UTICAJ KRIVE SNAGE VETROGENERATORA NA TEHNO-EKONOMSKE POKAZATELJE SISTEMA ZA NAPAJANJE POTROŠAČA MALE SNAGE

Size: px
Start display at page:

Download "UTICAJ KRIVE SNAGE VETROGENERATORA NA TEHNO-EKONOMSKE POKAZATELJE SISTEMA ZA NAPAJANJE POTROŠAČA MALE SNAGE"

Transcription

1 UTICAJ KRIVE SNAGE VETROGENERATORA NA TEHNO-EKONOMSKE POKAZATELJE SISTEMA ZA NAPAJANJE POTROŠAČA MALE SNAGE Vukman Bakić *, and Saša Stojković ** * University of Belgrade, Institute Vinča, Laboratory for Thermal and Energy Research, Belgrade, Serbia ** Faculty of technical sciences, Čačak, Serbia Apstrakt: U radu su prikazani rezultati analize uticaja krive snaga-energija vetrogeratora na tehnoekonomske pokazatelje sistema za napajanje potrošača relativno male snage. Rezultati su svedeni na vetrogenerator naznačene snage 1 kw. Zbog toga, oni važe i za vetrogeneratorski deo hibridnog sistema bilo koje vrste. Osnovni cilj je da se kvantifikuju prednosti vetrogeneratora sa boljom krivom snaga-brzina vetra. Detaljna ekonomska analiza izvedena je korišćenjem Life Cycling Costs (LCC) metoda, kojim se svi troškovi i prihodi u toku životnog veka aktuelizuju, tj., svode na sadašnju vrednost. Tehno-ekonomska analiza sedam sistema sa vetrogeneratorima sa različitim krivama snaga-brzina vetra izvedena je metodom numeričkih simulacija, za šta je korišćen softverski alat HOMER. Naznačene snage vetrogeneratora su 0.4 kw, 0.55 kw, 1 kw, 1.8 kw i 3 kw. Analiza je dinamička, sa satnom dinamikom, a za meteorološke podatke o brzini vetra korišćeni su podaci za Kopaonik i Beograd. Podaci su u vidu tipične meteorološke godine TMY2 ( Typical meteorological year 2 ). Rezultati analize pokazuju da kriva snaga-energija znatno utiče na efikasnost sistema, zbog različite iskoristivosti kinetičke energije vetra. Ključne reči: energetska efikasnost, obnovljivi izvori energije, vetrogenerator, HOMER softver. INFLUENCE OF POWER-WIND VELOCITY CURVE ON TECHNO- ECONOMICAL METRICS OF THE POWER SYSTEM FOR SUPPLY OF SMALL POWER CONSUMERS Abstract: The paper presents the results of analysis of the influence of the power curve upon techno-economical metrics of the power system which supplies electrical energy to the relatively small power consumers. Results are scaled to the rated wind generator power of 1 kw. The results are also valid for the wind generator of any hybrid system. The basic goal is to quantify advantages of systems with better power-wind velocity curve. Detailed economic analysis is done by Life Cycling Costs method (LCC), by which all expenditures and revenues are discounted, i.e. recalculated to present value. The techno-economic analysis of the seven systems with wind generators characterized by different power-wind velocity curve is done using method of numerical simulation by HOMER software tool. Rated powers of the wind generators are 0.4 kw, 0.55 kw, 1 kw, 1.8 kw and 3 kw. The analysis is dynamical, with hourly time step. The meteorological data about wind velocity of Kopaonik and Belgrade are employed. Data are in the so-called TMY2 (Typical meteorological year 2) form. Results of the analysis show that power-wind velocity curve greatly influences the efficacy of the system, due to different utilization of kinetic energy of wind. Keywords: energy efficiency, renewable energy sources, wind generator, HOMER software. 1. INTRODUCTION Energy of wind is used by mankind during 3000 years. Historical review of development of devices for wind energy utilization is shown in detail in [1]. Wind has been exploited in different ways, mainly for grain milling and water pumping. With the advent of the industrial era, wind energy was 1

2 replaced by fossil fuels. The revolution was in 20th sentury, when new designs enabled electricity generation. After the 1970s, wind technology expirienced a huge development. Today there are wind generators of powers 400 W, up to 5-6 MW. Wind energy is inexhaustible and renewable resource, like as solar energy. The basic drawback of wind energy is intermittent and seasonal variability of the wind, what needs complex control systems. Besides, wind turbines and generators designs are quite different. Several types of electrical machines are used for wind generators. Rotor velocity can be constant or variable, as control can be of stall or pitch type [2]. Due to that, regarding high power machines, higher of 0.5 MW, the basic goal is the better utilization of wind energy in all the regimes. However, as far as small power is concerned, stand-alone, as well as connected to grid power systems are developed. They serve for supply homes, cottages, government objects, telecom repeaters, meteorological stations, traffic signalization, and lighting. Due to their small power and accessibility to wider number of users, the basic goal is to design them in such a manner that are as cheap as possible, with simple control. Because of that, curves of power output are different for the generators of small power. The consequence is different electrical energy yield. In this paper the basic goal is to compare curves of electrical power vs. wind speed, regarded the small power wind generators. The power is of power up to 3 kw, and main concern is electrical energy yield of one kilowatt power. Seven generators are analysed, with the goal to calculate some technical and economical parameters. Final goal is to enable better choice of wind generator for supply of meteorological mast s electrical equipment for wind measurement. For analysis, method of numerical simulations is employed, and meteorological data relates to Kopaonik and Belgrade. Those are in the so-called Typical Meteorological Year 2 (TMY2), which are commonly used for analysis of solar power systems. The hourly averaged data are employed. The Life Cycling Costs (LCC) method is used for economic analysis [3,4]. For these type of analysis use of specialised software tools are common, as example [5-7]. In this paper HOMER software tool is employed [6]. The paper is organised in the following way. After Introduction, in Section 2 configuration of the system is presented, as in the Section 3 Simulation model is shown. The results of analysis are given in the Section 4, as Conclusion is in the fifth section. At last, the references are shown. 2. SYSTEM CONFIGURATION In the paper some technical and economical parameters of seven types of WG are analysed. The generators are of different rated power. The simulation model of the power system is simple and is shown in Fig. 1. The model is defined in HOMER software tool environment. Wind generators are analysed one by one. Types of generators and their rated powers are shown in Table 1. In the last column inverters rated powers for all of the generators are presented. Rated power approximately agrees to the rated power of the generator. Such choice of the inverter s power is needed because inverter s rated power influences technical and economical parameters. Figure 1. Wind generator system configuration 2

3 Table 1. Types of wind generators and inverters powers Tip WG Hummer 400 [9] SWAR [10] Whisper 100 [11] Whisper 200 [11] Skystream 3.7 [12] Whisper 500 [11] Westwind [13] Rated power of WG [kw] Rated power of inverter [kw] Six types of wind generators are DC type, as one is AC (Skystream). It is supposed that efficiency of all the generators is 95%. Efficiency is constant and does not depend on inverter s load. That means power which output from the inverter is calculated in HOMER as power 5% lower than power produced by wind generator. It is accepted that all electrical energy produced by wind generator (Westwind 3 kw in Fig. 1) is delivered into utility s grid (Grid in Fig. 1). That is the reason why load (Primary load in Fig. 1) is designated by zero, in order to calculate all the technical and economical parameters consistently, since wind generator s powers are different. Type of generator, inverter power and location (Kopaonik or Belgrade) are changeable in the model. 3. SIMULATION MODEL 3.1. Wind generators Power output vs. wind speed curve is the basic curve which is used for calculation of electrical energy produced by wind generator. During one-year period, output power is calculated in accordance with that curve, which is given by generator s manufacturer. It curve is defined by testing, but for sea-level conditions, i.e. for air density of ρ=1.225 kg/m 3. Figure 2 depicts these curves of Hummer 400, SWAIR (Southwest AIR-X), Whisper 100, and Whisper 200 types of generators. Curves of Skystream, Whisper 500, and Westwind 3 kw are shown in Fig. 3. They are presented separately due to better visibility. Figure 2. Power output vs. wind speed curve for four wind generators 3

4 Figure 3. Power output vs. wind speed curve for three wind generators Figures 2 and 3 depict curves of wind turbines of different rated powers, namely kw. Due to that, their technical parameters, which depend on rated generator power, could not be compared directly. They have to be scaled by dividing by base value. The base value is rated power of wind generator. However, economic parameters could be compared directly, because it is supposed that capital, as well as operating and maintenance costs are proportional to the generator s rated power. Figures 2 and 3 show that electrical energy yield is very much dependent on cut-in wind speed, i.e. wind speed generator starts to generate electrical power at. Also, electrical energy production depends on curve s rate in the zone where the generator works. For example, if we compare two curves of wind generators of same rated power, namely Whisper 500 and Westwind 3 kw (Fig. 3), we can see that at wind speed of 8 m/s Whisper 500 generates 1.7 kw of electrical power, as Westwind produces 0.8 kw. Due to that, the basic goal in the paper is to analyse the influence of power output vs. wind speed curve on electrical energy yield of the wind generator Power system s cost Basic goal of economic analysis is to find out an interaction of technical, climatic, and economic parameters. Such analyses can be done only on case-by-case basis. It is known in advance that generators are chosen to produce electrical energy in conditions with relatively weak wind, related to the rated power of the wind generator. Moreover, it is known that such power systems were not economically viable due to very high costs. Fortunately, during last several years costs are decreased to acceptable level. In this paper costs are used as follows. Wing generators: Capital cost: 2500 $/kw [5] Replacement cost: 90% of capital cost Operation and maintenance cost: 50 $/yr kw (fixed cost by capacity). These costs of wind generators are typical, and it is accepted that it is same for all analysed generators, in order these parameters to be compared. Exact costs are not known, they differ between manufacturers, but they do not differ much from typical costs. Wind generators costs are presented in Table 1. 4

5 Table 2. Wind generators and inverters system costs Tip WG Hummer SWAR Whisper Whisper Skystream Whisper Westwind Capital cost [$] Replacement cost [$] Operational and maintenance cost [$/yr] Inverter Capital cost [$] Replacement cost [$] Operational and maintenance cost [$/yr] Inverters: Capital cost: 400 $/kw Replacement cost: 400 $/kw Operation and maintenance cost: 0. Economic parameters: Annual real interest rate: 6% Project lifetime: 20 years System fixed capital costs (permiting, environment study, grid interconnection: 1600 $, fixed + engineering: 500 $, fixed): 2100 $ System fixed operational and maintenance 0 $/yr. Regarding the electrical energy that is sold to utility, flat rate of 9.20 c /kwh [8] was accepted. Currency on September in Repiblic of Serbia was 1 =1.35 $. This means rate is /kwh= $/kwh. That value is employed in HOMER simulation model. It is supposed that all the electrical energy is to be sold to the utility, without restrictions. Lifetime of all equipment is 20 years, wherefore there is no replacement of the equipment during project analysis period. Detailed economic analysis is done by Life Cycling Costs method, by which all expenditures and revenues are discounted, i.e. recalculated to present value [3,4] Wind resource Meteorological data about wind velocity used in this paper are in the form of Typical Meteorological Year 2 (TMY2), for two places in Republic of Serbia, namely mountain Kopaonik and Serbia s capital Belgrade. Mountain Kopaonik is characterised by greater wind speed in Republic of Serbia, because the meteorological station is placed at altitude of 1711 m, whereas Belgrade is at altitude of 132 m. Belgrade is very similar to majority of places in the state, and its wind speed is unfavourable for employing of wind generators. TMY2 data type is calculated on the several-decades measurements, using of statistics laws [7]. So-called typical months are created and connected in one-year period. In [6] it is pointed out that they are very appropriate for PV analyzing, because the measurements are intended to that purpose. However, wind data are precise, 5

6 but meteorological station in which data are gathered commonly is not in the strong wind area, which is proper for wind generator. Figure 4 shows average monthly wind speeds for Kopaonik. Figure 5 shows same data for Belgrade. Figure 4. Monthly average wind speed - Kopaonik Fifure 5. Monthly average wind speed - Belgrade The average monthly wind speed in Kopaonik (Figure 4) is 3.86 m/s, as in Belgrade it is 2.15 m/s (Figure 5). It is clear that with wind velocity of 2.15 m/s in Belgrade, wind generators of relatively small power and rated speed of m/s could not be efficient. There are two influential factors which should be taken into account if we want to calculate electrical energy produced by wind generators. Those are altitude, due to reduced air density, as well as the fact that the wind speed is measured commonly in station at altitude of 10 m, as hub of the wind generator is located on the greater altitude, dependent of rated power and application of wind generator. The hub height is the height above ground of the hub (the center of the rotor), as altitude is the elevation above sea level. Figures 4 and 5 indicate very great importance of the adequate local meteorological data in the hybrid system planning. In other words, meteorological masts for the wind characterization are erected at the places where the wind is relatively strong. That decision commonly is done by experience, or using measurements of nearby meteorological stations. Due to that reason, adequate wind data should be implemented, if they are available. 4. RESULTS OF NUMERICAL SIMULATIONS 4.1. Wind generators technical and economical indicators Ground-level obstacles such as topographic features and vegetation tend to slow the wind near the surface. Since the effect of these obstacles decreases with height above ground, wind speeds tend to increase with height above ground. The logarithmic or power law profile is commonly used by wind energy engineers. The power law profile with coefficient of α=0.18 is used in this analysis. This wind shear model is depicted in [6]. In this paper basic goal is to choose the wind generator for supply of the meteorological mast s equipment for wind measurements. These masts attain height of m [14], although their heights mostly are 50 m. The wind generator should be placed as high as possible, because the wind speed is stronger. Wind generation should be displaced from equipment for wind measurement enough (for example 10 m) in order not to influence 6

7 measurements results. For meteorological masts low electrical power is demanded. Due to weight and electrical power, Hummer 400 (5.5 kg) or AIR-X (5.8 kg) is appropriate. For other applications (supply of telecom repeaters, houses, cottages, objects, and so on) other wind generators analysed in this paper could be used. Figure 6 depicts dependency of electrical energy production (left) and LCOE (right) on hub height. LCOE is calculated without sale of electrical energy to the utility. The Hummer 400 is analysed. Figure 6. Electrical energy production (left), and Levelized cost of energy (right) as a function of hub height (Hummer 400) Figure 6 shows that produced electrical energy is greatly enhanced with hub height. Electrical energy yield on mountain Kopaonik is approximately 2.2 times greater than in Belgrade, due to much strong wind on Kopaonik than in Belgrade, although air density on Kopaonik is decreased because of high altitude (1711 m). Figure 7 (left) depicts capacity factor in per cent as a function of hub height. It is important technical parameter because it points out what part of installed wind generator s capacity is employed in average during one year. Figure 7 (right) shows influence of altitude on electrical energy yield, as well as on capacity factor. Figure 7. Capacity factor vs. hub height (left), and Energy production, as well as capacity factor as a function of altitude (right) (Hummer 400) Figure 7 shows that wind generator Hummer 400 is characterised by satisfactorily capacity factor, as it is of low value for same wind generator in Belgrade. It is clear that this curve presents scaled curve of electrical energy produced as a function of hub height (Figure 6 left). Wind generator s power depends on air density linearly. Air density at higher height is lower than at sea level, wherefore electrical energy yield is lower. Decreasing is nearly linear, but more 7

8 exact expression regarding electrical energy yield is shown in [6]. Yet, capacity factor decreases due to reducing of electrical energy production. Figure 8 shows the capacity factor for different types of wind generators analised in this paper. All remaining analyses were done for hub height of 30 m. Figure 8. Capacity factor for different wind generators types, hub height: 30 m Figure 8 shows that capacity factors for various types of wind generators analysed in this paper differ very much. The capacity factor is biggest for Hummer 400, as it is smallest for AIR-X. That is the consequence of power output vs. wind speed curve shape. In the case of Belgrade, capacity factor is much smaller, due to small wind speed. Figure 9 shows LCOE in the case that electrical energy is not sold to power system utility (0 $/kwh), as well as in the case of sale using flat rate of $/kwh. Figure 9. Levelized cost of energy for different types of generators, hub height: 30 m Figure 9 points out that LCOE is smaller if electrical energy is sold to utility, because of the revenue. If the electrical yield is greater (Kopaonik), the decrease of LCOE is greater. Figure 9 8

9 shows also that LCOE for various wind generators differ very much, what is the consequence of electrical energy production. This way, investments could be ranked, and the best is with the smallest LCOE. Figure 10 depicts one important technical parameter energy production (yield) per one kilowatt of rated power. Figure 10. Energy production per kw of rated power, hub height: 30 m If we want to compare wind generators, it is necessarily technical parameters to be calculated based on one kilowatt of rated (installed) power. Figure 10 shows that electrical energy yield produced by one kilowatt of rated power is very different for various types of wind generators. That is direct consequence of the influence of power output vs. wind speed curve, as well as location (Kopaonik or Belgrade). 5. CONCLUSION In the paper some technical and economical parameters were analysed. Power production vs. wind speed curves of various wind generators differ among themselves very much concerning the power values and shapes. In order to compare different types of wind generators, the results were calculated based on one kilowatt of rated (installed) power. Power production curves differ among themselves much more than in the case of high-power wind generators. The basic reason for that are wind generator s design, as well as its control. Results show that technical and economical parameters for various types of small power wind generators differ very much among themselves due to various power output vs. wind speed curves. Yet, analysis points out very great electrical energy production dependence on wind speed, i.e. location. On mountain Kopaonik with average annually wind speed of 3.86 m/s, electrical energy yield is 2.2 times greater than in Belgrade for same conditions, where average annually wind speed amounts 2.16 m/s for TMY2 used. That fact is paramount in the choice of the wind generator, or wind farm planning. The output power is influenced by cut-in wind speed, as well as power output curve s shape in the operating speed range, commonly 3-10 m/s, for conditions in Republic of Serbia. Hub height also influences power output very much, due to stronger wind. This influence is quantified in this paper. The output power curves as a function of wind speed given by wind generator manufacturers relates to wind speed which is averaged in short time interval. Because of that, for electrical energy yield calculation, it is better to use hourly averaged wind values, as is done in this paper, or the values averaged in shorter time interval as 10 minutes [15]. 9

10 ACKNOWLEDGMENTS This paper is the result of the investigations carried out within the scientific Project No. TR33036 supported by the Ministry of Education, Science and Technological Development of the Republic of Serbia. REFERENCES [1] Ackermann T., Editor, Wind Power in Power Systems, John Wiley & Sons, Ltd, England, 2005 [2] Bianchi F. D., De Battista H., Mantz R., Wind Turbine Control Systems: Principles, Modelling and Gain Scheduling Design, Springer-Verlag London Limited, London, 2007 [3] Short W., Packey D. J., Holt T., A Manual for the Economic Evalution of Energy Efficiency and Renewable Energy Technologies, NREL/TP , March 1995., [4] Ćalović, M., Sarić, A., Power System Planning, Part One: Principles and Methodology of Power System Planning (in Serbian), BEOPRES, Belgrade, [5] System Advisor Model, [6] HOMER, [7] TRNSYS transient system simulation program, Solar energy laboratory University of Wisconsin, Madison; 2003, [8] Decree on the Requirements for obtaining the Status of the Privileged Power Producer and the Criteria for Assessing Fulfillments of these Requirements ( Official Gazette RS, No. 8/13), [9] Hummer 400: [10] Southwest AIR-X (SWAIR): [11] Whisper: [12] Skystream: [13] Westwind 3 kw: [14] Netinvest, [15] Van Dam J., Meadors M., Link H., Migliore P., Power Performance Test Report for the Southwest Windpower AIR-X Wind Turbine, Technical report NREL/TP , September

DETERMINATION OF THE POWER LAW EXPONENT FOR SOUTHERN HIGHLANDS OF TANZANIA

DETERMINATION OF THE POWER LAW EXPONENT FOR SOUTHERN HIGHLANDS OF TANZANIA DETERMINATION OF THE POWER LAW EXPONENT FOR SOUTHERN HIGHLANDS OF TANZANIA HH Mwanyika and RM Kainkwa Department of Physics, University of Dar es Salaam, P.O Box 35063, Dar es Salaam, Tanzania. ABSTRACT

More information

Consumer Guide. Southwest Windpower 1801 W. Route 66 Flagstaff, AZ USA

Consumer Guide. Southwest Windpower 1801 W. Route 66 Flagstaff, AZ USA Consumer Guide wind turbine SITING Southwest Windpower 80 W. Route 66 Flagstaff, AZ 8600 USA www.windenergy.com Introduction Is wind power right for you? Wind generators are an effective source of renewable

More information

LECTURE 22 WIND POWER SYSTEMS. ECE 371 Sustainable Energy Systems

LECTURE 22 WIND POWER SYSTEMS. ECE 371 Sustainable Energy Systems LECTURE 22 WIND POWER SYSTEMS ECE 71 Sustainable Energy Systems 1 AVG POWER IN WIND WITH RAYLEIGH STATISTICS The average value of the cube of wind speed can be calculated with Raleigh probability density

More information

Site Description: Tower Site

Site Description: Tower Site Resource Summary for Elizabeth Site Final Report Colorado Anemometer Loan Program Monitoring Period: 7/3/06 /26/07 Report Date: January, 0 Site Description: The site is.6 miles northeast of the town of

More information

WIND INTEGRATION IN ELECTRICITY GRIDS WORK PACKAGE 3: SIMULATION USING HISTORICAL WIND DATA

WIND INTEGRATION IN ELECTRICITY GRIDS WORK PACKAGE 3: SIMULATION USING HISTORICAL WIND DATA WIND INTEGRATION IN ELECTRICITY GRIDS WORK PACKAGE 3: SIMULATION USING PREPARED BY: Strategy and Economics DATE: 18 January 2012 FINAL Australian Energy Market Operator Ltd ABN 94 072 010 327 www.aemo.com.au

More information

Systems Operations. PRAMOD JAIN, Ph.D. Consultant, USAID Power the Future. Astana, September, /6/2018

Systems Operations. PRAMOD JAIN, Ph.D. Consultant, USAID Power the Future. Astana, September, /6/2018 Systems Operations PRAMOD JAIN, Ph.D. Consultant, USAID Power the Future Astana, September, 26 2018 7/6/2018 Economics of Grid Integration of Variable Power FOOTER GOES HERE 2 Net Load = Load Wind Production

More information

Voltage Deviation of Wind Power Generation due to Wind Velocity Change

Voltage Deviation of Wind Power Generation due to Wind Velocity Change Proceedings of the 7th WSEAS International Conference on Power Systems, Beijing, China, September 15-17, 2007 242 Voltage Deviation of Wind Power Generation due to Wind Velocity Change JUNICHI ARAI, Department

More information

Integrated Electricity Demand and Price Forecasting

Integrated Electricity Demand and Price Forecasting Integrated Electricity Demand and Price Forecasting Create and Evaluate Forecasting Models The many interrelated factors which influence demand for electricity cannot be directly modeled by closed-form

More information

SHORT TERM LOAD FORECASTING

SHORT TERM LOAD FORECASTING Indian Institute of Technology Kanpur (IITK) and Indian Energy Exchange (IEX) are delighted to announce Training Program on "Power Procurement Strategy and Power Exchanges" 28-30 July, 2014 SHORT TERM

More information

Wind Resource Data Summary Cotal Area, Guam Data Summary and Transmittal for December 2011

Wind Resource Data Summary Cotal Area, Guam Data Summary and Transmittal for December 2011 Wind Resource Data Summary Cotal Area, Guam Data Summary and Transmittal for December 2011 Prepared for: GHD Inc. 194 Hernan Cortez Avenue 2nd Floor, Ste. 203 Hagatna, Guam 96910 January 2012 DNV Renewables

More information

Afghanistan Resource Data and Geospatial Toolkit (GsT)

Afghanistan Resource Data and Geospatial Toolkit (GsT) Afghanistan Resource Data and Geospatial Toolkit (GsT) WISER Clean Energy Access Workshop Shannon Cowlin 22 March 2010 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency

More information

Mapping of potential for mini-hydro and mini-wind in the Southeast region of Sweden

Mapping of potential for mini-hydro and mini-wind in the Southeast region of Sweden IEE/07/797/S12.499715 acronym RURAL-RES Report: Mapping of potential for mini-hydro and mini-wind in the Southeast region of Sweden Region: Southeast Sweden with the Counties of Blekinge, Kronoberg and

More information

Site Description: Tower Site

Site Description: Tower Site Resource Summary for Fort Collins Site Final Report Colorado Anemometer Loan Program Monitoring Period: /0/00 11/03/007 Report Date: January 1, 00 Site Description: The site is located adjacent to the

More information

EVALUATION OF OPERATIONAL DATA IN RESPECT TO PRODUCTION LOSSES DUE TO ICING

EVALUATION OF OPERATIONAL DATA IN RESPECT TO PRODUCTION LOSSES DUE TO ICING EVALUATION OF OPERATIONAL DATA IN RESPECT TO PRODUCTION LOSSES DUE TO ICING Annette Westerhellweg, Kai Mönnich DEWI GmbH, Wilhelmshaven, Germany, Tel. 0049 4421 4808 828, Fax. 0049 4421 4808 43, a.westerhellweg@

More information

Wind energy production backcasts based on a high-resolution reanalysis dataset

Wind energy production backcasts based on a high-resolution reanalysis dataset Wind energy production backcasts based on a high-resolution reanalysis dataset Liu, S., Gonzalez, L. H., Foley, A., & Leahy, P. (2018). Wind energy production backcasts based on a highresolution reanalysis

More information

2013 WEATHER NORMALIZATION SURVEY. Industry Practices

2013 WEATHER NORMALIZATION SURVEY. Industry Practices 2013 WEATHER NORMALIZATION SURVEY Industry Practices FORECASTING SPECIALIZATION Weather Operational Forecasting Short-term Forecasting to support: System Operations and Energy Trading Hourly Load Financial/Budget

More information

10 kw wind generator 100 kw wind generator 100 watt wind generator 1000 watt wind generator 1000w wind generator 100w wind generator 10kw wind

10 kw wind generator 100 kw wind generator 100 watt wind generator 1000 watt wind generator 1000w wind generator 100w wind generator 10kw wind 10 kw wind generator 100 kw wind generator 100 watt wind generator 1000 watt wind generator 1000w wind generator 100w wind generator 10kw wind generator 12v wind generator 1kw wind generator 2000 watt

More information

Solar Radiation and Solar Programs. Training Consulting Engineering Publications GSES P/L

Solar Radiation and Solar Programs. Training Consulting Engineering Publications GSES P/L Solar Radiation and Solar Programs Training Consulting Engineering Publications SOLAR RADIATION Purposes of Solar Radiation Software Successful project planning and solar plant implementation starts by

More information

not for commercial-scale installations. Thus, there is a need to study the effects of snow on

not for commercial-scale installations. Thus, there is a need to study the effects of snow on 1. Problem Statement There is a great deal of uncertainty regarding the effects of snow depth on energy production from large-scale photovoltaic (PV) solar installations. The solar energy industry claims

More information

Expedited Filing Draft August 22, 2017

Expedited Filing Draft August 22, 2017 Applicability 1 Section 304.9 applies to: (a) (b) Requirements Expedited Filing Draft August 22, 2017 the legal owner of a wind or solar aggregated generating facility connected to the interconnected electric

More information

elgian energ imports are managed using forecasting software to increase overall network e 칁 cienc.

elgian energ imports are managed using forecasting software to increase overall network e 칁 cienc. Elia linemen install Ampacimon real time sensors that will communicate with the dynamic thermal ratings software to control energy import levels over this transmission line. OV RH AD TRAN MI ION D namic

More information

Speedwell High Resolution WRF Forecasts. Application

Speedwell High Resolution WRF Forecasts. Application Speedwell High Resolution WRF Forecasts Speedwell weather are providers of high quality weather data and forecasts for many markets. Historically we have provided forecasts which use a statistical bias

More information

GENERATOR INTERCONNECTION APPLICATION

GENERATOR INTERCONNECTION APPLICATION GENERATOR INTERCONNECTION APPLICATION FOR BUY-ALL/SELL-ALL PROJECTS WITH AGGREGATE GENERATOR OUTPUT OF MORE THAN 20 KW BUT LESS THAN OR EQUAL TO 1 MW Electric Utility Contact Information Great Lakes Energy

More information

SMART GRID FORECASTING

SMART GRID FORECASTING SMART GRID FORECASTING AND FINANCIAL ANALYTICS Itron Forecasting Brown Bag December 11, 2012 PLEASE REMEMBER» Phones are Muted: In order to help this session run smoothly, your phones are muted.» Full

More information

Wind Resource Assessment Practical Guidance for Developing A Successful Wind Project

Wind Resource Assessment Practical Guidance for Developing A Successful Wind Project December 11, 2012 Wind Resource Assessment Practical Guidance for Developing A Successful Wind Project Michael C Brower, PhD Chief Technical Officer Presented at: What We Do AWS Truepower partners with

More information

EVALUATION OF WIND ENERGY SOURCES INFLUENCE ON COMPOSITE GENERATION AND TRANSMISSION SYSTEMS RELIABILITY

EVALUATION OF WIND ENERGY SOURCES INFLUENCE ON COMPOSITE GENERATION AND TRANSMISSION SYSTEMS RELIABILITY EVALUATION OF WIND ENERGY SOURCES INFLUENCE ON COMPOSITE GENERATION AND TRANSMISSION SYSTEMS RELIABILITY Carmen Lucia Tancredo Borges João Paulo Galvão carmen@dee.ufrj.br joaopaulo@mercados.com.br Federal

More information

Determination of Optimum Fixed and Adjustable Tilt Angles for Solar Collectors by Using Typical Meteorological Year data for Turkey

Determination of Optimum Fixed and Adjustable Tilt Angles for Solar Collectors by Using Typical Meteorological Year data for Turkey Determination of Optimum Fixed and Adjustable Tilt Angles for Solar Collectors by Using Typical Meteorological Year data for Turkey Yohannes Berhane Gebremedhen* *Department of Agricultural Machinery Ankara

More information

Recent US Wind Integration Experience

Recent US Wind Integration Experience Wind Energy and Grid Integration Recent US Wind Integration Experience J. Charles Smith Nexgen Energy LLC Utility Wind Integration Group January 24-25, 2006 Madrid, Spain Outline of Topics Building and

More information

Wind power and management of the electric system. EWEA Wind Power Forecasting 2015 Leuven, BELGIUM - 02/10/2015

Wind power and management of the electric system. EWEA Wind Power Forecasting 2015 Leuven, BELGIUM - 02/10/2015 Wind power and management of the electric system EWEA Wind Power Forecasting 2015 Leuven, BELGIUM - 02/10/2015 HOW WIND ENERGY IS TAKEN INTO ACCOUNT WHEN MANAGING ELECTRICITY TRANSMISSION SYSTEM IN FRANCE?

More information

Power Engineering II. Fundamental terms and definitions

Power Engineering II. Fundamental terms and definitions Fundamental terms and definitions Power engineering A scientific discipline that focuses on: Generation of electrical energy (EE) Transmission and distribution of EE Consumption of EE Power grid operation

More information

Multivariate Regression Model Results

Multivariate Regression Model Results Updated: August, 0 Page of Multivariate Regression Model Results 4 5 6 7 8 This exhibit provides the results of the load model forecast discussed in Schedule. Included is the forecast of short term system

More information

University of East London Institutional Repository:

University of East London Institutional Repository: University of East London Institutional Repository: http://roar.uel.ac.uk This paper is made available online in accordance with publisher policies. Please scroll down to view the document itself. Please

More information

Wind Rules and Forecasting Project Update Market Issues Working Group 12/14/2007

Wind Rules and Forecasting Project Update Market Issues Working Group 12/14/2007 Wind Rules and Forecasting Project Update Market Issues Working Group 12/14/2007 Background Over the past 3 MIWG meetings, NYISO has discussed a methodology for forecasting wind generation in the NYCA

More information

ANN and Statistical Theory Based Forecasting and Analysis of Power System Variables

ANN and Statistical Theory Based Forecasting and Analysis of Power System Variables ANN and Statistical Theory Based Forecasting and Analysis of Power System Variables Sruthi V. Nair 1, Poonam Kothari 2, Kushal Lodha 3 1,2,3 Lecturer, G. H. Raisoni Institute of Engineering & Technology,

More information

U a. In section : The relative permeability of ferromagnetic materials is very high, in the range of 10 3 to 10 5 (not 103 to 105).

U a. In section : The relative permeability of ferromagnetic materials is very high, in the range of 10 3 to 10 5 (not 103 to 105). Errata Chapter Equation.4.13 should read: p b ( U U U ) ( a b = U U a ) p U du (.4.13) Chapter 5 In section 5..3.: The relative permeability of ferromagnetic materials is very high, in the range of 1 3

More information

Wind Generation Curtailment Reduction based on Uncertain Forecasts

Wind Generation Curtailment Reduction based on Uncertain Forecasts Wind Generation Curtailment Reduction based on Uncertain Forecasts A. Alanazi & A. Khodaei University of Denver USA Authors M. Chamana & D. Kushner ComEd USA Presenter Manohar Chamana Introduction Wind

More information

WYANDOTTE MUNICIPAL SERVICES COMMUNITY WIND ENERGY PROJECT WIND RESOUCE SUMMARY

WYANDOTTE MUNICIPAL SERVICES COMMUNITY WIND ENERGY PROJECT WIND RESOUCE SUMMARY WYANDOTTE MUNICIPAL SERVICES COMMUNITY WIND ENERGY PROJECT WIND RESOUCE SUMMARY MONTHLY REPORT October 15, 2007 Black & Veatch Project: 144374 Prepared by: Black & Veatch Corporation 6300 S. Syracuse Way

More information

LOADS, CUSTOMERS AND REVENUE

LOADS, CUSTOMERS AND REVENUE EB-00-0 Exhibit K Tab Schedule Page of 0 0 LOADS, CUSTOMERS AND REVENUE The purpose of this evidence is to present the Company s load, customer and distribution revenue forecast for the test year. The

More information

FORECAST ACCURACY REPORT 2017 FOR THE 2016 NATIONAL ELECTRICITY FORECASTING REPORT

FORECAST ACCURACY REPORT 2017 FOR THE 2016 NATIONAL ELECTRICITY FORECASTING REPORT FORECAST ACCURACY REPORT 2017 FOR THE 2016 NATIONAL ELECTRICITY FORECASTING REPORT Published: November 2017 Purpose The National Electricity Rules (Rules) require AEMO to report to the Reliability Panel

More information

Chapter 1 Data Collection

Chapter 1 Data Collection Chapter 1 Data Collection 1. Climate of Brunei Darussalam and Temburong District Situated at around four degrees north of the Equator, Brunei Darussalam enjoys an equatorial climate with an abundance of

More information

The impact of climate change on wind energy resources

The impact of climate change on wind energy resources The impact of climate change on wind energy resources Prof. S.C. Pryor 1, Prof. R.J. Barthelmie 1,2, Prof. G.S. Takle 3 and T. Andersen 3 1 Atmospheric Science Program, Department of Geography, Indiana

More information

Drivetrains. Direct Drive Generators High Temperature Superconductor Based Machines. Daniel McGahn Senior Vice President

Drivetrains. Direct Drive Generators High Temperature Superconductor Based Machines. Daniel McGahn Senior Vice President Drivetrains Direct Drive Generators High Temperature Superconductor Based Machines Daniel McGahn Senior Vice President AGENDA Wind turbine power conversion Drivetrain evolution Market Driver: Cost of Electricity

More information

A simple mathematical description of an off-grid hybrid solar wind power generating system

A simple mathematical description of an off-grid hybrid solar wind power generating system Home Search Collections Journals About Contact us My IOscience A simple mathematical description of an off-grid hybrid solar wind power generating system This article has been downloaded from IOscience.

More information

Importance of Numerical Weather Prediction in Variable Renewable Energy Forecast

Importance of Numerical Weather Prediction in Variable Renewable Energy Forecast Importance of Numerical Weather Prediction in Variable Renewable Energy Forecast Dr. Abhijit Basu (Integrated Research & Action for Development) Arideep Halder (Thinkthrough Consulting Pvt. Ltd.) September

More information

Optimized Operation of a Micro-grid for Energy Resources

Optimized Operation of a Micro-grid for Energy Resources Preprints of the 19th World Congress The International Federation of Automatic Control Optimized Operation of a Micro-grid for Energy Resources Fernando Ornelas-Tellez Guillermo C. Zuñiga-Neria J. Jesus

More information

WASA Project Team. 13 March 2012, Cape Town, South Africa

WASA Project Team. 13 March 2012, Cape Town, South Africa Overview of Wind Atlas for South Africa (WASA) project WASA Project Team 13 March 2012, Cape Town, South Africa Outline The WASA Project Team The First Verified Numerical Wind Atlas for South Africa The

More information

Developing a Guide for Non-experts to Determine the Most Appropriate Use of Solar Energy Resource Information

Developing a Guide for Non-experts to Determine the Most Appropriate Use of Solar Energy Resource Information Developing a Guide for Non-experts to Determine the Most Appropriate Use of Solar Energy Resource Information Carsten Hoyer-Klick 1*, Jennifer McIntosh 2, Magda Moner-Girona 3, David Renné 4, Richard Perez

More information

Better Weather Data Equals Better Results: The Proof is in EE and DR!

Better Weather Data Equals Better Results: The Proof is in EE and DR! Better Weather Data Equals Better Results: The Proof is in EE and DR! www.weatherbughome.com Today s Speakers: Amena Ali SVP and General Manager WeatherBug Home Michael Siemann, PhD Senior Research Scientist

More information

Economic Operation of Power Systems

Economic Operation of Power Systems Economic Operation of Power Systems Section I: Economic Operation Of Power System Economic Distribution of Loads between the Units of a Plant Generating Limits Economic Sharing of Loads between Different

More information

AN INTERNATIONAL SOLAR IRRADIANCE DATA INGEST SYSTEM FOR FORECASTING SOLAR POWER AND AGRICULTURAL CROP YIELDS

AN INTERNATIONAL SOLAR IRRADIANCE DATA INGEST SYSTEM FOR FORECASTING SOLAR POWER AND AGRICULTURAL CROP YIELDS AN INTERNATIONAL SOLAR IRRADIANCE DATA INGEST SYSTEM FOR FORECASTING SOLAR POWER AND AGRICULTURAL CROP YIELDS James Hall JHTech PO Box 877 Divide, CO 80814 Email: jameshall@jhtech.com Jeffrey Hall JHTech

More information

Fault-tolerant Control of a Wind Turbine with a Squirrel-cage Induction Generator and Rotor Bar Defects

Fault-tolerant Control of a Wind Turbine with a Squirrel-cage Induction Generator and Rotor Bar Defects Fault-tolerant Control of a Wind Turbine with a Squirrel-cage Induction Generator and Rotor Bar Defects V. Lešić 1, M. Vašak 1, N. Perić 1, T. Wolbank 2 and G. Joksimović 3 vinko.lesic@fer.hr 1 University

More information

Energy saving in electromechanical equipment with power coefficient correction. Dimitris Al. Katsaprakakis Aeolian Land S.A.

Energy saving in electromechanical equipment with power coefficient correction. Dimitris Al. Katsaprakakis Aeolian Land S.A. Energy saving in electromechanical equipment with power coefficient correction Dimitris Al. Katsaprakakis Aeolian Land S.A. www.aiolikigi.gr Introduction Electricity production companies (utilities) provide

More information

Solar Resource Mapping in South Africa

Solar Resource Mapping in South Africa Solar Resource Mapping in South Africa Tom Fluri Stellenbosch, 27 March 2009 Outline The Sun and Solar Radiation Datasets for various technologies Tools for Solar Resource Mapping Maps for South Africa

More information

Week No. 6 Chapter Six: Power Factor Improvement

Week No. 6 Chapter Six: Power Factor Improvement Week No. 6 Chapter Six: Power Factor Improvement The electrical energy is almost wholly generated, transmitted and distributed in the form of alternating current. Therefore, the question of power factor

More information

Effect of Solar Radiation Control on Electricity Demand Costs an Addition to the DOE Cool Roof Calculator

Effect of Solar Radiation Control on Electricity Demand Costs an Addition to the DOE Cool Roof Calculator Final Version after Review. Published in the proceedings on CD and presented at Effect of Solar Radiation Control on Electricity Demand Costs an Addition to the DOE Cool Roof Calculator by Thomas W. Petrie,

More information

peak half-hourly Tasmania

peak half-hourly Tasmania Forecasting long-term peak half-hourly electricity demand for Tasmania Dr Shu Fan B.S., M.S., Ph.D. Professor Rob J Hyndman B.Sc. (Hons), Ph.D., A.Stat. Business & Economic Forecasting Unit Report for

More information

Northern Alberta Institute of Technology

Northern Alberta Institute of Technology Northern Alberta Institute of Technology Alternative Energy Program Solar Photovoltaic Reference Array Report March 31, 2016 Goals Provide solar energy system educators, installers and adopters with real

More information

peak half-hourly New South Wales

peak half-hourly New South Wales Forecasting long-term peak half-hourly electricity demand for New South Wales Dr Shu Fan B.S., M.S., Ph.D. Professor Rob J Hyndman B.Sc. (Hons), Ph.D., A.Stat. Business & Economic Forecasting Unit Report

More information

Representivity of wind measurements for design wind speed estimations

Representivity of wind measurements for design wind speed estimations Representivity of wind measurements for design wind speed estimations Adam Goliger 1, Andries Kruger 2 and Johan Retief 3 1 Built Environment, Council for Scientific and Industrial Research, South Africa.

More information

Basic information about developed Calculator for solar / wind hybrid power supply

Basic information about developed Calculator for solar / wind hybrid power supply Basic information about developed Calculator for solar / wind hybrid power supply It simulates behavior of the system for off grid power supply (components: solar panels, wind generator, batteries and

More information

Analysis of Wind Speed Data and Annual Energy Potential at Three locations in Iraq

Analysis of Wind Speed Data and Annual Energy Potential at Three locations in Iraq International Journal of Computer Applications (975 8887) Analysis of Wind Speed Data and Annual Energy Potential at Three locations in Iraq Ali M. Rasham University of Baghdad College of Engineering Energy

More information

Modeling Zero Energy Building with a Three- Level Fuzzy Cognitive Map

Modeling Zero Energy Building with a Three- Level Fuzzy Cognitive Map Modeling Zero Energy Building with a Three- Level Fuzzy Cognitive Map Eleni S. Vergini 1, Theodora-Eleni Ch. Kostoula 2, P. P. Groumpos 3 Abstract The concept of Zero Energy Buildings (ZEB) is briefly

More information

PROJECT ECONOMIC ANALYSIS

PROJECT ECONOMIC ANALYSIS Electricity Transmission Expansion and Supply Improvement Project (RRP NEP 41155) PROJECT ECONOMIC ANALYSIS A. Overview 1. The economic analysis undertaken for the Electricity Transmission and Supply Improvement

More information

P1 REVISION CHAPTER 1a Energy Tfr by Heating

P1 REVISION CHAPTER 1a Energy Tfr by Heating P1 REVISION CHAPTER 1a Energy Tfr by Heating Infrared Radiation What gives off infrared radiation? What is a vacuum? Surfaces & Radiation What surfaces are good absorbers of infrared radiation? What surfaces

More information

Design of experiments and empirical models for up to date burners design for process industries

Design of experiments and empirical models for up to date burners design for process industries Design of experiments and empirical models for up to date burners design for process industries Proceedings of European Congress of Chemical Engineering (ECCE-6) Copenhagen, 16-20 September 2007 Design

More information

MODELLING ENERGY DEMAND FORECASTING USING NEURAL NETWORKS WITH UNIVARIATE TIME SERIES

MODELLING ENERGY DEMAND FORECASTING USING NEURAL NETWORKS WITH UNIVARIATE TIME SERIES MODELLING ENERGY DEMAND FORECASTING USING NEURAL NETWORKS WITH UNIVARIATE TIME SERIES S. Cankurt 1, M. Yasin 2 1&2 Ishik University Erbil, Iraq 1 s.cankurt@ishik.edu.iq, 2 m.yasin@ishik.edu.iq doi:10.23918/iec2018.26

More information

WIND DATA REPORT FOR THE YAKUTAT JULY 2004 APRIL 2005

WIND DATA REPORT FOR THE YAKUTAT JULY 2004 APRIL 2005 WIND DATA REPORT FOR THE YAKUTAT JULY 2004 APRIL 2005 Prepared on July 12, 2005 For Bob Lynette 212 Jamestown Beach Lane Sequim WA 98382 By John Wade Wind Consultant LLC 2575 NE 32 nd Ave Portland OR 97212

More information

13 SHADOW FLICKER Introduction Methodology

13 SHADOW FLICKER Introduction Methodology Table of contents 13 SHADOW FLICKER... 13-1 13.1 Introduction... 13-1 13.2 Methodology... 13-1 13.2.1 Factors Influencing Shadow Flicker Occurrence... 13-2 13.2.2 Shadow Flicker Analysis Methodology...

More information

The Weather Information Value Chain

The Weather Information Value Chain The Weather Information Value Chain Jeffrey K. Lazo Societal Impacts Program National Center for Atmospheric Research Boulder CO April 27 2016 HIWeather Exeter, England Outline Shout out on WMO/USAID/World

More information

1.3 STATISTICAL WIND POWER FORECASTING FOR U.S. WIND FARMS

1.3 STATISTICAL WIND POWER FORECASTING FOR U.S. WIND FARMS 1.3 STATISTICAL WIND POWER FORECASTING FOR U.S. WIND FARMS Michael Milligan, Consultant * Marc Schwartz and Yih-Huei Wan National Renewable Energy Laboratory, Golden, Colorado ABSTRACT Electricity markets

More information

Preparing for your mock exams - AQA P1

Preparing for your mock exams - AQA P1 Name Topic title 1.1 Infrared radiation and surfaces Preparing for your mock exams - AQA P1 Know that all materials emit and absorb infrared radiation. Understand that the hotter an object is, the higher

More information

Application and verification of ECMWF products 2008

Application and verification of ECMWF products 2008 Application and verification of ECMWF products 2008 RHMS of Serbia 1. Summary of major highlights ECMWF products are operationally used in Hydrometeorological Service of Serbia from the beginning of 2003.

More information

Prashant Pant 1, Achal Garg 2 1,2 Engineer, Keppel Offshore and Marine Engineering India Pvt. Ltd, Mumbai. IJRASET 2013: All Rights are Reserved 356

Prashant Pant 1, Achal Garg 2 1,2 Engineer, Keppel Offshore and Marine Engineering India Pvt. Ltd, Mumbai. IJRASET 2013: All Rights are Reserved 356 Forecasting Of Short Term Wind Power Using ARIMA Method Prashant Pant 1, Achal Garg 2 1,2 Engineer, Keppel Offshore and Marine Engineering India Pvt. Ltd, Mumbai Abstract- Wind power, i.e., electrical

More information

Mass flow of steam through condenser m k, kg/s

Mass flow of steam through condenser m k, kg/s UTICAJ KLIMATSKE KRIVE NA RADNI REŽIM TURBINE U TEC "BITOLA INFLUENCE OF CLIMATIC CURVE VALUES ON THE OPERATING REGIME OF THE TURBINE AT TPP "BITOLA" V. Mijakovski*, K. Popovski* *Faculty of Technical

More information

Demand Forecasting Reporting Period: 19 st Jun th Sep 2017

Demand Forecasting Reporting Period: 19 st Jun th Sep 2017 N A T I O N A L G R I D P A G E 1 O F 21 C O M M E R C I A L, E L E C T R I C I T Y C O M M E R C I A L O P E R A T I O N S Demand Forecasting Reporting Period: 19 st Jun 2017 10 th Sep 2017 EXECUTIVE

More information

Application and verification of ECMWF products in Serbia

Application and verification of ECMWF products in Serbia Application and verification of ECMWF products in Serbia Hydrometeorological Service of Serbia 1. Summary of major highlights ECMWF products are operationally used in Hydrometeorological Service of Serbia

More information

2018 Annual Review of Availability Assessment Hours

2018 Annual Review of Availability Assessment Hours 2018 Annual Review of Availability Assessment Hours Amber Motley Manager, Short Term Forecasting Clyde Loutan Principal, Renewable Energy Integration Karl Meeusen Senior Advisor, Infrastructure & Regulatory

More information

Wind Atlas for South Africa (WASA)

Wind Atlas for South Africa (WASA) Wind Atlas for South Africa (WASA) Andre Otto (SANEDI), Jens Carsten Hansen (DTU Wind Energy) 7 November 2014 Outline Why Wind Resource Assessment Historical South African Wind Atlases Wind Atlas for South

More information

Customer-Meter Unit Cost of Electricity Customer-Meter Unit Cost of Electricity ($/kwh) = [Total Cost ($/yr) - Option Capacity Value ($/yr)]

Customer-Meter Unit Cost of Electricity Customer-Meter Unit Cost of Electricity ($/kwh) = [Total Cost ($/yr) - Option Capacity Value ($/yr)] Customer-Meter Unit Cost of Electricity Customer-Meter Unit Cost of Electricity ($/kwh) = [Total Cost ($/yr) - Option Capacity Value ($/yr)] Equivalent Capacity (MW)*1000*8760 Total Cost ($/yr) = Nominal

More information

UNITED KINGDOM FOREIGN AND COMMONWEALTH OFFICE, DRAGON CAPITAL GROUP

UNITED KINGDOM FOREIGN AND COMMONWEALTH OFFICE, DRAGON CAPITAL GROUP UNITED KINGDOM FOREIGN AND COMMONWEALTH OFFICE, DRAGON CAPITAL GROUP SOLAR OUTPUT AT PEAK TARIFF FOR DIFFERENT SLOPE AND ORIENTATION IN HOCHIMINH CITY ARTELIA Vietnam Ho Chi Minh City Office 6 Phung Khac

More information

Adaptive Control of Variable-Speed Variable-Pitch Wind Turbines Using RBF Neural Network

Adaptive Control of Variable-Speed Variable-Pitch Wind Turbines Using RBF Neural Network Schulich School of Engineering Department of Mechanical and Manufacturing Engineering Adaptive Control of Variable-Speed Variable-Pitch Wind Turbines Using RBF Neural Network By: Hamidreza Jafarnejadsani,

More information

Consideration of tip speed limitations in preliminary analysis of minimum COE wind turbines

Consideration of tip speed limitations in preliminary analysis of minimum COE wind turbines Journal of Physics: Conference Series OPEN ACCESS Consideration of tip speed limitations in preliminary analysis of minimum COE wind turbines To cite this article: A Cuerva-Tejero et al 2014 J. Phys.:

More information

Noadswood Science. Revision Cards. Science A (Core) Physics Basics.

Noadswood Science. Revision Cards. Science A (Core) Physics Basics. Noadswood Science Revision Cards Science A (Core) Physics Basics www.noadswoodscience.com How to use the revision cards It is suggested you cut the pack of cards out, so that there is a question on one

More information

Polyflex JB and Micro-V Belt Drive Selection Procedures

Polyflex JB and Micro-V Belt Drive Selection Procedures Polyflex JB and Micro-V Belt Drive Selection Procedures How to Design Polyflex JB and Micro-V Belt Drives Note: The upcoming drive selection and engineering sections provide information for Polyflex JB

More information

Mechanical Engineering for Renewable Energy Systems. Wind Turbines

Mechanical Engineering for Renewable Energy Systems. Wind Turbines ENGINEERING TRIPOS PART IB PAPER 8 - ELECTIVE (2) Mechanical Engineering for Renewable Energy Systems Wind Turbines Lecture 3: Aerodynamic fundamentals Hugh Hunt Fundamental fluid mechanics limits to energy

More information

ANALYSIS OF INFLUENCE OF PARAMETERS ON TRANSFER FUNCTIONS OF APERIODIC MECHANISMS UDC Života Živković, Miloš Milošević, Ivan Ivanov

ANALYSIS OF INFLUENCE OF PARAMETERS ON TRANSFER FUNCTIONS OF APERIODIC MECHANISMS UDC Života Živković, Miloš Milošević, Ivan Ivanov UNIVERSITY OF NIŠ The scientific journal FACTA UNIVERSITATIS Series: Mechanical Engineering Vol.1, N o 6, 1999 pp. 675-681 Editor of series: Nenad Radojković, e-mail: radojkovic@ni.ac.yu Address: Univerzitetski

More information

Incorporation of Asynchronous Generators as PQ Model in Load Flow Analysis for Power Systems with Wind Generation

Incorporation of Asynchronous Generators as PQ Model in Load Flow Analysis for Power Systems with Wind Generation Incorporation of Asynchronous Generators as PQ Model in Load Flow Analysis for Power Systems with Wind Generation James Ranjith Kumar. R, Member, IEEE, Amit Jain, Member, IEEE, Power Systems Division,

More information

Verification & Certification Report (August 2009) For Power Generation

Verification & Certification Report (August 2009) For Power Generation Verification & Certification Report (August 2009) For Power Generation With Reference To Power Generation Guarantee (Agreement between Gujarat Alkalies & Chemicals Ltd. and Suzlon Energy Ltd.) for 23.75MW

More information

Comparison of meteorological data from different sources for Bishkek city, Kyrgyzstan

Comparison of meteorological data from different sources for Bishkek city, Kyrgyzstan Comparison of meteorological data from different sources for Bishkek city, Kyrgyzstan Ruslan Botpaev¹*, Alaibek Obozov¹, Janybek Orozaliev², Christian Budig², Klaus Vajen², 1 Kyrgyz State Technical University,

More information

PHOTOVOLTAIC SOLAR ENERGY TRAINER DL SOLAR-D1 Manual

PHOTOVOLTAIC SOLAR ENERGY TRAINER DL SOLAR-D1 Manual PHOTOVOLTAIC SOLAR ENERGY TRAINER DL SOLAR-D1 Manual DL SOLAR-D1 Contents 1. Solar energy: our commitment 5 to the environment 1.1. Basic principles and concepts 6 Mechanical work, energy and power: 6

More information

New GCSE 4463/01 SCIENCE A FOUNDATION TIER PHYSICS 1

New GCSE 4463/01 SCIENCE A FOUNDATION TIER PHYSICS 1 Surname Other Names Centre Number 0 Candidate Number New GCSE 4463/01 SCIENCE A FOUNDATION TIER PHYSICS 1 P.M. THURSDAY, 17 January 2013 1 hour Question For s use Maximum Mark Mark Awarded 1. 2 2. 3 3.

More information

Thermodynamics I Spring 1432/1433H (2011/2012H) Saturday, Wednesday 8:00am - 10:00am & Monday 8:00am - 9:00am MEP 261 Class ZA

Thermodynamics I Spring 1432/1433H (2011/2012H) Saturday, Wednesday 8:00am - 10:00am & Monday 8:00am - 9:00am MEP 261 Class ZA Thermodynamics I Spring 1432/1433H (2011/2012H) Saturday, Wednesday 8:00am - 10:00am & Monday 8:00am - 9:00am MEP 261 Class ZA Dr. Walid A. Aissa Associate Professor, Mech. Engg. Dept. Faculty of Engineering

More information

SYNCHRONOUS GENERATOR s ROTOR INVESTIGATION OF A HYBRID POWER SYSTEM INCLUDING A.G.

SYNCHRONOUS GENERATOR s ROTOR INVESTIGATION OF A HYBRID POWER SYSTEM INCLUDING A.G. Proc. of the 5th WSEAS/IASME Int. Conf. on Electric Power Systems, High Voltages, Electric Machines, Tenerife, Spain, December 16-18, 25 (pp59-514) SYNCHRONOUS GENERATOR s ROTOR INVESTIGATION OF A HYBRID

More information

International Studies about the Grid Integration of Wind Generation

International Studies about the Grid Integration of Wind Generation International Studies about the Grid Integration of Wind Generation Dr.-Ing. Markus Pöller/DIgSILENT GmbH Internation Studies About Grid Integration of Wind Generation Grid Integration of Wind Generationin

More information

SHADOW FLICKER TURBINE LAYOUT 6A GULLEN RANGE WIND FARM GOLDWIND AUSTRALIA

SHADOW FLICKER TURBINE LAYOUT 6A GULLEN RANGE WIND FARM GOLDWIND AUSTRALIA SHADOW FLICKER TURBINE LAYOUT 6A GULLEN RANGE WIND FARM GOLDWIND AUSTRALIA Document Control Status Written by Approved by Date Comment Revision A T.Lam D.Bolton 14/03/14 Initial Revision B T.Lam D.Bolton

More information

APPENDIX 7.4 Capacity Value of Wind Resources

APPENDIX 7.4 Capacity Value of Wind Resources APPENDIX 7.4 Capacity Value of Wind Resources This page is intentionally left blank. Capacity Value of Wind Resources In analyzing wind resources, it is important to distinguish the difference between

More information

Activity 2.2: Recognizing Change (Observation vs. Inference)

Activity 2.2: Recognizing Change (Observation vs. Inference) Activity 2.2: Recognizing Change (Observation vs. Inference) Teacher Notes: Evidence for Climate Change PowerPoint Slide 1 Slide 2 Introduction Image 1 (Namib Desert, Namibia) The sun is on the horizon

More information

The World Bank. Kenya: Off-grid Solar Access Project for Underserved Counties (P160009) Key Dates. Project Development Objectives.

The World Bank. Kenya: Off-grid Solar Access Project for Underserved Counties (P160009) Key Dates. Project Development Objectives. Public Disclosure Authorized AFRICA Kenya Energy & Extractives Global Practice IBRD/IDA Investment Project Financing FY 2018 Seq No: 1 ARCHIVED on 24-Oct-2017 ISR29813 Implementing Agencies: Kenya Power

More information

wind power forecasts

wind power forecasts wind power forecasts the user friendly forecast studio about aiolos users Aiolos is Vitec s market-leading tool for effective management for all of your forecasts. With Aiolos it is possible to predict

More information

DNV GL s empirical icing map of Sweden and methodology for estimating annual icing losses