1 Risk Based Maintenance Scheduling of Circuit Breakers using Condition-Based d Data Satish Natti Graduate Student, TAMU Advisor: Dr. Mladen Kezunovic
2 Outline Introduction CB Monitoring Maintenance Quantification Model Risk Based Maintenance Approach Case Studies Summary of Achievements
3 Introduction: Problem Formulation If it is the same availability of the labor crew, and the labor hours, and the given budget is constrained, how the maintenance decisions need to be implemented (revised)? Develop: - Maintenance quantification model - component level maintenance strategy - system level maintenance strategy Apply the developments to: - individual circuit breakers - Multiple circuit breakers in a power system simultaneously
4 Introduction: Comparison of Existing and Proposed Researches Operation decision RCM, AMP, Riskbased, RCAM Maintenance Strategies Risk-based decision approach Failure rate, Probabilistic maintenance Models Quantification of maintenance Probabilistic approach via performance indices Condition-based Data
5 Introduction: Expected Contribution Probability Between Limits is Bus 14 L23 Bus 19 L29 BB1 B1 B2 Bus 15 L24 B4 B5 B7 B3 B6 B8 G Density BB2 L Lower Critical Value Upper (msec) Load Bus s17 Condition Based Data CB Control Circuit Signal Processing Performance Indices CB Failure Bayesian Approach Risk Analysis Probability Consequence Risk System Maintenance Risk Reduction Optimization
6 CB Monitoring Over view of monitoring choices: Operating Mechanism - Contact ttravel ltime Measurement - Control Circuit Monitoring - Vibration Analysis Contacts - Resistance Test - Temperature Monitoring Inspection of oil (oil circuit breakers) Partial Discharge
7 CB Monitoring: Data from CBMs Close Initiate Trip Initiate 52X/a 52Y/b CC 52Y/b 52X 52a 52Y 52a TC 52Y/a Control DC + Control DC _ CBM Portable Devices
8 CB Monitoring: Data from CBMs EVENT Waveform abnormalities and signal parameters EVENT DECRIPTION SIGNAL 1 Trip or close operation is initiated (Trip or close initiate signal changes from LOW to HIGH) 2 Coil current picks up 3 Coil current dips after saturation 4 Coil current drops off 5 B contact breaks or makes (a change of status from LOW to HIGH or vice versa) 6 A contact breaks or makes 7 Phase currents breaks or makes 8 X coil current picks up 9 X coil current drops off 10 Y coil current picks up T1 T2 T3 T4 T5 T6 T7 T8 T9 T10
9 CB Monitoring: Data from CBMs Summary of Test Records During Closing Operation of Circuit Breaker Manufacturer and Type: GE VIB Date T2 (sec) T3(sec) T4(sec) T5(sec) T6(sec) 2/12/ /12/ /13/ /13/ /19/ /21/ /11/ /11/ /11/ /11/ /11/
10 Maintenance Quantification Model 0.35 Probability Between Limits is Density History of control circuit signals Lower Upper (msec) Critical Value Extract signal parameters (T1-T10) and fit distribution i i to each parameter Define performance indices using parameter distributions Monitored control circuit data Bayesian approach to update parameter distribution t 1 (msec) t 2 (msec) t 3 (msec) t 4 (msec) t 5 (msec)
11 Assessment of CB Condition P(t i ) is defined d as the probability bilit that t the parameter t i fll falls in the predefined interval, and is given by p( ti ) Pr( li ti ui ) As long as the parameter t i falls in the specified interval, it is said that there is no violation with t i Probability Between Limits is Density p i Lower Upper (msec) Critical Value
12 Performance Indices Performance of close/trip coil Coil Free Travel Time Performance of Auxiliary contacts Contacts Mechanism Travel Time p ( CC) 1 p ( t ) p ( t ) p ( t ) ( AB) 1 p ( t ) p ( t ) p f ( 2 3 t4 p f ( FT ) 1 p( t2 ) p( t3) p f ( 5 t6 p f ( MT) 1 p( t3) p( t5 ) Performance of breaker Failure Probability Index p f 6 ( Br) 1 p( t i ) i 2
13 Bayesian Updating Approach Initial Data Analysis Scatter plot analysis Interdependency among parameters Formulation Normal distribution ib ti Prior Likelihood Posterior Implementation MCMC Updated distributions
14 Sequential Bayesian Approach Data Likelihood Prior Posterior y 1 π 0 L(Y) P(θ Y) y n Bayesian Data Likelihood Prior Posterior y 1 L(y 1 ) π 0 P (θ y 1 ) y 2 L(y 2 ) P (θ y 2 ) Sequential Bayesian y n L(y n ) P (θ y n )
15 Concept of Risk Event, E Failure of a component or group of components Line, Bus bar, Breaker Event Probability, p(e) Control circuit data Failure probability index Event Consequence, con(e) Loss of Load (CCDF) Loss of Line (OPF) Loss of Generator (OPF) Risk(E) p(e)*con(e) Risk associated with each event Risk reduction Maintenance decisions
16 Optimized problem formulation Max N Ri x i 1 i ST : N i 0 c i x i C x 0 or 1 i Where, i : index on breaker N : Total number of breakers c : Maintenance cost of breaker 'i' i RR i : Risk reduction by maintaning it i breaker 'i' C : Total budget This optimization problem is a standard Knap-sack problem This optimization problem is a standard Knap sack problem and can be solved using dynamic programming techniques
17 Case Studies List of case studies Category Case study # Details of the data Maintenance Quantification Model Risk based maintenance Optimization i Case study I Case study II Case study III Case study IV CB control circuit data during OPEN operation CB control circuit data during CLOSE operation Approximation to the Bayesian approach in case studies I & II Bus 16 of IEEE Reliability Test System
18 Case Study I: Open Operation The sequence of occurrence of timing i of parameters during opening is: t 2 -t 3 -t 6 -t 4 -t 5. Rename them as y 1 -y 5 in that order y 1, y 2 and y 3 can be treated as independent. y 4 =β 0 +β 1 y 3 +ε 4 y 5 = β 0 + β 1 y 3 + β 2 y 4 + ε 5 Tolerance Limits for Open Operation Event Lower Upper (msec) (msec) t Scatter plot analysis of timing parameters t t t t
19 Case Study I: Open Operation Summary of Analysis for Open Operation Performance Index Observations Maintenance required? pf(tc) Abnormal behavior of Yes trip coil current. pf(ab) Auxiliary contacts are No operating properly pf(ft) Abnormal free travel Yes times. Improper pope operation of trip latch mechanism pf(mt) Abnormal mechanism Yes travel times. Improper operation of operating mechanism. pf(br) Improper operation of Yes breaker as a whole Performance indices for CB opening
20 Case Study II: Close Operation The sequence of occurrence of timing of parameters during opening is: t 2 -t 3 -t 4 -t 5 -t 6. Rename them as y 1 -y 5 in that order y 1, y 2, y 3 and y 4 can be treated t as independent. d y 5 =β 0 +β 1 y 4 +ε 5. Tolerance Limits for Close Operation Scatter plot analysis of timing parameters Event Lower (msec) Upper (msec) t t t t t
21 Case Study II: Close Operation Summary of Analysis for Close Operation Performance Index Observations Maintenance required? pf(cc) Abnormal behavior of Yes close coil current. pf(ab) Auxiliary contacts are No operating properly. pf(ft) Abnormal free travel Yes times. Improper operation of close latch mechanism. pf(mt) Abnormal mechanism Yes travel times. Improper operation of operating mechanism. pf(br) Improper operation of Yes breaker as a whole. Performance indices for CB closing
22 Case Study III: Comparison CB opening Comparison of index p f (Br) between Bayesian and Sequential Bayesian approaches CB closing
23 Case Study IV: Risk Based System Maintenance Bus 14 L23 Bus 19 L29 BB1 BB2 B1 B2 Bus 15 L24 B4 B5 B7 B3 B6 B8 Load Bus 17 Substation configuration of bus 16 L28 G IEEE 24 bus RTS is considered Generator = 155MW and Load = 100MW 8 breakers (B1-B8) Which breaker needs immediate attention? How to spend a fixed pool of money towards the maintenance of these breakers?
24 Case Study IV: List of Events Event Event Event Definition Definition # # # Definition E1 Fault on BB1 E15 Fault on L28 E29 Fault on B2, B3 fails E2 Fault on BB1, B1 fails E16 Fault on L28, B5 fails E30 Fault on B3 E3 Fault on BB1, B4 fails E17 Fault on L28, B6 fails E31 Fault on B3, B6 fails E4 Fault on BB1, B7 fails E18 Fault on L29 E32 Fault on B3, B8 fails E5 Fault on BB2 E19 Fault on L29, B2 fails E33 Fault on B4 E6 Fault on BB2, B3 fails E20 Fault on L29, B3 fails E34 Fault on B4, B5 fails E7 Fault on BB2, B6 fails E21 Fault on G E35 Fault on B4, B7 fails E8 Fault on BB2, B8 fails E22 Fault on G, B7 fails E36 Fault on B5 E9 Fault on L23 E23 Fault on G, B8 fails E37 Fault on B5, B6 fails E10 Fault on L23, B1 fails E24 Fault on B1 E38 Fault on B6 E11 Fault on L23, B2 fails E25 Fault on B1, B2 fails E39 Fault on B6, B8 fails E12 Fault on L24 E26 Fault on B1, B4 fails E40 Fault on B7 E13 Fault on L24, B4 fails E27 Fault on B1, B7 fails E41 Fault on B7, B8 fails E14 Fault on L24, B5 fails E28 Fault on B2 E42 Fault on B8
25 Case Study IV: Event Risk Risk curves Risk associated with each event and breaker
26 Case Study IV: Risk Reduction Risk( E) p( E) Con( E) Interesting to note that, the amount of risk reduced dby maintaining B6 is less compared to B3 and B B3 and B8 should be given 4000 priority based on the risk 2000 reduction levels 0 Risk Reduction Event For the test system under consideration, it can be concluded that, t breakers B3 and B8 are more important t followed by B6 and should be given priority in budget allocation
27 Summary of Achievements A probabilistic methodology, Maintenance Quantification Model is proposed and implemented An approximation to the Bayesian approach, called Sequential Bayesian approach is implemented Risk based system level maintenance strategy is proposed and implemented
28 Financial Support Power Systems Engineering Research Center (Pserc), Project: Automated Integration of Condition Monitoring with an Optimized Maintenance Scheduler for Circuit Breakers and Power Transformers. Iowa State University: James D. McCalley Vasant thonavar Texas A&M University: Mladen Kezunovic Chanan Singh
29 Publications S. Natti and M. Kezunovic, Assessing Circuit Breaker Performance Using Condition-Based Data and Bayesian Approach, IEEE Trans. On Power Systems. (In Review). S. Natti and M. Kezunovic, Risk-Based Decision Approach for Maintenance Scheduling Strategies for Transmission System Equipment Maintenance, 10 th Int. Conference on Probabilistic Methods Applied to Power Systems, Rincon, Puerto Rico, May M. Kezunovic, E. Akleman, M. Knezev, O. Gonan and S. Natti, Optimized Fault Location, IREP Symposium 2007, Charleston, South Carolina, August S. Natti and M. Kezunovic, Model for Quantifying the Effect of Circuit Breaker Maintenance Using Condition-Based Data, Power Tech 2007, Lausanne, Switzerland, July 2007.
30 S. Natti and M. Kezunovic, Transmission System Equipment Maintenance: On-line Use of Circuit Breaker Condition Data, IEEE PES General Meeting, Tampa, Florida, June M. Kezunovic and S. Natti, Risk-Based Maintenance Approach: A Case of Circuit Breaker Condition i Based Monitoring, i 3 rd International CIGREWorkshop on Liberalization and Modernization of Power Systems, Irkutsk, Russia, August M. Kezunovic and S. Natti, Condition Monitoring and Diagnostics Using Operational and Non-operational Data, CMD 2006, Pusan, Korea, March S. Natti, M. Kezunovic and C. Singh, Sensitivity Analysis on Probabilistic Maintenance Model of Circuit Breaker, 9 th Int. Conference on Probabilistic Methods Applied to Power Systems, Stockholm, Sweden, June 11-15, S. Natti, P. Jirutitijaroen, M. Kezunovic and C. Singh, Circuit Breaker and Transformer Inspection and Maintenance: Probabilistic Models, 8 th Int. Conference on Probabilistic Methods Applied to Power Systems, Ames, Iowa, September 2004.
Probabilistic Evaluation of the Effect of Maintenance Parameters on Reliability and Cost
Probabilistic Evaluation of the Effect of Maintenance Parameters on Reliability and Cost Mohsen Ghavami Electrical and Computer Engineering Department Texas A&M University College Station, TX 77843-3128,
More informationModule 4-2 Methods of Quantitative Reliability Analysis
Module 4-2 Methods of Quantitative Reliability Analysis Chanan Singh Texas A&M University METHODS OF QUANTITATIVE RELIABILITY ANALYSIS ANALYTICAL METHODS - STATE SPACE USING MARKOV PROCESSES - NETWORK
More informationPower System Security. S. Chakrabarti
Power System Security S. Chakrabarti Outline Introduction Major components of security assessment On-line security assessment Tools for contingency analysis DC power flow Linear sensitivity factors Line
More informationMonte Carlo Simulation for Reliability Analysis of Emergency and Standby Power Systems
Monte Carlo Simulation for Reliability Analysis of Emergency and Standby Power Systems Chanan Singh, Fellow, IEEE Joydeep Mitra, Student Member, IEEE Department of Electrical Engineering Texas A & M University
More informationBulk Power System Reliability Assessment Considering Protection System Hidden Failures
2007 irep Symposium- Bulk Power System Dynamics and Control - V, Revitalizing Operational Reliability August 19-24, 2007, Charleston, SC, USA Bulk Power System Reliability Assessment Considering Protection
More informationMaintenance Optimization for Substations with Aging Equipment
University of Nebraska - Lincoln DigitalCommons@University of Nebraska - Lincoln Theses, Dissertations, and Student Research from Electrical & Computer Engineering Electrical & Computer Engineering, Department
More informationResearch on Transformer Condition-based Maintenance System using the Method of Fuzzy Comprehensive Evaluation
Research on Transformer -based Maintenance System using the Method of Fuzzy Comprehensive Evaluation Po-Chun Lin and Jyh-Cherng Gu Abstract This study adopted previous fault patterns, results of detection
More informationRequest Ensure that this Instruction Manual is delivered to the end users and the maintenance manager.
Request Ensure that this Instruction Manual is delivered to the end users and the maintenance manager. 1 -A - Introduction - Thank for your purchasing MITSUBISHI ELECTRIC MELPRO TM D Series Digital Protection
More informationSection 5. TADS Data Reporting Instruction Manual DRAFT Section 5 and Associated Appendices With Proposed Event Type Numbers
Section 5 TADS Data Reporting Instruction Manual DRAFT Section 5 and Associated Appendices With Proposed Event Type Numbers Rev. 5/10/2010 1 Section 5 Form for Event ID and Event Type Number Data TO s
More informationFinite Element Based Transformer Operational Model for Dynamic Simulations
496 Progress In Electromagnetics Research Symposium 2005, Hangzhou, China, August 22-26 Finite Element Based Transformer Operational Model for Dynamic Simulations O. A. Mohammed 1, Z. Liu 1, S. Liu 1,
More informationPerformance Evaluation and Review of System Protection Scheme Design with the help of Synchrophasor Measurements
Performance Evaluation and Review of System Protection Scheme Design with the help of Synchrophasor Measurements P. Mukhopadhyay V. Pandey Rajkumar Anumasula Chandan Kumar Sunil Patil Srinivas Chitturi
More informationInformation Updating in Infrastructure Systems
University of Washington, Seattle Civil and Environmental Engineering April 10, 2008 Information Updating in Infrastructure Systems Subject to Multiple Hazards Daniel Straub University of California, Berkeley
More informationReliability Assessment and Modeling of Cyber Enabled Power Systems with Renewable Sources and Energy Storage
Reliability Assessment and Modeling of Cyber Enabled Power Systems with Renewable Sources and Energy Storage Final Project Report T-53 Power Systems Engineering Research Center Empowering Minds to Engineer
More information12 - The Tie Set Method
12 - The Tie Set Method Definitions: A tie set V is a set of components whose success results in system success, i.e. the presence of all components in any tie set connects the input to the output in the
More informationContents Economic dispatch of thermal units
Contents 2 Economic dispatch of thermal units 2 2.1 Introduction................................... 2 2.2 Economic dispatch problem (neglecting transmission losses)......... 3 2.2.1 Fuel cost characteristics........................
More informationRESULTS OF ON-GRID OPERATION OF SUPERCONDUCTOR DYNAMIC SYNCHRONOUS CONDENSER
1 RESULTS OF ON-GRID OPERATION OF SUPERCONDUCTOR DYNAMIC SYNCHRONOUS CONDENSER Dr. Swarn S. Kalsi, David Madura, and Michael Ross American Superconductor Corporation (USA) Abstract: A high-temperature
More informationEvaluating the value of structural heath monitoring with longitudinal performance indicators and hazard functions using Bayesian dynamic predictions
Evaluating the value of structural heath monitoring with longitudinal performance indicators and hazard functions using Bayesian dynamic predictions C. Xing, R. Caspeele, L. Taerwe Ghent University, Department
More informationCascading Outages in Power Systems. Rui Yao
Cascading Outages in Power Systems Rui Yao yaorui.thu@gmail.com Outline Understanding cascading outages Characteristics of cascading outages Mitigation of cascading outages Understanding cascading outages
More informationReliability of Bulk Power Systems (cont d)
Reliability of Bulk Power Systems (cont d) Important requirements of a reliable electric power service Voltage and frequency must be held within close tolerances Synchronous generators must be kept running
More informationReliability Assessment Electric Utility Mapping. Maged Yackoub Eva Szatmari Veridian Connections Toronto, October 2015
Reliability Assessment Electric Utility Mapping Maged Yackoub Eva Szatmari Veridian Connections Toronto, October 2015 Agenda Introduction About Veridian Connections Veridian s GIS platform Reliability
More informationPUB NLH 185 Island Interconnected System Supply Issues and Power Outages Page 1 of 9
PUB NLH 1 Page 1 of 1 Q. Provide Hydro s list of outage cause codes and indicate how troublemen are managed and trained to properly use the codes. Explain the method used to report outage causes. A. Hydro
More informationTime-varying failure rate for system reliability analysis in large-scale railway risk assessment simulation
Time-varying failure rate for system reliability analysis in large-scale railway risk assessment simulation H. Zhang, E. Cutright & T. Giras Center of Rail Safety-Critical Excellence, University of Virginia,
More informationBayesian Knowledge Fusion in Prognostics and Health Management A Case Study
Bayesian Knowledge Fusion in Prognostics and Health Management A Case Study Masoud Rabiei Mohammad Modarres Center for Risk and Reliability University of Maryland-College Park Ali Moahmamd-Djafari Laboratoire
More informationDecision making under uncertainty in power system using Benders decomposition
Graduate Theses and Dissertations Graduate College 2008 Decision making under uncertainty in power system using Benders decomposition Yuan Li Iowa State University Follow this and additional works at:
More informationA Comprehensive Approach for Bulk Power System Reliability Assessment
PAPER D: #44 1 A Comprehensive Approach for Bulk Power System Reliability Assessment Fang Yang, Student Member, EEE, A. P. Sakis Meliopoulos, Fellow, EEE, George J. Cokkinides, Member, EEE, and George
More informationModern Electrical Diagnostics for Metal Oxide Surge Arresters
1 Modern Electrical Diagnostics for Metal Oxide Surge Arresters K. P. Mardira, Student Member, IEEE, and T. K. Saha, Senior Member, IEEE Abstract The aim of this study is to propose simple and reliable
More informationThe Eects of Harmonics in Power Systems and Methods to Reduce or Eliminate Them
The Eects of Harmonics in Power Systems and Methods to Reduce or Eliminate Them Wilbur N. Dale, Ph.D., P.E. wilburd@rstva.com March 15, 2012 Overview Introduction Analysis of Harmonics Sources of Harmonics
More informationChapter 5. System Reliability and Reliability Prediction.
Chapter 5. System Reliability and Reliability Prediction. Problems & Solutions. Problem 1. Estimate the individual part failure rate given a base failure rate of 0.0333 failure/hour, a quality factor of
More informationTransient Behavior of
Transient Behavior of Static Fault Current Limiter in Distribution System by Shahram Najafi, Vijay K. Sood University of Ontario Institute of Technology, Oshawa, Ontario Electrical Power and Energy Conference
More informationAn Innovative Simple Test Circuit for Single-Phase Short Circuit Making Test of High-Voltage Switching Devices
An Innovative Simple Test Circuit for Single-Phase Short Circuit Making Test of High-Voltage Switching Devices Downloaded from jiaeee.com at 2:32 +33 on Sunday November 4th 28 Abstract: N. Nikpour K. Niayesh
More informationA BAYESIAN SOLUTION TO INCOMPLETENESS
A BAYESIAN SOLUTION TO INCOMPLETENESS IN PROBABILISTIC RISK ASSESSMENT 14th International Probabilistic Safety Assessment & Management Conference PSAM-14 September 17-21, 2018 Los Angeles, United States
More informationA Novel Measure of Component Importance Considering Cost for All-Digital Protection Systems
A Novel Measure of Component Importance Considering Cost for All-Digital Protection Systems Peichao Zhang, Member, IEEE, Chao Huo and Mladen Kezunovic, Fellow, IEEE Abstract Component importance analysis
More informationCIGRE US National Committee 2015 Grid of the Future Symposium. Setting-less Protection: Laboratory Experiments and Field Trials
http : //www.cigre.org CIGRE US National Committee 2015 Grid of the Future Symposium Setting-less Protection: Laboratory Experiments and Field Trials A. P. MELIOPOULOS, G.J. COKKINIDES Georgia Institute
More informationComposite System Reliability Evaluation using State Space Pruning
Composite System Reliability Evaluation using State Space Pruning C. Singh, Fellow, IEEE J. Mitra, Student Member, IEEE Department of Electrical Engineering Texas A & M University College Station, Texas
More informationReliability of Technical Systems
Reliability of Technical Systems Main Topics 1. Short Introduction, Reliability Parameters: Failure Rate, Failure Probability, etc. 2. Some Important Reliability Distributions 3. Component Reliability
More informationSafety and Reliability of Embedded Systems
(Sicherheit und Zuverlässigkeit eingebetteter Systeme) Fault Tree Analysis Mathematical Background and Algorithms Prof. Dr. Liggesmeyer, 0 Content Definitions of Terms Introduction to Combinatorics General
More informationIntroduction to Reliability Theory (part 2)
Introduction to Reliability Theory (part 2) Frank Coolen UTOPIAE Training School II, Durham University 3 July 2018 (UTOPIAE) Introduction to Reliability Theory 1 / 21 Outline Statistical issues Software
More informationCyber Physical Power Systems Power in Communications
1 Cyber Physical Power Systems Power in Communications Information and Communications Tech. Power Supply 2 ICT systems represent a noticeable (about 5 % of total t demand d in U.S.) fast increasing load.
More informationProper Security Criteria Determination in a Power System with High Penetration of Renewable Resources
Proper Security Criteria Determination in a Power System with High Penetration of Renewable Resources Mojgan Hedayati, Kory Hedman, and Junshan Zhang School of Electrical, Computer, and Energy Engineering
More informationReal-Time Weather Hazard Assessment for Power System Emergency Risk Management
Real-Time Weather Hazard Assessment for Power System Emergency Risk Management Tatjana Dokic, Mladen Kezunovic Texas A&M University CIGRE 2017 Grid of the Future Symposium Cleveland, OH, October 24, 2017
More informationDynamic Decomposition for Monitoring and Decision Making in Electric Power Systems
Dynamic Decomposition for Monitoring and Decision Making in Electric Power Systems Contributed Talk at NetSci 2007 May 20, 2007 Le Xie (lx@ece.cmu.edu) Advisor: Marija Ilic Outline Motivation Problem Statement
More informationPART- B. Measurements and measurement systems:
PART- B UNIT-5 Measurements and measurement systems: Definition, significance of measurement, generalized measurement system Definitions and concept of accuracy, precision, calibration, threshold, sensitivity,
More informationSuperconducting Fault Current Limiters
Superconducting Fault Current Limiters Prof. Dr.-Ing. Mathias Noe, Karlsruhe Institute of Technology Institute for Technical Physics EASITrain Summer School,, September 3rd-7th 2018, Vienna KIT-ENERGY
More informationConductor Requirements for Superconducting Fault Current Limiters
superior performance. powerful technology. Conductor Requirements for Superconducting Current Limiters Chuck Weber, Director HTS Applications Coated Conductors in Applications 2008 Houston, Texas - December
More informationBig Data Paradigm for Risk- Based Predictive Asset and Outage Management
Big Data Paradigm for Risk- Based Predictive Asset and Outage Management M. Kezunovic Life Fellow, IEEE Regents Professor Director, Smart Grid Center Texas A&M University Outline Problems to Solve and
More informationRisk Analysis for Assessment of Vegetation Impact on Outages in Electric Power Systems. T. DOKIC, P.-C. CHEN, M. KEZUNOVIC Texas A&M University USA
21, rue d Artois, F-75008 PARIS CIGRE US National Committee http : //www.cigre.org 2016 Grid of the Future Symposium Risk Analysis for Assessment of Vegetation Impact on Outages in Electric Power Systems
More informationA Scenario-based Transmission Network Expansion Planning in Electricity Markets
A -based Transmission Network Expansion ning in Electricity Markets Pranjal Pragya Verma Department of Electrical Engineering Indian Institute of Technology Madras Email: ee14d405@ee.iitm.ac.in K.S.Swarup
More informationSoftware Reliability & Testing
Repairable systems Repairable system A reparable system is obtained by glueing individual non-repairable systems each around a single failure To describe this gluing process we need to review the concept
More informationReliability Assessment of Radial distribution system incorporating weather effects
International Journal of Engineering Research and Development e-issn: 2278-067X, p-issn: 2278-800X, www.ijerd.com Volume 6, Issue 7 (pril 2013), PP. 45-51 Reliability ssessment of Radial distribution system
More informationEstimation of Current Transformer Insulation Life with an Effect of Environmental Variables
Estimation of Current Transformer Insulation Life with an Effect of Environmental Variables Priti N. Bawankule 1, Dr. A. G. Thosar 2, P. S. Swami 3 PG Student [EPS], Dept. of EE, Government College of
More informationof an algorithm for automated cause-consequence diagram construction.
Loughborough University Institutional Repository Development of an algorithm for automated cause-consequence diagram construction. This item was submitted to Loughborough University's Institutional Repository
More informationA Markov model for estimating the remaining life of electrical insulation in distribution transformer
AMERICAN JOURNAL OF SCIENTIFIC AND INDUSTRIAL RESEARCH 2010, Science Huβ, http://www.scihub.org/ajsir ISSN: 2153-649X doi:10.5251/ajsir.2010.1.3.539.548 A Markov model for estimating the remaining life
More informationDevelopment of Multi-Unit Dependency Evaluation Model Using Markov Process and Monte Carlo Method
Development of Multi-Unit Dependency Evaluation Model Using Markov Process and Monte Carlo Method Sunghyon Jang, and Akira Yamaguchi Department of Nuclear Engineering and Management, The University of
More informationTeSys circuit-breakers
Presentation Thermal-magnetic motor circuit-breakers types GV2, GV and GV7 GV2-ME, GV2-P, GV-ME and GV7-R motor circuit-breakers are -pole thermal-magnetic circuit-breakers specifically designed for the
More informationRELIABILITY MODELING AND EVALUATION IN AGING POWER SYSTEMS. A Thesis HAG-KWEN KIM
RELIABILITY MODELING AND EVALUATION IN AGING POWER SYSTEMS A Thesis by HAG-KWEN KIM Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment of the requirements for the
More informationHigh Voltage Capacitors Designed to Avoid Catastrophic Failure Modes
GENERAL ATOMICS ENERGY PRODUCTS Engineering Bulletin High Voltage Capacitors Designed to Avoid Catastrophic Failure Modes F. W. MacDougall G. L. McKee, J.B. Ennis, R.A. Cooper Maxwell Energy Products,
More information5SJ4...-.HG Circuit Breakers to IEC and UL 489
Siemens AG 009 5SJ...-.HG Circuit Breakers to IEC and UL 89 BETA Low-Voltage Circuit Protection Compliance with industry standards is a must in today's manufacturing environment. Worldwide acceptance is
More informationManaging Uncertainty and Security in Power System Operations: Chance-Constrained Optimal Power Flow
Managing Uncertainty and Security in Power System Operations: Chance-Constrained Optimal Power Flow Line Roald, November 4 th 2016 Line Roald 09.11.2016 1 Outline Introduction Chance-Constrained Optimal
More informationURD Cable Fault Prediction Model
1 URD Cable Fault Prediction Model Christopher Gubala ComEd General Engineer Reliability Analysis 2014 IEEE PES General Meeting Utility Current Practices & Challenges of Predictive Distribution Reliability
More informationReactive Power Compensation for Reliability Improvement of Power Systems
for Reliability Improvement of Power Systems Mohammed Benidris, Member, IEEE, Samer Sulaeman, Student Member, IEEE, Yuting Tian, Student Member, IEEE and Joydeep Mitra, Senior Member, IEEE Department of
More informationCondition Based Maintenance Optimization Considering Improving Prediction Accuracy
Condition Based Maintenance Optimization Considering Improving Prediction Accuracy Zhigang Tian a,, Bairong Wu a,b, Mingyuan Chen b a Concordia Institute for Information Systems Engineering, Concordia
More informationKIT-ENERGY CENTRE. KIT The research University in the Helmholtz Association
Superconducting Fault Current Limiters Prof. Dr.-Ing. Mathias Noe, Karlsruhe Institute of Technology Institute for Technical Physics EUCAS Short Course Power Applications,, September 17th 2017, Geneva
More informationRailway Research. Study of Superconducting Fault Current Limiter Device in a AC Railway System. 1. Introduction. International Journal of
International Journal of Railway Research, (2015), Vol.2, No1, pp 10-14 ISSN: 236153768187 International Journal of Railway Research Study of Superconducting Fault Current Limiter Device in a AC Railway
More informationSINGLE OBJECTIVE RISK- BASED TRANSMISSION EXPANSION
Vol.2, Issue.1, Jan-Feb 2012 pp-424-430 ISSN: 2249-6645 SINGLE OBJECTIVE RISK- BASED TRANSMISSION EXPANSION V.Sumadeepthi 1, K.Sarada 2 1 (Student, Department of Electrical and Electronics Engineering,
More informationECE 476. Exam #2. Tuesday, November 15, Minutes
Name: Answers ECE 476 Exam #2 Tuesday, November 15, 2016 75 Minutes Closed book, closed notes One new note sheet allowed, one old note sheet allowed 1. / 20 2. / 20 3. / 20 4. / 20 5. / 20 Total / 100
More informationDetermination of Fault Location in Shunt Capacitor Bank through Compensated Neutral Current
International Journal of Advances in Scientific Research and Engineering (ijasre) E-ISSN : 2454-8006 DOI: http://dx.doi.org/10.7324/ijasre.2018.32630 Volume 4, Issue 3 March - 2018 Determination of Fault
More informationA Probabilistic Framework for solving Inverse Problems. Lambros S. Katafygiotis, Ph.D.
A Probabilistic Framework for solving Inverse Problems Lambros S. Katafygiotis, Ph.D. OUTLINE Introduction to basic concepts of Bayesian Statistics Inverse Problems in Civil Engineering Probabilistic Model
More informationInstruction. Vacuum Circuit Breaker Operator Module. Type 3AH 4.16kV to 38kV. Power Transmission & Distribution
Instruction 0001-22-2--00 Vacuum Circuit Breaker Operator Module Type 3AH 4.16kV to 38kV Power Transmission & Distribution Hazardous voltages and high-speed moving parts. Will cause death, serious injury
More informationReliability Assessment of Temporary Structures Using Past Performance Information. Jamshid Mohammadi 1, Mehdi Modares 1, and Aram Zare Najafabadi 2
Reliability Assessment of Temporary Structures Using Past Performance Information Jamshid Mohammadi 1, Mehdi Modares 1, and Aram Zare Najafabadi 2 1 Illinois Institute of Technology, Chicago, Illinois
More informationGENERATOR INTERCONNECTION APPLICATION
GENERATOR INTERCONNECTION APPLICATION FOR BUY-ALL/SELL-ALL PROJECTS WITH AGGREGATE GENERATOR OUTPUT OF MORE THAN 20 KW BUT LESS THAN OR EQUAL TO 1 MW Electric Utility Contact Information Great Lakes Energy
More informationRisk Estimation and Uncertainty Quantification by Markov Chain Monte Carlo Methods
Risk Estimation and Uncertainty Quantification by Markov Chain Monte Carlo Methods Konstantin Zuev Institute for Risk and Uncertainty University of Liverpool http://www.liv.ac.uk/risk-and-uncertainty/staff/k-zuev/
More informationLinear Motion Calculation of the High Voltage Circuit Breaker Contacts Using Rotary Motion Measurement with Nonlinear Transfer Function
Linear Motion Calculation of the High Voltage Circuit Breaker Contacts Using Rotary Motion Measurement with Nonlinear Transfer Function mr.sci. Kerim Obarčanin dipl.ing.el. Software Engineering Dept. DV
More informationAustralian Journal of Basic and Applied Sciences. General Fault Admittance Method Solution of a Balanced Line-to-Line-to-Line Fault
Australian Journal of Basic and Applied Sciences, 8() January 4, Pages: 8-47 AENSI Journals Australian Journal of Basic and Applied Sciences Journal home page: www.ajbasweb.com General Fault Admittance
More informationFleet Maintenance Simulation With Insufficient Data
Fleet Maintenance Simulation With Insufficient Data Zissimos P. Mourelatos Mechanical Engineering Department Oakland University mourelat@oakland.edu Ground Robotics Reliability Center (GRRC) Seminar 17
More informationEE392m Fault Diagnostics Systems Introduction
E39m Spring 9 EE39m Fault Diagnostics Systems Introduction Dimitry Consulting Professor Information Systems Laboratory 9 Fault Diagnostics Systems Course Subject Engineering of fault diagnostics systems
More informationApplication of Monte Carlo Simulation to Multi-Area Reliability Calculations. The NARP Model
Application of Monte Carlo Simulation to Multi-Area Reliability Calculations The NARP Model Any power system reliability model using Monte Carlo simulation consists of at least the following steps: 1.
More informationModeling of Transmission Line and Substation for Insulation Coordination Studies
TRAINING DUBROVNIK, CROATIA - APRIL, 27-29 2009 SIMULATION & ANALYSIS OF POWER SYSTEM TRANSIENTS WITH EMTP-RV Modeling of Transmission Line and Substation for Insulation Coordination Studies Prof. Ivo
More informationUNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. Interconnection for Wind Energy ) Docket No. RM
UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Interconnection for Wind Energy ) Docket No. RM05-4-000 REQUEST FOR REHEARING OF THE NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL
More informationRole of Synchronized Measurements In Operation of Smart Grids
Role of Synchronized Measurements In Operation of Smart Grids Ali Abur Electrical and Computer Engineering Department Northeastern University Boston, Massachusetts Boston University CISE Seminar November
More informationDynamic Voltage Stability Enhancement of a Microgrid with Static and Dynamic Loads Using Microgrid Voltage Stabilizer
Dynamic Voltage Stability Enhancement of a Microgrid with Static and Dynamic Loads Using Microgrid Voltage Stabilizer Kenan Hatipoglu 1, Ismail Fidan 2, Ghadir Radman 3 1 Electrical and Computer Engineering
More informationReducing Contingency-based Windfarm Curtailments through use of Transmission Capacity Forecasting
Reducing Contingency-based Windfarm Curtailments through use of Transmission Capacity Forecasting Doug Bowman Southwest Power Pool Jack McCall Lindsey Manufacturing Co. CIGRE US National Committee 2017
More informationSEQUENCING RELIABILITY GROWTH TASKS USING MULTIATTRIBUTE UTILITY FUNCTIONS
SEQUENCING RELIABILITY GROWTH TASKS USING MULTIATTRIBUTE UTILITY FUNCTIONS KEVIN J WILSON, JOHN QUIGLEY Department of Management Science University of Strathclyde, UK In both hardware and software engineering,
More informationFailure Analysis of Medium Voltage Capacitor Banks: The Egyptian Experience
Failure Analysis of Medium Voltage Capacitor Banks: The Egyptian Experience Mohamed A. EL-HADIDY Dalal H. HELMI Tech. Consultant dr_alhadidy@hotmail.com Studies and Research Dept. dalalhelmi@hotmail.com
More informationELECTRICAL STRESS DE-RATING ANALYSIS INTRODUCTION
ELECTRICAL TRE E-RATING ANALYI INTRUCTIN The purpose of this document is to familiarize the user with the basic concepts of a de-rating analysis, starting with circuit analysis and proceeding through documentation.
More informationADEQUACY ASSESSMENT IN POWER SYSTEMS USING GENETIC ALGORITHM AND DYNAMIC PROGRAMMING. A Thesis DONGBO ZHAO
ADEQUACY ASSESSMENT IN POWER SYSTEMS USING GENETIC ALGORITHM AND DYNAMIC PROGRAMMING A Thesis by DONGBO ZHAO Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment of
More informationNC7SB3157 TinyLogic Low Voltage UHS Analog Switch 2-Channel Multiplexer/Demultiplexer (Preliminary)
September 1999 Revised November 1999 TinyLogic Low Voltage UHS Analog Switch 2-Channel Multiplexer/Demultiplexer (Preliminary) General Description The is a high performance, Analog Switch 2- channel CMOS
More informationA new FMECA model for reliability computations in electrical distribution systems
Proceedings of the 6th WSEAS/IASME Int. Conf. on Electric Power Systems, High Voltages, Electric Machines, Tenerife, Spain, December 6-8, 2006 A new FMECA model for reliability computations in electrical
More informationMCB NB1-63H Miniature Circuit Breaker
NB-H Miniature Circuit Breaker. General. Function protection of circuits against short-circuit currents, protection of circuits against overload currents, switch, isolation, NB-H circuit-breakers are used
More informationA possible notion of short-term value-based reliability
Energy Laboratory MIT EL 1-13 WP Massachusetts Institute of Technology A possible notion of short-term value-based reliability August 21 A possible notion of short-term value-based reliability Yong TYoon,
More informationComparison of Partial Discharge Characteristics for Different Defect Types in SF 6 Gas Insulation System
Comparison of Partial Discharge Characteristics for Different Defect Types in SF 6 Gas Insulation System D.A. Mansour, T. Okusu, K. Nishizawa, H. Kojima, N. Hayakawa, F. Endo and H. Okubo Nagoya University
More information9. Reliability theory
Material based on original slides by Tuomas Tirronen ELEC-C720 Modeling and analysis of communication networks Contents Introduction Structural system models Reliability of structures of independent repairable
More informationAnalysis of Very Fast Transients in EHV Gas Insulated Substations
Analysis of Very Fast Transients in EHV Gas Insulated Substations A.Raghu Ram, k. Santhosh Kumar raghuram_a@yahoo.com,ksanthosheee@gmail.com Abstract: Gas insulated switchgear (GIS) has been in operation
More informationDISTRIBUTION SYSTEM OPTIMISATION
Politecnico di Torino Dipartimento di Ingegneria Elettrica DISTRIBUTION SYSTEM OPTIMISATION Prof. Gianfranco Chicco Lecture at the Technical University Gh. Asachi, Iaşi, Romania 26 October 2010 Outline
More informationBayesian Decision Theory
Bayesian Decision Theory Dr. Shuang LIANG School of Software Engineering TongJi University Fall, 2012 Today s Topics Bayesian Decision Theory Bayesian classification for normal distributions Error Probabilities
More informationCHAPTER 3 FUZZIFIED PARTICLE SWARM OPTIMIZATION BASED DC- OPF OF INTERCONNECTED POWER SYSTEMS
51 CHAPTER 3 FUZZIFIED PARTICLE SWARM OPTIMIZATION BASED DC- OPF OF INTERCONNECTED POWER SYSTEMS 3.1 INTRODUCTION Optimal Power Flow (OPF) is one of the most important operational functions of the modern
More information08/072 PKZ2 Motor-Protective Circuit-Breakers Tripping Characteristics
0/07 PKZ Tripping Characteristics Moeller HPL0-00/00 S-PKZ high-capacity contact module, SEA-PKZ contact module Normal switching duty AC-/00V kw A Rated output of three-phase motors 0...0 Hz. 7..... 0.7
More informationProcedure To Be Adopted When Working on High Voltage Mechanically Switched Capacitors with Damping Network (MSCDN)
1. SCOPE This document details the procedures to be adopted when working on High Voltage Mechanically Switched Capacitors with. 2. ISSUE RECORD This is a Reference document. The current version is held
More informationMP6901 MP6901. High Power Switching Applications. Hammer Drive, Pulse Motor Drive and Inductive Load Switching. Maximum Ratings (Ta = 25 C)
TOSHIBA Power Transistor Module Silicon Epitaxial Type (Darlington power transistor in ) High Power Switching Applications. Hammer Drive, Pulse Motor Drive and Inductive Load Switching. Industrial Applications
More informationChapter 2. Planning Criteria. Turaj Amraee. Fall 2012 K.N.Toosi University of Technology
Chapter 2 Planning Criteria By Turaj Amraee Fall 2012 K.N.Toosi University of Technology Outline 1- Introduction 2- System Adequacy and Security 3- Planning Purposes 4- Planning Standards 5- Reliability
More informationKey Words: Lifetime Data Analysis (LDA), Probability Density Function (PDF), Goodness of fit methods, Chi-square method.
Reliability prediction based on lifetime data analysis methodology: The pump case study Abstract: The business case aims to demonstrate the lifetime data analysis methodology application from the historical
More information