EFFICIENCY OF THE INTEGRATED RESERVOIR OPERATION FOR FLOOD CONTROL IN THE UPPER TONE RIVER OF JAPAN CONSIDERING SPATIAL DISTRIBUTION OF RAINFALL

Size: px
Start display at page:

Download "EFFICIENCY OF THE INTEGRATED RESERVOIR OPERATION FOR FLOOD CONTROL IN THE UPPER TONE RIVER OF JAPAN CONSIDERING SPATIAL DISTRIBUTION OF RAINFALL"

Transcription

1 EFFICIENCY OF THE INTEGRATED RESERVOIR OPERATION FOR FLOOD CONTROL IN THE UPPER TONE RIVER OF JAPAN CONSIDERING SPATIAL DISTRIBUTION OF RAINFALL Dawen YANG, Eik Chay LOW and Toshio KOIKE Department of Civil Engineering, University of Tokyo, Bunkyo-ku, Tokyo , Japan This paper presents a new methodology of flood control by utilizing the distributed hydrological model and advanced radar rainfall observation system. It explores the efficiency of integrated reservoir operation for flood control in the upper Tone River of Japan. According to two heavy rainfall events in August and September of 2001 observed by the weather radar, different spatial distribution patterns are assumed by reversing the direction in east-west and south-north. Considering the spatial pattern of rainfall, reduction of flood peak using an integrated reservoir operation is examined. The result shows that the efficiency of flood control is greatly related to the spatial pattern of rainfall and is limited by the capacities of reservoirs. INTRODUCTION The conversion of rainfall into surface runoff is traditionally analyzed by means of lumped models. These models assumed that rainfall and geographical conditions over a whole watershed is uniform and the conversion process is described by the familiar convolution integral and an instantaneous unit hydrograph for linear system. In practice, the rainfall and geographical conditions over a middle or large watershed are nonuniform, so errors can be caused if the lumped model is used to simulate the rainfallrunoff process. On the other hand, distributed hydrological models have the potential to account for the spatial variability of the catchment conditions and meteorological inputs, allowing better representations of the hydrological processes [1]. The distributed hydrological model examines geographical information such as land use, soil properties and topography to reflect the rainfall-runoff process more accurately. Also, studies have shown that by using radar rainfall with spatial distribution patterns, we were able to obtain better simulations of flood hydrographs as compared to those obtained using the catchment mean rainfall [2]. The Tone River basin usually suffers from heavy rainfall events as a result of rainy season frontal activity, typhoons and cumulus cloud activity associated with the local circulation. The reservoirs located in the upper basin play an important role in flood regulation. During a flood period, reservoirs are operated manually and individually. The reservoir release is determined according to the present water level of the reservoir and the inflow discharge, which is called the reservoir operation rule. Each reservoir has its 1

2 operational rule, independent of the others. For the efficient control of flood it needs an integrated operation of reservoirs which considers the spatial distribution of rainfall. By utilizing weather radar measurement and a coupled distributed hydrological model with reservoir operation, the present research explores the efficiency of integrated reservoir operation for flood control in the upper Tone River of Japan. STUDY AREA The Tone River is located in the Northeast of Tokyo, Japan. The Okutone basin, which has been selected as the study area, is located in the high steep mountainous region of the upper Tone River (Fig. 1). The elevation varies from about 300 m to 2600 m. The longterm mean precipitation in this region is about 1500 mm per year. 2 Code in Fig. 1 Figure 1. Study area Table 1. Characteristics of reservoirs located in the Okutone basin Name Complete Drainage area Crest depth year (km 2 ) (m) 1 Yagisawa Naramata Fujiwara Aimata Sonohara Total capacity ( 10 6 m 3 ) This region usually experiences heavy snowfall during the winter (December to February) and suffers from several typhoons during the late summer (August and September). Snowmelt runoff is the major water resource used for supplying Tokyo, however Tokyo s high flood risk is a result of typhoons. The catchment area of the

3 Okutone basin is 1700 km2 at the Iwamoto gauge point. There are five reservoirs located in this basin (see Fig. 1) which play an important role in flood regulation for protecting the Lower Kanto plain. Table 1 shows the main characteristics of the five reservoirs. METHODOLOGY The Hydrological Model For easy use of spatially distributed rainfall, a grid-based distributed hydrological model is used in this study, which is modified from the geomorphology-based hydrological model (GBHM) [3]. A digital elevation model (DEM) is used to define the target basin. The target basin is divided into sub-catchments of an appropriate size. 3 Figure 2. Concept of the distributed hydrological model

4 The locations of dams are defined in the river network. Each sub-catchment is divided into a discrete grid system, and a grid is represented by a number of geometrically-symmetrical hillslopes (see Fig. 2). The components of the hydrological model include the data input, the hydrological simulation and the resulting output. The hydrological simulation part includes runoff generation from the hillslope and the flow routing in the river network. The reservoir operation is coupled with the river flow routing [3]. Reservoir Routing Reservoir is an effective tool in flood control because of its large storage capacity. Basically, a reservoir is formed when a river is dammed. Depth and velocity change quickly with time during a flood, and therefore when the water travels downstream, we must solve this as an unsteady flow problem. In simplest terms, neglecting any lateral flow, the continuity equation for unsteady reservoir can be written as dv = I Q (1) dt where V is the volume of water, I is inflow and O is outflow. Typically, to solve this kind of equation, a numerical method is used. That is, to rewrite the equation in terms of finite differences. The equation then becomes Vn+ 1 Vn I n + I n+ 1 Qn + Qn+ 1 = (2) t Figure 3. Flowchart for determining reservoir release

5 At the initial time step (n=1), volume and outflow must be specified. In addition to these initial conditions, inflow is known from the hydrological simulation. Rearranging the equation, we get I n + I n+ 1 Vn+ 1 = Vn + Qn t (3) 2 where the lower index n indicates the current time level, n+1 indicates the next time level, and t is the time interval. The reservoir release Q n+ 1 for the next time step is then determined according to the operational rule and considering the inflows and the situations of all reservoirs and the downstream condition simultaneously. Figure 3 shows the flowchart for the integrated reservoir operation. Rainfall Data The gauge data are available from the AMeDAS (Automated Meteorological Data Acquisition System) provided by the Japanese Meteorological Agency (JMA), from the Ministry of Land, Infrastructure and Transportation (MLIT) and from the Japan Water Agency. These data sources are available at 1-hr resolution. A few of the AMeDAS gauges measure four parameters including precipitation, temperature, wind speed and sunshine duration. The availability of meteorological gauges in the Okutone basin is shown in Fig. 1. Thiessen polygons are used for estimating the distribution of rainfall from point measurements. The rainfall interpreted from the radar measurement used in this study is obtained from the Foundation of Rivers & Basin Integrated Communications (FRICS) of Japan. This data is available in 5-min temporal and 1-km spatial resolutions from According to the availability of precipitations from both gauge and radar measurements, two flood events on August 22 nd and September 11 th of the 2001 are selected for this study. Based on the observed rainfall events, different spatial patterns of the rainfall are assumed by changing the direction in east-west and south-north. MODEL APPLICATION, RESULTS AND DISCUSSION In this application, there are two main tasks: (1) to test the effect of rainfall spatial distribution on the flood forecasting, (2) to validate efficiency of the integrated reservoir operation for flood control. Effect of Rainfall Spatial Distribution on Flood Forecasting For the first task, simulations of inflows to four reservoirs in the uppermost stream, i.e., the Yagisawa, Naramata, Aimata and Sonohara, are examined. Figure 4 (a)-(d) compares the simulated results using both gauge and radar rainfall inputs. In the Yagisawa subcatchment, hydrograph simulated using gauge rainfall is better than the hydrograph simulated using radar rainfall. But in the other three sub-catchments, hydrographs simulated using radar rainfall are better than ones simulated using gauge rainfall. Above 5

6 each hydrograph, the spatially-averaged rainfall is illustrated. The general patterns of rainfall are similar between gauge and radar data, but the differences between their simulated hydrographs are much larger. There are no rain gauges located inside the drainage basin of the Aimata dam, and the nearest gauge is very far from the center of this sub-basin. In the drainage basin of the Sonohara dam, there are three rain gauges, but they are too close to each other and are concentrated in the middle of this basin. For the Aimata and Sonohara sub-basins, the simulated flood peaks from gauge rainfall are about two times higher than the observed. Due to their sparse distributions and locations in valleys, the spatial representativeness of rain gauges is poor, and the situation becomes worse in the case of a moving rainfall field during a typhoon. In contrast, radars are able to measure the spatial patterns of rainfall better than rain gauges. From the above results, it is can be seen that the spatial variability of rainfall is important for flood simulation. The accuracy of flood simulations can be greatly improved by utilizing radar measurements. However, the present algorithm for rainfall interpretation from radar measurements should also be improved for better estimates of rainfall values. As shown in Fig. 4(a), radar rainfall doesn t display a second peak as shown by the actual hydrograph. This might have been caused by a mountain effect on the radar signal. Efficiency of the Integrated Reservoir Operation for Flood Control The efficiency of flood control was investigated by operating the reservoirs as an integrated system. The period of examination runs from 1 st August to 30 th September 2001, focusing mainly on two floods occurring on August 21 st -25 th and September 9 th - 14 th. Based on the two rainfall events, different spatial distributions of rainfalls were made using a west-east reversion and a south-north reversion. Totally 6 cases were examined in the present study (see Table 2). Using radar measured rainfall from the 21 st to 25 th August 2001 as the input, the integrated reservoir operation was carried out for reducing the peak discharge at the Iwamoto gauge. As a result, flood peak at the Iwamoto gauge was reduced from 1,860 m 3 / sto 1,600 m 3 / s, a reduction of 260 m 3 / s(or 14.0%). By the same way, reductions of peak floods were examined using the integrated reservoir operation manually for other five cases. The results are then complied into Table 2. Table 2 shows that the peak discharge can be reduced by 6-18% when the integrated operations were carried out for the six cases. However, by the present study, it is difficult to conclude that the peak discharge can be reduced only by 6-18%. This is because the reduction of peak discharge is strongly affected by the flood control capacity of the reservoirs and the spatial patterns of rainfall. For example, when substantial rain fell mainly over the drainage areas of the Sonohara dam (such as the case-4 and case-6), being small in flood storage capacity, it had no choice but to engage in early release to maintain the dam safety. This means that the peak reduction percentage is small. On the other hand, when the heavy rainfall field was over the drainage areas of the Fujiwara dam, the Fujiwara reservoir was able to make full use of its large capacity in holding back the 6

7 release and hence made good contributions to a big peak reduction percentage (such as the case-1 and case-5). Table 2. Efficiency of the integrated reservoir operation Case 21 st -25 th August th -14 th September 2001 Case-2: Case-3: Case-5: Case-6: Case-1: Case-4: E-W N-S E-W N-S Original Rev. * Original Rev. Rev. Rev. Individual operation 1,860 3,330 3,500 1,555 1,740 1,900 ( m 3 / s) Integrated operation 1,600 3,070 3,075 1,450 1,430 1,780 ( m 3 / s) Peak reduction ( m 3 / s) Peak reduction 14.0% 8.5% 12.1% 7.4% 17.8% 6.3% * Rev.: reversion CONCLUSION A coupled distributed hydrological model with reservoir operation has been developed and applied to the Okutone basin for investigating its efficiency for flood control together with weather radar measurements. Comparing the gauge and radar rainfall on August 22, 2001 and their simulated flood hydrographs, radar measurements captured better the spatial pattern than the rain gauges, and greatly improved the accuracy of simulations of the inflows into the reservoirs. Simultaneously, the coupled model successfully simulated releases from the reservoirs in terms of the independent operational rule used in normal flood regulation. On efficient flood control in the Okutone basin, an integrated reservoir operation was carried out manually. The coupled distributed hydrological mode with reservoir operation provided the forecast of inflows and the situations of all reservoirs and the downstream condition simultaneously. The results showed that the peak discharge could be reduced by 6-18% when the integrated operations were carried out for the case studies. And the efficiency of flood control was greatly related to the spatial pattern of rainfall and was limited by the capacities of reservoirs. This research showed the advantages of using a distributed hydrological and radar measurements in practical applications of flood management. 7

8 Figure 4. Comparison of inflow simulations using different rainfall data 8

9 9 Figure 4. Comparison of inflow simulations using different rainfall data (Continued) ACKNOWLEDGEMENT The authors would like to thank the Tonegawa Integrated Dam and Reservoir Group Management Office for providing the radar precipitation data required for this study. REFERENCES [1] Yang D., S. Herath, K. Musiake (2002). Hillslope-based hydrological model using catchment area and width functions. Hydrological Sciences Journal 47(1): [2] Yang D, T. Koike, H. Tanizawa (2003). Effect of precipitation spatial distribution on the hydrological response in the upper Tone River of Japan. IAHS publication, no. 282, [3] Yang, D., T. Oki, S. Herath, and K. Musiake (2002). A Geomorphology-Based Hydrological Model and Its Applications. In V.P. Singh & D.K. Frevert (ed.) Mathematical Models of Small Watershed Hydrology and Applications, Water Resources Publications, Littleton, Colorado. Chapter 9,

Advanced /Surface Hydrology Dr. Jagadish Torlapati Fall 2017 MODULE 2 - ROUTING METHODS

Advanced /Surface Hydrology Dr. Jagadish Torlapati Fall 2017 MODULE 2 - ROUTING METHODS Routing MODULE - ROUTING METHODS Routing is the process of find the distribution of flow rate and depth in space and time along a river or storm sewer. Routing is also called Flow routing or flood routing.

More information

A distributed runoff model for flood prediction in ungauged basins

A distributed runoff model for flood prediction in ungauged basins Predictions in Ungauged Basins: PUB Kick-off (Proceedings of the PUB Kick-off meeting held in Brasilia, 2 22 November 22). IAHS Publ. 39, 27. 267 A distributed runoff model for flood prediction in ungauged

More information

1. Evaluation of Flow Regime in the Upper Reaches of Streams Using the Stochastic Flow Duration Curve

1. Evaluation of Flow Regime in the Upper Reaches of Streams Using the Stochastic Flow Duration Curve 1. Evaluation of Flow Regime in the Upper Reaches of Streams Using the Stochastic Flow Duration Curve Hironobu SUGIYAMA 1 ABSTRACT A stochastic estimation of drought evaluation in the upper reaches of

More information

Study 16.5 Probable Maximum Flood (PMF)

Study 16.5 Probable Maximum Flood (PMF) Initial Study Report Meeting Study 16.5 Probable Maximum Flood (PMF) March 30, 2016 Prepared by 3/30/2016 1 Study 16.5 Status ISR documents (ISR Part D Overview): Status: Initial Study Report: Parts A,

More information

Study 16.5 Probable Maximum Flood (PMF)

Study 16.5 Probable Maximum Flood (PMF) Initial Study Report Meeting Study 16.5 Probable Maximum Flood (PMF) October 22, 2014 Prepared by 10/22/2014 1 Study 16.5 Objectives Develop a site-specific PMP to be used for the derivation of the PMF

More information

The Importance of Snowmelt Runoff Modeling for Sustainable Development and Disaster Prevention

The Importance of Snowmelt Runoff Modeling for Sustainable Development and Disaster Prevention The Importance of Snowmelt Runoff Modeling for Sustainable Development and Disaster Prevention Muzafar Malikov Space Research Centre Academy of Sciences Republic of Uzbekistan Water H 2 O Gas - Water Vapor

More information

Hydrologic Forecast Centre Manitoba Infrastructure, Winnipeg, Manitoba. FEBRUARY OUTLOOK REPORT FOR MANITOBA February 23, 2018

Hydrologic Forecast Centre Manitoba Infrastructure, Winnipeg, Manitoba. FEBRUARY OUTLOOK REPORT FOR MANITOBA February 23, 2018 Page 1 of 17 Hydrologic Forecast Centre Manitoba Infrastructure, Winnipeg, Manitoba FEBRUARY OUTLOOK REPORT FOR MANITOBA February 23, 2018 Overview The February Outlook Report prepared by the Hydrologic

More information

THE DEVELOPMENT OF RAIN-BASED URBAN FLOOD FORECASTING METHOD FOR RIVER MANAGEMENT PRACTICE USING X-MP RADAR OBSERVATION

THE DEVELOPMENT OF RAIN-BASED URBAN FLOOD FORECASTING METHOD FOR RIVER MANAGEMENT PRACTICE USING X-MP RADAR OBSERVATION Research Paper Advances in River Engineering, JSCE, Vol.19, 2013,June THE DEVELOPMENT OF RAIN-BASED URBAN FLOOD FORECASTING METHOD FOR RIVER MANAGEMENT PRACTICE USING X-MP RADAR OBSERVATION Seongsim YOON

More information

7 Flood Prediction in Japan and the Need for Guidelines for Flood Runoff Modelling

7 Flood Prediction in Japan and the Need for Guidelines for Flood Runoff Modelling 7 Flood Prediction in Japan and the Need for Guidelines for Flood Runoff Modelling YASUTO TACHIKAWA, ROSHAN K. SHRESTHA & TAKAHIRO SAYAMA FLOOD DISASTER AND FLOOD RUNOFF MODELLING IN JAPAN About 5% of

More information

ESTIMATING SNOWMELT CONTRIBUTION FROM THE GANGOTRI GLACIER CATCHMENT INTO THE BHAGIRATHI RIVER, INDIA ABSTRACT INTRODUCTION

ESTIMATING SNOWMELT CONTRIBUTION FROM THE GANGOTRI GLACIER CATCHMENT INTO THE BHAGIRATHI RIVER, INDIA ABSTRACT INTRODUCTION ESTIMATING SNOWMELT CONTRIBUTION FROM THE GANGOTRI GLACIER CATCHMENT INTO THE BHAGIRATHI RIVER, INDIA Rodney M. Chai 1, Leigh A. Stearns 2, C. J. van der Veen 1 ABSTRACT The Bhagirathi River emerges from

More information

8 Current Issues and Research on Sediment Movement in the River Catchments of Japan

8 Current Issues and Research on Sediment Movement in the River Catchments of Japan 8 Current Issues and Research on Sediment Movement in the River Catchments of Japan YUTAKA ICHIKAWA INTRODUCTION Prediction of sediment movement is one of the challenging tasks in water-related research.

More information

HISTORY OF HEAVY RAINFALL DISASTER INFORMATION IN JAPAN

HISTORY OF HEAVY RAINFALL DISASTER INFORMATION IN JAPAN transmission, for a state-of-the-art review. In addition, issues expected to arise in the future are discussed. HISTORY OF HEAVY RAINFALL DISASTER INFORMATION IN JAPAN Progress of Rainfall Observation

More information

Near Real-Time Runoff Estimation Using Spatially Distributed Radar Rainfall Data. Jennifer Hadley 22 April 2003

Near Real-Time Runoff Estimation Using Spatially Distributed Radar Rainfall Data. Jennifer Hadley 22 April 2003 Near Real-Time Runoff Estimation Using Spatially Distributed Radar Rainfall Data Jennifer Hadley 22 April 2003 Introduction Water availability has become a major issue in Texas in the last several years,

More information

Floodplain modeling. Ovidius University of Constanta (P4) Romania & Technological Educational Institute of Serres, Greece

Floodplain modeling. Ovidius University of Constanta (P4) Romania & Technological Educational Institute of Serres, Greece Floodplain modeling Ovidius University of Constanta (P4) Romania & Technological Educational Institute of Serres, Greece Scientific Staff: Dr Carmen Maftei, Professor, Civil Engineering Dept. Dr Konstantinos

More information

Inflow forecasting for lakes using Artificial Neural Networks

Inflow forecasting for lakes using Artificial Neural Networks Flood Recovery Innovation and Response III 143 Inflow forecasting for lakes using Artificial Neural Networks R. K. Suryawanshi 1, S. S. Gedam 1 & R. N. Sankhua 2 1 CSRE, IIT Bombay, Mumbai, India 2 National

More information

Uncertainty in the SWAT Model Simulations due to Different Spatial Resolution of Gridded Precipitation Data

Uncertainty in the SWAT Model Simulations due to Different Spatial Resolution of Gridded Precipitation Data Uncertainty in the SWAT Model Simulations due to Different Spatial Resolution of Gridded Precipitation Data Vamsi Krishna Vema 1, Jobin Thomas 2, Jayaprathiga Mahalingam 1, P. Athira 4, Cicily Kurian 1,

More information

EFFECTIVE DAM OPERATION METHOD BASED ON INFLOW FORECASTING FOR SENANAYAKA SAMUDRA RESERVOIR, SRI LANKA

EFFECTIVE DAM OPERATION METHOD BASED ON INFLOW FORECASTING FOR SENANAYAKA SAMUDRA RESERVOIR, SRI LANKA EFFECTIVE DAM OPERATION METHOD BASED ON INFLOW FORECASTING FOR SENANAYAKA SAMUDRA RESERVOIR, SRI LANKA Muthubanda Appuhamige Sanath Susila GUNASENA (MEE13632) Supervisors: Dr. Mamoru Miyamoto, Dr. Duminda

More information

9. PROBABLE MAXIMUM PRECIPITATION AND PROBABLE MAXIMUM FLOOD

9. PROBABLE MAXIMUM PRECIPITATION AND PROBABLE MAXIMUM FLOOD 9. PROBABLE MAXIMUM PRECIPITATION AND PROBABLE MAXIMUM FLOOD 9.1. Introduction Due to the size of Watana Dam and the economic importance of the Project to the Railbelt, the Probable Maximum Flood (PMF)

More information

ENGINEERING HYDROLOGY

ENGINEERING HYDROLOGY ENGINEERING HYDROLOGY Prof. Rajesh Bhagat Asst. Professor Civil Engineering Department Yeshwantrao Chavan College Of Engineering Nagpur B. E. (Civil Engg.) M. Tech. (Enviro. Engg.) GCOE, Amravati VNIT,

More information

Hydrologic Forecast Centre Manitoba Infrastructure, Winnipeg, Manitoba. MARCH OUTLOOK REPORT FOR MANITOBA March 23, 2018

Hydrologic Forecast Centre Manitoba Infrastructure, Winnipeg, Manitoba. MARCH OUTLOOK REPORT FOR MANITOBA March 23, 2018 Page 1 of 21 Hydrologic Forecast Centre Manitoba Infrastructure, Winnipeg, Manitoba MARCH OUTLOOK REPORT FOR MANITOBA March 23, 2018 Overview The March Outlook Report prepared by the Hydrologic Forecast

More information

Workshop: Build a Basic HEC-HMS Model from Scratch

Workshop: Build a Basic HEC-HMS Model from Scratch Workshop: Build a Basic HEC-HMS Model from Scratch This workshop is designed to help new users of HEC-HMS learn how to apply the software. Not all the capabilities in HEC-HMS are demonstrated in the workshop

More information

Striving Sufficient Lead Time of Flood Forecasts via Integrated Hydro-meteorological Intelligence

Striving Sufficient Lead Time of Flood Forecasts via Integrated Hydro-meteorological Intelligence Striving Sufficient Lead Time of Flood Forecasts via Integrated Hydro-meteorological Intelligence Dong-Sin Shih Assistant Professor, National Chung Hsing University, Taiwan, Sep. 6, 2013 Outlines Introductions

More information

Flash Flood Guidance System On-going Enhancements

Flash Flood Guidance System On-going Enhancements Flash Flood Guidance System On-going Enhancements Hydrologic Research Center, USA Technical Developer SAOFFG Steering Committee Meeting 1 10-12 July 2017 Jakarta, INDONESIA Theresa M. Modrick Hansen, PhD

More information

Solution: The ratio of normal rainfall at station A to normal rainfall at station i or NR A /NR i has been calculated and is given in table below.

Solution: The ratio of normal rainfall at station A to normal rainfall at station i or NR A /NR i has been calculated and is given in table below. 3.6 ESTIMATION OF MISSING DATA Data for the period of missing rainfall data could be filled using estimation technique. The length of period up to which the data could be filled is dependent on individual

More information

Decision support for dam release during floods using a distributed biosphere hydrological model driven by quantitative precipitation forecasts

Decision support for dam release during floods using a distributed biosphere hydrological model driven by quantitative precipitation forecasts WATER RESOURCES RESEARCH, VOL. 46,, doi:10.1029/2010wr009502, 2010 Decision support for dam release during floods using a distributed biosphere hydrological model driven by quantitative precipitation forecasts

More information

Tarbela Dam in Pakistan. Case study of reservoir sedimentation

Tarbela Dam in Pakistan. Case study of reservoir sedimentation Tarbela Dam in Pakistan. HR Wallingford, Wallingford, UK Published in the proceedings of River Flow 2012, 5-7 September 2012 Abstract Reservoir sedimentation is a main concern in the Tarbela reservoir

More information

PRELIMINARY DRAFT FOR DISCUSSION PURPOSES

PRELIMINARY DRAFT FOR DISCUSSION PURPOSES Memorandum To: David Thompson From: John Haapala CC: Dan McDonald Bob Montgomery Date: February 24, 2003 File #: 1003551 Re: Lake Wenatchee Historic Water Levels, Operation Model, and Flood Operation This

More information

Pompton Lakes Dam Downstream Effects of the Floodgate Facility. Joseph Ruggeri Brian Cahill Michael Mak Andy Bonner

Pompton Lakes Dam Downstream Effects of the Floodgate Facility. Joseph Ruggeri Brian Cahill Michael Mak Andy Bonner Pompton Lakes Dam Downstream Effects of the Joseph Ruggeri Brian Cahill Michael Mak Andy Bonner ASFPM 2013: Overview Page 2 Overview Page 3 Overview Page 4 Overview Page 5 Overview - Historical Pompton

More information

SNOW AND GLACIER HYDROLOGY

SNOW AND GLACIER HYDROLOGY SNOW AND GLACIER HYDROLOGY by PRATAP SINGH National Institute of Hydrology, Roorkee, India and VIJAY P. SINGH Department of Civil and Environmental Engineering, Louisiana State University, Baton Rouge,

More information

STUDY ON THE PRECISION OF 1-MINUTE X-BAND MP RADAR RAINFALL DATA IN A SMALL URBAN WATERSHED

STUDY ON THE PRECISION OF 1-MINUTE X-BAND MP RADAR RAINFALL DATA IN A SMALL URBAN WATERSHED Y. Yonese, et al., Int. J. Sus. Dev. Plann. Vol. 13, No. 4 (2018) 614 625 STUDY ON THE PRECISION OF 1-MINUTE X-BAND MP RADAR RAINFALL DATA IN A SMALL URBAN WATERSHED YOSHITOMO YONESE 1, AKIRA KAWAMURA

More information

9. Flood Routing. chapter Two

9. Flood Routing. chapter Two 9. Flood Routing Flow routing is a mathematical procedure for predicting the changing magnitude, speed, and shape of a flood wave as a function of time at one or more points along a watercourse (waterway

More information

Simulating hydrological processes in a sub-basin of the Mekong using GBHM and RS data

Simulating hydrological processes in a sub-basin of the Mekong using GBHM and RS data Remote Sensing and GIS for Hydrology and Water Resources (IAHS Publ. 368, 2015) (Proceedings RSHS14 and ICGRHWE14, Guangzhou, China, August 2014). 221 Simulating hydrological processes in a sub-basin of

More information

River Water Circulation Model on the Natural Environment

River Water Circulation Model on the Natural Environment River Water Circulation Model on the Natural Environment Yoshirou Takanashi, Haruna Sakagami, Yuta Taki, Minetada Osano, Computer Science, University of Aizu Tsuruga, Ikki-machi, Aizu-Wakamatsu City, Fukushima,

More information

SUB CATCHMENT AREA DELINEATION BY POUR POINT IN BATU PAHAT DISTRICT

SUB CATCHMENT AREA DELINEATION BY POUR POINT IN BATU PAHAT DISTRICT SUB CATCHMENT AREA DELINEATION BY POUR POINT IN BATU PAHAT DISTRICT Saifullizan Mohd Bukari, Tan Lai Wai &Mustaffa Anjang Ahmad Faculty of Civil Engineering & Environmental University Tun Hussein Onn Malaysia

More information

CARFFG System Development and Theoretical Background

CARFFG System Development and Theoretical Background CARFFG Steering Committee Meeting 15 SEPTEMBER 2015 Astana, KAZAKHSTAN CARFFG System Development and Theoretical Background Theresa M. Modrick, PhD Hydrologic Research Center Key Technical Components -

More information

A real-time flood forecasting system based on GIS and DEM

A real-time flood forecasting system based on GIS and DEM Remote Sensing and Hydrology 2000 (Proceedings of a symposium held at Santa Fe, New Mexico, USA, April 2000). IAHS Publ. no. 267, 2001. 439 A real-time flood forecasting system based on GIS and DEM SANDRA

More information

Watershed Processes and Modeling

Watershed Processes and Modeling Watershed Processes and Modeling Pierre Y. Julien Hyeonsik Kim Department of Civil Engineering Colorado State University Fort Collins, Colorado Kuala Lumpur - May Objectives Brief overview of Watershed

More information

Folsom Dam Water Control Manual Update

Folsom Dam Water Control Manual Update Folsom Dam Water Control Manual Update Public Workshop April 3, 2014 Location: Sterling Hotel Ballroom 1300 H Street, Sacramento US Army Corps of Engineers BUILDING STRONG WELCOME & INTRODUCTIONS 2 BUILDING

More information

2015 Fall Conditions Report

2015 Fall Conditions Report 2015 Fall Conditions Report Prepared by: Hydrologic Forecast Centre Date: December 21 st, 2015 Table of Contents Table of Figures... ii EXECUTIVE SUMMARY... 1 BACKGROUND... 2 SUMMER AND FALL PRECIPITATION...

More information

2016 Fall Conditions Report

2016 Fall Conditions Report 2016 Fall Conditions Report Prepared by: Hydrologic Forecast Centre Date: December 13, 2016 Table of Contents TABLE OF FIGURES... ii EXECUTIVE SUMMARY... 1 BACKGROUND... 5 SUMMER AND FALL PRECIPITATION...

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.

More information

Flood Inundation Mapping under different climate change scenarios in the upper Indus River Basin, Pakistan

Flood Inundation Mapping under different climate change scenarios in the upper Indus River Basin, Pakistan Flood Inundation Mapping under different climate change scenarios in the upper Indus River Basin, Pakistan Sohaib Baig (doctoral student) 16 November 2017 Disaster Prevention Research Institute 1 Kyoto

More information

TRANSBOUNDARY FLOOD FORECASTING THROUGH DOWNSCALING OF GLOBAL WEATHER FORECASTING AND RRI MODEL SIMULATION

TRANSBOUNDARY FLOOD FORECASTING THROUGH DOWNSCALING OF GLOBAL WEATHER FORECASTING AND RRI MODEL SIMULATION TRANSBOUNDARY FLOOD FORECASTING THROUGH DOWNSCALING OF GLOBAL WEATHER FORECASTING AND RRI MODEL SIMULATION Rashid Bilal 1 Supervisor: Tomoki Ushiyama 2 MEE15624 ABSTRACT The study comprise of a transboundary

More information

Table 1 PRISM/OB1 data summary in this study. PI400-2 Table 2 PRISM/OB1 data summary in this study. 2'#7-#/ :> 8>?= B-/"# 899:;98;<= :> 8A89

Table 1 PRISM/OB1 data summary in this study. PI400-2 Table 2 PRISM/OB1 data summary in this study. 2'#7-#/ :> 8>?= B-/# 899:;98;<= :> 8A89 PI400-1 EVALUATION ANALYSIS FOR DIGITAL TERRAIN MODELS GENERATED FROM ALOS/PRISM -OB2 DATA PI No. 400 Tomohito Asaka (PI) 1, Yoshiyuki Yamamoto (CI) 2 1 Nihon University, Izumi 1-2-1, Narashino Chiba,

More information

Impact assessment on disasters

Impact assessment on disasters The 5th International Coordination Group (ICG) Meeting GEOSS Asian Water Cycle Initiative (AWCI), Dec. 16, 2009. Impact assessment on disasters Eiichi Nakakita Disaster Prevention Research Institute Kyoto

More information

Watershed simulation and forecasting system with a GIS-oriented user interface

Watershed simulation and forecasting system with a GIS-oriented user interface HydroGIS 96: Application of Geographic Information Systems in Hydrology and Water Resources Management (Proceedings of the Vienna Conference, April 1996). IAHS Publ. no. 235, 1996. 493 Watershed simulation

More information

Modelling snow accumulation and snow melt in a continuous hydrological model for real-time flood forecasting

Modelling snow accumulation and snow melt in a continuous hydrological model for real-time flood forecasting IOP Conference Series: Earth and Environmental Science Modelling snow accumulation and snow melt in a continuous hydrological model for real-time flood forecasting To cite this article: Ph Stanzel et al

More information

Haiti and Dominican Republic Flash Flood Initial Planning Meeting

Haiti and Dominican Republic Flash Flood Initial Planning Meeting Dr Rochelle Graham Climate Scientist Haiti and Dominican Republic Flash Flood Initial Planning Meeting September 7 th to 9 th, 2016 Hydrologic Research Center http://www.hrcwater.org Haiti and Dominican

More information

Influence of the timing of flood events on sediment yield in the north-western Algeria

Influence of the timing of flood events on sediment yield in the north-western Algeria Calabria, 5-7 Septembre 2 4th International Workshop on Hydrological Extremes Session A : Modelling and forecast of hydrological extreme event Influence of the timing of flood events on sediment yield

More information

NOTES AND CORRESPONDENCE. Relationship between Orographic Enhancement of Rainfall Rate and Movement Speed of Radar Echoes: Case Study of Typhoon 0709

NOTES AND CORRESPONDENCE. Relationship between Orographic Enhancement of Rainfall Rate and Movement Speed of Radar Echoes: Case Study of Typhoon 0709 Journal of the Meteorological Society of Japan, Vol. 88, No. 6, pp. 931--936, 2010. 931 DOI:10.2151/jmsj.2010-605 NOTES AND CORRESPONDENCE Relationship between Orographic Enhancement of Rainfall Rate and

More information

Oregon Water Conditions Report May 1, 2017

Oregon Water Conditions Report May 1, 2017 Oregon Water Conditions Report May 1, 2017 Mountain snowpack in the higher elevations has continued to increase over the last two weeks. Statewide, most low and mid elevation snow has melted so the basin

More information

Souris River Basin Spring Runoff Outlook As of March 15, 2018

Souris River Basin Spring Runoff Outlook As of March 15, 2018 Souris River Basin Spring Runoff Outlook As of March 15, 2018 Prepared by: Flow Forecasting & Operations Planning Water Security Agency Basin Conditions Summer rainfall in 2017 in the Saskatchewan portion

More information

INTRODUCTION TO HEC-HMS

INTRODUCTION TO HEC-HMS INTRODUCTION TO HEC-HMS Hydrologic Engineering Center- Hydrologic Modeling System US Army Corps of Engineers Hydrologic Engineering Center HEC-HMS Uses Schematics Enter properties: watershed, rivers (reaches),

More information

3.0 TECHNICAL FEASIBILITY

3.0 TECHNICAL FEASIBILITY 3.0 TECHNICAL FEASIBILITY 3.1 INTRODUCTION To enable seasonal storage and release of water from Lake Wenatchee, an impoundment structure would need to be constructed on the lake outlet channel. The structure

More information

A GIS-based Subcatchments Division Approach for SWMM

A GIS-based Subcatchments Division Approach for SWMM Send Orders for Reprints to reprints@benthamscience.ae The Open Civil Engineering Journal, 2015, 9, 515-521 515 A GIS-based Subcatchments Division Approach for SWMM Open Access Shen Ji and Zhang Qiuwen

More information

Integrating Hydrologic and Storm Surge Models for Improved Flood Warning

Integrating Hydrologic and Storm Surge Models for Improved Flood Warning Integ Hydrologic and Storm Surge Models for Improved Flood Warning Leahy, C.P, Entel, M, Sooriyakumaran, S, and Warren, G Flood Warning Program Office, Bureau of Meteorology, Docklands, Victoria National

More information

Hydrological modeling and flood simulation of the Fuji River basin in Japan

Hydrological modeling and flood simulation of the Fuji River basin in Japan Hydrological modeling and flood simulation of the Fuji River basin in Japan H. A. P. Hapuarachchi *, A. S. Kiem, K. Takeuchi, H. Ishidaira, J. Magome and A. Tianqi T 400-8511, Takeuchi-Ishidaira Lab, Department

More information

QUANTITATIVE ANALYSIS OF HYDROLOGIC CYCLE IN COLD SNOWY BASIN

QUANTITATIVE ANALYSIS OF HYDROLOGIC CYCLE IN COLD SNOWY BASIN QUANTITATIVE ANALYSIS OF HYDROLOGIC CYCLE IN COLD SNOWY BASIN Tomohide USUTANI 1 and Makoto NAKATSUGAWA 2 1 Japan Weather Association, Sapporo, Japan 2 Toyohashi Office of River Works, Ministry of Land,

More information

CIVIL ENGINEERING. Engineering Hydrology RIB-R T11 RIB. Detailed Explanations. Rank Improvement Batch ANSWERS. RIB(R)-18 CE Engineering Hydrology

CIVIL ENGINEERING. Engineering Hydrology RIB-R T11 RIB. Detailed Explanations. Rank Improvement Batch ANSWERS. RIB(R)-18 CE Engineering Hydrology RIB-R T11 RIB Rank Improvement Batch Session 18-1 S.No. : 118_SK CIVIL ENGINEERING Engineering Hydrology ANSWERS 1. (b) 7. (c) 1. (c) 1. (b). (d). (c) 8. (a) 1. (a). (b). (c). (a). (d) 1. (c) 1. (a) 7.

More information

Speakers: NWS Buffalo Dan Kelly and Sarah Jamison, NERFC Jeane Wallace. NWS Flood Services for the Black River Basin

Speakers: NWS Buffalo Dan Kelly and Sarah Jamison, NERFC Jeane Wallace. NWS Flood Services for the Black River Basin Speakers: NWS Buffalo Dan Kelly and Sarah Jamison, NERFC Jeane Wallace NWS Flood Services for the Black River Basin National Weather Service Who We Are The National Oceanic and Atmospheric Administration

More information

FFGS Additional Functionalities and Products. Konstantine P. Georgakakos, Sc.D. HYDROLOGIC RESEARCH CENTER 23 May 2018

FFGS Additional Functionalities and Products. Konstantine P. Georgakakos, Sc.D. HYDROLOGIC RESEARCH CENTER 23 May 2018 FFGS Additional Functionalities and Products Konstantine P. Georgakakos, Sc.D. HYDROLOGIC RESEARCH CENTER 23 May 2018 Advanced Functionalities 0. Multi-Model QPF A. Urban Flash Flood Warning B. Riverine

More information

Water Supply Conditions and Outlook October 1, 2018

Water Supply Conditions and Outlook October 1, 2018 Water Supply Conditions and Outlook October 1, 2018 Flow Forecasting & Operations Planning Water Security Agency Overview Water supply conditions across Saskatchewan remain near normal, with most reservoirs

More information

Hydrologic Forecast Centre. Manitoba Infrastructure. Winnipeg, Manitoba FEBRUARY FLOOD OUTLOOK REPORT FOR MANITOBA.

Hydrologic Forecast Centre. Manitoba Infrastructure. Winnipeg, Manitoba FEBRUARY FLOOD OUTLOOK REPORT FOR MANITOBA. Page 1 of 20 Hydrologic Forecast Centre Manitoba Infrastructure Winnipeg, Manitoba FEBRUARY FLOOD OUTLOOK REPORT FOR MANITOBA February 28, 2019 Overview The February Outlook Report prepared by the Hydrologic

More information

2017 January Conditions Report Manitoba Hydrologic Forecasting and Coordination Branch Manitoba Infrastructure

2017 January Conditions Report Manitoba Hydrologic Forecasting and Coordination Branch Manitoba Infrastructure 2017 January Conditions Report Manitoba Hydrologic Forecasting and Coordination Branch Manitoba Infrastructure 1/30/2017 Page 1 of 22 Hydrologic Forecast Centre Manitoba Infrastructure and Transportation

More information

Presented by Jerry A. Gomez, P.E. National Hydropower Association Northeast Regional Meeting - September 17, 2009

Presented by Jerry A. Gomez, P.E. National Hydropower Association Northeast Regional Meeting - September 17, 2009 Presented by Jerry A. Gomez, P.E. National Hydropower Association Northeast Regional Meeting - September 17, 2009 Defining Probable Maximum Precipitation (PMP) PMP is the theoretically greatest depth of

More information

Development of Water Management Modeling by Using GIS in Chirchik River Basin, Uzbekistan

Development of Water Management Modeling by Using GIS in Chirchik River Basin, Uzbekistan Available online at www.sciencedirect.com Procedia Earth and Planetary Science 6 ( 2013 ) 169 176 Development of Water Management Modeling by Using GIS in Chirchik River Basin, Uzbekistan Hendra PACHRI

More information

Preliminary Runoff Outlook February 2018

Preliminary Runoff Outlook February 2018 Preliminary Runoff Outlook February 2018 Prepared by: Flow Forecasting & Operations Planning Water Security Agency General Overview The Water Security Agency (WSA) is preparing for 2018 spring runoff including

More information

Results of Intensity-Duration- Frequency Analysis for Precipitation and Runoff under Changing Climate

Results of Intensity-Duration- Frequency Analysis for Precipitation and Runoff under Changing Climate Results of Intensity-Duration- Frequency Analysis for Precipitation and Runoff under Changing Climate Supporting Casco Bay Region Climate Change Adaptation RRAP Eugene Yan, Alissa Jared, Julia Pierce,

More information

January 2011 Calendar Year Runoff Forecast

January 2011 Calendar Year Runoff Forecast January 2011 Calendar Year Runoff Forecast 2010 Runoff Year Calendar Year 2010 was the third highest year of runoff in the Missouri River Basin above Sioux City with 38.8 MAF, behind 1978 and 1997 which

More information

Hydrologic Overview & Quantities

Hydrologic Overview & Quantities Hydrologic Overview & Quantities It is important to understand the big picture when attempting to forecast. This includes the interactive components and hydrologic quantities. Hydrologic Cycle The complexity

More information

David R. Vallee Hydrologist-in-Charge NOAA/NWS Northeast River Forecast Center

David R. Vallee Hydrologist-in-Charge NOAA/NWS Northeast River Forecast Center David R. Vallee Hydrologist-in-Charge NOAA/NWS Northeast River Forecast Center Record flooding along the Shawsheen River during the 2006 Mother s Day Floods Calibrate and implement a variety of hydrologic

More information

2017 Fall Conditions Report

2017 Fall Conditions Report 2017 Fall Conditions Report Prepared by: Hydrologic Forecast Centre Date: November 15, 2017 Table of Contents TABLE OF FIGURES... ii EXECUTIVE SUMMARY... 1 BACKGROUND... 4 SUMMER AND FALL PRECIPITATION...

More information

Modelling runoff from large glacierized basins in the Karakoram Himalaya using remote sensing of the transient snowline

Modelling runoff from large glacierized basins in the Karakoram Himalaya using remote sensing of the transient snowline Remote Sensing and Hydrology 2000 (Proceedings of a symposium held at Santa Fe, New Mexico, USA, April 2000). IAHS Publ. no. 267, 2001. 99 Modelling runoff from large glacierized basins in the Karakoram

More information

Satellite-based applications for water resources management in Asia and Pacific region

Satellite-based applications for water resources management in Asia and Pacific region Satellite-based applications for water resources management in Asia and Pacific region Ko Hamamoto Japan Aerospace Exploration Agency The views expressed in this paper/presentation are the views of the

More information

NRC Workshop Probabilistic Flood Hazard Assessment (PFHA) Jan 29-31, Mel Schaefer Ph.D. P.E. MGS Engineering Consultants, Inc.

NRC Workshop Probabilistic Flood Hazard Assessment (PFHA) Jan 29-31, Mel Schaefer Ph.D. P.E. MGS Engineering Consultants, Inc. Stochastic Event Flood Model (SEFM) Stochastic Modeling of Extreme Floods A Hydrological Tool for Analysis of Extreme Floods Mel Schaefer Ph.D. P.E. MGS Engineering Consultants, Inc. Olympia, WA NRC Workshop

More information

Preliminary Viability Assessment (PVA) for Lake Mendocino Forecast Informed Reservoir Operations (FIRO)

Preliminary Viability Assessment (PVA) for Lake Mendocino Forecast Informed Reservoir Operations (FIRO) Preliminary Viability Assessment (PVA) for Lake Mendocino Forecast Informed Reservoir Operations (FIRO) Rob Hartman Consultant to SCWA and CW3E May 30, 2017 Why Conduct a PVA? Key Questions for the PVA

More information

ISSN Vol.03,Issue.10 May-2014, Pages:

ISSN Vol.03,Issue.10 May-2014, Pages: www.semargroup.org, www.ijsetr.com ISSN 2319-8885 Vol.03,Issue.10 May-2014, Pages:2187-2191 YIN YIN HTWE 1, AYE AYE THANT 2 1 Dept of Civil Engineering, Mandalay Technological University, Mandalay, Myanmar,

More information

Unseasonable weather conditions in Japan in August 2014

Unseasonable weather conditions in Japan in August 2014 Unseasonable weather conditions in Japan in August 2014 Summary of analysis by the TCC Advisory Panel on Extreme Climatic Events In an extraordinary session held at the Japan Meteorological Agency on 3

More information

Delft-FEWS User Days 2 nd & 3 rd November 2011

Delft-FEWS User Days 2 nd & 3 rd November 2011 Delft-FEWS User Days 2 nd & 3 rd November 2011 Recent developments in EA Midlands Flood Forecasting using FEWS NFFS Ian Clayton Flood Forecasting Technical Specialist Environment Agency Midlands Flood

More information

Integrating Weather Forecasts into Folsom Reservoir Operations

Integrating Weather Forecasts into Folsom Reservoir Operations Integrating Weather Forecasts into Folsom Reservoir Operations California Extreme Precipitation Symposium September 6, 2016 Brad Moore, PE US Army Corps of Engineers Biography Brad Moore is a Lead Civil

More information

PRECIPITATION ASSESSMENT FROM THE VIEWPOINT DATA AVAILABILITY FOR PURPOSES OF FLOOD MODELLING

PRECIPITATION ASSESSMENT FROM THE VIEWPOINT DATA AVAILABILITY FOR PURPOSES OF FLOOD MODELLING Proceedings of the 14 th International Conference on Environmental Science and Technology Rhodes, Greece, 3-5 September 2015 PRECIPITATION ASSESSMENT FROM THE VIEWPOINT DATA AVAILABILITY FOR PURPOSES OF

More information

Optimal Artificial Neural Network Modeling of Sedimentation yield and Runoff in high flow season of Indus River at Besham Qila for Terbela Dam

Optimal Artificial Neural Network Modeling of Sedimentation yield and Runoff in high flow season of Indus River at Besham Qila for Terbela Dam Optimal Artificial Neural Network Modeling of Sedimentation yield and Runoff in high flow season of Indus River at Besham Qila for Terbela Dam Akif Rahim 1, Amina Akif 2 1 Ph.D Scholar in Center of integrated

More information

Drought Monitoring with Hydrological Modelling

Drought Monitoring with Hydrological Modelling st Joint EARS/JRC International Drought Workshop, Ljubljana,.-5. September 009 Drought Monitoring with Hydrological Modelling Stefan Niemeyer IES - Institute for Environment and Sustainability Ispra -

More information

Souris River Basin Spring Runoff Outlook As of March 1, 2019

Souris River Basin Spring Runoff Outlook As of March 1, 2019 Souris River Basin Spring Runoff Outlook As of March 1, 2019 Prepared by: Flow Forecasting & Operations Planning Water Security Agency Basin Conditions Summer rainfall in 2018 over the Saskatchewan portion

More information

Flood Inundation Analysis by Using RRI Model For Chindwin River Basin, Myanmar

Flood Inundation Analysis by Using RRI Model For Chindwin River Basin, Myanmar Flood Inundation Analysis by Using RRI Model For Chindwin River Basin, Myanmar Aye Aye Naing Supervisor : Dr. Miho Ohara MEE14625 Dr. Duminda Perera Dr. Yoshihiro Shibuo ABSTRACT Floods occur during the

More information

HYDROLOGIC AND WATER RESOURCES EVALUATIONS FOR SG. LUI WATERSHED

HYDROLOGIC AND WATER RESOURCES EVALUATIONS FOR SG. LUI WATERSHED HYDROLOGIC AND WATER RESOURCES EVALUATIONS FOR SG. LUI WATERSHED 1.0 Introduction The Sg. Lui watershed is the upper part of Langat River Basin, in the state of Selangor which located approximately 20

More information

An Overview of Operations at the West Gulf River Forecast Center Gregory Waller Service Coordination Hydrologist NWS - West Gulf River Forecast Center

An Overview of Operations at the West Gulf River Forecast Center Gregory Waller Service Coordination Hydrologist NWS - West Gulf River Forecast Center National Weather Service West Gulf River Forecast Center An Overview of Operations at the West Gulf River Forecast Center Gregory Waller Service Coordination Hydrologist NWS - West Gulf River Forecast

More information

Proposal to limit Namakan Lake to 1970 Upper Rule Curve for remainder of summer

Proposal to limit Namakan Lake to 1970 Upper Rule Curve for remainder of summer July 7, 214 Subject: Proposal to limit Namakan Lake to 197 Upper Rule Curve for remainder of summer Background: Flooding in 214 has resulted in the highest water levels on Namakan Lake since 1968, and

More information

LESSON HEC-HMS

LESSON HEC-HMS LESSON 2.2 - HEC-HMS Introduction: TEAM 8 SCS method: The input data: Thiessen Polygons: Concentration Lag Time: SCS Method: Calculation of CN: Result figures: CONSTRUCTING HYDROGRAPH WITH HEC-HMS: Rainfall

More information

DEPTH-AREA-DURATION ANALYSIS IN A KOREAN RIVER BASIN

DEPTH-AREA-DURATION ANALYSIS IN A KOREAN RIVER BASIN Annual Journal of Hydraulic Engineering, JSCE, Vol.57, 213, February DEPTH-AREA-DURATION ANALYSIS IN A KOREAN RIVER BASIN Young-a SHIN 1, Kaoru TAKARA 2 and Maja OSTRIC 1 1 Student Member of JSCE, Dept.

More information

Overview of a Changing Climate in Rhode Island

Overview of a Changing Climate in Rhode Island Overview of a Changing Climate in Rhode Island David Vallee, Hydrologist in Charge, National Weather Service Northeast River Forecast Center, NOAA Lenny Giuliano, Air Quality Specialist, Rhode Island Department

More information

Water & Climate; Floods & Droughts (The yin & yang of water availablilty) Water & Climate; Floods & Droughts (The yin & yang of water availablilty)

Water & Climate; Floods & Droughts (The yin & yang of water availablilty) Water & Climate; Floods & Droughts (The yin & yang of water availablilty) (Acknowledgment: This presentation was developed in collaboration with ESA, NEON and NCEAS, federal agencies and academic team members from minority serving institutions.) Water & Climate; Floods & Droughts

More information

ELEMENTS OF DECISION SUPPORT SYSTEM FOR FLOOD CONTROL IN THE NYSA KŁODZKA CATCHMENT

ELEMENTS OF DECISION SUPPORT SYSTEM FOR FLOOD CONTROL IN THE NYSA KŁODZKA CATCHMENT ELEMENTS OF DECISION SUPPORT SYSTEM FOR FLOOD CONTROL IN THE NYSA KŁODZKA CATCHMENT KAEiOG 2005, 295-303 Jarosław J. Napiórkowski Institute of Geophysics, Polish Academy of Sciences ul. Księcia Janusza

More information

Flood Risk Assessment

Flood Risk Assessment Flood Risk Assessment February 14, 2008 Larry Schick Army Corps of Engineers Seattle District Meteorologist General Assessment As promised, La Nina caused an active winter with above to much above normal

More information

Rong Jiang. Map of River. Table of Basic Data. China 14. Serial No. : China-14

Rong Jiang. Map of River. Table of Basic Data. China 14. Serial No. : China-14 Rong Jiang Map of River Table of Basic Data Name(s): Rong Jiang Location: Guangdong Province, Coastways China Area: 4,408 km 2 Serial No. : China-14 N 23 11' ~ 23 55' E 115 37' ~ 116 38' Length of the

More information

Sanjeev Kumar Jha Assistant Professor Earth and Environmental Sciences Indian Institute of Science Education and Research Bhopal

Sanjeev Kumar Jha Assistant Professor Earth and Environmental Sciences Indian Institute of Science Education and Research Bhopal Sanjeev Kumar Jha Assistant Professor Earth and Environmental Sciences Indian Institute of Science Education and Research Bhopal Email: sanjeevj@iiserb.ac.in 1 Outline 1. Motivation FloodNet Project in

More information

Governing Rules of Water Movement

Governing Rules of Water Movement Governing Rules of Water Movement Like all physical processes, the flow of water always occurs across some form of energy gradient from high to low e.g., a topographic (slope) gradient from high to low

More information

Rainwater storage facilities

Rainwater storage facilities Rainwater storage facilities Development of facilities for target rainfall Planned discharge in pump drainage areas City Yokohama Kawasaki Total Discharge area Tsuzuki Kouhoku Hokubu Kase Planned discharge

More information

Technical Notes: Magnitude and Return Period of 2004 Hurricane Rainfall in Florida

Technical Notes: Magnitude and Return Period of 2004 Hurricane Rainfall in Florida Journal of Floodplain Management Floodplain Management Association NOV. 2005 Vol. 5, No. 1 Glenn Tootle 1 Thomas Mirti 2 Thomas Piechota 3 Technical Notes: Magnitude and Return Period of 2004 Hurricane

More information

RELATIVE IMPORTANCE OF GLACIER CONTRIBUTIONS TO STREAMFLOW IN A CHANGING CLIMATE

RELATIVE IMPORTANCE OF GLACIER CONTRIBUTIONS TO STREAMFLOW IN A CHANGING CLIMATE Proceedings of the Second IASTED International Conference WATER RESOURCE MANAGEMENT August 20-22, 2007, Honolulu, Hawaii, USA ISGN Hardcopy: 978-0-88986-679-9 CD: 978-0-88-986-680-5 RELATIVE IMPORTANCE

More information