1 Figure Conceptual Profile Alternative Massachusetts Department of Transportation 4-6

2 Figure Profile Figure Typical Cross Section Massachusetts Department of Transportation 4-7

3 Figure Bascule Bridge Elevation Bascule Bridge A bascule bridge consists of cantilevered leafs that rotate on a horizontal axis at a trunnion located on a pier (see Figure 4.3-5). The leafs are balanced by counterweights that swing down as the bridge opens. The proposed bascule bridge would have a distance of at least 315 feet from trunnion-to-trunnion to clear a channel width of 225 feet. The structure at Leaf the trunnion would be nearly 30 feet deep, and the movable span would weigh approximately sixteen million pounds. Opening the bridge would require an estimated 800 horsepower to achieve a two minute and 30 second opening time for a total cycle time of 13 minutes. These are near record-setting dimensions and properties. If built, the Fore River bascule bridge would be one of the largest in the U.S. Trunnion The bascule span would have a four-leaf arrangement. The movable span would consist of two parallel double-leaf bascules in a deck truss configuration. The approximate angle of opening would be 70 degrees. The length of the truss itself from toe to tail would be approximately 215 feet for each leaf. The trusses would range from an eight-foot depth at the toe to a 30-foot depth at the trunnion centerline. The total width of the bascule span would be 73 feet, 9 inches. Due to the size of the movable span and the necessary counterweight arm, the bascule pier would need to be constructed in a closed pit configuration, as the counterweight would swing down well below the mean high water line but could not be submerged. This closed pit pier would support the control house, electrical equipment, and generator room. In addition, the pier would support live load bearing on the front wall and the live load anchorage in the back wall. Also supported on the back wall of the bascule pier would be the approach span superstructure. Each massive pier structure would occupy an area of approximately 9,000 square feet of the river. The proposed bascule alternative spanning 225-foot navigation channel the absolute minimum that the USCG will accept also presents a potential for vessel allisions with the bridge superstructure itself when the bridge is in the open position. If a Panamax vessel were to strike the fender system at an angle of less than 15 degrees, the bow may arch over the fender system and strike the bridge superstructure when the vessel is unloaded. Increasing the distance between the centerlines of trunnions would alleviate this potential for allisions, but it would require a substantial and unacceptable increase in span length. Massachusetts Department of Transportation 4-8

4 Figure Bascule Bridge Proposed Roadway Surface Construction of the bascule bridge span would most likely be performed onsite. Even if large sections were constructed off-site and barged into place to accelerate the construction process, the deck construction would have to occur after the leafs were installed. Deck construction must occur with the leafs in a horizontal position, which leaves the movable span closed to navigation traffic. As an example, a five-month restriction of navigation in the Taunton River began in April 2010 when the channel was closed to vessels requiring more than 60 feet of air draft because the Brightman Street bascule bridge deck had to be constructed in the horizontal position. 2 Construction of a bascule bridge at the Fore River site would require a similar extended channel closure that would not be acceptable to the USCG or the users of the navigation channel. Figure depicts the roadway surface elevation for the bascule bridge evaluated in this (EA) compared to the roadway surface elevation for the 1936 bascule bridge. Figures to provide a rendering of the bascule bridge s appearance at the site in both the open and closed positions. 2 Local Notice to Mariners, District 1, Week 28/10, U.S. Department of Homeland Security, United States Coast Guard, Massachusetts Department of Transportation 4-9

5 Fore River Bridge Replacement Project Figure Figure Bascule Bridge Closed Position, Looking North Bascule Bridge Open Position, Looking North Massachusetts Department of Transportation Figure Figure Bascule Bridge Closed Position, Looking East Bascule Bridge Open Position, Looking East 4-10

Water Street over Eel Pond Channel Falmouth Massachusetts Jeffrey D. Keyt, PE Parsons

Water Street over Eel Pond Channel Falmouth Massachusetts Jeffrey D. Keyt, PE Parsons Jeffrey D. Keyt, PE Description The existing bridge carried. Eel pond Channel is the inlet from Great Harbor and Vineyard Sound to Eel Pond. Water Street has two 12 foot lanes for highway traffic in both

More information

DISCRIPTION ARSHI AHMED (M.E 3 RD SEM.) MD. SOWBAN FIRDAUS (M.E 3 RD SEM.) AHMADAPALACE ROAD, BHOPAL, M.P.

DISCRIPTION ARSHI AHMED (M.E 3 RD SEM.) MD. SOWBAN FIRDAUS (M.E 3 RD SEM.) AHMADAPALACE ROAD, BHOPAL, M.P. DISCRIPTION TEAM NAME: EXPLORERS MEMBERS: ARSHI AHMED (M.E 3 RD SEM.) MD. SOWBAN FIRDAUS (M.E 3 RD SEM.) CONTACT ADDRESS: H.NO. 14, NEAR SAFIA COLLEGE AHMADAPALACE ROAD, BHOPAL, M.P. EMAIL ID: ARSHI_AHMED16@GMAIL.COM

More information

The Southwest Second Avenue

The Southwest Second Avenue The New 2nd Avenue Bridge, when completed, will be the longest bascule span bridge in the State of Florida and will contain one of the longest, widest, and heaviest bascule leafs in the world. The Southwest

More information

At4ERICM CONSULTING ENGINEERS COUNCIL'S HEAVY MOVABLE STRUCTURES MOVABLE BRIDGES AFFILIATE 3RD BIENNIAL SYMPOSIUM

At4ERICM CONSULTING ENGINEERS COUNCIL'S HEAVY MOVABLE STRUCTURES MOVABLE BRIDGES AFFILIATE 3RD BIENNIAL SYMPOSIUM At4ERICM CONSULTING ENGINEERS COUNCIL'S HEAVY MOVABLE STRUCTURES MOVABLE BRIDGES AFFILIATE 3RD BIENNIAL SYMPOSIUM NOVEMBER 12TH - 15TH, 1990 ST. PETER'SBURG HILTON b TOWERS ST. PETERSBURG, FLORIDA SESSION

More information

Replacing the Counterweight Trunnion Bearings in a Strauss Bascule Bridge Burnside Bridge Reconstruction Project Multnomah County, Oregon

Replacing the Counterweight Trunnion Bearings in a Strauss Bascule Bridge Burnside Bridge Reconstruction Project Multnomah County, Oregon Replacing the Counterweight Trunnion Bearings in a Strauss Bascule Bridge Burnside Bridge Reconstruction Project Multnomah County, Oregon Jon Henrichsen, P.E., Chuck Maggio, P.E., Ed Wortman, P.E., Tye

More information

Marine Analysis. LA 23 New. Louisiana. Prepared by:

Marine Analysis. LA 23 New. Louisiana. Prepared by: Gulf Intracoastal Waterway (GIWW) Marine Vessel Trafficc Analysis LA 23 New Orleans Gulf Coastt Railway Relocation PE/NEPA Project Jefferson and Plaquemines Parishes, Louisiana RPC Task LA23RR1 RPC/FRA

More information

HURRICANES KATRINA AND RITA LOUISIANA S RESPONSE AND RECOVERY. Ray A. Mumphrey 1 and Hossein Ghara 2

HURRICANES KATRINA AND RITA LOUISIANA S RESPONSE AND RECOVERY. Ray A. Mumphrey 1 and Hossein Ghara 2 HURRICANES KATRINA AND RITA LOUISIANA S RESPONSE AND RECOVERY Ray A. Mumphrey 1 and Hossein Ghara 2 Abstract: Louisiana s transportation and hurricane protection system took a tremendous blow from two

More information

Emergency Repair of the I-695 Drawbridge over Curtis Creek

Emergency Repair of the I-695 Drawbridge over Curtis Creek Emergency Repair of the I-695 Drawbridge over Curtis Creek By: Scott Reynolds, PE Hardesty & Hanover, LLP Emergency Repair of the I-695 Drawbridge over Curtis Creek EMERGENCY Mid-day on June 29, 2009 the

More information

Equilibrium in Two Dimensions

Equilibrium in Two Dimensions C h a p t e r 6 Equilibrium in Two Dimensions In this chapter, you will learn the following to World Class standards: 1. The Ladder Against the Wall 2. The Street Light 3. The Floor Beam 6-1 The Ladder

More information

Conic Sections. Pre-Calculus Unit Completing the Square. Solve each equation by completing the square x 2 + 8x 10 = 0

Conic Sections. Pre-Calculus Unit Completing the Square. Solve each equation by completing the square x 2 + 8x 10 = 0 Pre-Calculus Unit 7 Conic Sections Name: 7.1 Completing the Square Solve each equation by completing the square. 1. x 2 + 4x = 21 6. x 2 5x 5 = 0 11. x 2 6x + 6 = 0 2. x 2 8x = 33 7. x 2 + 7x = 0 12. x

More information

NAME: Given Formulae: Law of Cosines: Law of Sines:

NAME: Given Formulae: Law of Cosines: Law of Sines: NME: Given Formulae: Law of Cosines: EXM 3 PST PROBLEMS (LESSONS 21 TO 28) 100 points Thursday, November 16, 2017, 7pm to 9:30, Room 200 You are allowed to use a calculator and drawing equipment, only.

More information

Monitoring Scour Critical Bridges During Floods For Local Bridge Owners. Presented by

Monitoring Scour Critical Bridges During Floods For Local Bridge Owners. Presented by Monitoring Scour Critical Bridges During Floods For Local Bridge Owners Presented by SAFETY FIRST DO NOT ENDANGER YOURSELF OR OTHERS WHILE MONITORING BRIDGES DO NOT ENTER FLOOD WATERS FLOOD WATERS INCLUDE

More information

Auxiliary Bridge Program Training Guide

Auxiliary Bridge Program Training Guide FIRST NORTHERN Auxiliary Bridge Program Training Guide Revision B 2-15-2011 Prepared by the First Northern Navigation Systems Team UNITED STATES COAST GUARD AUXILIARY FIRST DISTRICT, NORTHERN REGION 2011

More information

Parish of Ascension. ASCENSION PARISH SITUATIONAL REPORT 06 August 2008 As of: 1600 Hours

Parish of Ascension. ASCENSION PARISH SITUATIONAL REPORT 06 August 2008 As of: 1600 Hours Parish of Ascension OFFICE OF HOMELAND SECURITY AND EMERGENCY PREPAREDNESS Tommy Martinez Parish President Richard A. Webre Director ASCENSION PARISH SITUATIONAL REPORT 06 August 2008 As of: 1600 Hours

More information

HURRICANES KATRINA AND RITA LOUISIANA S RESPONSE AND RECOVERY

HURRICANES KATRINA AND RITA LOUISIANA S RESPONSE AND RECOVERY HURRICANES KATRINA AND RITA LOUISIANA S RESPONSE AND RECOVERY Ray A. Mumphrey, P.E., Louisiana Department of Transportation and Development, Baton Rouge, Louisiana, and Hossein Ghara, P.E., MBA, Louisiana

More information

Appendix I. Dredged Volume Estimates. Draft Contractor Document: Subject to Continuing Agency Review

Appendix I. Dredged Volume Estimates. Draft Contractor Document: Subject to Continuing Agency Review Appendix I Dredged Volume Estimates Draft Contractor Document: Subject to Continuing Agency Review Interoffice Correspondence Date: April 6, 2007 To: L. Bossi (WHI) Copy: S. Thompson (WHI), B. Fidler (NNJ)

More information

Innovated Technological Trends in Highways. Flood Modelling & Evaluation of Impacts on Infrastructure

Innovated Technological Trends in Highways. Flood Modelling & Evaluation of Impacts on Infrastructure Innovated Technological Trends in Highways Flood Modelling & Evaluation of Impacts on Infrastructure Dr. Waheed Uddin Professor and Director CAIT University of Mississippi Contributions from: CAIT and

More information

VIBRATION MEASUREMENT OF TSING MA BRIDGE DECK UNITS DURING ERECTION

VIBRATION MEASUREMENT OF TSING MA BRIDGE DECK UNITS DURING ERECTION VIBRATION MEASUREMENT OF TSING MA BRIDGE DECK UNITS DURING ERECTION Tommy CHAN Assistant Professor The Polytechnic University Ching Kwong LAU Deputy Director Highways Dept., Government Jan Ming KO Chair

More information

APPENDIX A M&T/Llano Seco Long-Term Water Reliability Study These photos are examples of rock spurs in use throughout the United States

APPENDIX A M&T/Llano Seco Long-Term Water Reliability Study These photos are examples of rock spurs in use throughout the United States APPENDIX A M&T/Llano Seco Long-Term Water Reliability Study These photos are examples of rock spurs in use throughout the United States Glenn Colusa Irrigation District completed a Sacramento River project

More information

When designing structures like dams, many questions

When designing structures like dams, many questions L A B 9 CONSTRUCTING AN ARCH DAM Surface Area, Volume, and Fluid Force When designing structures like dams, many questions arise. How much material will be needed to build the structure? If the material

More information

Cause Investigation of Flooding & Sinking Accident of Ro-Ro Ferry Ship using Marine Accident Integrated Analysis System

Cause Investigation of Flooding & Sinking Accident of Ro-Ro Ferry Ship using Marine Accident Integrated Analysis System Cause Investigation of Flooding & Sinking Accident of Ro-Ro Ferry Ship using Marine Accident Integrated Analysis System Sang-Gab Lee, Jae-Seok Lee, Ji-Hoon Park and Tae-Young Jung Korea Maritime & Ocean

More information

City of Six Project. Gold Mining Property in Downieville, CA. 60 Acres of Claims. Estimated Resource of over 8,800 ounces of Gold

City of Six Project. Gold Mining Property in Downieville, CA. 60 Acres of Claims. Estimated Resource of over 8,800 ounces of Gold City of Six Project Gold Mining Property in Downieville, CA 60 Acres of Claims Estimated Resource of over 8,800 ounces of Gold Adjoining the famous Ruby Mine Property Located on a Rich Tertiary Channel

More information

Greater New Orleans Hurricane and Storm Damage Risk Reduction System 101

Greater New Orleans Hurricane and Storm Damage Risk Reduction System 101 Greater New Orleans Hurricane and Storm Damage Risk Reduction System 101 René Poché New Orleans District U.S. Army Corps of Engineers US Army Corps of Engineers BUILDING STRONG 1878 Gentilly Ridge Metairie

More information

SHORT ANSWER. Write the word or phrase that best completes each statement or answers the question.

SHORT ANSWER. Write the word or phrase that best completes each statement or answers the question. Final Exam Review - Math 2412 Fall 2013 Name SHORT ANSWER. Write the word or phrase that best completes each statement or answers the question. Find the term indicated in the expansion. 1) (x + 3y)11;

More information

TRAFFIC ALERT FOR WEEK OF February 4 8, 2008

TRAFFIC ALERT FOR WEEK OF February 4 8, 2008 TRAFFIC ALERT FOR WEEK OF February 4 8, 2008 Highway work zones in the Staunton District The following is a list of highway work that might affect traffic in the Staunton transportation district during

More information

MA 1135 Practice Test III (answers on last page) Tuesday, April 16, 2013

MA 1135 Practice Test III (answers on last page) Tuesday, April 16, 2013 MA 35 Practice Test III (answers on last page) Tuesday, April 6, 203 Name Note: Test III is Thursday (4/8/3). Big Note: Bring your calculators, no computers for this test. I m going to restrict you to

More information

STUDY GUIDE TABLE OF CONTENTS WITH REPORT EXHIBITS. LIST OF ACRONYMS...iv. OVERVIEW OF THE STUDY GUIDE...v SECTION I - PREPARATION AND TOOLS...

STUDY GUIDE TABLE OF CONTENTS WITH REPORT EXHIBITS. LIST OF ACRONYMS...iv. OVERVIEW OF THE STUDY GUIDE...v SECTION I - PREPARATION AND TOOLS... STUDY GUIDE TABLE OF CONTENTS WITH REPORT EXHIBITS SUBJECT-SECTION SECTION-PAGE LIST OF ACRONYMS...iv OVERVIEW OF THE STUDY GUIDE...v SECTION I - PREPARATION AND TOOLS...1-1 SECTION II- FEDERAL SHORT RANGE

More information

ALASKA DEEP-DRAFT ARCTIC PORT EVALUATION

ALASKA DEEP-DRAFT ARCTIC PORT EVALUATION ALASKA DEEP-DRAFT ARCTIC PORT EVALUATION Joint Study of Federal and State June 20, 2012 Opportunity and Constraint Warming of Arctic region is leading to new maritime opportunities. Thawing of permafrost

More information

Physics 160 Spring 2012 Homework Assignments

Physics 160 Spring 2012 Homework Assignments Physics 160 Spring 2012 Homework Assignments HW #11 - Due May 7. Mastering Physics: 5 questions from chapter 13. Written Question: None. HW #10 - Due April 23. Mastering Physics: 7 problems from chapter

More information

THE WEATHER CASE STUDIES

THE WEATHER CASE STUDIES THE WEATHER CASE STUDIES Hedi Maurer, NEA (Panteia) Athens, 23.04.2012 Case studies, regions and modes 1. Flood of 2002 in Eastern Germany 2. Summer heat 2007 in Southern Europe 3. Flooding of the rail

More information

Advancing Real Time Observations and Coastal Modeling Forecasts-

Advancing Real Time Observations and Coastal Modeling Forecasts- Advancing Real Time Observations and Coastal Modeling Forecasts- Moving Forward in a Changing Coastal Landscape Next Generation Navigation-Coastal Operations- Coastal and Nearshore Coastal Operational

More information

Red River Flooding June 2015 Caddo and Bossier Parishes Presented by: Flood Technical Committee Where the Rain Falls Matters I-30 versus I-20 I-20 Backwater and Tributary Floods (Localized) 2016 Flood

More information

THE LOSMANDY G-11 MOUNT

THE LOSMANDY G-11 MOUNT Checking the parts THE LOSMANDY G-11 MOUNT Depending on which accessories you ordered, your G-11 mount was shipped in four or more boxes. The contents of each box are as follows: Equatorial Mount Adjustable

More information

MAY 5, Noise Barrier Presentation SE Quadrant Noyes Street and Lincoln Street NOISE BARRIER ABUTTER MEETING. Tech Environmental, Inc.

MAY 5, Noise Barrier Presentation SE Quadrant Noyes Street and Lincoln Street NOISE BARRIER ABUTTER MEETING. Tech Environmental, Inc. MAY 5, 2011 Noise Barrier Presentation SE Quadrant Noyes Street and Lincoln Street Jacobs Engineering Group Group Inc. Inc. 1 Introductions Agenda Overview of Interchange Project Overview of noise barrier

More information

AED Design Requirements: Chlorinators

AED Design Requirements: Chlorinators US Army Corps of Engineers Afghanistan Engineer District AED Design Requirements: Various Locations, Afghanistan MARCH 2009 TABLE OF CONTENTS AED DESIGN REQUIREMENTS FOR CHLORINATORS VARIOUS LOCATIONS,

More information

DESIGN AND CONSTRUCTION OF A WATER TUNNEL. Stephen C. Ko

DESIGN AND CONSTRUCTION OF A WATER TUNNEL. Stephen C. Ko i DESGN AND CONSTRUCTON OF A WATER TUNNEL By Stephen C. Ko This work has been carried out as a part of a grant from the National Science Foundation for the development of fluid mechanics laboratory equipments

More information

Red River Levee Panel

Red River Levee Panel Red River Levee Panel Mississippi River Commission Monday, August 9, 2017 Red River Levees in LA & AR NONE along TX & OK Boarder Red River Levee Issues Caddo Levee Cherokee Park Authorization Bossier Levee

More information

Classwork 2.4 Trigonometric Ratios- Application Problems. 1. How tall is the building? 2. How far up will the ladder reach?

Classwork 2.4 Trigonometric Ratios- Application Problems. 1. How tall is the building? 2. How far up will the ladder reach? 1. How tall is the building? 2. How far up will the ladder reach? 3. A rock dropped from the top of the Leaning Tower of Pisa falls to a point 14 feet from the base. If the tower is 182 feet tall, at what

More information

Investigation of the Vibrations on Overhead Sign Bridges on US290/SH71

Investigation of the Vibrations on Overhead Sign Bridges on US290/SH71 PMFSEL REPORT NO. 06-01 April 2006 Investigation of the Vibrations on Overhead Sign Bridges on US290/SH71 by Eric Schell Liang Yu Karl H. Frank conducted for the Texas Department of Transportation Investigation

More information

Seismic Vulnerabilities of Multnomah County s Willamette River Bridges November 6, 2014

Seismic Vulnerabilities of Multnomah County s Willamette River Bridges November 6, 2014 Seismic Vulnerabilities of Multnomah County s Willamette River Bridges November 6, 2014 Ian Cannon, P.E. - Multnomah County Bridge Division Steve Drahota, P.E. - HDR Engineering, Inc. Response to the Budget

More information

Field Instrumentation and Monitoring of Eyebars within the Southeast Anchorage of the Walt Whitman Bridge

Field Instrumentation and Monitoring of Eyebars within the Southeast Anchorage of the Walt Whitman Bridge Field Instrumentation and Monitoring of Eyebars within the Southeast Anchorage of the Walt Whitman Bridge Final Report by Robert J. Connor Ian C. Hodgson Carl A Bowman ATLSS Report No. 03-25 November 2003

More information

2/23/ WIND PRESSURE FORMULA 2. PERCENT OF ALLOWABLE STRESS 3. FATIGUE DESIGN

2/23/ WIND PRESSURE FORMULA 2. PERCENT OF ALLOWABLE STRESS 3. FATIGUE DESIGN Original Title Presented by Northwest Signal copyright 2010 Designing & Building Structural Steel Products since 1976 Primary Users Traffic Signal Strain & Mast Arm Poles Cantilever & Bridge Sign Structures

More information

REHABILITATION TO CORRECT POOR OPERATING BEHAVIOR OF NORFOLK SOUTHERN RAILWAY BRIDGE AT MILEPOST DH

REHABILITATION TO CORRECT POOR OPERATING BEHAVIOR OF NORFOLK SOUTHERN RAILWAY BRIDGE AT MILEPOST DH REHABILITATION TO CORRECT POOR OPERATING BEHAVIOR OF NORFOLK SOUTHERN RAILWAY BRIDGE AT MILEPOST DH-514.47 AUTHORS: David Bonas, P.E. Norfolk Southern Corporation 1200 Peachtree Street, NE Atlanta, GA

More information

TINTAGEL CASTLE FOOTBRIDGE OPTIONS APPRAISAL. Feasibility Report July 2014

TINTAGEL CASTLE FOOTBRIDGE OPTIONS APPRAISAL. Feasibility Report July 2014 TINTAGEL CASTLE FOOTBRIDGE OPTIONS APPRAISAL Feasibility Report July 2014 THE SETTING LOCATION Proposed alignment of bridge 09 ALIGNMENT 01 03 02 04 05 07 09 Key 1. Lower Mainland Courtyard 06 2. Existing

More information

Slope Stability Evaluation Ground Anchor Construction Area White Point Landslide San Pedro District Los Angeles, California.

Slope Stability Evaluation Ground Anchor Construction Area White Point Landslide San Pedro District Los Angeles, California. Slope Stability Evaluation Ground Anchor Construction Area White Point Landslide San Pedro District Los Angeles, California Submitted To: Mr. Gene Edwards City of Los Angeles Department of Public Works

More information

FIELD INSTRUMENTATION AND ANALYSIS OF PROTOTYPE AND EXISTING LIGHT POLES ON THE BRONX-WHITESTONE BRIDGE. Final Report. Ian C. Hodgson.

FIELD INSTRUMENTATION AND ANALYSIS OF PROTOTYPE AND EXISTING LIGHT POLES ON THE BRONX-WHITESTONE BRIDGE. Final Report. Ian C. Hodgson. FIELD INSTRUMENTATION AND ANALYSIS OF PROTOTYPE AND EXISTING LIGHT POLES ON THE BRONX-WHITESTONE BRIDGE Final Report by Ian C. Hodgson and Robert J. Connor ATLSS Report No. 03-17 August 2003 ATLSS is a

More information

Transforming the Maricopa County Department of Transportation (MCDOT) GIS-based Transportation Asset Inventory System June 30, 2016

Transforming the Maricopa County Department of Transportation (MCDOT) GIS-based Transportation Asset Inventory System June 30, 2016 Transforming the Maricopa County Department of Transportation (MCDOT) GIS-based Transportation Asset Inventory System June 30, 2016 Presented By Steve Hossack, GIS Database Administrator 2016 Esri User

More information

Former U.S. 59 Amelia Earhart Memorial Bridge Demolition Project Information *** Third & Final Blast ***

Former U.S. 59 Amelia Earhart Memorial Bridge Demolition Project Information *** Third & Final Blast *** Former U.S. 59 Amelia Earhart Memorial Bridge Demolition Project Information *** Third & Final Blast *** The following information is to provide the public, local residents, businesses and community officials

More information

Precalculus PreAP/D Rev A: Simple Harmonic Motion. apply the rules of trigonometry and solve using simple harmonic motion.

Precalculus PreAP/D Rev A: Simple Harmonic Motion. apply the rules of trigonometry and solve using simple harmonic motion. 4.8A: Simple Harmonic Motion I WILL apply the rules of trigonometry and solve using simple harmonic motion. Precalculus PreAP/D I. Simple Harmonic Motion A. Simple harmonic motion is a special kind of

More information

Chapter 4 Seismic Design Requirements for Building Structures

Chapter 4 Seismic Design Requirements for Building Structures Chapter 4 Seismic Design Requirements for Building Structures where: F a = 1.0 for rock sites which may be assumed if there is 10 feet of soil between the rock surface and the bottom of spread footings

More information

Math 1720 Final Exam REVIEW Show All work!

Math 1720 Final Exam REVIEW Show All work! Math 1720 Final Exam REVIEW Show All work! The Final Exam will contain problems/questions that fit into these Course Outcomes (stated on the course syllabus): Upon completion of this course, students will:

More information

Math 2412 General Review for Precalculus Last Updated 12/15/2015

Math 2412 General Review for Precalculus Last Updated 12/15/2015 Math 4 General Review for Precalculus Last Updated /5/05 Give the equation of the horizontal asymptote, if any, of the function.. h(x) = 9x - 9x - 8 6x - 7x + 8 8. f(x) = x + 4 x. h(x) = x - x - 9 9x +

More information

NEEDLES S STREET LEVEE SYSTEM SAN BERNARDINO COUNTY, CALIFORNIA NLD SYSTEM ID #

NEEDLES S STREET LEVEE SYSTEM SAN BERNARDINO COUNTY, CALIFORNIA NLD SYSTEM ID # SAN BERNARDINO COUNTY, CALIFORNIA NLD SYSTEM ID # 3805030008 PERIODIC INSPECTION REPORT NO. 1 GENERALIZED EXECUTIVE SUMMARY FINAL SYSTEM RATING: MINIMALLY ACCEPTABLE FINAL RATING DATE: AUGUST 2014 PERIODIC

More information

Centrifuge Shaking Table Tests and FEM Analyses of RC Pile Foundation and Underground Structure

Centrifuge Shaking Table Tests and FEM Analyses of RC Pile Foundation and Underground Structure Centrifuge Shaking Table s and FEM Analyses of RC Pile Foundation and Underground Structure Kenji Yonezawa Obayashi Corporation, Tokyo, Japan. Takuya Anabuki Obayashi Corporation, Tokyo, Japan. Shunichi

More information

W riters always like to ask,

W riters always like to ask, Moving to Galaxy Country article and photos by Tom Clark W riters always like to ask, "So, what would you change if you had to do it all over again?" whenever we have the chance to visit someone's homemade

More information

PT Lapindo Brantas Banjar Panji #1 Exploration well

PT Lapindo Brantas Banjar Panji #1 Exploration well PT Lapindo Brantas Banjar Panji #1 Exploration well Lapindo Medco Santos 50%, Operator 32% 18% ANTARA NEWS 4 September, 2006 29 May, 2006, 10:00 pm, blowout of hot formation water ( mud ) began The East

More information

Near-Field Sturgeon Monitoring for the New NY Bridge at Tappan Zee. Quarterly Report October 1 December 31, 2014

Near-Field Sturgeon Monitoring for the New NY Bridge at Tappan Zee. Quarterly Report October 1 December 31, 2014 Near-Field Sturgeon Monitoring for the New NY Bridge at Tappan Zee Quarterly Report October 1 December 31, 2014 Prepared by AKRF, Inc. 7250 Parkway Drive, Suite 210 Hanover, MD 21076 for New York State

More information

Evaluating success of diamond grinding to attain project noise reduction goal via system-wide OBSI study

Evaluating success of diamond grinding to attain project noise reduction goal via system-wide OBSI study Evaluating success of diamond grinding to attain project noise reduction goal via system-wide OBSI study J. Eric Cox Christopher Menge TRB ADC40 Summer Meeting 2013 Santa Fe, New Mexico Overview OBSI study

More information

Colorado Department of Transportation Structure Inspection and Inventory Report (English Units)

Colorado Department of Transportation Structure Inspection and Inventory Report (English Units) 10/23/2017 Header Information Colorado Department of Transportation Structure Inspection and Inventory Report (English Units) Bridge Name: D-02-PR-030A Inspection Date: 12/2/2015 Sufficiency Rating: Inspection

More information

Bridge Risk Modeling

Bridge Risk Modeling time good Bridge Risk Modeling Current Florida DOT Research condition bad Paul D. Thompson, Consultant Background Research team Florida State University John Sobanjo (PI) Paul D. Thompson (co-pi) Florida

More information

Formation Stratigraphy and Interfingering at the Port of Miami

Formation Stratigraphy and Interfingering at the Port of Miami Formation Stratigraphy and Interfingering at the Port of Miami AUGUST 6, 2012 PROJECT PARTNERS Public Sponsors 90% Equity Partner Contractor 10% Equity Partner VMS Operator Federal Support FUNDING PARTNERS

More information

A STUDY OF LOCAL SCOUR AT BRIDGE PIERS OF EL-MINIA

A STUDY OF LOCAL SCOUR AT BRIDGE PIERS OF EL-MINIA A STUDY OF LOCAL SCOUR AT BRIDGE PIERS OF EL-MINIA Dr. Gamal A. Sallam 1 and Dr. Medhat Aziz 2 ABSTRACT Bridges are critical structures that require a substantial investment to construct and serve an important

More information

National Maritime Center

National Maritime Center National Maritime Center Providing Credentials to Mariners (Sample Examination) Page 1 of 14 Choose the best answer to the following Multiple Choice Questions. 1. If your vessel must pass through a draw

More information

Finite Element Analyses on Dynamic Behavior of Railway Bridge Due To High Speed Train

Finite Element Analyses on Dynamic Behavior of Railway Bridge Due To High Speed Train Australian Journal of Basic and Applied Sciences, 6(8): 1-7, 2012 ISSN 1991-8178 Finite Element Analyses on Dynamic Behavior of Railway Bridge Due To High Speed Train Mehrdad Bisadi, S.A. Osman and Shahrizan

More information

PART 4 HURRICANE KATRINA STRIKES NEW ORLEANS AUGUST 2005

PART 4 HURRICANE KATRINA STRIKES NEW ORLEANS AUGUST 2005 PART 4 HURRICANE KATRINA STRIKES NEW ORLEANS AUGUST 2005 Hurricane Katrina Hurricane Katrina swept across southern Florida and lost momentum, then gained speed and water, showing the second lowest barometric

More information

Facts Underlying the High Performance of the 188-cm Reflector Telescope

Facts Underlying the High Performance of the 188-cm Reflector Telescope Facts Underlying the High Performance of the 188-cm Reflector Telescope Okayama Astrophysical Observatory s 188-cm Reflector Telescope is the largest optical-infrared telescope in Japan. When introduced

More information

SYDNEY MARINE TERMINAL Second Berth Progress

SYDNEY MARINE TERMINAL Second Berth Progress SYDNEY MARINE TERMINAL Second Berth Progress Second Berth - Project Proponents Second Berth - Project Partners Second Berth - Key Stakeholder Second Berth Project Components New Second Berth: 1 2 Main

More information

A Portable Real Time Data Acquisition System for the Comparison of Floor Vibration Data with AISC Design Guide 11 Estimates

A Portable Real Time Data Acquisition System for the Comparison of Floor Vibration Data with AISC Design Guide 11 Estimates A Portable Real Time Data Acquisition System for the Comparison of Floor Vibration Data with AISC Design Guide 11 Estimates Authors: Matthew D. Dodge, Graduate R.A., Tufts University, Dept. of Civil &

More information

U.S. Standard for Revolving Pedestrian Doors Seriously Flawed

U.S. Standard for Revolving Pedestrian Doors Seriously Flawed U.S. Standard for Revolving Pedestrian Doors Seriously Flawed Warren F. Davis, Ph.D. Davis Associates, Inc. 43 Holden Road Newton, MA 02465-1909 June 21, 2009 Introduction The current version of the American

More information

PEACE REGION GRANDE PRAIRIE GEOHAZARD RISK ASSESSMENT SITE INSPECTION FORM NAD 83 COORDINATES N 6,178,811 E 403,309

PEACE REGION GRANDE PRAIRIE GEOHAZARD RISK ASSESSMENT SITE INSPECTION FORM NAD 83 COORDINATES N 6,178,811 E 403,309 PEACE REGION GRANDE PRAIRIE GEOHAZARD RISK ASSESSMENT SITE INSPECTION FORM SITE NUMBER GP-4a LEGAL DESCRIPTION LSD 12-10-78-4-W6M SITE NAME Burnt River Bridge - West Approach Slide HIGHWAY & KM Hwy 49:06

More information

Ship structure dynamic analysis - effects of made assumptions on computation results

Ship structure dynamic analysis - effects of made assumptions on computation results Ship structure dynamic analysis - effects of made assumptions on computation results Lech Murawski Centrum Techniki Okrętowej S. A. (Ship Design and Research Centre) ABSTRACT The paper presents identification

More information

Circuit Court, S. D. New York. December 5, 1885.

Circuit Court, S. D. New York. December 5, 1885. 106 THE PAVONIA. 1 HOBOKEN LAND & IMP. CO. V. THE PAVONIA. Circuit Court, S. D. New York. December 5, 1885. 1. COLLISION OBLIGATIONS OF FERRY BOATS WHEN APPROACHING SLIPS. The ferry-boats Pavonia and Weehawken

More information

Forward. Definition of Terms

Forward. Definition of Terms Forward The word investigation is defined as a searching inquiry for ascertaining facts; detailed or careful examination. The key word here is facts. Do ghosts exist? No, it has not been proven. Therefore

More information

Science In Action 7 Structures and Forces Section Quiz

Science In Action 7 Structures and Forces Section Quiz Section 2 External and Internal Forces Act on Structures 2.1 Measuring Forces 1. A force is a push or a pull that tends to cause an object to change its height or length B. movement or shape C. colour

More information

Convert the equation to the standard form for an ellipse by completing the square on x and y. 3) 16x y 2-32x - 150y = 0 3)

Convert the equation to the standard form for an ellipse by completing the square on x and y. 3) 16x y 2-32x - 150y = 0 3) Math 370 Exam 5 Review Name Graph the ellipse and locate the foci. 1) x 6 + y = 1 1) foci: ( 15, 0) and (- 15, 0) Objective: (9.1) Graph Ellipses Not Centered at the Origin Graph the ellipse. ) (x + )

More information

2018 North Carolina Residential Code Prescriptive Tables for Selection of Support Elements for Beams, Girders, and Headers: Example Problems

2018 North Carolina Residential Code Prescriptive Tables for Selection of Support Elements for Beams, Girders, and Headers: Example Problems 2018 North Carolina Residential Code Prescriptive Tables for Selection of Support Elements for Beams, Girders, and Structural Building Components Association (SBCA) August 10, 2018 SBCA is an APPROVED

More information

ALUMINUM STRUCTURAL PLATE HEADWALLS AASHTO LRFD BASIS OF DESIGN

ALUMINUM STRUCTURAL PLATE HEADWALLS AASHTO LRFD BASIS OF DESIGN ALUMINUM STRUCTURAL PLATE EADWALLS AASTO LRFD BASIS OF DESIGN LANE ENTERPRISES, INC. www.lane-enterprises.com Required Backfill and Load Cases: ALUMINUM STRUCTURAL PLATE EADWALLS BASIS OF DESIGN Backfill

More information

Map Reading & Compass Use

Map Reading & Compass Use Spring 2013 Kestrel Land Trust Page 2 / 10 Contents Map Basics... 3 Map Types... 3 Terrain Association... 4 Estimating Distance: Pacing... 4 Contour Lines... 5 Navigating with a Compass... 6 Compass Types...

More information

2012 USACE Drought Actions

2012 USACE Drought Actions 2012 USACE Drought Actions for Inland Waterway Users Board 68 Jim Walker Navigation Branch Chief 19 December 2012 US US Army Corps of of Engineers US Drought Monitor 1 2 3 4 6 5 Impacts: 1. The area in

More information

Appendix A Zoning Ordinance

Appendix A Zoning Ordinance Appendix A Zoning Ordinance Appendix A Zoning Ordinance Sec. 94-164. Brookings Airport Zoning Ordinance. (a) Purpose and authority. (1) It is hereby found that an airport obstruction has the potential

More information

Electrolytic Tiltmeter Temperature Coefficients: Source, Definition and Use to Improve Accuracy

Electrolytic Tiltmeter Temperature Coefficients: Source, Definition and Use to Improve Accuracy Electrolytic Tiltmeter Temperature Coefficients: Source, Definition and Use to Improve Accuracy Introduction Environmental temperature changes alter the mechanical and electrical characteristics of all

More information

DE PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE

DE PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE DE 05-142 PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE Petition for License to Construct and Maintain Electric Lines Over and Across the Public Waters of the Nashua River in the City of Nashua, New Hampshire

More information

At the Edge of the Continent

At the Edge of the Continent Islands in the Stream 2002: Exploring Underwater Oases At the Edge of the Continent FOCUS Bathymetry of the South Atlantic Bight continental shelf and upper shelf-edge GRADE LEVEL 9-12 (Earth Science)

More information

Pre-Test. Use trigonometric ratios to find the value of x. Show all your work and round your answer to the nearest tenth.

Pre-Test. Use trigonometric ratios to find the value of x. Show all your work and round your answer to the nearest tenth. Pre-Test Name Date 1. Write the trigonometric ratios for A. Write your answers as simplified fractions. A 6 cm 10 cm sin A cos A 8 10 5 6 10 3 5 C 8 cm B tan A 8 6 3 2. Write the trigonometric ratios for

More information

PRESENTATION & AREAS OF ACTIVITIES

PRESENTATION & AREAS OF ACTIVITIES RABAT Benin Senegal Cameroon Côte d'ivoire Equatorial Guinea PRESENTATION & AREAS OF ACTIVITIES MDC engineering is a multidisciplinary engineering company situated in Rabat, occurringin the harbor and

More information

Experiment Design to Obtain Unsteady Force and Moment Data on a Yawing Submarine Model - Sept. 2011

Experiment Design to Obtain Unsteady Force and Moment Data on a Yawing Submarine Model - Sept. 2011 Experiment Design to Obtain Unsteady Force and Moment Data on a Yawing Submarine Model - Sept. 2011 Problem: This problem is to determine (1) the desired values of fixed parameters and (2) the required

More information

Physics 1 Summer Assignment

Physics 1 Summer Assignment Physics 1 Summer Assignment 2018-2019 Welcome to the Physics 1- Honors level course. Physics 1 course is an Algebra and Trigonometry based College- Level course in Physics. The following topics will be

More information

Inter State Large Navigable Rivers of the United States

Inter State Large Navigable Rivers of the United States Inter State Large Navigable Rivers of the United States REVIEW OF NORTH AMERICAN BASINS: GREAT LAKES AND MISSISSIPPI RIVER HELEN A. BROHL, EXECUTIVE DIRECTOR US COMMITTEE ON THE MARINE TRANSPORTATION SYSTEM

More information

Jonathan Fraser METEOR Project P07102 Environmental Test Stand Project Manager/Lead Engineer Detail Design Review Report

Jonathan Fraser METEOR Project P07102 Environmental Test Stand Project Manager/Lead Engineer Detail Design Review Report Jonathan Fraser METEOR Project P07102 Environmental Test Stand Project Manager/Lead Engineer Detail Design Review Report The project, P07102 Environmental Test Stand, is specifically involved in the design,

More information

NUMERICAL MODELLING IN ENVIRONMENTAL IMPACT ASSESSMENT OF CONSTRUCTION WORKS WITHIN RIVER BAYS - A CASE STUDY

NUMERICAL MODELLING IN ENVIRONMENTAL IMPACT ASSESSMENT OF CONSTRUCTION WORKS WITHIN RIVER BAYS - A CASE STUDY NUMERICAL MODELLING IN ENVIRONMENTAL IMPACT ASSESSMENT OF CONSTRUCTION WORKS WITHIN RIVER BAYS - A CASE STUDY M. Jovanović 1, R. Kapor, B. Zindović University of Belgrade Faculty of Civil Engineering E-mail:

More information

Preferred practice on semi-integral abutment layout falls in the following order:

Preferred practice on semi-integral abutment layout falls in the following order: GENERAL INFORMATION: This section of the chapter establishes the practices and requirements necessary for the design and detailing of semi-integral abutments. For general requirements and guidelines on

More information

Part 1 is to be completed without notes, beam tables or a calculator. DO NOT turn Part 2 over until you have completed and turned in Part 1.

Part 1 is to be completed without notes, beam tables or a calculator. DO NOT turn Part 2 over until you have completed and turned in Part 1. NAME CM 3505 Fall 06 Test 2 Part 1 is to be completed without notes, beam tables or a calculator. Part 2 is to be completed after turning in Part 1. DO NOT turn Part 2 over until you have completed and

More information

BookletChart. Intracoastal Waterway Bahia Honda Key to Sugarloaf Key NOAA Chart A reduced-scale NOAA nautical chart for small boaters

BookletChart. Intracoastal Waterway Bahia Honda Key to Sugarloaf Key NOAA Chart A reduced-scale NOAA nautical chart for small boaters BookletChart Intracoastal Waterway Bahia Honda Key to Sugarloaf Key NOAA Chart 11445 A reduced-scale NOAA nautical chart for small boaters When possible, use the full-size NOAA chart for navigation. Published

More information

Budge Road Landslide Jackson Extensometer installation report April 2014 with data to 20 May

Budge Road Landslide Jackson Extensometer installation report April 2014 with data to 20 May Budge Road Landslide Jackson Extensometer installation report 23-27 April 14 with data to May Four extensometers were installed across fissures at the head of the Budge Road landslide on the East Gros

More information

Tenth Edition STATICS 1 Ferdinand P. Beer E. Russell Johnston, Jr. David F. Mazurek Lecture Notes: John Chen California Polytechnic State University

Tenth Edition STATICS 1 Ferdinand P. Beer E. Russell Johnston, Jr. David F. Mazurek Lecture Notes: John Chen California Polytechnic State University T E CHAPTER 1 VECTOR MECHANICS FOR ENGINEERS: STATICS Ferdinand P. Beer E. Russell Johnston, Jr. David F. Mazurek Lecture Notes: Introduction John Chen California Polytechnic State University! Contents

More information

IZMIT BAY BRIDGE SOUTH APPROACH VIADUCT: SEISMIC DESIGN NEXT TO THE NORTH ANATOLIAN FAULT

IZMIT BAY BRIDGE SOUTH APPROACH VIADUCT: SEISMIC DESIGN NEXT TO THE NORTH ANATOLIAN FAULT Istanbul Bridge Conference August 11-13, 2014 Istanbul, Turkey IZMIT BAY BRIDGE SOUTH APPROACH VIADUCT: SEISMIC DESIGN NEXT TO THE NORTH ANATOLIAN FAULT A. Giannakou 1, J. Chacko 2 and W. Chen 3 ABSTRACT

More information

CE415L Applied Fluid Mechanics Laboratory

CE415L Applied Fluid Mechanics Laboratory Applied Fluid Mechanics Laboratory Learning Objective Following completion of this experiment and the analysis of the data, you should be able to 1. generalize results of introducing changes to a natural

More information

Downtown Anchorage Seismic Risk Assessment & Land Use Regulations to Mitigate Seismic Risk

Downtown Anchorage Seismic Risk Assessment & Land Use Regulations to Mitigate Seismic Risk Prepared for: The Municipality of Anchorage Planning Department and the Geotechnical Advisory Commission Downtown Anchorage Seismic Risk Assessment & Land Use Regulations to Mitigate Seismic Risk Prepared

More information

Mathematics 5 Worksheet 2 Units and Proportion

Mathematics 5 Worksheet 2 Units and Proportion Mathematics 5 Worksheet 2 Units and Proportion Problem 1. Note that one yard is three feet. Assume that a day is exactly 24 hours. Water leaks from a faucet at a rate of.2 cubic yards per week. How many

More information

3.18 GEOLOGY AND SOILS

3.18 GEOLOGY AND SOILS 3.18 GEOLOGY AND SOILS This section discusses geologic resource concerns as they relate to the environment, public safety, and project design both during construction and after completion of the project.