRILLING IN EARTH EMBANKMENT DAMS AND LEVEES 237 237 237 217 217 217 200 200 200 80 119 27 252 174.59 1 255 255 255 0 0 0 163 163 163 131 132 122 239 65

More information

ENCE 3610 Soil Mechanics. Site Exploration and Characterisation Field Exploration Methods

ENCE 3610 Soil Mechanics. Site Exploration and Characterisation Field Exploration Methods ENCE 3610 Soil Mechanics Site Exploration and Characterisation Field Exploration Methods Geotechnical Involvement in Project Phases Planning Design Alternatives Preparation of Detailed Plans Final Design

More information

1 of 46 Erik Eberhardt UBC Geological Engineering ISRM Edition

1 of 46 Erik Eberhardt UBC Geological Engineering ISRM Edition Rock Engineering Practice & Design Lecture 12: Rock Stabilization Principles 1 of 46 Erik Eberhardt UBC Geological Engineering ISRM Edition Author s Note: The lecture slides provided here are taken from

More information

Geotechnical Models and Data Confidence in Mining Geotechnical Design

Geotechnical Models and Data Confidence in Mining Geotechnical Design Geotechnical Models and Data Confidence in Mining Geotechnical Design Michael Dunn Principal Consultant (Geotechnical Engineering) Overview Geotechnical models Geotechnical model and design Data reliability

More information

HYDROGEOLOGICAL PROPERTIES OF THE UG2 PYROXENITE AQUIFERS OF THE BUSHVELD COMPLEX

HYDROGEOLOGICAL PROPERTIES OF THE UG2 PYROXENITE AQUIFERS OF THE BUSHVELD COMPLEX R. Gebrekristos, P.Cheshire HYDROGEOLOGICAL PROPERTIES OF THE UG2 PYROXENITE AQUIFERS OF THE BUSHVELD COMPLEX R. Gebrekristos Digby Wells Environmental P. Cheshire Groundwater Monitoring Services Abstract

More information

Expertise from Surface to Great Depths

Expertise from Surface to Great Depths Expertise from Surface to Great Depths Helsinki, Railway Line15 m Stockholm Waste Water Plant 45 m Tosbotn, Hydro Power tunnel 200 m ONKALO & Äspö HRL from 160 to 440 m Kylylahti Mine 400 m and 650 m Tara

More information

Empirical Design in Geotechnical Engineering

Empirical Design in Geotechnical Engineering EOSC433: Geotechnical Engineering Practice & Design Lecture 5: Empirical Design (Rock Mass Classification & Characterization) 1of 42 Erik Eberhardt UBC Geological Engineering EOSC 433 (2013) Empirical

More information

Predicting rock conditions ahead of the face

Predicting rock conditions ahead of the face Predicting rock conditions ahead of the face Dr Thomas Dickmann, Product Manager Geophysics, Amberg Technologies AG Seismic methods of predicting rock conditions ahead of the tunnel face have developed

More information

APPLICATIONS OF ULTRASONIC TECHNIQUES TO IN-SITU INVESTIGATION OF CRITICAL STRUCTURES IN ROCK AND CONCRETE

APPLICATIONS OF ULTRASONIC TECHNIQUES TO IN-SITU INVESTIGATION OF CRITICAL STRUCTURES IN ROCK AND CONCRETE APPLICATIONS OF ULTRASONIC TECHNIQUES TO IN-SITU INVESTIGATION OF CRITICAL STRUCTURES IN ROCK AND CONCRETE Calum Baker Applied Seismology Consultants Ltd., 10 Belmont, Shrewsbury, United Kingdom R. Paul

More information

Huaman A., Cabrera J. and Samaniego A. SRK Consulting (Peru) Introduction ABSTRACT

Huaman A., Cabrera J. and Samaniego A. SRK Consulting (Peru) Introduction ABSTRACT Managing and validating limited borehole geotechnical information for rock mass characterization purposes experience in Peruvian practice for open pit mine projects Huaman A., Cabrera J. and Samaniego

More information

Numerical modelling for estimation of first weighting distance in longwall coal mining - A case study

Numerical modelling for estimation of first weighting distance in longwall coal mining - A case study University of Wollongong Research Online Coal Operators' Conference Faculty of Engineering and Information Sciences 2012 Numerical modelling for estimation of first weighting distance in longwall coal

More information

Cavity Expansion Methods in Geomechanics

Cavity Expansion Methods in Geomechanics Cavity Expansion Methods in Geomechanics by Hai-Sui Yu School of Civil Engineering, University of Nottingham, U. K. KLUWER ACADEMIC PUBLISHERS DORDRECHT / BOSTON / LONDON TABLE OF CONTENTS Foreword Preface

More information

Central Queensland Coal Project Appendix 4b Geotechnical Assessment. Environmental Impact Statement

Central Queensland Coal Project Appendix 4b Geotechnical Assessment. Environmental Impact Statement Central Queensland Coal Project Appendix 4b Geotechnical Assessment Environmental Impact Statement GEOTECHNICAL ASSESSMENT OF OPEN CUT MINING ADJACENT TO THE BRUCE HIGHWAY, CENTRAL QUEENSLAND COAL PROJECT

More information

5.1 Conceptual Rock Mechanics Model and Its Component Parts

5.1 Conceptual Rock Mechanics Model and Its Component Parts 123 5 ROCK MECHANICS This chapter describes the Rock Mechanics Descriptive Modelling. The modelling uses the characterisation data listed in Section 2.3 and the resulting rock mechanics model will then

More information

25th International Conference on Ground Control in Mining

25th International Conference on Ground Control in Mining ANALYTICAL INVESTIGATION OF SHAFT DAMAGES AT WEST ELK MINE Tim Ross, Senior Associate Agapito Associates, Inc. Golden, CO, USA Bo Yu, Senior Engineer Agapito Associates, Inc. Grand Junction, CO, USA Chris

More information

Rock slope rock wedge stability

Rock slope rock wedge stability Engineering manual No. 28 Updated: 02/2018 Rock slope rock wedge stability Program: Rock stability File: Demo_manual_28.gsk The aim of the chapter of this engineering manual is to explain a rock slope

More information

Impact of permafrost on repository safety

Impact of permafrost on repository safety Impact of permafrost on repository safety IGD TP Exchange Forum, Prague, 29 October 2013 Ton Wildenborg (TNO) Richard Shaw (BGS) Simon Norris (NDA) My presentation Uncertainties Permafrost related processes

More information

ractical Geomechanics for Oil & Gas Industry

ractical Geomechanics for Oil & Gas Industry P ractical Geomechanics for Oil & Gas Industry Practical Geomechanics for Oil and Gas Industry The integrity of the wellbore plays an important role in petroleum operations including drilling, completion

More information

Borehole radar measurements aid structure geological interpretations

Borehole radar measurements aid structure geological interpretations Ž. Journal of Applied Geophysics 43 2000 www.elsevier.nlrlocaterjappgeo Borehole radar measurements aid structure geological interpretations S. Wanstedt ), S. Carlsten, S. Tiren GEOSIGMA, Box 894, S-751

More information

N.Nikolaev Antech TFA ltd, Sofia, Bulgaria. V.Parushev University of Mining and Geology, Sofia, Bulgaria. S.Nikolaev Antech TFA Ltd.

N.Nikolaev Antech TFA ltd, Sofia, Bulgaria. V.Parushev University of Mining and Geology, Sofia, Bulgaria. S.Nikolaev Antech TFA Ltd. 17th International Mining Congress and Exhibition of Turkey- IMCET 2001, 2001, ISBN 975-395-417-4 An Approach for Selection and Design of Rock Bolting Systems N.Nikolaev Antech TFA ltd, Sofia, Bulgaria

More information

Thermal and Mechanical Influence of a Deep Geological Repository in Crystalline Rock on the Ground Surface

Thermal and Mechanical Influence of a Deep Geological Repository in Crystalline Rock on the Ground Surface Thermal and Mechanical Influence of a Deep Geological Repository in Crystalline Rock on the Ground Surface NWMO-TR-2016-15 October 2016 Ruiping Guo Nuclear Waste Management Organization Nuclear Waste Management

More information

HYDRAULIC INVESTIGATION OF THE EXCAVATION DISTURBED ZONE AROUND DRIFTS IN ROCK SALT

HYDRAULIC INVESTIGATION OF THE EXCAVATION DISTURBED ZONE AROUND DRIFTS IN ROCK SALT HYDRAULIC INVESTIGATION OF THE EXCAVATION DISTURBED ZONE AROUND DRIFTS IN ROCK SALT ABSTRACT Johannes Droste, Klaus Wieczorek, Ulrich Zimmer Gesellschaft für Anlagen- und Reaktorsicherheit (GRS) mbh D-381

More information

Reliable in situ rock stress measurement from the excavation surface

Reliable in situ rock stress measurement from the excavation surface Underground Mining Technology 2017 M Hudyma & Y Potvin (eds) 2017 Australian Centre for Geomechanics, Perth, ISBN 978-0-9924810-7-0 https://papers.acg.uwa.edu.au/p/1710_38_perras/ Reliable in situ rock

More information

Flin Flon Mining Belt

Flin Flon Mining Belt EOSC433: Geotechnical Engineering Practice & Design Lecture 7: Stress Analysis around Underground Openings 1 of 40 Erik Eberhardt UBC Geological Engineering EOSC 433 (2007) Flin Flon Mining Belt Since

More information

SYLLABUS AND REFERENCES FOR THE STRATA CONTROL CERTIFICATE. METALLIFEROUS MINING OPTION Updated November 1998

SYLLABUS AND REFERENCES FOR THE STRATA CONTROL CERTIFICATE. METALLIFEROUS MINING OPTION Updated November 1998 CHAMBER OF MINES OF SOUTH AFRICA SYLLABUS AND REFERENCES FOR THE STRATA CONTROL CERTIFICATE METALLIFEROUS MINING OPTION Updated November 1998 1 PART 1 : THEORY 1.1 Basic principles of rock engineering

More information