1 Space-Time Wind Speed Forecasting for Improved Power System Dispatch Xinxin Zhu 1, Marc G. Genton 1, Yingzhong Gu 2 and Le Xie 2 January 16, 2012 Abstract In order to support large scale integration of wind power, state-of-the-art wind speed forecasting methods should provide accurate and adequate information to enable efficient scheduling of wind power in electric energy systems. In this article, space-time wind forecasts are incorporated into power system economic dispatch models. First, we proposed a new space-time wind forecasting model, which generalizes and improves upon a so-called regime-switching space-time model by allowing the forecast regimes to vary with the dominant wind direction and with the seasons. Then, results from the new wind forecasting model are implemented into a power system economic dispatch model, which takes into account both spatial and temporal wind speed correlations. This, in turn, leads to an overall more cost-effective scheduling of system-wide wind generation portfolio. The potential economic benefits arise in the system-wide generation cost savings and in the ancillary service cost savings. This is illustrated in a test system in the northwest region of the U.S. Compared with persistent and autoregressive models, our proposed method could lead to annual integration cost savings on the scale of tens of millions of dollars in regions with high wind penetration, such as Texas and the Northwest. Key words: Power system economic dispatch; Power system operation; Space-time statistical model; Wind data; Wind speed forecasting. Short title: Improved Power System Dispatch 1 Department of Statistics, Texas A&M University, College Station, TX , USA. {xzhu, genton}@stat.tamu.edu 2 Department of Electrical and Computer Engineering, Texas A&M University, College Station, TX , USA. Lxie@ece.tamu.edu, gyzdmgqy@gmail.com The work of the first two authors was supported in part by NSF grant DMS The work of the last two authors was supported in part by NSF ECCS grant This publication is based in part on work supported by Award No. KUS-C made by King Abdullah University of Science and Technology (KAUST)

2 1 Introduction 1.1 Wind Energy Renewable energy, in particular wind energy, is rapidly penetrating into electric power systems throughout the world. In Demark, wind has become one of the largest electricity sources, supplying 21% of the electricity demand in In Portugal, 18% of the electricity consumption was generated by wind in 2010, along with 16% and 9% in Spain and Germany, according to the World Wind Energy Association (WWEA, 2010). The US Department of Energy (DOE) published a report in 2008 to describe a model-based scenario in which wind energy provides 20% of the US electricity demand by 2030 (DOE, 2008). China also is pursuing a total capacity of 150 Gigawatts (GW) by 2020, 250 GW by 2030 and 450 GW by 2050 (CREIA, 2010); see the review by Zhu and Genton (2012) for more information about world wide wind energy. Large scale penetration of wind power poses profound challenges to today s power system scheduling due to the high variations and limited predictability in wind. Power system operations require the balance of total supply and demand of electricity in near real-time. Unlike conventional fossil fuel generation, wind power is not fully dispatchable. A coal power plant, for example, can be turned on or off, or can adjust its output based on dispatch commands. However, wind power cannot be fully controlled by power system operators because wind farms cannot increase their power generation when there is not sufficient wind, only reduce their outputs. Also wind cannot be stored like coal, natural gas or atoms for future power generation. Therefore, highly accurate wind speed forecasting and advanced power system scheduling are needed. Otherwise the full potential of wind power would be largely offset by the balancing and ancillary cost provided by fast responsive fossil fuel units. 1.2 Power System Scheduling The basic objective of power system scheduling is to maintain the supply and demand balance 1

3 at a minimum cost, subject to transmission constraints and plausible contingencies. Before high penetration of renewable energy, such as wind and solar, the uncertainty in power system scheduling primarily came from the demand side (Xie et al., 2011). With the high presence of intermittent wind power, the uncertainty comes from both the demand and supply sides. Load forecasting has been an active area of research for more than four decades. Stateof-the-art load forecasts can achieve high accuracy in the day-ahead stage. In contrast to load forecasting, the variable wind generation is very difficult to be accurately predicted at hours ahead, only short-term (hours ahead) prediction is of acceptable confidence; see Monteiro et al. (2009) and Marquis et al. (2011). An overview of the major technical challenges for power system operations in support of large-scale wind energy integration are given by Xie et al. (2011). It is pointed out that the impact of wind power integration appears in scheduling, frequency regulations, and system stabilization requirements, and new computationally efficient methods for improving system performances by using prediction and operational interdependencies over different time horizons are needed. Xie and Ilić (2009) proposed a look-ahead optimal control algorithm for dispatching the available generation resources with the objective of minimizing an objective function comprising of both generation and environmental costs, based on the prediction of the available output from the intermittent resources. Lower economic and environmental costs of generation outputs can be achieved by a look-ahead dispatch algorithm. 1.3 Wind Speed Forecasting Highly accurate wind speed prediction is a crucial solution to reducing the uncertainty from the supply side in the power system scheduling. Compared to long-term prediction, shortterm forecasting is more accurate and reliable, and also it is essential to effective power system operation planning. Hours ahead wind forecasting allows conventional power sources to have enough time to start and provide power as demanded on time. Typically, it is between 2

4 1 to 10 hours, but for quick resources, it can be under 1 hour; see Genton and Hering (2007). In their discussion, it was pointed out that wind power forecasts by converting wind speed forecasts based on a power curve is more general than predicting wind power generation directly. In this article, the focus is on short-term wind speed forecasting. Extensive research has been devoted to short-term wind speed forecasting, among which statistical models are the most competitive. Unlike black-box approaches such as neural networks and fuzzy logic, statistical models give more interpretable results and achieve high accuracy. Statistical models for short-term wind speed forecasting that incorporate spatial information are found to be more accurate than conventional time series models. Zhu and Genton (2012) reviewed the statistical models for short-term wind speed forecasting from conventional time series models to space-time models. Gneiting et al. (2006) proposed a regime-switching space-time diurnal (RSTD) model to forecast 2-hour-ahead wind speed at Vansycle, Oregon, in the northwest of the US and it outperformed persistence forecasts and autoregressive forecasts, by 29% and 13% in terms of root mean squared error (RMSE) in July 2003, for instance. However, the RSTD model relies on local geographic features. To eliminate these constraints, Hering and Genton (2010) generalized the RSTD model by treating wind direction as a circular variable and including it in their model, coined a trigonometric direction diurnal (TDD) model. The TDD model obtained similar or better forecasting results than the RSTD model without requiring prior geographic information. In order to support large scale integration of wind power, state-of-the-art power forecasting methods should be able to provide accurate and adequate information to help advanced technologies in power system operation utilize wind power in an efficient way. In this article we propose a first attempt to incorporate wind forecasts from a new space-time model into a power system dispatch. In summary, the main contributions of this article are the following: 1) A new space-time statistical model for short-term wind speed forecasting is proposed. This model generalizes the RSTD model by allowing the forecast regimes to vary with 3

5 the dominant wind direction in each season instead of fixing the forecast regimes based on prior geographic information. In the original application of the RSTD model, it was straightforward to define west and east forecast regimes due to prevailing westerly winds. However, for other situations where the winds have more complicated patterns, the number and position of the forecast regimes are difficult to decide. In the new model, the best position of the forecast regimes are detected by rotating the regime dividing angles until the minimum prediction mean absolute error (MAE) for each season is reached. We name this new model RRSTD for rotating RSTD. 2) We formulate an power system economic dispatch model which incorporates the spacetime wind forecast information. Then numerical simulations are conducted in a representative test system derived from the northwest of the US and the results demonstrate economic benefits from improved wind forecasts. This article is organized as follows. In Section 2, we first introduce our new space-time statistical model for short-term wind speed forecasting, the RRSTD model, and then describe persistence and autoregressive models as reference models along with the TDD model for later comparisons. In Section 3, the newly proposed RRSTD model is then applied to a spatio-temporal wind data set from the northwest of the US. Its prediction MAE values for each month are compared with other models. In Section 4, we propose an economic dispatch model which incorporates available short-term space-time wind power forecasts. An illustrative power system economic dispatch example for the northwest of the US is presented, which quantifies the potential savings in both generation costs and ancillary services in the proposed dispatch model. Concluding remarks are provided in Section 5. 2 The Rotating RSTD Model In this section, we propose a new space-time statistical model for short-term wind speed forecasting problems, the RRSTD model. This model is motivated by the need to generalize 4

6 the aforementioned RSTD model, which builds separate forecasting models for each fixed forecast regime predefined by the user and based on local geographic information. In the RRSTD model, we define variable forecast regimes to allow the forecast regimes to vary with the dominant wind direction and with the seasons. Detailed descriptions of the RRSTD model are given in this section, along with a brief introduction to two reference models and the aforementioned TDD model for later comparisons. 2.1 RRSTD Model Description Let y s,t and θ s,t be wind speed and direction at site s and time t, where s = 1,..., S, t = 1,..., T, and θ s,t [0, 360 ) with 0, 90, 180, 270 indicating southerly, easterly, northerly and westerly winds, respectively. The objective is to predict y s,t+k, the k-step-ahead wind speed at site s, k = 1, 2,.... When k = 1 for example, depending on the resolution of the wind data, it is 1-hour-ahead forecasting for hourly wind data, and 10-minute-ahead forecasting for 10-minute wind data. To simplify, we illustrate the RRSTD model in the setting of forecasting wind speed k-step-ahead at a site s 1. Since wind speed is non-negative and has large values with low probabilities (right skew distributed), we assume that Y s1,t+k follows a truncated normal distribution (Gneiting et al., 2006) with a center and scale parameters µ s1,t+k and σ s1,t+k: Y s1,t+k N + (µ s1,t+k, σ s1,t+k). To predict y s1,t+k precisely, the key lies in modeling µ s1,t+k and σ s1,t+k appropriately. Generally, seasonal and diurnal patterns are seen in winds. In the RRSTD model, we fit the diurnal pattern with two pairs of harmonics as D s1,h = d 0 + d 1 sin ( 2πh ) + d 2 cos 24 ( 2πh ) + d 3 sin 24 ( 4πh ) + d 4 cos 24 ( 4πh ), (1) 24 where h indicates the hour of a day, h = 1, 2,..., 24, and the coefficients are estimated by the least squares method. Then, the center parameter is modeled as µ s1,t+k = D s1,t+k + µ r s 1,t+k, (2) 5

7 where µ r s 1,t+k is the residual wind speed after removing the diurnal pattern. The residual, µ r s 1,t+k, is modeled by a linear combination of historical wind speed residuals, up to p-step lags, of itself as well as its neighbors (to take the spatio-temporal correlations in wind into account), allowing the linear coefficients to vary with the dominant wind direction and season by defining variable forecast regimes: S p ( µ r s 1,t+k = α 0 + α s,j θs,t, θm(t+k)) µ r s,t j, (3) s=1 j=0 where α 0 and α s,j, s = 1,..., S and j = 0,..., p, are linear coefficients. Here θ m(t+k) [0, 360 ) defines the forecast regimes based on the prevailing wind direction in the season, m(t + k), that time t + k belongs to. Here θ s,t is the current wind direction at site s used to indicate the direction of nearby future wind. The site s {1,..., S} is located at the upstream of wind and indicates the wind source; see Section 3.3 for details on its selection. The meaning of the above model is that, for a certain season, if the future wind direction at the target site, which is estimated by θ s,t, falls into a predefined forecast regime, a particular space-time linear model will be applied to estimate µ r s 1,t+k, and the forecast regimes are based on the dominant wind in that season. For example, if θ m(t+k) = {26, 206 } Aug and s = s 2, then, in August the RRSTD model fits two separate models for the center parameters µ r s 1,t+k : model 1, when the current wind direction at site s 2 is between 26 and 206, or θ s2,t [26, 206 ); model 2, when θ s2,t [206, 360 ) [0, 26 ); see Figure 1 (left panel). The dimension of θ m(t+k) indicates the number of regimes that are defined. For θ m(t+k) = {60, 196, 295 } Aug and s = s 2, three separate models are built for the three forecast regimes divided by these angles; see Figure 1 (right panel). The scale parameter σ s1,t+k is modeled as where b 0, b 1 > 0 and v s1,t is the volatility value: v s1,t = { 1 2S σ s1,t+k = b 0 + b 1 v s1,t, (4) S s=1 1 } 1/2. (µ r s,t i µ r s,t i 1) 2 i=0 6

8 The key point of the RRSTD model is how to decide the number and the position of the regimes. For locations that have significant prevailing wind, this can be determined practically. The RSTD model is a special case of the RRSTD model with θ = {0, 180 }, motivated by the westerly prevailing wind in the northwest area of the US. For other situations, we propose that θ m(t+k) be chosen by minimizing the prediction MAE for each season/month after deciding the number of regimes. The predictors in equation (3) are selected by the Bayesian Information Criterion as in Hering and Genton (2010). The coefficients in (3) along with b 0, b 1 in (4) are estimated by means of the continuous ranked probability score method; see Gneiting and Raftery (2007) for more details. With the estimated predictive distribution N + (µ s1,t+k, σ s1,t+k), we take the median of the truncated normal distribution as the wind speed forecast k-step-ahead at s 1, defined as ( z = µ s1,t+k + σ s1,t+k Φ {1 1 µs1 )}/,t+k + Φ 2, σ s1,t+k where Φ( ) is the cumulative distribution function of a standard normal distribution. 2.2 Persistence, Autoregressive, and TDD Models To evaluate the performance of the RRSTD model, we compare its forecasts to other models, including the persistence (PSS), autoregressive (AR), and the TDD models, by the prediction MAE values in Section 3 and the economic benefits to power system dispatch in Section 4. The main ideas of the three reference models are introduced briefly: PSS assumes the future wind speed is the same as the current one, or ŷ s1,t+k = y s1,t. An AR(p) model estimates µ r s 1,t+k in (3) as a linear combination of the previous p wind speed residuals from the same location only, or µ r s 1,t+k = α 0 + p i=0 α iµ r s 1,t i. For the scale parameter, a GARCH(1,1) model is used instead of (4). The TDD model is similar to the RRSTD model except that (3) has the form: S p S p µ r s 1,t+k = α 0 + α s,j µ r s,t j + {β s,j cos(θs,t j) r + γ s,j sin(θs,t j)}, r (5) s=1 j=0 7 s=1 j=0

9 where θ r s,t is the residual of wind direction after removing a diurnal pattern fitted similarly to the formulation in (1). The PSS is reasonable in short-term wind speed forecasting problems because wind lasts in time. However, due to the high variation in wind, it works better for very short-term forecasting, such as 10-minute-ahead prediction. The AR(p) model predicts future wind speed by a linear combination of historical wind speeds based on a stationarity assumption. It can capture the temporal correlation in wind patterns and usually outperforms the persistence in short-term wind speed forecasting problems. The TDD model includes wind direction as circular variables to take into account the spatial correlations in wind and it was found to be more accurate than the PSS and AR(p) models in 2-hour-ahead wind speed forecasting, and similar or better forecasts than the RSTD model; see Hering and Genton (2010). 3 Numerical Experiments 3.1 Wind Data The data sets considered here are 10-minute wind speed (m/s) and direction (degrees) records from three meteorological towers located at Vansycle (Oregon), Kennewick (Washington), and Goodnoe Hills (Washington) in the northwest of the US. The period is from 1st August to 30th November 2002, and from 25th February to 30th November Missing data are imputed by linear interpolation described in Gneiting et al. (2006). This area has westerly prevailing winds due to its special geographical features. Vansycle is close to the Stateline Wind Energy Center, 39 km away from Kennewick to the southeast and 146 km away from Goodnoe Hills to the east. Detailed information about the data and the three sites can be found in Gneiting et al. (2006). These three locations are along the Columbia River, which runs from east to west along the boundary of the states of Washington and Oregon, with high terrain in both north and south. 8

10 Due to the relative position of the 3 sites and the westerly prevailing winds, the winds at the three locations are spatially correlated. When wind is blowing from west, Goodnoe Hills is at the upstream while Vansycle and Kennewick are at the downstream. Depending on the wind speed, the future wind speed at the latter two sites will be highly correlated with the wind blowing at the former site currently. This indicates that including wind information from neighbors is of great benefits in improving wind speed prediction accuracy regarding to the setting considered here. The data are divided into two parts as follows: Training set: data from 1st August to 30th November The regime dividing angles θ in (3) are trained by minimizing the prediction MAE values, as well as s, the wind source indicator. The linear models for the center parameter are obtained for each forecast regime and monthly, in order to take into account the seasonality in wind. Testing set: data from 25th February to 31st November The trained models are evaluated during this period. The parameters in the models are estimated by the data up to 45-day earlier as suggested by Gneiting et al. (2006). 3.2 Exploratory Data Analysis In this subsection, an exploratory analysis is carried out on the relationship between wind speed and wind direction intending to determine the number of forecast regimes and how to divide the regimes in the RRSTD model. The wind roses in Figure 2 give a view of how wind speed and wind direction are distributed each month from August to November 2002 at Vansycle (top row), Kennewick (middle row), and Goodnoe Hills (bottom row). In a wind rose, each petal indicates the frequency of winds blowing from a particular direction and the color bands in each petal show the ranges of wind speed. As we can see from the wind roses, at Goodnoe Hills (bottom row), which is located along the north bank of the Columbia River, there are high frequencies and large speed ranges in the west direction in August, September, and October. This indicates that in 9

11 these months winds are mostly from the west and the wind speeds are higher than those from other directions. In November, the east wind has higher frequency than other months and it balances the westerly wind. These wind patterns are consistent with the comment in Subsection 3.1 that the dominant wind is westerly. Based on this information, two forecast regimes would be appropriate for each month to forecast wind speed at Goodnoe Hills. At Vansycle (top row), northwesterly wind has high frequency in all of the four months. Also wind speeds are larger in directions with higher frequency. In August, September and October, most of the winds blow from west, while there are low frequencies of easterly wind. In November, a spike appears in the southwest direction with wind speed in the main range from 0 to 5 (m/s) and the east and northeast winds have slightly higher frequencies than other months. This also indicates that two forecast regimes would be appropriate for each month to forecasting wind speed at Vansycle. At Kennewick (middle row), high frequency of wind happens in the north direction slightly to west in all four months and the other frequencies concentrate in the opposite direction. Since Kennewick is along the southwest bank of the Columbia River, these wind patterns are consistent with the geographic features near this location. Here again, two forecast regimes would be appropriate for each month to forecasting wind speed at Kennewick. Based on the discussion above and similarly to Gneiting et al. (2006), we consider two equally divided regimes resulting in a two-regime RRSTD model. The two regimes are divided by a diameter in Figure 1, θ m(t+k) degrees away counterclockwise from the south. 3.3 Training Data Results In this subsection, the two-regime RRSTD model for each month is trained by minimizing the prediction MAE of the forecasts in the training set at all three locations for 1-hour-ahead and 2-hour-ahead forecasting problems. The gains of using the RRSTD model rather than the RSTD model are presented by the MAE values in each month. 10

12 Since the best two-regime forecasting design in the RRSTD model is defined as the one that results in the minimum MAE value, we calculate the MAE value resulting from a dense number of possible two-regime forecasting designs, and get the best two-regime RRSTD model as the one that reaches the smallest value of MAE. This is equivalent to rotating the dashed line in Figure 1 until we get the smallest value of MAE, and the resulting two regimes are the best forecast regimes. To illustrate the training procedure, we describe in detail how the two-regime RRSTD model is trained to predict 1-hour-ahead wind speed at Vansycle in August, while implementations are similar for other months, locations and forecasting horizons. To simplify the exposition, we define some notations based on this particular wind data set. The label for site s has values V, K and G. As a result, the wind speeds and directions at time t at Vansycle, Kennewick and Goodnoe Hills are denoted by y V,t, y K,t, y G,t, θ V,t, θ K,t, and θ G,t, respectively, and the goal here is to predict y V,t+6 (1-hour-ahead is equal to 6-step-ahead for 10-minute data). The objective of the training procedure is to find the best two-regime dividing angle θ m(t+6) among the set of possible two-regime dividing angles δ = 1, 2,..., 180, (where m(t + 6) is August in this setting), the wind source indicator, and the models for each forecast regime in (3). Specifically, the training procedure is as follows: 1) Let δ = 1, which results in two equally divided forecast regimes. 2) Find the corresponding s. Divide the series of 10-minute wind speed data at Vansycle in August {y V,t } into two subsets based on the wind directions 1-hour-behind at Vansycle: {y V,{t:θV,t 6 regime1}} and {y V,{t:θV,t 6 regime2}}, and calculate the difference between the two medians of wind speeds in the subsets. Repeat this based on the 1-hour-behind wind directions at Kennewick and Goodnoe Hills. Then s is the site that has the largest value of difference. For example, for δ = 8, s = G, or Goodnoe Hills; see Figure 3. 11

13 3) Given s, divide the wind speeds in August {y V,t } into two subsets: {y V,{t:θs,t 6 regime1}} and {y V,{t:θs,t 6 regime2}}. For each subset, fit the predictive distribution N + (µ V,t+6, σ V,t+6 ) through equations (2) to (4) and use its median as the point forecast of y V,t+6. 4) Calculate the MAE value of the forecasts in August. The above procedure is carried out for δ = 0, 2,..., 180, resulting 180 corresponding prediction MAE values, as shown in Figure 4. The blue dashed line indicates the position of the best two-regime dividing angle, or θ, that has smallest MAE value. From the plots, we can see that there is no significant pattern in the MAE values when the dividing angle changes from 0 to 180. In August, the MAE values have several dramatic falls and downs, and small values happen when δ is around 8 to 20, as well as 120 to 130 and the smallest value is at 8. In September, October and November, the MAE curves are smooth in the middle part and have small values at the two ends, and the smallest values are at 9, 175 and 29. The resulting two regimes are close to the west-east regime, which are reasonable according to the prevailing westerly wind. The training results of the two-regime RRSTD model for 1-hour-ahead and 2-hour-ahead wind speed forecasting in the 4 months at Vansycle, Kennewick and Goodnoe Hills are shown in Table 1. For 1-hour-ahead forecasting at Vansycle, all the s have the same value G, or Goodnoe Hills, which is consistent with the trained two forecast regimes. The trained two forecast regimes in each month are all close to west-east regime, indicating that the dominant wind is from west. In this case, Goodnoe Hills is at the upstream and is a good indicator of the wind source for Vansycle. Smaller or equal prediction MAE values are achieved by the RRSTD model for all of the four months compared to the RSTD model. This means that although the westerly wind dominates this area, a simple west-east forecast regime may not be the best forecasting model. Since wind power generation is the cubic of wind speed, small improvements in wind speed are valuable. The wind roses in Figure 2 show how the two-regimes are adjusted with wind direction and season, from the RSTD model 12

14 (the vertical dotted line) to the two-regime RRSTD model in 1-hour-ahead (dashed lines) and 2-hour-ahead forecasting problem at all of the three locations. The resulting linear models for the residual of the center parameter in (3) in predicting 1-hour-ahead wind speed at Vansycle from August to November 2002, or µ r V,t+6, are: August: September: 8 >< µ r V,t+6 = α 0 + P 1 j=0 α V,jµ r V,t j + α Kµ r K,t if θ G,t [8, 188 ), >: β 0 + P 4 j=0 β V,jµ r V,t j + β Kµ r K,t + β Gµ r G if θ G,t [188, 360 ) [0, 8 ), 8 >< µ r V,t+6 = α 0 + P 3 j=0 α V,jµ r V,t j + P 1 j=0 α K,jµ r K,t j if θ G,t [9, 189 ), >: β 0 + P 1 j=0 β V,jµ r V,t j + P 2 j=0 β K,jµ r K,t j + P 6 j=0 β G,jµ r K,t j if θ G,t [189, 360 ) [0, 9 ), October: 8 >< µ r V,t+6 = α 0 + α V µ r V,t + P 2 j=0 α K,t jµ r K,t j + P 3 j=0 α G,jµ r G,t j if θ G,t [0, 175 ) [355, 360 ), >: β 0 + β V µ r V,t + β Kµ r K,t + β Gµ r G,t if θ G,t [175, 355 ), November: 8 >< µ r V,t+6 = α 0 + P 7 j=0 α V,jµ r V,t j + α Gµ r G,t if θ G,t [29, 209 ), >: β 0 + P 5 j=0 β V,jµ r V,t j + β Kµ r K,t + P 1 j=0 β G,jµ r G,t j if θ G,t [209, 360 ) [0, 29 ). (6) (7) (8) (9) 3.4 Testing Data Results In this subsection, the trained two-regime RRSTD models for each month are applied to forecast wind speed in the same months in the testing set at all 3 locations, as well as the PSS, AR and TDD models. The prediction MAE values from different models are compared. In the testing procedure, the two-regime RRSTD models for the months in the training set are applied to the same months in the testing set based on the assumption that the monthly pattern in wind remains similar from one year to another. Specifically, the trained models in (6) to (9) are implemented to forecast 1-hour-ahead wind speed at Vansycle from August to November. Due to the lack of data from May to July in the training set, the two-regime RRSTD model of August is used to forecast wind speed from May to July along with August in the testing set, since these months are all in the same summer season. 13

15 The assumption that monthly patterns remain similar for training and testing sets is challenged by the high variations in wind and the limitation of available data. This means that the monthly wind pattern in the training set may be different from that in the testing set and at least several years of wind data would be needed to model the monthly patterns accurately. Given that the two-regime RRSTD model is still reasonable for the training data, the best two-regime dividing angles trained from August to November 2002 may not be the best dividing angles for the months in As a result, the forecasts may not be as good as one would expect. In order to evaluate the potential performance of the RRSTD model with our data set in the northwest of the US, an oracle RRSTD (ORRSTD) model is constructed. The main idea of the ORRSTD model is based on the following questions: if the true wind speeds in the testing set were known, what would be the best two-regime dividing angles and what would be the resulting wind speed forecasts for each month? To do this, two cases are studied based on including information from the training set or only using the testing set. For the first case, only the s and model in (3) are trained from the training set for each dividing angle each month, while the best dividing angle is chosen to be the one that has the smallest prediction MAE value in that month of the testing set instead of the training set. For the second case, the s and model in (3) are trained from the 45-day training period and the dividing angle is defined as the same as the first case. These two cases of the ORRSTD model are denoted by ORRSTD02 and ORRSTD03, based on whether the training results are from the data in 2002 or The MAE values of 1-hour-ahead forecasts at Vansycle in each month of the testing data from ORRSTD02 and ORRSTD03 with the two-regime dividing angle ranging from 0 to 180 are plotted in Figure 5. The dashed vertical lines indicate the positions of the best two-regime dividing angles. Comparing plots of August to November in Figures 4 and 5, we can see the differences in how the MAE values change with the two-regime dividing angle, which indicate the different monthly patterns in wind between 2002 and

16 Wind roses in Figure 6 show the difference of two-regime divisions in different models for each month in the testing data. The vertical dotted lines give the west-east RRSTD model, or the RSTD model, the blue dashed line gives the two-regime RRSTD models with minimum prediction MAE value for each month, the pink dashed line is from the ORRSTD02 model and the cyan dashed line is from the ORRSTD03 model in the 1-hour-ahead forecasting problem. From May to August, there are not many differences in the two-regime division between the ORRSTD02 and ORRSTD03 models, which have a northeast-southwest tworegime division, and are away from the dividing angle of the RRSTD model. In September, the resulting two-regime from the three RRSTD models are different, with 9, 136 and 64 from the south, respectively. In October and November, the dividing angle in the ORRSTD02 model is close to the one in the RRSTD model and away from that in the ORRSTD03 model. The training results of ORRSTD02 and ORRSTD03 are shown in Table 1. For 1-hourahead forecasting at Vansycle, the values of s are different from those of the RRSTD model, which have Goodnoe Hills as the wind source indicator for all months in the training set. In the ORRSTD02 model, Vansycle is chosen to be the wind source indicator from May to September. This is reasonable according to the two-regime divisions for these months, which are mainly northeast and southwest forecast regimes, and since Vansycle is located in the southeast of the area of interest. In October and November, the wind source indicators are Kennewick and Goodnoe Hills in the ORRSTD02 model. Differences in training results are also found for other locations, which indicate that due to wind variation, the RRSTD model trained in 2002 may not be as good as one would expect to predict wind speed in The ORRSTD03 model is trained from data up to 45-day earlier to forecast wind speed at time t + k, which allows the model structure to vary with t instead of a fixed model for each month. This means that there is one s value for each t, and due to space limitation, the s values in the ORRSTD03 model are not listed in Table 1. Then 1-hour-ahead and 2-hour-ahead forecasts at all three sites in the testing set are performed by the PSS, AR(p), RSTD, TDD and RRSTD models, as well as the oracles, 15

17 ORRSTD02 and ORRSTD03. The AR model is fitted with order at most 9 based on the Akaike Information Criterion. Tables 2 display the prediction MAE values of the forecasting results from the above models for each month as well as the overall MAE values. From the results, we can see that space-time models always achieve better forecast results than the PSS and AR models with smaller MAE value. The differences between the spacetime models are very small. On average, the results from the TDD model are slightly better than those from the RSTD and RRSTD models. The results from the ORRSTD02 and ORRSTD03 models have smaller MAE values than those from the TDD and RSTD model. This indicates that, if the assumption that monthly patterns between each year were similar or if there were enough data to model the monthly patterns appropriately, then the RRSTD model would be able to improve the forecasting accuracy from the RSTD and TDD models. 4 Integrating Wind Power into a Power System In this section, we propose a first attempt to incorporate space-time wind forecasts into a power system dispatch. In terms of potential economic benefits in the system-wide generation cost saving, as well as the ancillary service cost saving, the performances of the aforementioned forecasting models are compared. First, a test system based on the Bonneville Power Administration (BPA) system, which covers the area where the wind data were collected, is introduced and studied for power system operation with space-time wind forecasts. Second, we formulate the power system dispatch problem which incorporates advanced spatio-temporal correlated wind forecast. Finally, an illustrative example is simulated and analyzed, and the results from different forecasting models are compared. 4.1 Power System Specification in the BPA Region Power system economic dispatch is used by system operators in generation scheduling, which determines the generators output so as to maintain the supply and demand balance, as well 16

18 as to minimize the total system operating cost while satisfying the security constraints. In this subsection, a detailed procedure of power system dispatch is introduced based on the BPA system which covers the area of Vansycle, Kennewick and Goodnoe Hills. Established in 1937, BPA is a nonprofit agency located in the Pacific Northwest area. About one-third of the electric power used in the northwest comes from BPA. BPA also operates and maintains about 75% of the high-voltage transmission network (15,212 circuit miles) in its service territory (BPA, 2010). The service territory of BPA includes Idaho, Oregon, Washington, western Montana and small parts of eastern Montana, California, Nevada, Utah and Wyoming. The major missions of BPA in operating electric energy are two folds: 1) act as an adequate, efficient, economical and reliable power supply; and 2) maintain a transmission system that is capable of integrating different kinds of power resources, providing electricity service to BPA s customers, providing interregional interconnections, and maintaining electrical reliability and stability. In order to balance the power demand, the output of every generator in the power system has to be dispatched over different time frameworks (i.e. day-ahead, hour-ahead, and 5-10 minutes-ahead). This process is called generation scheduling. The BPA scheduling procedure is shown in Figure 8. In the generation scheduling process, the system operator at BPA will schedule generators to meet the expected demand at several time scales. All the scheduled generation must be within their output capacity, as well as within their ramping capacity which refers to the maximum change of generation output between two consecutive time intervals. For example, a natural gas generator s ramping capacity can be 15% of its maximum output in 10 minutes. Given the fact that it takes several hours to start up or shut down many large generators (e.g. nuclear, coal), a day-ahead schedule (or pre-schedule) process is required to plan the generators operations over the next 24 hours. Based on day-ahead forecast, the pre-schedule is completed before 2 pm the day before the day-of-delivery (or the day on which the real- 17

19 time operation takes place). However, the day-ahead load forecast and day-ahead wind forecast have relatively low accuracies so a real-time schedule which is one hour-ahead in BPA is required to pick up the mismatch between the near-term forecast and the day-ahead forecast. Real-time schedule is established on hour-ahead forecast, which has to be completed 20 minutes before the hour-of-delivery (the hour when real-time operation takes place). Within each hour, the available wind generation, as well as the electricity demand, still varies from second to second. Such imbalance between total supply and total demand will cause the degradation of the electricity frequency, which has very stringent requirement for the safety of many appliances. In order to maintain the system electrical frequency at 60Hz, automatic feedback control loops are installed at many generators speed governors, which is referred to as the automatic generation control (AGC) mechanism. Such a mechanism is very similar in principle to the cruise speed control in automobiles. 4.2 A Power System Dispatch Model with Space-Time Wind Forecasts The power system economic dispatch problem is formulated in this subsection. Table 4 lists the notations and the mathematical formulation of the model is described as follows: min : C Gi (P Gi ) + C Wi (P P Gi,PW k W k i ) + C Ri (P Ri ) (10),P Ri i i G i W i G subject to P Gi + PW k i = P Di, (11) i G i W i D P Ri R D + R W, (12) i G F F max, (13) P Gi P 0 G i P R i T, i G W, (14) P min G i P Gi P max G i, (15) 18

20 P min G i 0 P Ri P max G i, (16) P Gi + P Ri P max G i, (17) P min W i P k W i P max W i, (18) P k W i ˆP k W i. (19) In the proposed formulation, the objective function (10) is to minimize the power system operating costs which include costs of generation and costs of providing reserve and regulation services. The decision variables include the generation dispatch point for each generator P Gi, the dispatch point for wind generators PW k i, the dispatch point for regulation and reserve capacity P Ri. Constraints of this problem are system and individual units operating constraints for security and reliability purposes. The energy balance equation (11) requires the total generation to be always equal to the total load in steady state. The system reserve and regulation requirements (12) are determined by reliability requirement component of load R D and reliability requirement component of wind generation R W. The load component is a linear function of actual system-wide load level for each interval as a practice of major independent system operators (ERCOT, 2010). The wind component is given by the deviation between the actual wind generation production potential and the wind generation forecast. Although this is not exactly the way how a system operator estimates the reliability requirement caused by wind forecast uncertainty, this is what the system operator wants to estimate, which serves as a lower bound for the reliability requirement due to wind forecast uncertainty. The transmission line capacity limitations (13) contribute to network transmission congestion. The ramping constraints of generators are described by (14). The upper bounds and lower bounds of conventional generators outputs are provided by (15). The available reserve and regulation capacity constraints are given by (16). The system reserve is determined by a reliability requirement component associated with load R D and a reliability requirement component associated with wind generation R W. The load component is a linear function of actual system-wide load level for each interval as a practice of 19

21 major system operators. The wind component is given by the deviation between the actual wind generation production potential and the wind generation forecast. This approach of quantifying system reserve requirement approximates the actual empirical-based approach to quantifying reserve requirement, and serves as a lower bound for the reliability requirement due to wind forecast uncertainty. The capacity constraints of each generator for providing both energy and reserve services are in (17). The upper and lower bounds of wind farms power output are described by (18). The wind forecast for each wind farm is provided by (19). This is where the improved space-time forecasts enter in the optimization problem. 4.3 A Realistic Illustrative Example In this subsection, numerical simulations are performed in a test system representative of a realistic BPA system. The wind speed forecasts in Section 3 are converted into wind power forecasts with a 2.5 MW Nordex power curve, and put, along with other variables, into the power system dispatch model which is setup based on the BPA system. According to the economic dispatch results, different wind forecasting models are compared in terms of potential savings in both generation cost and ancillary services. Vansycle, Kennewick and Goodnoe Hills are located in the Columbia River Basin. The electric power grid of this area is operated by BPA as introduced in Section 4.1. Our simulation system is revised from the IEEE Reliability Test System (RTS-24) (Grigg et al., 1999). The generators are assigned as different technology based power resources such as hydro power, coal power, wind power, natural gas power and nuclear power. The generator capacity portfolio (installed capacity percentage of different technologies) is configured according to the generation portfolio of the practical BPA system (BPA, 2010); see Table 3. The network typology of the simulation system is presented in Figure 9. The load profile used in the simulation is scaled from the historical load profile of the BPA system (BPA, 2007). Fourteen typical days in seven months of different seasons are selected 20

22 for simulation. The duration of simulation for each day is a typical power system operation period of 24 hours (T = 144). Different wind forecast methods described in Sections 2.2 and 2.3 are implemented in the simulation. The operating interval T of generation scheduling is 10 minutes. Wind profiles during the selected fourteen days are collected from the BPA system, which are scaled into the simulation system. For example, the wind generation potentials at the three locations (n = 3) on Aug. 15th are presented in Figure 10. Wind generation over the maximum generation capability of wind turbines has to be curtailed for security purpose. One-hour-ahead forecast data are used as inputs of the established simulation system. Generator parameters are configured according to Gu and Xie (2010). In the simulation, the minimum output levels of conventional generators P min G i and wind generators P min W i assumed to be zero. The capacities of transmission lines F max are assumed to be 999 MW. The total installed generation capacity is 4,000 MW of which 290 MW are the capacity of wind generation, which is about 7.3% (representative of a realistic scenario). Ramping are rates and marginal costs of different generators are shown in Table 5. Bus number (the number of the electrical node where the generator is located), type (what technology is used), capacity (Cap.: the total power capacity of the generator, in MW), marginal cost (M.C.: the marginal generation cost which indicates the cost increment due to generation increase, in $/MWh), and ramp rate (RP.: the capability of a generator to change its output per minute in normalized per unit value) of each generator are listed in Table Analysis of Economic Dispatch Results We present in Table 6 the economic dispatch performance under different kinds of wind forecast methods. The wind observation (OB), i.e. the true value, has the lowest system operating cost for all fourteen days. Among different methods, the total operating costs by using PSS are relatively higher over the fourteen days. The AR model which only considers 21

23 temporal wind correlations results in an operating cost second to the highest. Other spacetime methods such as RSTD, RRSTD, and TDD have a relatively better performance in the power system economic dispatch. To be noted, the wind speed spatial correlations may vary from day to day due to the change of wind patterns and directions. It is difficult to say that one space-time approach is always outperforming all the other approaches, even the PSS model and AR model. For most of the days, space-time wind forecast approaches (i.e. RSTD, RRSTD and TDD) have relatively higher cost savings than other approaches such as the PSS and AR models. Among the fourteen days, Aug. 15th is selected for a detailed study in the rest of this section. The system operating results of this day are presented in Table 7. The row Energy Market Cost infers the generation cost of all the generator units in the perspective of the system operator. The rows Regulation Cost and Reserve Cost indicate the total cost of providing regulation services and providing reserve services of all the units. The row Cost Reduced refers to the cost reduction (in %) by applying different wind forecast models compared to the cost when using the PSS model. According to the results of the simulation system, the space-time wind forecast models (such as RSTD, RRSTD, and TDD) can increase the actual wind resources utilization, reduce the system-wide generation cost, the system ancillary services (including regulation and reserve services) cost, the wind generation deviation penalty and thus reduce the total system operating costs. It can be observed in Table 7 that the system-wide operating cost using the RRSTD model is 3.0% lower than using the PSS or AR models. One of the advantages of space-time wind forecasts such as the RSTD, RRSTD and TDD is the reduction in wind generation deviation. As is observed in Table 7, using the RRSTD model, the wind generation deviation penalty has been reduced by almost 60% compared to the PSS model and by 24% compared to the AR model. The reduction in wind generation deviation is because the space-time wind forecasts can increase the wind forecast accuracy and reduce the overestimation of available 22

24 wind generation. The oracle space-time wind forecast models such as ORRSTD02 have of course better performance than the RRSTD in reducing the wind generation deviation. By training the RRSTD model as the ORRSTD02 model, the performance of the RRSTD model can be further improved. Besides, the results of space-time wind forecast models such as the RSTD, RRSTD, TDD, ORRSTD02, and ORRSTD03 reveal the advantage in the operating cost of ancillary services. For instance, the total cost of regulation services and reserve services are reduced by 3.0%, when using the RRSTD model. Given the same wind pressure patterns and system load patterns, the space-time wind forecast models accomplish higher wind resources utilization and a higher wind generation ratio than other models such as the PSS and AR models. This is because the increased accuracy of the space-time wind forecast models (e.g. the RRSTD), by considering spatial wind patterns correlations, decreases the wind generation that would be wasted by underestimation of available wind generation potentials. In Figure 11 (top panel), the actual wind generation output at Kennewick is presented. The curve OB depicts the case where there is no wind forecast error, which gives the highest utilization of wind generation as well as the best performance in the economic dispatch. The wind generation profile of the PSS model is with the lowest utilization of wind resources, while the wind generation profile of the AR model is with the second to the lowest utilization. As we can see, by using the RRSTD model, more wind generation can be integrated into the power system. This is because a high accuracy of wind forecasts avoids the underestimation of available wind generation during the dispatch process and reduces the potential waste of wind resources not being dispatched. The system overall reserve requirement takes into account the uncertainty in both wind generation (or wind forecast errors) and load (or load forecast errors). The selected reserve capacity is used to compensate the energy imbalance within time frameworks of half an hour to 2 hours. In Figure 11 (middle panel), the total system reserve requirement is compared between using the space-time wind forecast model (e.g. the RRSTD model) and the temporal wind forecast models (e.g. the PSS and the AR 23

25 models). It can be observed that by using the RRSTD model, due to the improved forecast accuracy, the overall reserve requirement can be reduced. Regulation services also help to compensate the energy imbalance of the system in order to keep the system frequency within a secure range. Unlike reserve services, regulation capacity is used to smooth out the short-time (1 minute to 10 minutes) frequency fluctuation and energy imbalance. It can be seen from Figure 11 (bottom panel) that the RRSTD model can decrease the system requirement for regulation services and therefore reduce the corresponding regulation cost. Because of the reduction in both energy balancing market (total generation cost) and ancillary services market by using the RRSTD model, the total system operating cost has been reduced by 3.0% compared with using the PSS model. Given the fact that the electric energy market is a significant market (multi billion annual sale in regions like Texas and BPA), 3.0% savings in operating costs means tens of millions of dollars of cost savings due to improved wind forecasts. 5 Discussion To support high penetration of wind power into the electric supply market, today s power system operation is greatly challenged by the high variations and limited predictability in wind. Advanced technologies in both highly accurate wind forecasting and algorithms that can help utilize wind energy efficiently are in need. In this article, we proposed a first attempt to incorporate space-time wind forecasting results into a power system dispatch. First, a new space-time model, the RRSTD model, was introduced in short-term wind speed forecasting problems. This model generalizes the RSTD model by allowing the forecast regimes to vary with the dominant wind direction and with the season without requiring much prior geographic information. Its forecasting results are as good as the RSTD and TDD models according to our numerical experiments, while better than the PSS and AR 24

26 models. Also this model has great potential to achieve better forecasts, if more information of monthly patterns in wind were available. Second, we formulated an economic dispatch model which takes into account the spacetime wind forecast information. With more accurate wind forecasts, the potential economic benefits were illustrated in a modified IEEE RTS-24 bus system. It was observed that using the RRSTD model reduced the wind generation deviation penalty by almost 60% compared to the PSS model and by 24% compared to the AR model. The advantages of space-time wind forecasting models appear in reducing the operating cost of ancillary services including regulation and reserve. The total cost of regulation services and reserve services were reduced by 3.0%, when using the RRSTD model. Given the same wind pressure patterns and system load patterns, the space-time wind forecast models accomplish higher wind resources utilization and generation ratio than other models such as the PSS and AR. References BPA (2007), BPA Total Transmission System Load, Bonneville Power Administration. BPA (2010), 2009 BPA Facts, Bonneville Power Administration. CREIA (2010), 2010 China Wind Power Outlook, China Renewable Energy Industries Association. DOE (2008), 20% Wind Energy by 2030: Increasing Wind Energy s Contribution to U.S. Electricity Supply, The US Department of Energy. ERCOT (2010), ERCOT Quick Facts, Electric Reliability Council of Texas. Genton, M. G. and Hering, A. S. (2007), Blowing in the Wind, Significance, 4, Gneiting, T., Larson, K., Westrick, K., Genton, M. G., and Aldrich, E. (2006), Calibrated Probabilistic Forecasting at the Stateline Wind Energy Center: The Regime-Switching Space-Time Method, Journal of the American Statistical Association, 101, Gneiting, T. and Raftery, A. E. (2007), Strictly Proper Scoring Rules, Prediction, and Estimation, Journal of the American Statistical Association, 201,

27 Grigg, C., Wong, P., Albrecht, P., Allan, R., Bhavaraju, M., Billinton, R., Chen, Q., Fong, C., Haddad, S., Kuruganty, S., Li, W., Mukerji, R., Patton, D., Rau, N., Reppen, D., Schneider, A., Shahidehpour, M., and Singh, C. (1999), A Report Prepared by the Reliability Test System Task Force of the Application of Probability Methods Subcommittee, IEEE Transactions on Power Systems, 14, Gu, Y. and Xie, L. (2010), Look-ahead Coordination of Wind Energy and Electric Vehicles: A Market-based Approach, in North American Power Symposium 2010, The University of Texas, Arlington. Hering, A. and Genton, M. (2010), Powering Up with Space-time Wind Forecasting, Journal of the American Statistical Association, 105, Makarov, Y., Lu, S., McManus, B., and Pease, J. (2008), The Future Impact of Wind on BPA Power System Ancillary Services, in Transmission and Distribution Conference and Exposition, IEEE/PES. Marquis, M., Wilczak, J., Ahlstrom, M., Sharp, J., Stern, A., Smith, J., and Calvert, S. (2011), Forecasting the Wind to Reach Significant Penetration Levels of Wind Energy, Bulletin of the American Meteorological Society, 92, Monteiro, C., Bessa, R., Miranda, V., Botterud, A., Wang, J., and Conzelmann, G. (2009), Wind Power Forecasting: State-of-the-Art 2009,. WWEA (2010), World Wind Energy Report 2010, World Wind Energy Association. Xie, L., Carvalho, P., Ferreira, L., Liu, J., Krogh, B., Popli, N., and Ilić, M. (2011), Wind Energy Integration in Power Systems: Operational Challenges and Possible Solutions, Special Issue of the Proceedings of IEEE on Network Systems Engineering for Meeting the Energy and Environment Dream, 99, Xie, L. and Ilić, M. (2009), Model Predictive Economic/Environmental Dispatch of Power Systems with Intermittent Resources, in IEEE Power and Energy Society General Meeting, Galgary, Canada. Zhu, X. and Genton, M. G. (2012), Short-term Wind Speed Forecasting for Power System Operation, International Statistical Review, to appear.

28 Figure 1: Regime dividing plots for θ m(t+k) = {26, 206 } Aug (left) and θ m(t+k) = {60, 196, 295 } Aug (right). The dashed line connects the south (0 ) and the north (180 ), with westerly wind to the left and easterly wind to the right. Separate models of µ r s,t+k are built in each regime. Figure 2: Wind roses of wind data from August to November 2002 at Vansycle (top row), Kennewick (middle row) and Goodnoe Hills (bottom row). Each petal indicates the frequency of wind blowing from a particular direction and the color bands in each petal show the ranges of wind speed. The vertical dotted lines give the west-east RRSTD model, or the RSTD model, while the blue dashed and solid lines give the two forecast regimes of the two-regime RRSTD models with minimum prediction MAE value for each month, for 1-hour-ahead and 2-hour-ahead forecasting problems.

29 Aug 2002 at Vansycle, 1 hour ahead Wind Speed at VS Wind Speed at VS Wind Speed at VS Regime1 Regime2 Regime1 Regime2 Regime1 Regime2 Wind direction at VS Wind direction at KW Wind direction at GH Figure 3: Boxplots of 10-minute wind speed (m/s) at Vansycle in August 2002 based on the wind directions 1-hour-behind of itself, Kennewick and Goodnoe Hills for δ = 8. It suggests s = G (Goodnoe Hills) as the indicator of wind source. Aug Sep MAE MAE Two Regime Dividing Angle (degree) Two Regime Dividing Angle (degree) Oct Nov MAE MAE Two Regime Dividing Angle (degree) Two Regime Dividing Angle (degree) Figure 4: Plots of 1-hour-ahead prediction MAE results based on the two-regime RRSTD model with dividing angle δ from 0 to 180 for each month at Vansycle. The blue dashed line indicates the position of the best two-regime dividing angle, or θ, that has smallest MAE value.

30 May at Vansycle 2003, 1 hour ahead June at Vansycle 2003, 1 hour ahead July at Vansycle 2003, 1 hour ahead Aug at Vansycle 2003, 1 hour ahead MAE MAE MAE MAE Two Regime Dividing Angle (degree) Two Regime Dividing Angle (degree) Two Regime Dividing Angle (degree) Two Regime Dividing Angle (degree) Sep at Vansycle 2003, 1 hour ahead Oct at Vansycle 2003, 1 hour ahead Nov at Vansycle 2003, 1 hour ahead MAE MAE MAE Two Regime Dividing Angle (degree) Two Regime Dividing Angle (degree) Two Regime Dividing Angle (degree) May at Vansycle 2003, 1 hour ahead June at Vansycle 2003, 1 hour ahead July at Vansycle 2003, 1 hour ahead Aug at Vansycle 2003, 1 hour ahead MAE MAE MAE MAE Two Regime Dividing Angle (degree) Two Regime Dividing Angle (degree) Two Regime Dividing Angle (degree) Two Regime Dividing Angle (degree) Sep at Vansycle 2003, 1 hour ahead Oct at Vansycle 2003, 1 hour ahead Nov at Vansycle 2003, 1 hour ahead MAE MAE MAE Two Regime Dividing Angle (degree) Two Regime Dividing Angle (degree) Two Regime Dividing Angle (degree) Figure 5: Plots of 1-hour-ahead prediction MAE results based on the ORRSTD02 (top) and ORRSTD03 (bottom) models with dividing angle δ from 0, to 180 for each month at Vansycle. The blue dashed line indicates the best two-regime dividing angle, or θ, that has smallest MAE value.

31 Figure 6: Wind roses from May to November 2003 at Vansycle (by row). The vertical dotted lines give the west-east RRSTD model, or the RSTD model, the blue dashed line gives the two-regime RRSTD models with minimum prediction MAE value for each month, the pink dashed line is from the ORRSTD02 model and the cyan dashed line is from the ORRSTD03 models in 1-hour-ahead forecasting problem. Figure 7: BPA transmission system including Idaho, Oregon, Washington, Montana and Wyoming (BPA, 2010). Figure 8: BPA scheduling procedure (Makarov et al., 2008).

Space-time wind speed forecasting for improved power system dispatch

Space-time wind speed forecasting for improved power system dispatch TT (2014) 23:1 25 DOI 10.1007/s11749-014-0351-0 IVITD PAPR pace-time wind speed forecasting for improved power system dispatch Xinxin Zhu Marc G. Genton Yingzhong Gu Le Xie Published online: 27 February

More information

WIND SPEED FORECASTING FOR POWER SYSTEM OPERATION. A Dissertation XINXIN ZHU

WIND SPEED FORECASTING FOR POWER SYSTEM OPERATION. A Dissertation XINXIN ZHU WIND SPEED FORECASTING FOR POWER SYSTEM OPERATION A Dissertation by XINXIN ZHU Submitted to the Office of Graduate and Professional Studies of Texas A&M University in partial fulfillment of the requirements

More information

Power System Economic Dispatch with Spatio-temporal Wind Forecasts

Power System Economic Dispatch with Spatio-temporal Wind Forecasts Power System Economic Dispatch with Spatio-temporal Wind Forecasts Le Xie*, Yingzhong Gu*, Xinxin Zhu t, and Marc G. Genton t *Department of Electrical and Computer Engineering, Texas A&M University, College

More information

FORECASTING: A REVIEW OF STATUS AND CHALLENGES. Eric Grimit and Kristin Larson 3TIER, Inc. Pacific Northwest Weather Workshop March 5-6, 2010

FORECASTING: A REVIEW OF STATUS AND CHALLENGES. Eric Grimit and Kristin Larson 3TIER, Inc. Pacific Northwest Weather Workshop March 5-6, 2010 SHORT-TERM TERM WIND POWER FORECASTING: A REVIEW OF STATUS AND CHALLENGES Eric Grimit and Kristin Larson 3TIER, Inc. Pacific Northwest Weather Workshop March 5-6, 2010 Integrating Renewable Energy» Variable

More information

International Workshop on Wind Energy Development Cairo, Egypt. ERCOT Wind Experience

International Workshop on Wind Energy Development Cairo, Egypt. ERCOT Wind Experience International Workshop on Wind Energy Development Cairo, Egypt ERCOT Wind Experience March 22, 21 Joel Mickey Direcr of Grid Operations Electric Reliability Council of Texas jmickey@ercot.com ERCOT 2 2

More information

Draft Wholesale Power Price Forecasts

Draft Wholesale Power Price Forecasts Sixth & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Generating Resource Advisory Committee Meeting Portland, OR December 18, 28 Outline 1. Overall Perspective: Major AURORA

More information

Renewables and the Smart Grid. Trip Doggett President & CEO Electric Reliability Council of Texas

Renewables and the Smart Grid. Trip Doggett President & CEO Electric Reliability Council of Texas Renewables and the Smart Grid Trip Doggett President & CEO Electric Reliability Council of Texas North American Interconnected Grids The ERCOT Region is one of 3 North American grid interconnections. The

More information

INCORPORATING GEOSTROPHIC WIND INFORMATION FOR IMPROVED SPACE TIME SHORT-TERM WIND SPEED FORECASTING 1

INCORPORATING GEOSTROPHIC WIND INFORMATION FOR IMPROVED SPACE TIME SHORT-TERM WIND SPEED FORECASTING 1 The Annals of Applied Statistics 2014, Vol. 8, No. 3, 1782 1799 DOI: 10.1214/14-AOAS756 Institute of Mathematical Statistics, 2014 INCORPORATING GEOSTROPHIC WIND INFORMATION FOR IMPROVED SPACE TIME SHORT-TERM

More information

California Independent System Operator (CAISO) Challenges and Solutions

California Independent System Operator (CAISO) Challenges and Solutions California Independent System Operator (CAISO) Challenges and Solutions Presented by Brian Cummins Manager, Energy Management Systems - CAISO California ISO by the numbers 65,225 MW of power plant capacity

More information

Prediction of Power System Balancing Requirements and Tail Events

Prediction of Power System Balancing Requirements and Tail Events Prediction of Power System Balancing Requirements and Tail Events PNNL: Shuai Lu, Yuri Makarov, Alan Brothers, Craig McKinstry, Shuangshuang Jin BPA: John Pease INFORMS Annual Meeting 2012 Phoenix, AZ

More information

Bringing Renewables to the Grid. John Dumas Director Wholesale Market Operations ERCOT

Bringing Renewables to the Grid. John Dumas Director Wholesale Market Operations ERCOT Bringing Renewables to the Grid John Dumas Director Wholesale Market Operations ERCOT 2011 Summer Seminar August 2, 2011 Quick Overview of ERCOT The ERCOT Market covers ~85% of Texas overall power usage

More information

Multi-Area Stochastic Unit Commitment for High Wind Penetration in a Transmission Constrained Network

Multi-Area Stochastic Unit Commitment for High Wind Penetration in a Transmission Constrained Network Multi-Area Stochastic Unit Commitment for High Wind Penetration in a Transmission Constrained Network Anthony Papavasiliou Center for Operations Research and Econometrics Université catholique de Louvain,

More information

CAISO Participating Intermittent Resource Program for Wind Generation

CAISO Participating Intermittent Resource Program for Wind Generation CAISO Participating Intermittent Resource Program for Wind Generation Jim Blatchford CAISO Account Manager Agenda CAISO Market Concepts Wind Availability in California How State Supports Intermittent Resources

More information

Economic Operation of Power Systems

Economic Operation of Power Systems Economic Operation of Power Systems Section I: Economic Operation Of Power System Economic Distribution of Loads between the Units of a Plant Generating Limits Economic Sharing of Loads between Different

More information

Recent US Wind Integration Experience

Recent US Wind Integration Experience Wind Energy and Grid Integration Recent US Wind Integration Experience J. Charles Smith Nexgen Energy LLC Utility Wind Integration Group January 24-25, 2006 Madrid, Spain Outline of Topics Building and

More information

1.3 STATISTICAL WIND POWER FORECASTING FOR U.S. WIND FARMS

1.3 STATISTICAL WIND POWER FORECASTING FOR U.S. WIND FARMS 1.3 STATISTICAL WIND POWER FORECASTING FOR U.S. WIND FARMS Michael Milligan, Consultant * Marc Schwartz and Yih-Huei Wan National Renewable Energy Laboratory, Golden, Colorado ABSTRACT Electricity markets

More information

Current best practice of uncertainty forecast for wind energy

Current best practice of uncertainty forecast for wind energy Current best practice of uncertainty forecast for wind energy Dr. Matthias Lange Stochastic Methods for Management and Valuation of Energy Storage in the Future German Energy System 17 March 2016 Overview

More information

ANN and Statistical Theory Based Forecasting and Analysis of Power System Variables

ANN and Statistical Theory Based Forecasting and Analysis of Power System Variables ANN and Statistical Theory Based Forecasting and Analysis of Power System Variables Sruthi V. Nair 1, Poonam Kothari 2, Kushal Lodha 3 1,2,3 Lecturer, G. H. Raisoni Institute of Engineering & Technology,

More information

Wind Rules and Forecasting Project Update Market Issues Working Group 12/14/2007

Wind Rules and Forecasting Project Update Market Issues Working Group 12/14/2007 Wind Rules and Forecasting Project Update Market Issues Working Group 12/14/2007 Background Over the past 3 MIWG meetings, NYISO has discussed a methodology for forecasting wind generation in the NYCA

More information

Integrating Wind Resources Into the Transmission Grid

Integrating Wind Resources Into the Transmission Grid Integrating Wind Resources Into the Transmission Grid Gary D. Bachman Wisconsin Public Utility Institute May 26, 2010 Introduction Statement of FERC Chairman Jon Wellinghoff on Efficient Integration of

More information

Systems Operations. PRAMOD JAIN, Ph.D. Consultant, USAID Power the Future. Astana, September, /6/2018

Systems Operations. PRAMOD JAIN, Ph.D. Consultant, USAID Power the Future. Astana, September, /6/2018 Systems Operations PRAMOD JAIN, Ph.D. Consultant, USAID Power the Future Astana, September, 26 2018 7/6/2018 Economics of Grid Integration of Variable Power FOOTER GOES HERE 2 Net Load = Load Wind Production

More information

Wind power and management of the electric system. EWEA Wind Power Forecasting 2015 Leuven, BELGIUM - 02/10/2015

Wind power and management of the electric system. EWEA Wind Power Forecasting 2015 Leuven, BELGIUM - 02/10/2015 Wind power and management of the electric system EWEA Wind Power Forecasting 2015 Leuven, BELGIUM - 02/10/2015 HOW WIND ENERGY IS TAKEN INTO ACCOUNT WHEN MANAGING ELECTRICITY TRANSMISSION SYSTEM IN FRANCE?

More information

Forecasting Wind Ramps

Forecasting Wind Ramps Forecasting Wind Ramps Erin Summers and Anand Subramanian Jan 5, 20 Introduction The recent increase in the number of wind power producers has necessitated changes in the methods power system operators

More information

Automatic Generation Control. Meth Bandara and Hassan Oukacha

Automatic Generation Control. Meth Bandara and Hassan Oukacha Automatic Generation Control Meth Bandara and Hassan Oukacha EE194 Advanced Controls Theory February 25, 2013 Outline Introduction System Modeling Single Generator AGC Going Forward Conclusion Introduction

More information

HyMet Company. Streamflow and Energy Generation Forecasting Model Columbia River Basin

HyMet Company. Streamflow and Energy Generation Forecasting Model Columbia River Basin HyMet Company Streamflow and Energy Generation Forecasting Model Columbia River Basin HyMet Inc. Courthouse Square 19001 Vashon Hwy SW Suite 201 Vashon Island, WA 98070 Phone: 206-463-1610 Columbia River

More information

Wind Generation Curtailment Reduction based on Uncertain Forecasts

Wind Generation Curtailment Reduction based on Uncertain Forecasts Wind Generation Curtailment Reduction based on Uncertain Forecasts A. Alanazi & A. Khodaei University of Denver USA Authors M. Chamana & D. Kushner ComEd USA Presenter Manohar Chamana Introduction Wind

More information

Wind Power Capacity Assessment

Wind Power Capacity Assessment Wind Power Capacity Assessment Mary Johannis, BPA, representing Northwest Resource Adequacy Forum Northwest Wind Integration Forum Technical Working Group October 29,2009 March 2007 NW Wind Integration

More information

A Unified Framework for Defining and Measuring Flexibility in Power System

A Unified Framework for Defining and Measuring Flexibility in Power System J A N 1 1, 2 0 1 6, A Unified Framework for Defining and Measuring Flexibility in Power System Optimization and Equilibrium in Energy Economics Workshop Jinye Zhao, Tongxin Zheng, Eugene Litvinov Outline

More information

Economic Evaluation of Short- Term Wind Power Forecasts in ERCOT: Preliminary Results

Economic Evaluation of Short- Term Wind Power Forecasts in ERCOT: Preliminary Results Economic Evaluation of Short- Term Wind Power Forecasts in ERCOT: Preliminary Results Preprint K. Orwig, B.-M. Hodge, G. Brinkman, E. Ela, and M. Milligan National Renewable Energy Laboratory V. Banunarayanan

More information

Better Weather Data Equals Better Results: The Proof is in EE and DR!

Better Weather Data Equals Better Results: The Proof is in EE and DR! Better Weather Data Equals Better Results: The Proof is in EE and DR! www.weatherbughome.com Today s Speakers: Amena Ali SVP and General Manager WeatherBug Home Michael Siemann, PhD Senior Research Scientist

More information

Multivariate Regression Model Results

Multivariate Regression Model Results Updated: August, 0 Page of Multivariate Regression Model Results 4 5 6 7 8 This exhibit provides the results of the load model forecast discussed in Schedule. Included is the forecast of short term system

More information

APPENDIX H WIND INTEGRATION STUDY

APPENDIX H WIND INTEGRATION STUDY STUDY Introduction This wind integration study (WIS) estimates the operating reserves required to both maintain PacifiCorp s system reliability and comply with North American Electric Reliability Corporation

More information

Value of Forecasts in Unit Commitment Problems

Value of Forecasts in Unit Commitment Problems Tim Schulze, Andreas Grothery and School of Mathematics Agenda Motivation Unit Commitemnt Problem British Test System Forecasts and Scenarios Rolling Horizon Evaluation Comparisons Conclusion Our Motivation

More information

The document was not produced by the CAISO and therefore does not necessarily reflect its views or opinion.

The document was not produced by the CAISO and therefore does not necessarily reflect its views or opinion. Version No. 1.0 Version Date 2/25/2008 Externally-authored document cover sheet Effective Date: 4/03/2008 The purpose of this cover sheet is to provide attribution and background information for documents

More information

peak half-hourly Tasmania

peak half-hourly Tasmania Forecasting long-term peak half-hourly electricity demand for Tasmania Dr Shu Fan B.S., M.S., Ph.D. Professor Rob J Hyndman B.Sc. (Hons), Ph.D., A.Stat. Business & Economic Forecasting Unit Report for

More information

peak half-hourly New South Wales

peak half-hourly New South Wales Forecasting long-term peak half-hourly electricity demand for New South Wales Dr Shu Fan B.S., M.S., Ph.D. Professor Rob J Hyndman B.Sc. (Hons), Ph.D., A.Stat. Business & Economic Forecasting Unit Report

More information

APPENDIX 7.4 Capacity Value of Wind Resources

APPENDIX 7.4 Capacity Value of Wind Resources APPENDIX 7.4 Capacity Value of Wind Resources This page is intentionally left blank. Capacity Value of Wind Resources In analyzing wind resources, it is important to distinguish the difference between

More information

Power System Seminar Presentation Wind Forecasting and Dispatch 7 th July, Wind Power Forecasting tools and methodologies

Power System Seminar Presentation Wind Forecasting and Dispatch 7 th July, Wind Power Forecasting tools and methodologies Power System Seminar Presentation Wind Forecasting and Dispatch 7 th July, 2011 Wind Power Forecasting tools and methodologies Amanda Kelly Principal Engineer Power System Operational Planning Operations

More information

WIND INTEGRATION IN ELECTRICITY GRIDS WORK PACKAGE 3: SIMULATION USING HISTORICAL WIND DATA

WIND INTEGRATION IN ELECTRICITY GRIDS WORK PACKAGE 3: SIMULATION USING HISTORICAL WIND DATA WIND INTEGRATION IN ELECTRICITY GRIDS WORK PACKAGE 3: SIMULATION USING PREPARED BY: Strategy and Economics DATE: 18 January 2012 FINAL Australian Energy Market Operator Ltd ABN 94 072 010 327 www.aemo.com.au

More information

Outage Coordination and Business Practices

Outage Coordination and Business Practices Outage Coordination and Business Practices 1 2007 Objectives What drove the need for developing a planning/coordination process. Why outage planning/coordination is crucial and important. Determining what

More information

Modelling residual wind farm variability using HMMs

Modelling residual wind farm variability using HMMs 8 th World IMACS/MODSIM Congress, Cairns, Australia 3-7 July 2009 http://mssanz.org.au/modsim09 Modelling residual wind farm variability using HMMs Ward, K., Korolkiewicz, M. and Boland, J. School of Mathematics

More information

About Nnergix +2, More than 2,5 GW forecasted. Forecasting in 5 countries. 4 predictive technologies. More than power facilities

About Nnergix +2, More than 2,5 GW forecasted. Forecasting in 5 countries. 4 predictive technologies. More than power facilities About Nnergix +2,5 5 4 +20.000 More than 2,5 GW forecasted Forecasting in 5 countries 4 predictive technologies More than 20.000 power facilities Nnergix s Timeline 2012 First Solar Photovoltaic energy

More information

CHAPTER 6 CONCLUSION AND FUTURE SCOPE

CHAPTER 6 CONCLUSION AND FUTURE SCOPE CHAPTER 6 CONCLUSION AND FUTURE SCOPE 146 CHAPTER 6 CONCLUSION AND FUTURE SCOPE 6.1 SUMMARY The first chapter of the thesis highlighted the need of accurate wind forecasting models in order to transform

More information

elgian energ imports are managed using forecasting software to increase overall network e 칁 cienc.

elgian energ imports are managed using forecasting software to increase overall network e 칁 cienc. Elia linemen install Ampacimon real time sensors that will communicate with the dynamic thermal ratings software to control energy import levels over this transmission line. OV RH AD TRAN MI ION D namic

More information

SOUTH AUSTRALIAN WIND STUDY REPORT SOUTH AUSTRALIAN ADVISORY FUNCTIONS

SOUTH AUSTRALIAN WIND STUDY REPORT SOUTH AUSTRALIAN ADVISORY FUNCTIONS SOUTH AUSTRALIAN WIND STUDY REPORT SOUTH AUSTRALIAN ADVISORY FUNCTIONS Published: October 2015 IMPORTANT NOTICE Purpose The purpose of this publication is to provide information about wind generation in

More information

High Wind and Energy Specific Models for Global. Production Forecast

High Wind and Energy Specific Models for Global. Production Forecast High Wind and Energy Specific Models for Global Production Forecast Carlos Alaíz, Álvaro Barbero, Ángela Fernández, José R. Dorronsoro Dpto. de Ingeniería Informática and Instituto de Ingeniería del Conocimiento

More information

Modelling Wind Farm Data and the Short Term Prediction of Wind Speeds

Modelling Wind Farm Data and the Short Term Prediction of Wind Speeds Modelling Wind Farm Data and the Short Term Prediction of Wind Speeds An Investigation into Wind Speed Data Sets Erin Mitchell Lancaster University 6th April 2011 Outline 1 Data Considerations Overview

More information

Spatiotemporal analysis and modeling of shortterm wind power forecast errors

Spatiotemporal analysis and modeling of shortterm wind power forecast errors Downloaded from orbit.dtu.dk on: Sep 29, 2018 Spatiotemporal analysis and modeling of shortterm wind power forecast errors Tastu, Julija; Pinson, Pierre; Kotwa, Ewelina Katarzyna; Madsen, Henrik; Nielsen,

More information

Multi-Area Stochastic Unit Commitment for High Wind Penetration

Multi-Area Stochastic Unit Commitment for High Wind Penetration Multi-Area Stochastic Unit Commitment for High Wind Penetration Workshop on Optimization in an Uncertain Environment Anthony Papavasiliou, UC Berkeley Shmuel S. Oren, UC Berkeley March 25th, 2011 Outline

More information

Report on Phase 2: System Performance Evaluation. Prepared for:

Report on Phase 2: System Performance Evaluation. Prepared for: THE EFFECTS OF INTEGRATING WIND POWER ON TRANSMISSION SYSTEM PLANNING, RELIABILITY, AND OPERATIONS Report on Phase 2: System Performance Evaluation Prepared for: THE NEW YORK STATE ENERGY RESEARCH AND

More information

Colorado PUC E-Filings System

Colorado PUC E-Filings System Page 1 of 10 30-Minute Flex Reserve on the Public Service Company of Colorado System Colorado PUC E-Filings System Prepared by: Xcel Energy Services, Inc. 1800 Larimer St. Denver, Colorado 80202 May 13,

More information

Information Document Calculation of Pool Price and Transmission Constraint Rebalancing Costs During a Constraint Event ID # R

Information Document Calculation of Pool Price and Transmission Constraint Rebalancing Costs During a Constraint Event ID # R Information Documents are not authoritative. Information Documents are for information purposes only and are intended to provide guidance. In the event of any discrepancy between an Information Document

More information

The Spatial Analysis of Wind Power on Nodal Prices in New Zealand

The Spatial Analysis of Wind Power on Nodal Prices in New Zealand The Spatial Analysis of Wind Power on Nodal Prices in New Zealand Le Wen Research Fellow Energy Centre The University of Auckland l.wen@auckland.ac.nz 1974 1975 1976 1977 1978 1979 1980 1981 1982 1983

More information

This wind energy forecasting capability relies on an automated, desktop PC-based system which uses the Eta forecast model as the primary input.

This wind energy forecasting capability relies on an automated, desktop PC-based system which uses the Eta forecast model as the primary input. A Simple Method of Forecasting Wind Energy Production at a Complex Terrain Site: An Experiment in Forecasting Using Historical Data Lubitz, W. David and White, Bruce R. Department of Mechanical & Aeronautical

More information

Prashant Pant 1, Achal Garg 2 1,2 Engineer, Keppel Offshore and Marine Engineering India Pvt. Ltd, Mumbai. IJRASET 2013: All Rights are Reserved 356

Prashant Pant 1, Achal Garg 2 1,2 Engineer, Keppel Offshore and Marine Engineering India Pvt. Ltd, Mumbai. IJRASET 2013: All Rights are Reserved 356 Forecasting Of Short Term Wind Power Using ARIMA Method Prashant Pant 1, Achal Garg 2 1,2 Engineer, Keppel Offshore and Marine Engineering India Pvt. Ltd, Mumbai Abstract- Wind power, i.e., electrical

More information

2018 Annual Review of Availability Assessment Hours

2018 Annual Review of Availability Assessment Hours 2018 Annual Review of Availability Assessment Hours Amber Motley Manager, Short Term Forecasting Clyde Loutan Principal, Renewable Energy Integration Karl Meeusen Senior Advisor, Infrastructure & Regulatory

More information

The following information is provided for your use in describing climate and water supply conditions in the West as of April 1, 2003.

The following information is provided for your use in describing climate and water supply conditions in the West as of April 1, 2003. Natural Resources Conservation Service National Water and Climate Center 101 SW Main Street, Suite 1600 Portland, OR 97204-3224 Date: April 8, 2003 Subject: April 1, 2003 Western Snowpack Conditions and

More information

International Studies about the Grid Integration of Wind Generation

International Studies about the Grid Integration of Wind Generation International Studies about the Grid Integration of Wind Generation Dr.-Ing. Markus Pöller/DIgSILENT GmbH Internation Studies About Grid Integration of Wind Generation Grid Integration of Wind Generationin

More information

A Novel ARX-based Multi-scale Spatiotemporal Solar Power Forecast Model

A Novel ARX-based Multi-scale Spatiotemporal Solar Power Forecast Model A Novel ARX-based Multi-scale Spatiotemporal Solar Power Forecast Model Abstract In this paper an autoregressive with exogenous input (ARX) based spatio-temporal solar forecast model is proposed. Compared

More information

EUROPEAN EXPERIENCE: Large-scale cross-country forecasting with the help of Ensemble Forecasts

EUROPEAN EXPERIENCE: Large-scale cross-country forecasting with the help of Ensemble Forecasts WEPROG Weather & wind Energy PROGnoses EUROPEAN EXPERIENCE: Large-scale cross-country forecasting with the help of Ensemble Forecasts Session 6: Integrating forecasting into market operation, the EMS and

More information

Needs for Flexibility Caused by the Variability and Uncertainty in Wind and Solar Generation in 2020, 2030 and 2050 Scenarios

Needs for Flexibility Caused by the Variability and Uncertainty in Wind and Solar Generation in 2020, 2030 and 2050 Scenarios Downloaded from orbit.dtu.dk on: Jan 12, 2019 Needs for Flexibility Caused by the Variability and Uncertainty in Wind and Solar Generation in 2020, 2030 and 2050 Scenarios Koivisto, Matti Juhani; Sørensen,

More information

Resource Adequacy Load Forecast A Report to the Resource Adequacy Advisory Committee

Resource Adequacy Load Forecast A Report to the Resource Adequacy Advisory Committee Resource Adequacy Load Forecast A Report to the Resource Adequacy Advisory Committee Tomás Morrissey November 2013 Introduction The Northwest Power and Conservation Council periodically conducts a regional

More information

2006 IRP Technical Workshop Load Forecasting Tuesday, January 24, :00 am 3:30 pm (Pacific) Meeting Summary

2006 IRP Technical Workshop Load Forecasting Tuesday, January 24, :00 am 3:30 pm (Pacific) Meeting Summary 2006 IRP Technical Workshop Load Forecasting Tuesday, January 24, 2006 9:00 am 3:30 pm (Pacific) Meeting Summary Idaho Oregon Utah Teri Carlock (IPUC) Ming Peng (OPUC), Bill Wordley (OPUC) Abdinasir Abdulle

More information

Proper Security Criteria Determination in a Power System with High Penetration of Renewable Resources

Proper Security Criteria Determination in a Power System with High Penetration of Renewable Resources Proper Security Criteria Determination in a Power System with High Penetration of Renewable Resources Mojgan Hedayati, Kory Hedman, and Junshan Zhang School of Electrical, Computer, and Energy Engineering

More information

WEATHER NORMALIZATION METHODS AND ISSUES. Stuart McMenamin Mark Quan David Simons

WEATHER NORMALIZATION METHODS AND ISSUES. Stuart McMenamin Mark Quan David Simons WEATHER NORMALIZATION METHODS AND ISSUES Stuart McMenamin Mark Quan David Simons Itron Forecasting Brown Bag September 17, 2013 Please Remember» Phones are Muted: In order to help this session run smoothly,

More information

Prediction of Snow Water Equivalent in the Snake River Basin

Prediction of Snow Water Equivalent in the Snake River Basin Hobbs et al. Seasonal Forecasting 1 Jon Hobbs Steve Guimond Nate Snook Meteorology 455 Seasonal Forecasting Prediction of Snow Water Equivalent in the Snake River Basin Abstract Mountainous regions of

More information

Integrated Electricity Demand and Price Forecasting

Integrated Electricity Demand and Price Forecasting Integrated Electricity Demand and Price Forecasting Create and Evaluate Forecasting Models The many interrelated factors which influence demand for electricity cannot be directly modeled by closed-form

More information

EVALUATION OF WIND ENERGY SOURCES INFLUENCE ON COMPOSITE GENERATION AND TRANSMISSION SYSTEMS RELIABILITY

EVALUATION OF WIND ENERGY SOURCES INFLUENCE ON COMPOSITE GENERATION AND TRANSMISSION SYSTEMS RELIABILITY EVALUATION OF WIND ENERGY SOURCES INFLUENCE ON COMPOSITE GENERATION AND TRANSMISSION SYSTEMS RELIABILITY Carmen Lucia Tancredo Borges João Paulo Galvão carmen@dee.ufrj.br joaopaulo@mercados.com.br Federal

More information

Power Engineering II. Fundamental terms and definitions

Power Engineering II. Fundamental terms and definitions Fundamental terms and definitions Power engineering A scientific discipline that focuses on: Generation of electrical energy (EE) Transmission and distribution of EE Consumption of EE Power grid operation

More information

NASA Products to Enhance Energy Utility Load Forecasting

NASA Products to Enhance Energy Utility Load Forecasting NASA Products to Enhance Energy Utility Load Forecasting Erica Zell, Battelle zelle@battelle.org, Arlington, VA ESIP 2010 Summer Meeting, Knoxville, TN, July 20-23 Project Overview Funded by the NASA Applied

More information

Weather and Climate Summary and Forecast August 2018 Report

Weather and Climate Summary and Forecast August 2018 Report Weather and Climate Summary and Forecast August 2018 Report Gregory V. Jones Linfield College August 5, 2018 Summary: July 2018 will likely go down as one of the top five warmest July s on record for many

More information

Software Tools: Congestion Management

Software Tools: Congestion Management Software Tools: Congestion Management Tom Qi Zhang, PhD CompuSharp Inc. (408) 910-3698 Email: zhangqi@ieee.org October 16, 2004 IEEE PES-SF Workshop on Congestion Management Contents Congestion Management

More information

SYSTEM OPERATIONS. Dr. Frank A. Monforte

SYSTEM OPERATIONS. Dr. Frank A. Monforte SYSTEM OPERATIONS FORECASTING Dr. Frank A. Monforte Itron s Forecasting Brown Bag Seminar September 13, 2011 PLEASE REMEMBER» In order to help this session run smoothly, your phones are muted.» To make

More information

Statistical Forecast of the 2001 Western Wildfire Season Using Principal Components Regression. Experimental Long-Lead Forecast Bulletin

Statistical Forecast of the 2001 Western Wildfire Season Using Principal Components Regression. Experimental Long-Lead Forecast Bulletin Statistical Forecast of the 2001 Western Wildfire Season Using Principal Components Regression contributed by Anthony L. Westerling 1, Daniel R. Cayan 1,2, Alexander Gershunov 1, Michael D. Dettinger 2

More information

Monthly Long Range Weather Commentary Issued: APRIL 1, 2015 Steven A. Root, CCM, President/CEO

Monthly Long Range Weather Commentary Issued: APRIL 1, 2015 Steven A. Root, CCM, President/CEO Monthly Long Range Weather Commentary Issued: APRIL 1, 2015 Steven A. Root, CCM, President/CEO sroot@weatherbank.com FEBRUARY 2015 Climate Highlights The Month in Review The February contiguous U.S. temperature

More information

March 1, 2003 Western Snowpack Conditions and Water Supply Forecasts

March 1, 2003 Western Snowpack Conditions and Water Supply Forecasts Natural Resources Conservation Service National Water and Climate Center 101 SW Main Street, Suite 1600 Portland, OR 97204-3224 Date: March 17, 2003 Subject: March 1, 2003 Western Snowpack Conditions and

More information

Energy Forecasting Customers: Analysing end users requirements Dec 3rd, 2013 Carlos Alberto Castaño, PhD Head of R&D

Energy Forecasting Customers: Analysing end users requirements Dec 3rd, 2013 Carlos Alberto Castaño, PhD Head of R&D IT Solutions for Renewables Energy Forecasting Customers: Analysing end users requirements Dec 3rd, 2013 Carlos Alberto Castaño, PhD Head of R&D carlos.castano@gnarum.com I. Who we are II. Customers Profiles

More information

Multi Hazard Evaluation of a High Voltage Transmission Network. John Eidinger 1 and Leon Kempner 2

Multi Hazard Evaluation of a High Voltage Transmission Network. John Eidinger 1 and Leon Kempner 2 Multi Hazard Evaluation of a High Voltage Transmission Network John Eidinger 1 and Leon Kempner 2 1 G&E Engineering Systems Inc., P. O. Box 3592 Olympic Valley, CA 96146-3592; eidinger@earthlink.net. 2

More information

A Unified Framework for Near-term and Short-term System Load Forecasting

A Unified Framework for Near-term and Short-term System Load Forecasting Forecasting / Load Research A Unified Framework for Near-term and Short-term System Load Forecasting Dr. Frank A. Monforte Director, Forecasting Solutions 2009, Itron Inc. All rights reserved. 1 A Unified

More information

Solar irradiance forecasting for Chulalongkorn University location using time series models

Solar irradiance forecasting for Chulalongkorn University location using time series models Senior Project Proposal 2102490 Year 2016 Solar irradiance forecasting for Chulalongkorn University location using time series models Vichaya Layanun ID 5630550721 Advisor: Assist. Prof. Jitkomut Songsiri

More information

Short Term Load Forecasting Based Artificial Neural Network

Short Term Load Forecasting Based Artificial Neural Network Short Term Load Forecasting Based Artificial Neural Network Dr. Adel M. Dakhil Department of Electrical Engineering Misan University Iraq- Misan Dr.adelmanaa@gmail.com Abstract Present study develops short

More information

Deep Thunder. Local Area Precision Forecasting for Weather-Sensitive Business Operations (e.g. Electric Utility)

Deep Thunder. Local Area Precision Forecasting for Weather-Sensitive Business Operations (e.g. Electric Utility) 1 Deep Thunder Local Area Precision Forecasting for Weather-Sensitive Business Operations (e.g. Electric Utility) Dipl. Ing. Helmut Ludwar Chief Technologist Wien, im Oktober 2010 Forecasts for Weather-Sensitive

More information

Uncertainty analysis of heliostat alignment at the Sandia solar field

Uncertainty analysis of heliostat alignment at the Sandia solar field Available online at www.sciencedirect.com Energy Procedia 00 (2013) 000 000 www.elsevier.com/locate/procedia SolarPACES 2013 Uncertainty analysis of heliostat alignment at the Sandia solar field Rachel

More information

Analysis and the methods of forecasting of the intra-hour system imbalance

Analysis and the methods of forecasting of the intra-hour system imbalance POSTER 2016, PRAGUE MAY 24 1 Analysis and the methods of forecasting of the intra-hour system imbalance Štěpán KRATOCHVÍL 1, Jan BEJBL 2 1,2 Dept. of Economy, management and humanities, Czech Technical

More information

CHAPTER 5 - QUEENSLAND FORECASTS

CHAPTER 5 - QUEENSLAND FORECASTS CHAPTER 5 - QUEENSLAND FORECASTS Summary This chapter presents information about annual energy, maximum demand (summer and winter), and nonscheduled generation for the Queensland region. It also includes

More information

Forecasting of Renewable Power Generations

Forecasting of Renewable Power Generations Forecasting of Renewable Power Generations By Dr. S.N. Singh, Professor Department of Electrical Engineering Indian Institute of Technology Kanpur-2816, INDIA. Email: snsingh@iitk.ac.in 4-12-215 Side 1

More information

Wind Integration Study for Public Service of Colorado Addendum Detailed Analysis of 20% Wind Penetration

Wind Integration Study for Public Service of Colorado Addendum Detailed Analysis of 20% Wind Penetration Final Report: Wind Integration Study for Public Service of Colorado Addendum Detailed Analysis of 2% Wind Penetration Prepared for Xcel Energy 55 15th Street Denver, Colorado 822 c/o Mr. Tom Ferguson thomas.f.ferguson@xcelenergy.com

More information

A possible notion of short-term value-based reliability

A possible notion of short-term value-based reliability Energy Laboratory MIT EL 1-13 WP Massachusetts Institute of Technology A possible notion of short-term value-based reliability August 21 A possible notion of short-term value-based reliability Yong TYoon,

More information

Mean, Median, Mode, More. Tilmann Gneiting University of Washington

Mean, Median, Mode, More. Tilmann Gneiting University of Washington Mean, Median, Mode, More ÓÖ ÉÙ ÒØ Ð ÇÔØ Ñ Ð ÈÓ ÒØ ÈÖ ØÓÖ Tilmann Gneiting University of Washington Mean, Median, Mode, More or Quantiles as Optimal Point Predictors Tilmann Gneiting University of Washington

More information

Defining Normal Weather for Energy and Peak Normalization

Defining Normal Weather for Energy and Peak Normalization Itron White Paper Energy Forecasting Defining Normal Weather for Energy and Peak Normalization J. Stuart McMenamin, Ph.D Managing Director, Itron Forecasting 2008, Itron Inc. All rights reserved. 1 Introduction

More information

Contents Economic dispatch of thermal units

Contents Economic dispatch of thermal units Contents 2 Economic dispatch of thermal units 2 2.1 Introduction................................... 2 2.2 Economic dispatch problem (neglecting transmission losses)......... 3 2.2.1 Fuel cost characteristics........................

More information

Big Data Analysis in Wind Power Forecasting

Big Data Analysis in Wind Power Forecasting Big Data Analysis in Wind Power Forecasting Pingwen Zhang School of Mathematical Sciences, Peking University Email: pzhang@pku.edu.cn Thanks: Pengyu Qian, Qinwu Xu, Zaiwen Wen and Junzi Zhang The Keywind

More information

CARLOS F. M. COIMBRA (PI) HUGO T. C. PEDRO (CO-PI)

CARLOS F. M. COIMBRA (PI) HUGO T. C. PEDRO (CO-PI) HIGH-FIDELITY SOLAR POWER FORECASTING SYSTEMS FOR THE 392 MW IVANPAH SOLAR PLANT (CSP) AND THE 250 MW CALIFORNIA VALLEY SOLAR RANCH (PV) PROJECT CEC EPC-14-008 CARLOS F. M. COIMBRA (PI) HUGO T. C. PEDRO

More information

Stochastic Unit Commitment with Topology Control Recourse for Renewables Integration

Stochastic Unit Commitment with Topology Control Recourse for Renewables Integration 1 Stochastic Unit Commitment with Topology Control Recourse for Renewables Integration Jiaying Shi and Shmuel Oren University of California, Berkeley IPAM, January 2016 33% RPS - Cumulative expected VERs

More information

Skilful seasonal predictions for the European Energy Industry

Skilful seasonal predictions for the European Energy Industry Skilful seasonal predictions for the European Energy Industry Hazel Thornton, Philip Bett, Robin Clark, Adam Scaife, Brian Hoskins, David Brayshaw WGSIP, 10/10/2017 Outline Energy industry and climate

More information

Demand Forecasting Models

Demand Forecasting Models E 2017 PSE Integrated Resource Plan Demand Forecasting Models This appendix describes the econometric models used in creating the demand forecasts for PSE s 2017 IRP analysis. Contents 1. ELECTRIC BILLED

More information

Probabilistic forecasting of solar radiation

Probabilistic forecasting of solar radiation Probabilistic forecasting of solar radiation Dr Adrian Grantham School of Information Technology and Mathematical Sciences School of Engineering 7 September 2017 Acknowledgements Funding: Collaborators:

More information

Monthly Long Range Weather Commentary Issued: February 15, 2015 Steven A. Root, CCM, President/CEO

Monthly Long Range Weather Commentary Issued: February 15, 2015 Steven A. Root, CCM, President/CEO Monthly Long Range Weather Commentary Issued: February 15, 2015 Steven A. Root, CCM, President/CEO sroot@weatherbank.com JANUARY 2015 Climate Highlights The Month in Review During January, the average

More information

Modelling wind power in unit commitment models

Modelling wind power in unit commitment models Modelling wind power in unit commitment models Grid integration session IEA Wind Task 25 Methodologies to estimate wind power impacts to power systems Juha Kiviluoma, Hannele Holttinen, VTT Technical Research

More information

SUBMITTED TO IEEE TRANSACTIONS ON POWER SYSTEMS, AUGUST

SUBMITTED TO IEEE TRANSACTIONS ON POWER SYSTEMS, AUGUST SUBMITTED TO IEEE TRANSACTIONS ON POWER SYSTEMS, AUGUST 2014 1 Adaptive Robust Optimization with Dynamic Uncertainty Sets for Multi-Period Economic Dispatch under Significant Wind Álvaro Lorca, Student

More information