1 mining energy - infrastructure - processes Block 4, Tunsgate Office Park, 30 Tunsgate Road, P.O. Box 1022, Mount Pleasant, Harare, Zimbabwe, Tel: /7 Mobile: vpinfo@virimaiprojects.co.zw; VPTRX004 - Buckreef High Level Phase 1 Underground Potential Confirmation Drilling Programme and Cost Estimate Proposal Prepared for: Tanzanian Royalty Exploration Company 82 Richmond Street West, Suite 208 Toronto, Ontario, Canada MSC 1P1 Attention: Ulrich Rath Page 1 of 22

2 Buckreef High Level Underground Potential Confirmation and Pit Infill Drilling Programme and Cost Estimate Background This note should be read in conjunction with the earlier ones: VPTRX002 - Buckreef High Level Drilling Programme and Estimate, and VPTRX003 - Buckreef High Level Underground Potential Confirmation and Pit Infill Drilling Programme and Cost Estimate Following the strong results presented in the recently completely compliant Prefeasibility Study, TRX is looking to moving ahead with the development of the Buckreef Open Pit Project. While the PFS recommended an infill drilling program within the Buckreef Mine model designed to upgrade the open pit mineable ounces, priority is now being given to conducting Phase 1 drilling to confirm the previously known strong intersections and grades for underground and therefore enhance its knowledge of the deposit at depth or beyond the open pit. Philosophy The Buckreef Mine Project underground confirmation drilling for depth is required ahead of pit infill drilling. The reason being to demonstrate the full potential value of the project and to have a Life of Mine comfort before committing more financial resources. In other words, whilst the pit is a viable and solid standalone project, what else could possibly be available beyond the pit life and could there be possibly a stage where open pit and underground production would be done at the same time. Therefore, the purpose of the initial drilling for depth is: To target the strong ore zones in terms of grade and width. To confirm previous depth interception To test the continuity of strong zones with depth Page 2 of 22

3 To test the inverted carrot thesis, which says the mineralised zones are wider with depth. To test for similarity with adjacent properties, as well as testing for Copper The drilling phases are now rearranged as follows: Phase 1: Confirmation drilling for Underground potential Phase 2: Pit infill drilling for Open Pit Resource upgrade and Feasibility Study Phase 3: Underground further drilling. Virimai Projects has updated its high-level drilling programme, as well as the capital estimate and schedule for these phases. Summary Phase 1: Confirmation drilling for Underground potential o 6565 metres o 15 holes o $1.030million ($1.200 million with down the hole geophysics and survey) o Four months schedule with two machines Phase 2: Open Pit infill drilling o 4478 metres o 29 holes o $592k o Four months schedule Phase 3: Underground further drilling (LoM) o metres o 48 holes o $4.455million o Thirteen months schedule with two machines Page 3 of 22

4 Programme estimates Buckreef High Level UG Potential Confirmation & Infill Drilling Table 1: Drilling Programme capital cost estimate Phase 1 - Confimation Drilling for Underground Potential Phase 2 - Pit Infill Drilling Phase 3 - UG Further Resource Drilling (LOM) Total UG Drilling Programe No. of holes # Type of Holes DD RC DD DD Metrage m 6,565 4,478 29,970 36,535 Av. Hole of length m HQ Drilling Costs-Contractor US$ 28, , , ,483 NQ Drilling Costs-Contractor US$ 763,935 3,487,452 4,251,387 Contractors -Mobilisation/Demob US$ 15,000 10,000 5,000 20,000 Consumables Sample bags US$ 922 3,347 4,207 5,129 Consumables String/Packaging US$ Consumables QAQC STDs (4/STD) US$ 353 1,116 1,612 1,965 Consumables Ticket books ($/50pack) US$ ,032 1,258 Sample delivery (Truck/fuel/Accom) US$ 2, ,673 11,792 Assay/analysis US$ 34,466 70, , ,809 Contigency (7.5%) US$ 63,445 36, , ,316 Subtotal Drillind and Assaying US$ 909, ,709 4,083,157 4,992,530 Consultant Project Management US$ 42,000 21, , ,500 Drilling Supervision US$ 10,000 10,000 32,500 42,500 Resouces modelling US$ 2,400 4,000 3,200 5,600 Resource Estimation & Classification US$ 7,000 12,600 9,800 16,800 Write ups US$ 1,800 3,000 2,400 4,200 Total Consultant US$ 63,200 50, , ,600 Owners Exploration team US$ 57,600 14, , ,800 Grand total US$ 1,030, ,709 4,454,757 5,484,930 Down the Hole survey and Geophysics US$ 170,000 Period two machines - months Period four machines - months Page 4 of 22

5 Table 2: Drilling Programme Schedule estimate Activity Feb-19 Mar-19 Apr-19 May-19 Jun-19 Jul-19 Aug-19 Sep-19 Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20 Jun-20 Jul-20 Drilling for Underground - Two Machines Confirmation Drilling for UG Phase 1 - Two machines Resource Modelling Estim. & Classification Further Drilling for UG Phase 3 - Two machines Resource Modelling Estim. & Classification Phase2 Pit Infill Open Pit Infill Drilling Resource Modelling Estim. & Classification - Open Pit Processing Pilot Testing - Open Pit Definitive Feasiblity Study - Open Pit Project Implementation - Open Pit??? Drilling for Underground - Four Machines Confirmation Drilling for UG Phase 1 - Four machines Resource Modelling Estim. & Classification Purther Drilling for UG Phase 3 - Four machines Resource Modelling Estim. & Classification Page 5 of 22

6 Table 3: Phase 1 Proposed drilling below the envisaged pit targeting high grade and width intersections BHID XCOLLAR YCOLLAR ZCOLLAR Depth (m) AZIMUTH(o) DIP PHASE Intersections (m) Major (From-To) Minor (From-To) Width (m) Sampling (m) 1 L9_ x 4m-5m from m L12_ ; L13_ ; x 4m from L14_ ; ; None L15_ x 1-2m from L16_ ; None L17_ L18_ L19_ x 1-2m from L19_ None L20_ ; None L21_ x 2-4m from L21_ ; None L22_ ; ; None U22_ tba None Totals 15 6,565 metres Page 6 of 22

7 Figure 1: Plan view of the section lines, extant and planned drill holes Phase 1 = Blue drill holes = Targets below envisaged pit, ug confirmation drill holes Page 7 of 22

8 Section 9 Page 8 of 22

9 Section 12 Page 9 of 22

10 Section 13 Page 10 of 22

11 Section 14 Page 11 of 22

12 Section 15 Page 12 of 22

13 Section 16 Page 13 of 22

14 Section 17 Page 14 of 22

15 Section 18 Page 15 of 22

16 Section 19 Page 16 of 22

17 Section 20 Page 17 of 22

18 Section 21 Page 18 of 22

19 Section 22 Page 19 of 22

20 Phase 2 Pit Infill Drilling Visuals Figure 2: Plan view of pit infill (red) and existing (black) drill holes in red superimposed on the resource shell Page 20 of 22

21 Figure 3: Perspective view of planned pit infill holes facing NE Figure 4: Perspective view of planned pit infill holes facing SSE Page 21 of 22

22 Figure 5: Cross section view of pit classified blocks, planned (red) and existing (black) drill holes facing NE End Wenceslaus Kutekwatekwa 9 November 2018 Page 22 of 22

GAMINGRE 8/1/ of 7

GAMINGRE 8/1/ of 7 FYE 09/30/92 JULY 92 0.00 254,550.00 0.00 0 0 0 0 0 0 0 0 0 254,550.00 0.00 0.00 0.00 0.00 254,550.00 AUG 10,616,710.31 5,299.95 845,656.83 84,565.68 61,084.86 23,480.82 339,734.73 135,893.89 67,946.95

More information

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC DRILL CORE WEEKLY VOLUME 7. Wayne Hewgill, P. Geo Research Analyst

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC DRILL CORE WEEKLY VOLUME 7. Wayne Hewgill, P. Geo Research Analyst JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC DRILL CORE WEEKLY VOLUME 7 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Drill Core Weekly highlights drilling

More information

RESOURCE INCREASED BY 75% TO 1.29 BILLION TONNES FOR GINDALBIE S KARARA MAGNETITE PROJECT

RESOURCE INCREASED BY 75% TO 1.29 BILLION TONNES FOR GINDALBIE S KARARA MAGNETITE PROJECT STOCK EXCHANGE ANNOUNCEMENT 13 November 2006 RESOURCE INCREASED BY 75 TO 1.29 BILLION TONNES FOR GINDALBIE S KARARA MAGNETITE PROJECT Summary The Board of Gindalbie Metals Ltd (ASX Code: GBG) is pleased

More information

For personal use only Heemskirk Tin Project - Tasmania

For personal use only Heemskirk Tin Project - Tasmania Heemskirk Tin Project - Tasmania CEO Peter Blight International Tin Conference 24-25 April 2012 Focused on Tin Rapidly advancing Heemskirk Tin near Zeehan, Tasmania single commodity - single project focus

More information

New Drilling Program Commences at Mutiny s Deflector Deposit

New Drilling Program Commences at Mutiny s Deflector Deposit New Drilling Program Commences at Mutiny s Deflector Deposit Drilling Program Highlights 12,000 metre RC and diamond drilling program underway New drilling program targets strike extensions in the Northern

More information

EXPLORING FOR COPPER AND GOLD IN CHILE

EXPLORING FOR COPPER AND GOLD IN CHILE EXPLORING FOR COPPER AND GOLD IN CHILE November 2013 Competent Person Statement The information contained in this report that relates to Exploration Results and Exploration Targets is based on information

More information

FIVE RIGS DRILLING AT KARLAWINDA

FIVE RIGS DRILLING AT KARLAWINDA FIVE RIGS DRILLING AT KARLAWINDA Major resource in-fill and extensional drill program well underway at Karlawinda Gold Project with 88 holes already completed ASX ANNOUNCMENT 2 September 2016 Australian

More information

Premier Updates Mercedes Mine Exploration Over 45,000 Metres Drilled During the Year

Premier Updates Mercedes Mine Exploration Over 45,000 Metres Drilled During the Year Press Release Thunder Bay: January 03, 2018 Premier Updates Mercedes Mine Exploration Over 45,000 Metres Drilled During the Year PREMIER GOLD MINES LIMITED ( Premier or The Company ) (TSX:PG) is pleased

More information

CROCODILE GOLD INTERSECTS 7.1 G/T AU OVER 4.5 METERS INCLUDING 11.2 G/T AU OVER 2.6 METERS AT THE UNION REEFS PROJECT, PROSPECT DEPOSIT

CROCODILE GOLD INTERSECTS 7.1 G/T AU OVER 4.5 METERS INCLUDING 11.2 G/T AU OVER 2.6 METERS AT THE UNION REEFS PROJECT, PROSPECT DEPOSIT 65 Queen Street West Suite 825, P.O. Box 75 Toronto, Ontario M5H 2M5 Canada CROCODILE GOLD INTERSECTS 7.1 G/T AU OVER 4.5 METERS INCLUDING 11.2 G/T AU OVER 2.6 METERS AT THE UNION REEFS PROJECT, PROSPECT

More information

AMUR MINERALS CORPORATION (AIM: AMC) Kubuk Drilling To Upgrade and Expand Resource

AMUR MINERALS CORPORATION (AIM: AMC) Kubuk Drilling To Upgrade and Expand Resource 14 September 2017 AMUR MINERALS CORPORATION (AIM: AMC) Kubuk Drilling To Upgrade and Expand Resource New Mineralisation Expands Kubuk Deposit by 50% to 1,500 Metres Amur Minerals Corporation ( Amur or

More information

A1 Minerals Limited EXPLORER TO MINER. Presented by John Williams - Managing Director A1 Minerals Limited

A1 Minerals Limited EXPLORER TO MINER. Presented by John Williams - Managing Director A1 Minerals Limited A1 Minerals Limited EXPLORER TO MINER Presented by John Williams - Managing Director A1 Minerals Limited 1 Disclaimer This presentation contains certain forward-looking information and forecasts which

More information

FIVE RIGS DRILLING AT KARLAWINDA

FIVE RIGS DRILLING AT KARLAWINDA FIVE RIGS DRILLING AT KARLAWINDA Major resource in-fill and extensional drill program well underway at Karlawinda Gold Project with 88 holes already completed ASX ANNOUNCMENT 26 August 2016 Australian

More information

Trouser Legs Mine Strong Drilling Results - including g/t Au Potential for Further Mine Development

Trouser Legs Mine Strong Drilling Results - including g/t Au Potential for Further Mine Development ABN 44 009 157 439 Company Announcement 22 November 2018 Level 2, 90 William St Melbourne Victoria 3000 Australia Telephone: +61 3 9605 5950 Facsimile: +61 3 9605 5999 Email: info@hawthornresources.com

More information

Malachite Resources Limited ABN

Malachite Resources Limited ABN Malachite Resources Limited ABN 86 075 63 268 ASX Announcement ASX Code: MAR 27 October 20 NEW DRILLING RESULTS AT LORENA SUPPORT COMMENCEMENT OF MINING FEASIBILITY STUDY Malachite Resources Limited (

More information

For personal use only

For personal use only ASX RELEASE 2 August 2011 Significant Gold intersections at Chameleon Prospect Maiden 15 hole RC drilling programme (3,170 metres) completed by Scotia Gold Rights JV partner, Aphrodite Gold at the Chameleon

More information

Monument Announces NOA 7/8 Drilling Program Results at Burnakura Gold Project

Monument Announces NOA 7/8 Drilling Program Results at Burnakura Gold Project September 24, 2018 News Release Release #15 2018 Monument Announces NOA 7/8 Drilling Program Results at Burnakura Gold Project Vancouver, B.C. Monument Mining Limited (TSX-V: MMY and FSE: D7Q1) ("Monument"

More information

CROCODILE GOLD INTERSECTS GRAMS PER TONNE GOLD OVER 2.05 METERS BELOW THE PROSPECT DEPOSIT AT UNION REEFS

CROCODILE GOLD INTERSECTS GRAMS PER TONNE GOLD OVER 2.05 METERS BELOW THE PROSPECT DEPOSIT AT UNION REEFS 65 Queen Street West Suite 825, P.O. Box 75 Toronto, Ontario M5H 2M5 Canada CROCODILE GOLD INTERSECTS 27.96 GRAMS PER TONNE GOLD OVER 2.05 METERS BELOW THE PROSPECT DEPOSIT AT UNION REEFS RESULTS FROM

More information

FIRST RESULTS FROM RC DRILLING AT KONONGO

FIRST RESULTS FROM RC DRILLING AT KONONGO ASX Release Monday 29 March 2010 SIGNATURE METALS LIMITED Level 1 / 33 Richardson Street WEST PERTH Australia Tel: +61 8 9481 0101 Fax: +61 8 9200 4469 FIRST RESULTS FROM RC DRILLING AT KONONGO Signature

More information

P ROJ EC T UPDATE PANDA HILL NIOBIUM PROJ ECT

P ROJ EC T UPDATE PANDA HILL NIOBIUM PROJ ECT 2 September 2013 ASX Release ASX Code: CXX P ROJ EC T UPDATE PANDA HILL NIOBIUM PROJ ECT Highlights Project is on schedule, with completion of the preliminary economic assessment study on target for Quarter

More information

STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE AT SYNDICATED S 100% BARBARA SOUTH LODE

STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE AT SYNDICATED S 100% BARBARA SOUTH LODE November 5th 2009 Manager Announcements Companies Announcements Office Australian Securities Exchange Limited Level 4, 20 Bridge Street Sydney NSW 2000 STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE

More information

Monument Announces Significant Intercepts Assay Results at NOA7_8 in Burnakura

Monument Announces Significant Intercepts Assay Results at NOA7_8 in Burnakura July 11, 2016 News Release Release 15-2016 Monument Announces Significant Intercepts Assay Results at NOA7_8 in Burnakura Vancouver, B.C., July 11, 2016, Monument Mining Limited (TSX-V: MMY and FSE: D7Q1)

More information

For personal use only

For personal use only ACN 092 471 513 28 November 2016 ASX Release PENNY S FIND GOLD MINE UPGRADED POTENTIAL FOR MINE LIFE EXTENSION Empire Resources Limited ( Empire, ASX code: ERL) is pleased to give an update on the progress

More information

July Exploring for Canadian Gold in the Rainy River District of Ontario

July Exploring for Canadian Gold in the Rainy River District of Ontario July 2013 Exploring for Canadian Gold in the Rainy River District of Ontario 1 Forward Looking Statements Some of the statements in this document may be deemed to be "forward-looking statements". All statements

More information

MARCH 2010 QUARTERLY REPORT

MARCH 2010 QUARTERLY REPORT MARCH 2010 QUARTERLY REPORT ASX Release HIGHLIGHTS Friday 30 April 2010 SIGNATURE METALS LIMITED Level 1 / 33 Richardson Street WEST PERTH Australia Tel: +61 8 9481 0101 Fax: +61 8 9200 4469 Contact: Bill

More information

Timok Project Čukaru Peki Deposit O C T O B E R

Timok Project Čukaru Peki Deposit O C T O B E R Timok Project Čukaru Peki Deposit O C T O B E R 2 0 1 6 2 Rakita Team VP, Serbia Projects Manager, Government Relations Technical Assistant, Project Support Geology Manager Environmental & Permitting Document

More information

Mineral Resource Estimate Comparison at 3 g/t Au cut-off

Mineral Resource Estimate Comparison at 3 g/t Au cut-off HARTE GOLD CORP. 8 King Street East, Suite 1700 Toronto, Ontario, M5C 1B5 Tel: 416-368-0999 Fax: 416-368-5146 Harte Gold Announces 2018 Drilling Increases Indicated Mineral Resources by 55% Overall Resource

More information

A New Silver-Zinc Developer in Peru. June 2012

A New Silver-Zinc Developer in Peru. June 2012 A New Silver-Zinc Developer in Peru June 2012 LEGAL All statements and other information contained in this document related to Caracara Silver Inc. ( CSV ), as well as other statements about anticipated

More information

In Centre, Online Classroom Live and Online Classroom Programme Prices

In Centre, Online Classroom Live and Online Classroom Programme Prices In Centre, and Online Classroom Programme Prices In Centre Online Classroom Foundation Certificate Bookkeeping Transactions 430 325 300 Bookkeeping Controls 320 245 225 Elements of Costing 320 245 225

More information

CROCODILE GOLD CONTINUES POSITIVE EXPLORATION RESULTS INTERSECTS HIGH GRADE GOLD AT UNION REEFS PROJECT

CROCODILE GOLD CONTINUES POSITIVE EXPLORATION RESULTS INTERSECTS HIGH GRADE GOLD AT UNION REEFS PROJECT 65 Queen Street West CROCODILE GOLD CONTINUES POSITIVE EXPLORATION RESULTS INTERSECTS HIGH GRADE GOLD AT UNION REEFS PROJECT July 6, 2011 Crocodile Gold Corp. (TSX:CRK) (OTCQX:CROCF) (Frankfurt:XGC) (

More information

ENGINE SERIAL NUMBERS

ENGINE SERIAL NUMBERS ENGINE SERIAL NUMBERS The engine number was also the serial number of the car. Engines were numbered when they were completed, and for the most part went into a chassis within a day or so. However, some

More information

KIRKLAND LAKE GOLD ANNOUNCES 120 METRE DOWN-PLUNGE EXTENSION OF SWAN ZONE

KIRKLAND LAKE GOLD ANNOUNCES 120 METRE DOWN-PLUNGE EXTENSION OF SWAN ZONE KIRKLAND LAKE GOLD ANNOUNCES 120 METRE DOWN-PLUNGE EXTENSION OF SWAN ZONE High-grade, visible-gold mineralization intersected 120 metres ( m ) down-plunge of Swan Zone Inferred Mineral Resource and 210

More information

For personal use only

For personal use only PRIMARY INTERSECTS BROAD ZONES OF GOLD MINERALISATION AT MOUNT BUNDY INCLUDING 117M AT 1.5G/T GOLD HIGHLIGHTS Initial results from Rustlers Roost shows 117m at 1.5 g/t gold including 8m at 6.9 g/t gold

More information

WHAT IS MINERAL EXPLORATION?

WHAT IS MINERAL EXPLORATION? INDABA PRESENTATION CAPE TOWN FEBRUARY 2017 AIM:SAV WHAT IS MINERAL EXPLORATION? AIM:SAV What is mineral exploration? 2 Exploration is the term used to describe a wide range of activities aimed at searching

More information

CIMA Dates and Prices Online Classroom Live September August 2016

CIMA Dates and Prices Online Classroom Live September August 2016 CIMA Dates and Prices Online Classroom Live September 2015 - August 2016 This document provides detail of the programmes that are being offered for the Objective Tests and Integrated Case Study Exams from

More information

Silver Coin Project British Columbia. Bulk-Tonnage Advanced-Stage Gold-Silver Deposit

Silver Coin Project British Columbia. Bulk-Tonnage Advanced-Stage Gold-Silver Deposit Silver Coin Project British Columbia Bulk-Tonnage Advanced-Stage Gold-Silver Deposit FORWARD LOOKING STATEMENT This presentation contains certain forward-looking statements that may involve a number of

More information

AMUR MINERALS CORPORATION (AIM: AMC)

AMUR MINERALS CORPORATION (AIM: AMC) 28 July 2017 AMUR MINERALS CORPORATION (AIM: AMC) Drilling Expands Kubuk Resource Newly defined mineralisation has potential to significantly expand mining potential Amur Minerals Corporation ( Amur or

More information

EXCELLON ANNOUNCES LA PLATOSA EXPLORATION RESULTS: HIGH GRADES CONTINUE TO EXTEND MANTO SULPHIDES DRILL HOLE ENCOUNTERS SOURCE ENVIRONMENT INDICATORS

EXCELLON ANNOUNCES LA PLATOSA EXPLORATION RESULTS: HIGH GRADES CONTINUE TO EXTEND MANTO SULPHIDES DRILL HOLE ENCOUNTERS SOURCE ENVIRONMENT INDICATORS FOR IMMEDIATE RELEASE: APRIL 13, 2012 Exchange EXN Toronto Stock No. 06 2012 EXCELLON ANNOUNCES LA PLATOSA EXPLORATION RESULTS: HIGH GRADES CONTINUE TO EXTEND MANTO SULPHIDES DRILL HOLE ENCOUNTERS SOURCE

More information

Unigold Provides Neita Exploration Update

Unigold Provides Neita Exploration Update UNIGOLD INC. P.O. Box 936, STN Adelaide, Toronto, Canada M5C 2K3 T. 416.866.8157 Unigold Provides Neita Exploration Update www.unigoldinc.com PR No. 2018-04 Toronto, Ontario, August 7, 2018 Unigold Inc.

More information

MANN SILVER-COBALT MINE. PORE: TSXV PowerOre.com

MANN SILVER-COBALT MINE. PORE: TSXV PowerOre.com MANN SILVER-COBALT MINE PORE: TSXV PowerOre.com FORWARD LOOKING STATEMENTS We are in the mineral exploration and development business. It is inherently risky, and all potential investors should be keenly

More information

Drilling Extending Mineralization in La Mina North Zone

Drilling Extending Mineralization in La Mina North Zone Toachi Mining Inc. Intersects 10.78 m grading 6.35 g/t Au, 54.32 g/t Ag, 9.64% Cu, 8.70% Zn and 0.43% Pb at the Gold-Rich La Plata VMS Project in Ecuador Drilling Extending Mineralization in La Mina North

More information

For personal use only

For personal use only 21 December 2017 MASSIVE SULPHIDES INTERSECTED IN DRILLING 15 hole, 2270m diamond drill program completed at Midrim Thick zones of massive sulphides intersected Core being logged and sampled with assays

More information

AUGUSTINE VENTURES ANNOUNCES HIGH GRADE GOLD BEARING TENSION VEINS IN THE HANGING WALL OF THE SURLUGA DEPOSIT

AUGUSTINE VENTURES ANNOUNCES HIGH GRADE GOLD BEARING TENSION VEINS IN THE HANGING WALL OF THE SURLUGA DEPOSIT NEWS RELEASE November 29, 2016 AUGUSTINE VENTURES ANNOUNCES HIGH GRADE GOLD BEARING TENSION VEINS IN THE HANGING WALL OF THE SURLUGA DEPOSIT Toronto, Ontario November 29, 2016 - The Manager, Red Pine Exploration

More information

Aurora Tank Gold Drilling Update

Aurora Tank Gold Drilling Update ASX ANNOUNCEMENT 19 December 2016 Marmota Limited (ASX: MEU) ( Marmota ) Aurora Tank Gold Drilling Update Marmota is pleased to advise that 31 RC holes at Aurora Tank have now been completed. KEY POINTS

More information

Compliant Exploration for JORC and CIM Definition Standards / NI Certification

Compliant Exploration for JORC and CIM Definition Standards / NI Certification Compliant Exploration for JORC and CIM Definition Standards / NI 43-101 Certification Dr Norman Lock Private Consultant norman.lock@yahoo.co.uk +1 647 242 9471 Presentation to CBMINA Belo Horizonte, August,

More information

Detour Gold Reports Drilling Results from Lower Detour

Detour Gold Reports Drilling Results from Lower Detour December 17, 2015 NEWS RELEASE Detour Gold Reports Drilling Results from Lower Detour Detour Gold Corporation (TSX: DGC) ( Detour Gold or the Company ) reports final results from its 2015 summer drilling

More information

Cora Gold Limited / EPIC: CORA.L / Market: AIM / Sector: Mining

Cora Gold Limited / EPIC: CORA.L / Market: AIM / Sector: Mining 4 December 2017 Cora Gold Limited / EPIC: CORA.L / Market: AIM / Sector: Mining Cora Gold Limited ( Cora Gold, Cora or the Company ) Drilling Commences at Sanankoro Gold Discovery Cora Gold Limited, the

More information

Click to edit Master title style

Click to edit Master title style Click to edit Master title style 1-2-1 Conference, Hong Kong March 2017 ASX:PNR Rapidly Click to Growing edit Master Gold Production title style Pantoro is a gold production company which owns 100% of

More information

ASX/Media Announcement

ASX/Media Announcement ASX/Media Announcement 25 March 2013 MAIDEN HIGH-GRADE JUDY LODE RESOURCE INDICATES POTENTIAL TO INCREASE ANDY WELL MINE LIFE 106,000 ounce high-grade resource (Indicated & Inferred) Judy South (137,000t

More information

Pahtavaara Drill Program Intersects 32.8 G/T Gold Over 2.0M And 2.1 G/T Gold Over 18.0M In The Karoliina Zone

Pahtavaara Drill Program Intersects 32.8 G/T Gold Over 2.0M And 2.1 G/T Gold Over 18.0M In The Karoliina Zone Page 1 of 6 a Pahtavaara Drill Program Intersects 32.8 G/T Gold Over 2.0M And 2.1 G/T Gold Over 18.0M In The Karoliina Zone Jan 11, 2017 Toronto, Ontario, Canada Listed: RUP-TSX-V January 10, 2017 Rupert

More information

IAMGOLD REPORTS FURTHER HIGH-GRADE INTERSECTIONS FROM INFILL AND EXPANSION DRILLING AT SARAMACCA

IAMGOLD REPORTS FURTHER HIGH-GRADE INTERSECTIONS FROM INFILL AND EXPANSION DRILLING AT SARAMACCA TSX: IMG NYSE: IAG NEWS RELEASE IAMGOLD REPORTS FURTHER HIGH-GRADE INTERSECTIONS FROM INFILL AND EXPANSION DRILLING AT SARAMACCA ronto, Ontario, February 28, 2018 IAMGOLD Corporation ( IAMGOLD or the Company

More information

BANANGHILIG GOLD DEPOSIT: STERILISATION DRILLING UPDATE

BANANGHILIG GOLD DEPOSIT: STERILISATION DRILLING UPDATE MEDUSA MINING LIMITED ABN: 60 099 377 849 Unit 7, 11 Preston Street Como WA 6152 PO Box 860 Canning Bridge WA 6153 Telephone: +618-9367 0601 Facsimile: +618-9367 0602 Email: admin@medusamining.com.au Internet:

More information

MAssAwA GOLD project 2.7Moz Randgold ResouRces

MAssAwA GOLD project 2.7Moz Randgold ResouRces MAssAWA GOLD PROJECT TOTAL RESERveS 2.7Moz 80 Randgold Resources ANNUAL REPORT 2017 The Massawa project is a grassroots exploration discovery located on the Kanoumba permit in eastern Senegal. Randgold

More information

INFILL DRILLING EXPANDS MINERALIZATION IN HIGH-GRADE GOLD-COPPER CORE AT SOUTHWEST DISCOVERY ZONE TURQUOISE HILL PROJECT, MONGOLIA

INFILL DRILLING EXPANDS MINERALIZATION IN HIGH-GRADE GOLD-COPPER CORE AT SOUTHWEST DISCOVERY ZONE TURQUOISE HILL PROJECT, MONGOLIA For Immediate Release November 18, 2002 INFILL DRILLING EXPANDS MINERALIZATION IN HIGH-GRADE GOLD-COPPER CORE AT SOUTHWEST DISCOVERY ZONE TURQUOISE HILL PROJECT, MONGOLIA 110 METRES GRADING 4.08 G/T GOLD

More information

QMX GOLD CONTINUES TO INTERSECT STRONG MINERALIZATION AT BONNEFOND, INTERSECTING 39.5 g/t Au OVER 2.4 METRES AND 31.5 g/t Au OVER 1.

QMX GOLD CONTINUES TO INTERSECT STRONG MINERALIZATION AT BONNEFOND, INTERSECTING 39.5 g/t Au OVER 2.4 METRES AND 31.5 g/t Au OVER 1. 65 Queen Street West Suite 815 Toronto, Ontario Canada M5H 2M5 QMX GOLD CONTINUES TO INTERSECT STRONG MINERALIZATION AT BONNEFOND, INTERSECTING 39.5 g/t Au OVER 2.4 METRES AND 31.5 g/t Au OVER 1.6 METRES

More information

Co-O MINE MINERAL RESOURCE UPDATE

Co-O MINE MINERAL RESOURCE UPDATE MEDUSA MINING LIMITED ABN: 60 099 377 849 Unit 7, 11 Preston Street Como WA 6152 PO Box 860 Canning Bridge WA 6153 Telephone: +618-9367 0601 Facsimile: +618-9367 0602 Email: admin@medusamining.com.au Internet:

More information

AVION GOLD DJAMBAYE II ZONE, TABAKOTO PROJECT, MALI, RETURNS HIGH GRADE INTERCEPTS OF 7.56 G/T Au OVER 7.0 METRES AND G/T Au OVER 3.

AVION GOLD DJAMBAYE II ZONE, TABAKOTO PROJECT, MALI, RETURNS HIGH GRADE INTERCEPTS OF 7.56 G/T Au OVER 7.0 METRES AND G/T Au OVER 3. August 2, 2011 AVION GOLD DJAMBAYE II ZONE, TABAKOTO PROJECT, MALI, RETURNS HIGH GRADE INTERCEPTS OF 7.56 G/T Au OVER 7.0 METRES AND 26.39 G/T Au OVER 3.0 METRES Toronto, Ontario -- Avion Gold Corporation

More information

News Release DRILLING STEPPED UP AT FORRESTANIA NICKEL PROJECT AND UPDATE ON DIGGERS SOUTH PRE - FEASIBILITY STUDY

News Release DRILLING STEPPED UP AT FORRESTANIA NICKEL PROJECT AND UPDATE ON DIGGERS SOUTH PRE - FEASIBILITY STUDY June 29, 2007 ASX & TSX: WSA News Release DRILLING STEPPED UP AT FORRESTANIA NICKEL PROJECT AND UPDATE ON DIGGERS SOUTH PRE - FEASIBILITY STUDY The Board of Western Areas is pleased to announce that the

More information

AdvAlg9.7LogarithmsToBasesOtherThan10.notebook. March 08, 2018

AdvAlg9.7LogarithmsToBasesOtherThan10.notebook. March 08, 2018 AdvAlg9.7LogarithmsToBasesOtherThan10.notebook In order to isolate a variable within a logarithm of an equation, you need to re write the equation as the equivalent exponential equation. In order to isolate

More information

ASX ANNOUNCEMENT 21 MARCH 2011

ASX ANNOUNCEMENT 21 MARCH 2011 ASX ANNOUNCEMENT 21 MARCH 2011 Sihayo Pungkut Gold Project New JORC Compliant Estimate Sihayo Resource increases 43% to 1.30 Million ounces, total project resources grow to 1.4 million ounces Highlights

More information

Assay Results Highlights (as of November 16, 2017) representing approximately 4,500 metres ( m ) of drilling:

Assay Results Highlights (as of November 16, 2017) representing approximately 4,500 metres ( m ) of drilling: TSX: RMX OTCQX: RBYCF Rubicon Minerals Provides Additional Drill Results and Observations from its 2017 Exploration Program and Commences Exploratory Underground Development TORONTO, Ontario, November

More information

NEWS RELEASE FULLER PROPERTY CONTINUES TO DELIVER GOOD RESULTS 2.53 GRAMS PER TONNE GOLD OVER METRES

NEWS RELEASE FULLER PROPERTY CONTINUES TO DELIVER GOOD RESULTS 2.53 GRAMS PER TONNE GOLD OVER METRES NEWS RELEASE FULLER PROPERTY CONTINUES TO DELIVER GOOD RESULTS 2.53 GRAMS PER TONNE GOLD OVER 122.7 METRES March 1, 2012, Toronto, Ontario, Canada: Lexam VG Gold Inc. (TSX: LEX), (FRANKFURT: VN3A), (OTCQX:

More information

MEDIA RELEASE OCEANAGOLD ANNOUNCES FURTHER DRILL RESULTS AND UPDATED RESOURCE FROM BLACKWATER HIGH-GRADE GOLD PROJECT

MEDIA RELEASE OCEANAGOLD ANNOUNCES FURTHER DRILL RESULTS AND UPDATED RESOURCE FROM BLACKWATER HIGH-GRADE GOLD PROJECT MEDIA RELEASE 12 April 2013 OCEANAGOLD ANNOUNCES FURTHER DRILL RESULTS AND UPDATED RESOURCE FROM BLACKWATER HIGH-GRADE GOLD PROJECT (MELBOURNE) OceanaGold Corporation (ASX: OGC, TSX: OGC, NZX: OGC) (the

More information

Option agreement with Randgold set to commercialise Massigui Gold Project

Option agreement with Randgold set to commercialise Massigui Gold Project ASX Announcement 4 November 2016 Option agreement with Randgold set to commercialise Massigui Gold Project Option agreement with the Morila mine-operator provides potential low risk and low cost processing

More information

Symbols: Z: TSX V / SDMTF: OTCQX / E9X: Frankfurt NEWS RELEASE. STRONGHOLD METALS DRILLS METRES AT 9.10 g/t Au

Symbols: Z: TSX V / SDMTF: OTCQX / E9X: Frankfurt NEWS RELEASE. STRONGHOLD METALS DRILLS METRES AT 9.10 g/t Au September 26, 2011 STRONGHOLD METALS INC. Suite 1220, 1066 West Hastings Street Vancouver, British Columbia, V6E 3X1 Tel: +1 604.806.0916 Fax: +1 604.806.0956 www.strongholdmetals.com Symbols: Z: TSX V

More information

Kalman Mineral Resource Update

Kalman Mineral Resource Update 10 September 2008 The Manager Company Announcements Office stralian Stock Exchange Via Online Electronic Lodgement Kalman Mineral source Update The Directors are pleased to announce an updated mineral

More information

Compliance Statement

Compliance Statement The material in this presentation ( material ) is not and does not constitute an offer, invitation or recommendation to subscribe for, or purchase any security in Oklo Resources Limited ( OKU ) nor does

More information

IAMGOLD REPORTS HIGH-GRADE DRILL INTERSECTIONS FROM ITS 2017 DRILLING PROGRAM ON THE DIAKHA DEPOSIT, SIRIBAYA PROJECT IN MALI

IAMGOLD REPORTS HIGH-GRADE DRILL INTERSECTIONS FROM ITS 2017 DRILLING PROGRAM ON THE DIAKHA DEPOSIT, SIRIBAYA PROJECT IN MALI TSX: IMG NYSE: IAG NEWS RELEASE IAMGOLD REPORTS HIGH-GRADE DRILL INTERSECTIONS FROM ITS 2017 DRILLING PROGRAM ON THE DIAKHA DEPOSIT, SIRIBAYA PROJECT IN MALI TORONTO, January 31, 2018 IAMGOLD Corporation

More information

A B C PAD A HIGHLIGHTS

A B C PAD A HIGHLIGHTS Murchison Minerals Intercepts 12.30% Zinc, 0.70% Copper, 0.18% Lead and 42.03 g/t Silver 14.97% ZnEq over 6.37 Metres and Extends Known Limits of Brabant McKenzie VMS Deposit June 25, 2018 (Toronto, Ontario):

More information

MAJOR EXPLORATION PROGRAMME TO COMMENCE AT ROSEBY

MAJOR EXPLORATION PROGRAMME TO COMMENCE AT ROSEBY 24 April 2013 ASX: AOH, FSE: A2O MAJOR EXPLORATION PROGRAMME TO COMMENCE AT ROSEBY 1,000 hole RAB drilling programme directed at large copper-gold anomalies Altona Mining Limited ( Altona ) has commenced

More information

For personal use only

For personal use only ASX: AOH, FSE: A2O 13 September 2012 NEW COPPER DEPOSIT IDENTIFIED AT ROSEBY Copper mineralisation at Turkey Creek over 1km strike in RAB drilling RC drilling over 400m confirms strike continuity and widths

More information

IAMGOLD PROVIDES UPDATE ON ADVANCED EXPLORATION PROJECT DIAMOND DRILLING RESULTS BOTO PROJECT, SENEGAL

IAMGOLD PROVIDES UPDATE ON ADVANCED EXPLORATION PROJECT DIAMOND DRILLING RESULTS BOTO PROJECT, SENEGAL TSX: IMG NYSE: IAG NEWS RELEASE IAMGOLD PROVIDES UPDATE ON ADVANCED EXPLORATION PROJECT DIAMOND DRILLING RESULTS BOTO PROJECT, SENEGAL TORONTO, July 20, 2015 IAMGOLD Corporation ( IAMGOLD or the Company

More information

LATEST RESULTS FROM RC DRILLING

LATEST RESULTS FROM RC DRILLING ASX Release Tuesday 6 July 2010 SIGNATURE METALS LIMITED Level 1 / 33 Richardson Street WEST PERTH Australia Tel: +61 8 9481 0101 Fax: +61 8 9200 4469 LATEST RESULTS FROM RC DRILLING Signature Metals Limited

More information

Disclaimer. Forward-Looking Statements. Competent Person s Statement

Disclaimer. Forward-Looking Statements. Competent Person s Statement Ulysses: Genesis of a significant new underground gold mine near Leonora, WA Michael Fowler, Managing Director Resources Rising Stars, May 29-30 2018 Disclaimer Forward-Looking Statements Some statements

More information

Developing the +1.2Moz Pilbara Gold Project

Developing the +1.2Moz Pilbara Gold Project Developing the +1.2Moz Pilbara Gold Project ASX Announcement 20 November 2017 ASX Code DEG FRA Code WKN 633879 Resource infill and extension drilling has commenced at the Toweranna Prospect ABN 65 094

More information

April Exploring for Canadian Gold in the Rainy River District of Ontario

April Exploring for Canadian Gold in the Rainy River District of Ontario April 2013 Exploring for Canadian Gold in the Rainy River District of Ontario 1 Forward Looking Statements This presentation may contain forward-looking statements including but not limited to comments

More information

High Grade Gold Intercepts at Bangaba

High Grade Gold Intercepts at Bangaba 20th March 2012 ASX Announcement High Grade Gold Intercepts at Bangaba Level 2, 9 Colin Street West Perth WA 6005 ABN 11 127 171 877 p (08) 9216 1000 f (08) 9481 7939 w www.predictivediscovery.com e info@predictivediscovery.com

More information

New High Grade Gold-Copper Extensions At Mutiny s Deflector Deposit Highlight Project s Significant Growth Potential

New High Grade Gold-Copper Extensions At Mutiny s Deflector Deposit Highlight Project s Significant Growth Potential ASX/Media Release P. (08) 9368 2722 F. (08) 9367 9043 E. mgl@mutinygold.com.au 18 March 2011 New High Grade Gold-Copper Extensions At Mutiny s Deflector Deposit Highlight Project s Significant Growth Potential

More information

CAUTIONARY STATEMENT

CAUTIONARY STATEMENT AUGUST 2018 RLG CAUTIONARY STATEMENT Some of the statements contained in this presentation are forward-looking statements. Such forward-looking statements involve known and unknown risks, uncertainties

More information

Drilling highlights include:

Drilling highlights include: Toro Gold Ltd Trafalgar Court Admiral Park Guernsey GY1 3EL News Release: 10 th July 2018, Guernsey Mako Mine, Senegal Exploration Drilling Update Toro Gold ( Toro Gold or the Company ) is pleased to provide

More information

DRIVING NICKEL AND COPPER SULPHIDE DISCOVERY ON THE FRASER RANGE

DRIVING NICKEL AND COPPER SULPHIDE DISCOVERY ON THE FRASER RANGE INVESTOR UPDATE DRIVING NICKEL AND COPPER SULPHIDE DISCOVERY ON THE FRASER RANGE JUNE 2014 Disclaimer The information in this presentation is published to inform you about Classic Minerals Limited and

More information

Resource upgrade at Greater Whitewash Project to 604 ppm Moly Equivalent*

Resource upgrade at Greater Whitewash Project to 604 ppm Moly Equivalent* Resource upgrade at Greater Whitewash Project to 242mt @ 604 Moly Equivalent* 240% increase in tonnage Date: Monday 30 May, 2011 ASX: AQR Share Price: $0.40 Shares on issue: 145,022,440 Market Capitalisation:

More information

Competent Person s Declaration

Competent Person s Declaration The material in this presentation ( material ) is not and does not constitute an offer, invitation or recommendation to subscribe for, or purchase any security in Oklo Resources Limited ( OKU ) nor does

More information

For personal use only

For personal use only Company Announcements Office, ASX Securities Limited, 20, Bridge Street, Sydney, N.S.W. 2000 COMMENCEMENT OF DRILLING, PILOT MOUNTAIN - NEVADA The Board of Thor Mining Plc ( Thor or the Company ) (AIM,

More information

NEWS RELEASE. Helio Announces Updated Mineral Resource Estimate at SMP Gold Project, Tanzania.

NEWS RELEASE. Helio Announces Updated Mineral Resource Estimate at SMP Gold Project, Tanzania. Suite 580 625 Howe Street Vancouver, B.C. Canada V6C 2T6 Toll free: +1 888 955 4728 info@helioresource.com NEWS RELEASE Helio Announces Updated Mineral Estimate at SMP Gold Project, Tanzania. Measured

More information

OSISKO METALS INTERSECTS 10.49% ZINC+LEAD OVER METRES AND 12.15% ZINC+LEAD OVER METRES AT PINE POINT

OSISKO METALS INTERSECTS 10.49% ZINC+LEAD OVER METRES AND 12.15% ZINC+LEAD OVER METRES AT PINE POINT OSISKO METALS INTERSECTS 10.49% ZINC+LEAD OVER 22.84 METRES AND 12.15% ZINC+LEAD OVER 17.00 METRES AT PINE POINT (Montreal November 19, 2018) Osisko Metals Incorporated (the Company or Osisko Metals )

More information

Mimosa MSZ 6E metal ratio (%) Harare Hartley Complex. Bulawayo ZAMBIA ZIMBABWE BOTSWANA SOUTH AFRICA Pt Pd Rh Ru Ir Au

Mimosa MSZ 6E metal ratio (%) Harare Hartley Complex. Bulawayo ZAMBIA ZIMBABWE BOTSWANA SOUTH AFRICA Pt Pd Rh Ru Ir Au FACT SHEET MIMOSA N ZAMBIA Musengezi Complex ZIMBABWE Harare Hartley Complex Great Dyke Bulawayo Mimosa BOTSWANA Selukwe Complex Wedza Complex SOUTH AFRICA Mimosa is jointly held by Implats and Sibanye.

More information

Fission Increases Indicated Resource; Doubles Inferred Resource

Fission Increases Indicated Resource; Doubles Inferred Resource Suite 700 1620 Dickson Ave. Kelowna, BC V1Y 9Y2 rich@fissionuranium.com www.fissionuranium.com TSX SYMBOL: FCU OTCQX SYMBOL: FCUUF February 20, 2018 FRANKFURT SYMBOL: 2FU Fission Increases Indicated Resource;

More information

ROX DEFINES STRONG IP ANOMALIES AT PHA LUANG

ROX DEFINES STRONG IP ANOMALIES AT PHA LUANG ASX/MEDIA RELEASE ROX DEFINES STRONG IP ANOMALIES AT PHA LUANG Rox Resources (ASX: RXL, Rox ) has completed Induced Polarisation ( IP ) surveys at its Pha Luang zinc project in Laos. The survey was conducted

More information

IVANHOE S EXPLORATION TEAM AWARDED THE THAYER LINDSLEY INTERNATIONAL DISCOVERY AWARD BY PDAC FOR DISCOVERY OF THE HUGO DUMMETT DEPOSIT IN MONGOLIA.

IVANHOE S EXPLORATION TEAM AWARDED THE THAYER LINDSLEY INTERNATIONAL DISCOVERY AWARD BY PDAC FOR DISCOVERY OF THE HUGO DUMMETT DEPOSIT IN MONGOLIA. March 08, 2004 IVANHOE S EXPLORATION TEAM AWARDED THE THAYER LINDSLEY INTERNATIONAL DISCOVERY AWARD BY PDAC FOR DISCOVERY OF THE HUGO DUMMETT DEPOSIT IN MONGOLIA. RECENT HUGO DEPOSIT DRILLING FURTHER EXPANDS

More information

Drilling Extending Mineralization in La Mina North Zone

Drilling Extending Mineralization in La Mina North Zone Toachi Mining Inc. Intersects 5.42 m grading 4.35 g/t Au, 77.34 g/t Ag, 7.48% Cu, 4.24% Zn and 0.22% Pb at the Gold-Rich La Plata VMS Project in Ecuador Drilling Extending Mineralization in La Mina North

More information

AuRico Metals Intersects 628m Grading 0.53 g/t Au and 0.41% Cu at Kemess East And Announces Results from Successful 2016 Drill Program

AuRico Metals Intersects 628m Grading 0.53 g/t Au and 0.41% Cu at Kemess East And Announces Results from Successful 2016 Drill Program NEWS RELEASE AuRico Metals Intersects 628m Grading 0.53 g/t Au and 0.41% Cu at Kemess East And Announces Results from Successful 2016 Drill Program 11/8/2016 TORONTO, Nov. 8, 2016 /CNW/ AuRico Metals Inc.

More information

TROILUS GOLD CORP. INITIATES 30,000 METRE DRILL PROGRAM ON TROILUS PROPERTY

TROILUS GOLD CORP. INITIATES 30,000 METRE DRILL PROGRAM ON TROILUS PROPERTY TROILUS GOLD CORP. INITIATES 30,000 METRE DRILL PROGRAM ON TROILUS PROPERTY February 5, 2018, Toronto, Ontario Troilus Gold Corp. (TSX- V: TLG) ( Troilus or the Company ) is pleased to announce the commencement

More information

Bass Metals records further positive drill results & progress at 3 prospects.

Bass Metals records further positive drill results & progress at 3 prospects. 16 March 2011 Bass Metals records further positive drill results & progress at 3 prospects. HIGHLIGHTS: New high-grade drilling intercept confirms Switchback potential; Drilling commences at Lake Margaret

More information

May, 2013 TSX-V: GXM

May, 2013 TSX-V: GXM May, 2013 TSX-V: GXM This presentation by Geodex Minerals Ltd. (the Company ) contains forward-looking statements, including, in particular, statements about the Company s plans, strategies and prospects.

More information

HIGH-GRADE GOLD MINERALISATION CONTINUES ALONG STRIKE AT THE BODDINGTON SOUTH GOLD PROJECT

HIGH-GRADE GOLD MINERALISATION CONTINUES ALONG STRIKE AT THE BODDINGTON SOUTH GOLD PROJECT The Manager ASX Company Announcements PO Box H224, Australia Square Sydney NSW 2001 22 December 2010 HIGH-GRADE GOLD MINERALISATION CONTINUES ALONG STRIKE AT THE BODDINGTON SOUTH GOLD PROJECT New true-width

More information

COPPER CONTAINED IN MEASURED AND INDICATED RESOURCES INCREASES BY MORE THAN 350% AT IVANHOE S OYU TOLGOI PROJECT

COPPER CONTAINED IN MEASURED AND INDICATED RESOURCES INCREASES BY MORE THAN 350% AT IVANHOE S OYU TOLGOI PROJECT May 3, 2005 COPPER CONTAINED IN MEASURED AND INDICATED RESOURCES INCREASES BY MORE THAN 350% AT IVANHOE S OYU TOLGOI PROJECT IVANHOE PLANS TO DEVELOP OYU TOLGOI INTO ONE OF THE WORLD S LARGEST COPPER AND

More information

For personal use only

For personal use only 1 ASX: BRW Drilling for Exploration Success Building an Australian Base Metal Company Resources Rising Stars 27 September 2011 David Hutton, Managing Director Disclaimer 2 Certain oral and written statements

More information

For personal use only

For personal use only 6 February 2012 Australian Securities Exchange Exchange Centre 20 Bridge Street Sydney NSW 2000 SIGNIFICANT MAIDEN JORC COMPLIANT RESOURCE FOR EUCLA WEST MINERAL SANDS PROJECT Forge Resources Ltd (ASX:FRG,

More information

Toachi Mining Inc. Drills Four High Grade Gold-Copper-Zinc-Silver intercepts at the Gold-Rich La Plata VMS Project in Ecuador

Toachi Mining Inc. Drills Four High Grade Gold-Copper-Zinc-Silver intercepts at the Gold-Rich La Plata VMS Project in Ecuador Toachi Mining Inc. Drills Four High Grade Gold-Copper-Zinc-Silver intercepts at the Gold-Rich La Plata VMS Project in Ecuador Maiden 43-101 Resource Estimate Study Under Way Toronto, Ontario July 10, 2017

More information

BUNDARRA RESOURCE UPDATE

BUNDARRA RESOURCE UPDATE t Friday 15 April 2011 Company Announcement ASX ANNOUNCEMENT ASX CODE: TMX, TMXOA CAPITAL STRUCTURE TMX - Shares on Issue 217.98m TMXOA - Options on Issue 18.24m - Unlisted Options 56.81m DIRECTORS & KEY

More information