System and Concurrent Engineering for the e.deorbit Mission Assessment Studies Robin Biesbroek Jakob Hüsing Andrew Wolahan
|
|
- Arron Nicholson
- 6 years ago
- Views:
Transcription
1 System and Concurrent Engineering for the e.deorbit Mission Assessment Studies Robin Biesbroek Jakob Hüsing Andrew Wolahan
2 Why Active Debris Removal? catalogued objects Less than 1000 active km polar / Sun-Synchronous orbits most populated Environment can be stabilised if 5 such objects are removed per year from these orbits Space Debris with highest collision impact are large objects in populated orbits
3 Is space debris a problem? Even if the world stops launching satellites, the number of debris in space increases Anno 2013: collision warnings on weekly basis Satellites in densely populated orbits such as SSO/polar (ERS-1, ERS-2, Envisat, METOP, Biomass, SMOS, Cryosat-2, Sentinels) may suffer from continuous collision avoidance manoeuvres in the future -> interrupted service
4 The need for an ADR mission The answer of Clean Space is to develop European capability to remove a large space debris from orbit by means of an ADR mission The mission objective is to perform Active Debris Removal a. Uncooperative ESA-owned debris object (large satellite or upper stage) with heavy mass (> 4000 kg) b. In km (near) polar region
5 Mission Profile Target orbit Rendezvous Capture Target Altitude raising to >2000 km Or Phasing Perigee lowering burns (1 to 5) Initial orbit (300 x 300 km) Commissioning De-orbit burn Re-Entry over SPOUA Launch Note: initial orbit could be optimised, performances of the UM assumed
6 Timeline of de-orbit studies Service Oriented Service Oriented Approach to ADR Envisat Deorbit Envisat DA e.deorbit Conventional Approach VEGA upper-stage e.deorbit Phase A
7 2011: Envisat de-orbit study Target assumed to be controlled 1. Orbit: a. Re-orbit to >2000 km b. De-orbit to <600 km c. Controlled re-entry 2. Propulsion a. Chemical (CP) b. Electrical (EP) 3. Capture techniques a. Robotic arm b. Clamping mechanisms ( tentacles ) c. Net d. Ion-beam shephard e. Others (harpoon, clamp, etc.) Reduced team. Five CDF sessions
8 2012: Envisat DA study Why? New requirements: Target assumed to be uncontrolled Could be tumbling with 1 /sec Solar panel locked in worst position Need to re-evaluate trades Reduced team Four CDF sessions
9 2012: e.deorbit CDF study results Clamping Mechanisms ( tentacles )option Clamping mechanisms + pushing rods May need robotic arm (baselined in CDF study) VEGA launch (1590 kg) Chemical Propulsion (2 x 425N) 52% of total mass is propellant LIDAR, Far field & near field, RW s + thrusters Controlled re-entry (3 + 1 burns) Net option Net shot towards target 1 net + 1 redundant VEGA launch (1560 kg) Chemical Propulsion (2 x 425N + 2 x 220N) 56% of total mass is propellant LIDAR, Far field, thrusters Controlled re-entry (3 + 1 burns)
10 Timeline of de-orbit studies Service Oriented Service Oriented Approach to ADR Envisat Deorbit Envisat DA e.deorbit Conventional Approach VEGA upper-stage e.deorbit Phase A
11 2013: A service-oriented approach Objectives of this study were to address the feasibility of an Active Debris Removal mission, to define a business model for the implementation of the ADR mission: 1. ESA buys a service for the first ADR mission 2. to define a business plan for future ADR missions and technology roadmaps for the removal of large debris from space. Final presentations end of Presented to TAWG in 2014 Credits: Kayser-threde / OHB system / Polimi Credits: Astrium / DLR Credits: SSTL / Aviospace / Deimos SpaceCode design
12 Timeline of de-orbit studies Service Oriented Service Oriented Approach to ADR Envisat Deorbit Envisat DA e.deorbit Conventional Approach VEGA upper-stage e.deorbit Phase A
13 Using AVUM as platform 1. Contract give by ESA to ELV to perform a phase-0 assessment of a mission to de-orbit a large ESA-owned debris by means of adapting VEGA s upper-stage a. Rigid connection b. Flexible connection 2. Final presentation 12 Dec CDF review in March Full team 5. Reduced number of sessions: Session 1 K/O Session 2 Review Session 3 Update CDF model option 1 Session 4 AM Update CDF model option 2 Session 4 PM Final presentation
14 e.deorbit Phase A
15 2014: Phase A Phase A: Capture technique selection MBR Platform Design CE sessions by industry MDR 1. Review board 2. Technical panel -> CDF team 7 Sessions: KO+ 2 for each contractor Contractors delivered IDM Macros for RIDs collection and report generation PRR Review only no sessions for design update
16 Design comparison rigid option CDF Airbus Kayser-Threde Thales Launcher VEGA VEGA VEGA VEGA Capture technique Robotic arm + fixation device Attachment points Robotic arm (TBC) + clamping mechanism Arm: launcher adapter Clamp: target body Arm: launcher adapter Clamp: target solar panel holddown points Robotic arm + clamping mechanism Arm: launcher adapter Clamp: target body Data Relay sat TBC No No No Payload sensors LIDAR (TBC), far range and close range camera LIDAR, far range, inspection, and fixation camera Laser range finder, far range and close range camera Robotic arm + clamping mechanism Arm: launcher adapter Clamp: launcher adapter Far range and close range camera Dry Mass [%] 100% 102% 112% 104% Wet Mass [%] 100% 102% 108% 101% Cost [%] 100% Average of three contractors: 122%
17 Design comparison flexible option CDF Airbus Kayser-Threde Thales Launcher VEGA VEGA VEGA VEGA Capture Net Net Net Harpoon technique Data Relay Sat TBC No No No Payload sensors LIDAR (TBC), far range camera LIDAR (TBC), far range and inspection camera Laser range finder, far range and close range camera Dry Mass [%] 100% 104% 111% 103% Wet Mass [%] 100% 101% 102% 101% Cost [%] 100% 102% Far range and close range camera
18 Conclusions and recommendations 1. Concurrent Engineering was successfully applied during the phase 0 and phase A studies of e.deorbit. a. The phase 0 studies in ESA s CDF b. Industry studies were reviewed by the CDF 2. The e.deorbit mission concept changed only slightly during its conversion from phase 0 to phase A 3. A minimum of four CDF sessions is recommended if the review team is to not only review the work but also implement design changes to verify feasibility of the updated design. 4. Contractors adopted the use of concurrent engineering sessions in some cases a. Communication with ESA using VC/WebEx remained difficult due to the lack of videoconference facilities in industry b. Restrictions related to the use of tools such as WebEx c. New Collaborative Working Environment will be used for phase B1
GUIDANCE, NAVIGATION, AND CONTROL TECHNIQUES AND TECHNOLOGIES FOR ACTIVE DEBRIS REMOVAL
GUIDANCE, NAVIGATION, AND CONTROL TECHNIQUES AND TECHNOLOGIES FOR ACTIVE DEBRIS REMOVAL Antonio Rinalducci, Guillermo Ortega Hernando, Sven Erb, Alexander Cropp, Thomas Voirin, Olivier Dubois-Matra, Gianfranco
More informationAnalysis of the Rendezvous Phase of e.deorbit Guidance, Communication and Illumination. MSc Thesis Report 19 December 2014 J.A.F.
Analysis of the Rendezvous Phase of e.deorbit Guidance, Communication and Illumination MSc Thesis Report 19 December 214 J.A.F. Deloo Credits cover image: AGI (Analytical Graphics, Inc.) Analysis of the
More informationOHB System AG, Universitätsallee 27-29, Bremen, Germany, (2)
DESIGN AND DEVELOPMENT PLAN OF A TENTACLES BASED CLAMPING MECHANISM FOR ACTIVE DEBRIS REMOVAL 13 TH SYMPOSIUM ON ADVANCED SPACE TECHNOLOGIES IN ROBOTICS AND AUTOMATION Jan-Christian Meyer (1), Marc Scheper
More informationACTIVE DEBRIS REMOVAL AND SPACE DEBRIS MITIGATION USING HYBRID PROPULSION SOLUTIONS
ACTIVE DEBRIS REMOVAL AND SPACE DEBRIS MITIGATION USING HYBRID PROPULSION SOLUTIONS Stefania Tonetti (1), Stefania Cornara (1), Martina Faenza (2), Onno Verberne (2), Tobias Langener (3), Gonzalo Vicario
More informationSpacecraft design indicator for space debris
Spacecraft design indicator for space debris Camilla Colombo (1), Mirko Trisolini (2), Francesca Letizia (2), Hugh G. Lewis (2), Augustin Chanoine (3), Pierre-Alexis Duvernois (3), Julian Austin (4), Stijn
More informationBINARY ASTEROID ORBIT MODIFICATION
2013 IAA PLANETARY DEFENSE CONFERENCE BEAST BINARY ASTEROID ORBIT MODIFICATION Property of GMV All rights reserved TABLE OF CONTENTS 1. Mission Concept 2. Asteroid Selection 3. Physical Principles 4. Space
More informationSustainable activities in space: Space debris problematic in a nutshell
Sustainable activities in space: Space debris problematic in a nutshell Christophe BONNAL CNES, Launcher Directorate Chairman IAA Space Debris Committee OUTLINE Evolution of the orbital population Casualty
More informationAstrodynamics tools in the ESTEC Concurrent Design Facility. Robin Biesbroek CDF Technical Assistant ESA/ESTEC Noordwijk - NL
Astrodynamics tools in the ESTEC Concurrent Design Facility Robin Biesbroek CDF Technical Assistant ESA/ESTEC Noordwijk - NL CDF Astrodynamics CDF Presentation - 1 Introduction Concurrent Design Facility
More informationPropellantless deorbiting of space debris by bare electrodynamic tethers
Propellantless deorbiting of space debris by bare electrodynamic tethers Juan R. Sanmartín Universidad Politécnica de Madrid Presentation to the 51 th Session of the Scientific and Technical Subcommittee
More informationStatus of the European Student Moon Orbiter (ESMO) Project:
Status of the European Student Moon Orbiter (ESMO) Project: Roger Walker, Project Manager Education Projects Unit, ESA Education Office, ESTEC 1 What is ESMO? Fourth mission in the ESA Education Satellite
More informationThe AEOLUS Mission - In Orbit Commissioning and Verification
The AEOLUS Mission - In Orbit Commissioning and Verification ADM-Aeolus CAL/VAL Workshop, ESRIN P McGoldrick, J Brewster, J Marshall, F Fabre Airbus Defence and Space, UK and France 12 th February 2015
More informationEnd of Life Re-orbiting The Meteosat-5 Experience
End of Life Re-orbiting The Meteosat-5 Experience Milan EUMETSAT, Darmstadt, Germany This article illustrates the orbit maneuver sequence performed during Meteosat- 5 End of Life (EOL) re-orbiting operations
More informationIMPACT OF SPACE DEBRIS MITIGATION REQUIREMENTS ON THE MISSION DESIGN OF ESA SPACECRAFT
IMPACT OF SPACE DEBRIS MITIGATION REQUIREMENTS ON THE MISSION DESIGN OF ESA SPACECRAFT Rüdiger Jehn (1), Florian Renk (1) (1 ) European Space Operations Centre, Robert-Bosch-Str. 5, 64293 Darmstadt, Germany,
More informationNet Capture Mechanism for Debris Removal Demonstration Mission
Net Capture Mechanism for Debris Removal Demonstration Mission Robert Axthelm (1), Barbara Klotz (2), Dr. Ingo Retat (3), Uwe Schlossstein (4), Wolfgang Tritsch (5), Susanne Vahsen (6) Airbus DS, Airbus
More informationINTER-AGENCY SPACE DEBRIS COORDINATION COMMITTEE (IADC) SPACE DEBRIS ISSUES IN THE GEOSTATIONARY ORBIT AND THE GEOSTATIONARY TRANSFER ORBITS
INTER-AGENCY SPACE DEBRIS COORDINATION COMMITTEE (IADC) SPACE DEBRIS ISSUES IN THE GEOSTATIONARY ORBIT AND THE GEOSTATIONARY TRANSFER ORBITS Presented to: 37-th Session of the SCIENTIFIC AND TECHNICAL
More informationSPACE DEBRIS MITIGATION TECHNOLOGIES
SPACE DEBRIS MITIGATION TECHNOLOGIES Rob Hoyt Tethers Unlimited, Inc. The orbital debris population and its potential for continued rapid growth presents a significant threat to DoD, NASA, commercial,
More informationAn Update on EUMETSAT Programmes and Plans. Dieter Klaes on behalf of EUMETSAT teams
An Update on EUMETSAT Programmes and Plans Dieter Klaes on behalf of EUMETSAT teams 1 21 st International TOVS Study Conference (ITSC), Darmstadt, Germany, 29 November 2017 5 December 2017 Current EUMETSAT
More informationRECENT SPACE DEBRIS MITIGATION ACTIVITIES IN FRANCE F.ALBY
RECENT SPACE DEBRIS MITIGATION ACTIVITIES IN FRANCE F.ALBY GEO END OF LIFE WORKSHOP BACKGROUND Particularity of the GEO orbit: unique resource Need to protect and to keep available orbital positions Mitigation
More informationSpace Environment & Technology Space Policy and Law Course 2018
Space Environment & Technology Space Policy and Law Course 2018 Professor Alan Smith Mullard Space Science Laboratory University College London 15 October 2018 Orbits and Space The Space Environment The
More informationIndividual Adapter Solutions for Multi-Spacecraft Launches on Rockot
SSC14-IV-9 Individual Adapter Solutions for Multi-Spacecraft Launches on Rockot York Viertel, Peter Freeborn, Markus Poetsch, Anna Zorina Eurockot Launch Services GmbH Flughafenalle 26, 28199 Bremen, Germany
More informationFORMATION FLYING GUIDANCE FOR SPACE DEBRIS OBSERVATION, MANIPULATION AND CAPTURE
ASTRONET II INTERNATIONAL FINAL CONFERENCE FORMATION FLYING GUIDANCE FOR SPACE DEBRIS OBSERVATION, MANIPULATION AND CAPTURE T. V. Peters (GMV) Property of GMV All rights reserved OVERVIEW n Presentation
More informationOverview of the Jovian Exploration Technology Reference Studies
Overview of the Jovian Exploration Technology Reference Studies The Challenge of Jovian System Exploration Peter Falkner & Alessandro Atzei Solar System Exploration Studies Section ESA/ESTEC Peter.Falkner@esa.int,
More informationBEOSAT (BRUNSWICK-EARTH-OBSERVATION-SATELLITE)
ABSTRACT BEOSAT (BRUNSWICK-EARTH-OBSERVATION-SATELLITE) Rolf Kluge Jörn Pfingstgräff ExperimentalRaumfahrt-InteressenGemeinschaft e.v., Germany r.kluge@tu-braunschweig.de j.pfingstgraeff@tu-braunschweig.de
More informationCase Studies for Uncertainty Quantification of a High-fidelity Spacecraft Oriented Break-up Tool. Bent Fritsche, HTG Stijn Lemmens, ESA
Case Studies for Uncertainty Quantification of a High-fidelity Spacecraft Oriented Break-up Tool Bent Fritsche, HTG Stijn Lemmens, ESA 8th European Symposium on Aerothermodynamics for Space Vehicles Lisbon,
More information48 宇宙航空研究開発機構特別資料 JAXA-SP-3-08 ACTIVE DEBRIS REMOVAL: CURRENT STATUS OF ACTIVITIES IN CNES Christophe BONNAL CNES Paris - Launcher Directorate christo
47 A4 Active Debris Removal activities in CNES Christophe Bonnal (CNES) A vast majority of studies led at international level, mainly in the frame of IADC, has shown that the future stabilization of the
More informationSENTINEL-1A LAUNCH CONTENTS. CONTACT & LINKS Press Contact Mario de Lepine
SENTINEL-1A LAUNCH Arianespace s seventh Soyuz launch from the Guiana Space Center will orbit Sentinel-1A, the first satellite in Europe s Earth observation program, Copernicus. The European Space Agency
More informationTHIRD VEGA LAUNCH FROM THE GUIANA SPACE CENTER
THIRD VEGA LAUNCH FROM THE GUIANA SPACE CENTER On the third Vega launch from the Guiana Space Center (CSG) in French Guiana, Arianespace will orbit Kazakhstan s first Earth observation satellite, DZZ-HR.
More informationLaser de-spin maneuver for an active debris removal mission - a realistic scenario for Envisat
Laser de-spin maneuver for an active debris removal mission - a realistic scenario for Envisat Daniel Kucharski Space Environment Research Centre, Mt Stromlo Observatory, Weston Creek ACT, 2611, AUSTRALIA
More informationDEOS - THE IN-FLIGHT TECHNOLOGY DEMONSTRATION OF GERMAN'S ROBOTICS APPROACH TO DISPOSE MALFUNCTIONED SATELLITES
DEOS - THE IN-FLIGHT TECHNOLOGY DEMONSTRATION OF GERMAN'S ROBOTICS APPROACH TO DISPOSE MALFUNCTIONED SATELLITES D. Reintsema (1), B. Sommer (2), T. Wolf (3), J. Theater (4), A. Radthke (5), J. Sommer (6),
More informationFormation Flying and Rendezvous and Docking Simulator for Exploration Missions (FAMOS-V2)
Formation Flying and Rendezvous and Docking Simulator for Exploration Missions (FAMOS-V2) Galder Bengoa, F. Alonso, D. García, M. Graziano (GMV S.A.) Dr. Guillermo Ortega (ESA/ESTEC) 2nd ESA Workshop on
More informationSECOND VEGA LAUNCH FROM THE GUIANA SPACE CENTER
SECOND VEGA LAUNCH FROM THE GUIANA SPACE CENTER On the second Vega launch from the Guiana Space Center (CSG) in French Guiana, Arianespace will orbit three satellites: PROBA-V, VNREDSat-1 and ESTCube-1.
More informationDE-ORBITATION STUDIES AND OPERATIONS FOR SPIRALE GTO SATELLITES
DE-ORBITATION STUDIES AND OPERATIONS FOR SPIRALE GTO SATELLITES François BONAVENTURE (1), Slim LOCOCHE (2), Anne-Hélène GICQUEL (3) (1) Tel. (+33) (0)5 62 19 74 27, E-mail. francois.bonaventure@astrium.eads.net
More informationSolid Propellant Autonomous DE-Orbit System [SPADES]
Solid Propellant Autonomous DE-Orbit System [SPADES] Solid Propellant Rocket Motor development Presented: Rogier Schonenborg Study: T. Soares J. Huesing A. Cotuna W. van Meerbeeck I. Carnelli L. Innocenti
More informationINTERSTELLAR PRECURSOR MISSIONS USING ADVANCED DUAL-STAGE ION PROPULSION SYSTEMS
INTERSTELLAR PRECURSOR MISSIONS USING ADVANCED DUAL-STAGE ION PROPULSION SYSTEMS David G Fearn, 23 Bowenhurst Road, Church Crookham, Fleet, Hants, GU52 6HS, UK dg.fearn@virgin.net Roger Walker Advanced
More informationsentinel-2 COLOUR VISION FOR COPERNICUS
sentinel-2 COLOUR VISION FOR COPERNICUS SATELLITES TO SERVE By providing a set of key information services for a wide range of practical applications, Europe s Copernicus programme is providing a step
More informationJUpiter Icy Moons Explorer (JUICE) Status report for OPAG. N. Altobelli (on behalf of O. Witasse) JUICE artist impression (Credits ESA, AOES)
JUpiter Icy Moons Explorer (JUICE) Status report for OPAG N. Altobelli (on behalf of O. Witasse) JUICE artist impression (Credits ESA, AOES) Message on behalf of the JUICE Science Working Team Congratulations
More informationThe European Student Moon Orbiter (ESMO) A Small Mission for Education, Outreach, and Science
(ESMO) A Small Mission for Education, Outreach, and Science Roger Walker, Matthew Cross Education Projects Unit, ESA Education Office ESTEC, Noordwijk, The Netherlands LEAG-ILEWG-SRR Meeting Cape Canaveral,
More informationJulia Figa-Saldaña & Klaus Scipal
Julia Figa-Saldaña & Klaus Scipal julia.figa@eumetsat.int klaus.scipal@esa.int Meeting, Outline MetOp/EPS status MetOp/EPS Second Generation status 2016 scatterometer conference Other European ocean programme
More informationASTRIUM. Minimum-time problem resolution under constraints for low-thrust stage trajectory computation. Nathalie DELATTRE ASTRIUM Space Transportation
Minimum-time problem resolution under constraints for low-thrust stage trajectory computation Nathalie DELATTRE Space Transportation Page 1 Introduction Purpose : Taking into account new technology for
More informationThe Satellite Sweeper Approach for the Solution of the Space Debris Problem
SPACE PROPULSION 2016, MARRIOTT PARK HOTEL, ROME, ITALY / 2-6 MAY 2016 The Satellite Sweeper Approach for the Solution of the Space Debris Problem P. Pergola (1) and A. Pasini (2) (1) Sitael S.p.A., Via
More informationLISA Pathfinder measuring pico-meters and femto-newtons in space
LISA Pathfinder measuring pico-meters and femto-newtons in space M Hewitson for the LPF team Barcelona, February 15th 2012 Observing from Space 2 Observing from Space 2 Observing from Space Push down to
More informationPico-Satellite Orbit Control by Vacuum Arc Thrusters as Enabling Technology for Formations of Small Satellites
1/25 Pico-Satellite Orbit Control by Vacuum Arc Thrusters as Enabling Technology for Formations of Small Satellites Igal Kronhaus, Mathias Pietzka, Klaus Schilling, Jochen Schein Department of Computer
More informationEUROSTAR 3000 INCLINED ORBIT MISSION : LIFETIME OPTIMISATION IN CASE OF INJECTION WITH A LOW INCLINATION
EUROSTAR 3000 INCLINED ORBIT MISSION : LIFETIME OPTIMISATION IN CASE OF INJECTION WITH A LOW INCLINATION Franck Raballand (1), Julie De Lamarzelle (2), François Bonaventure (3), Anne-Hélène Gicquel (4)
More informationarxiv:gr-qc/ v1 15 Nov 2004
Mission design for LISA Pathfinder arxiv:gr-qc/0411071v1 15 Nov 2004 M Landgraf, M Hechler, and S Kemble ESA/ESOC, Robert-Bosch-Straße 5, D-64293 Darmstadt, Germany E-mail: Markus.Landgraf@esa.int EADS
More informationLOFAR on the Moon: Mission Configuration and Orbit Design
LOFAR on the Moon: Mission Configuration and Orbit Design Maximizing the Payload Mass Using Chemical or Electrical Propulsion May 12, 2015 Aerospace Engineering - Space Exploration LOFAR on the Moon:
More informationCUBESAT ATMOSPHERIC PROBE FOR EDUCATION (CAPE)
Presenting author: Christoph Montag Institute of Space Systems, University of Stuttgart montag@irs.uni-stuttgart.de CUBESAT ATMOSPHERIC PROBE FOR EDUCATION (CAPE) Adam S. Pagan (1), Christoph Montag (1),
More informationMISSION ENGINEERING SPACECRAFT DESIGN
MISSION ENGINEERING & SPACECRAFT DESIGN Alpbach 2007 - D.J.P. Moura - CNES MISSION ENGINEERING (1) OVERALL MISSION ENGINEERING IS A COMPLEX TASK SINCE AT THE BEGINNING THE PROBLEM IS GENERALLY BADLY EXPRESSED
More informationSPACE DEBRIS REMOVAL
M.K. Yangel Yuzhnoye State Design Office Ukraine SPACE DEBRIS REMOVAL The Fiftieth Session of the Scientific and Technical Subcommittee of the Committee on the Peaceful Uses of Outer Space Vienna International
More informationGravitational & Planetary Research Program
2012 Gravitational & Planetary Research Program Goals Why? Relativity, Gravitational Waves, Geodesy, Aeronomy Space Technology Education and Training: STEM Team Who? NASA Universities Industry Foreign
More informationLAUNCH KIT MARCH 2017 VV09. Sentinel-2B
LAUNCH KIT MARCH 2017 VV09 FLIGHT VV09: A NEW VEGA MISSION AT THE SERVICE OF EARTH OBSERVATION WITH EUROPE S COPERNICUS PROGRAM CONTENTS For its third launch of the year - and the ninth to be performed
More informationASCAT - Metop A developments, Metop B preparations & EPS-SG
ASCAT - Metop A developments, Metop B preparations & EPS-SG Hans Bonekamp, Craig Anderson, Julia Figa & Julian Wilson Slide: 1 ASCAT Metop A - overview Instrument operating nominally (minor incident in
More informationESA activities towards the Gravitation Waves Space Observatory
ESA activities towards the Gravitation Waves Space Observatory Frédéric Safa ESA Science Directorate, Future Missions LISA Symposium, Zurich 2016 The Gravitation Wave Observatory in ESA Science Programme
More informationSolid Propellant Autonomous DE-Orbit System [SPADES] Co-authors: T. Soares J. Huesing A. Cotuna I. Carnelli L. Innocenti
Solid Propellant Autonomous DE-Orbit System [SPADES] Co-authors: T. Soares J. Huesing A. Cotuna I. Carnelli L. Innocenti SPADES introduction SPADES is: Cross-cutting system to support the compliance of
More informationDecember VV 06. LISA Pathfinder
December 2015 VV 06 VEGA'S SIXTH LAUNCH WILL ORBIT EUROPE'S LISA PATHFINDER DEMONSTRATOR On its 11 th launch of the year, and sixth flight overall of the Vega light launcher from the Guiana Space Center,
More informationSpace Debris. Dr. David Kendall Canadian Space Agency
Space Debris Dr. David Kendall Canadian Space Agency International Interdisciplinary Congress on Space Debris Remediation 11-12 November, 2011 Faculty of Law, McGill University Recent CSA Space Debris
More informationRobotic Lunar Exploration Scenario JAXA Plan
Workshop May, 2006 Robotic Lunar Exploration Scenario JAXA Plan Tatsuaki HASHIMOTO JAXA 1 Question: What is Space Exploration? Answers: There are as many answers as the number of the people who answer
More informationA MISSION TO DEMONSTRATE THE PRESERVATION OF THE GEOSTATIONARY ORBIT
A MISSION TO DEMONSTRATE THE PRESERVATION OF THE GEOSTATIONARY ORBIT R. Longstaff (1), M. Hempsell (2) (1) Guest Associates (Europe) Ltd., 2 Alyson Villas, Vincent Close, Ilford, IG6 2FE, United Kingdom
More informationA Regional Microsatellite Constellation with Electric Propulsion In Support of Tuscan Agriculture
Berlin, 20 th - 24 th 2015 University of Pisa 10 th IAA Symposium on Small Satellites for Earth Observation Student Conference A Regional Microsatellite Constellation with Electric Propulsion In Support
More informationIOVWST Meeting, Sapporo/Japan, May 2016
IOVWST Meeting, Sapporo/Japan, May 2016 The Design and Performance of the SCA Radar carried by the METOP Second Generation Satellites J. J. W. Wilson, C. Anderson EUMETSAT, Darmstadt, Germany. A. Ostergaard,
More informationCreating Large Space Platforms From Small Satellites
SSC99-VI-6 Creating Large Space Platforms From Small Satellites Andrew W. Lewin Principal Systems Engineer Orbital Sciences Corporation Dulles, VA 20166 (703) 406-5000 lewin.andy@orbital.com Abstract.
More informationEvolving Systems Approach to the Attitude Control of a Space-Debris Removal Spacecraft
Delft University of echnology Evolving Systems Approach to the Attitude Control of a Space-Debris Removal Spacecraft Habets, Jannick; Mooij, Erwin; Frost, Susan A. DOI 1.2514/6.217-139 Publication date
More informationThe E-SAIL programme. 10th IAA Symposium on Small Satellites for Earth Observation April 20-24, 2015 Berlin LuxSpace s.à.r.
The E-SAIL programme 10th IAA Symposium on Small Satellites for Earth Observation April 20-24, 2015 Berlin LuxSpace s.à.r.l An OHB company Contents LuxSpace Background Consortium Spacecraft Specific issues
More informationDEOS AUTOMATION AND ROBOTICS PAYLOAD
w e. c r e a t e. s p a c e. Kayser-Threde GmbH Space Industrial Applications DEOS AUTOMATION AND ROBOTICS PAYLOAD 11th Symposium on Advanced Space Technologies in Robotics and Automation ESA/ESTEC, Noordwijk,
More informationStatus overview of the European scatterometer activities
Status overview of the European scatterometer activities S Linow (EUMETSAT), K Scipal (ESA) IOVWST 2018 24 26 April 2018, Barcelona 1 Current and future European operational scatterometer missions YEAR...
More informationThe In-Orbit Commissioning of MSG-1
Earth Observation The In-Orbit Commissioning of MSG-1 MSG Project Team, Earth Observation Projects Department, ESA Directorate of Earth Observation, ESTEC, Noordwijk, The Netherlands 80 esa bulletin 114
More informationToshinori Kuwahara*, Yoshihiro Tomioka, Yuta Tanabe, Masato Fukuyama, Yuji Sakamoto, Kazuya Yoshida, Tohoku University, Japan
Toshinori Kuwahara*, Yoshihiro Tomioka, Yuta Tanabe, Masato Fukuyama, Yuji Sakamoto, Kazuya Yoshida, Tohoku University, Japan The 3 rd Nano-Satellite Symposium Micro/Nano Satellite & Debris Issues December
More informationReport of the Venera-D Joint Science Definition Team: "Together to Venus"
Report of the Venera-D Joint Science Definition Team: "Together to Venus" L. Zasova1, D. Senske2, T. Economou3, N. Eismont1, L. Esposito4, M. Gerasimov1, N. Ignatiev1, M. Ivanov5, I. Khatuntsev1, O. Korablev1,
More informationGRASP: An Asteroid Lander/Rover for Asteroid Surface Gravity Surveying
GRASP: An Asteroid Lander/Rover for Asteroid Surface Gravity Surveying Kieran A. Carroll, Gedex Systems Inc. Henry Spencer, SP Systems Robert E. Zee, Space Flight Laboratory CASI ASTRO 2016 30 th Annual
More informationUSA Space Debris Environment, Operations, and Policy Updates
USA Space Debris Environment, Operations, and Policy Updates Presentation to the 48 th Session of the Scientific and Technical Subcommittee Committee on the Peaceful Uses of Outer Space United Nations
More informationSSC13-VI-1 MISSION DESIGN CONCEPT
SSC13-VI-1 INTRODUCTION TO FORMOSAT-7/COSMIC-2 MISSION Alex da Silva Curiel, Meryl Lambert, Doug Liddle, Prof Sir Martin Sweeting. Surrey Satellite Technology Ltd. Tycho House, Surrey Research Park, ;
More informationOptElec: an Optimisation Software for Low-Thrust Orbit Transfer Including Satellite and Operation Constraints
OptElec: an Optimisation Software for Low-Thrust Orbit Transfer Including Satellite and Operation Constraints 7th International Conference on Astrodynamics Tools and Techniques, DLR, Oberpfaffenhofen Nov
More informationDavid Antoine on behalf of the OCAPI science team
European prospects for a geostationary ocean color sensor: the ocean color advanced permanent imager (OCAPI) David Antoine on behalf of the OCAPI science team Curtin University, Remote Sensing & Satellite
More informationGG studies at TAS-I: state of the art
GG studies at TAS-I: state of the art A. Anselmi INRIM, 24-10-2014 83230350-DOC-TAS-EN-002 GG@ThalesAleniaSpace! 1996 Early experiment concept presented to ESA HQ! Industrial support on satellite & drag-free
More informationESA UNCLASSIFIED For Official Use. BepiColombo à Exploring Mercury
BepiColombo à Exploring Mercury ESA / JAXA BepiColombo Mercury Mercury has always been something of a puzzle for planetary scientists. Its close position to the Sun means it is very difficult to observe.
More informationMeteosat Third Generation. The Future European Geostationary Meteorological Satellite
Meteosat Third Generation The Future European Geostationary Meteorological Satellite Meteosat Third Generation Jean-Loup Bézy, Donny Aminou & Paolo Bensi Future Programmes Department, ESA Directorate of
More informationMAE 180A: Spacecraft Guidance I, Summer 2009 Homework 4 Due Thursday, July 30.
MAE 180A: Spacecraft Guidance I, Summer 2009 Homework 4 Due Thursday, July 30. Guidelines: Please turn in a neat and clean homework that gives all the formulae that you have used as well as details that
More informationEUMETSAT Satellite Status
EUMETSAT Satellite Status Dr. K. Dieter Klaes EUMETSAT 1 ET-SAT Meeting 4-6 April 2017, WMO, Geneva, Switzerland EUMETSAT is an intergovernmental organisation with 30 Member States and 1 Cooperating State
More informationA Passive De-orbiting Strategy for High Altitude CubeSat Missions using a Deployable Reflective Balloon
A Passive De-orbiting Strategy for High Altitude CubeSat Missions using a Deployable Reflective Balloon Charlotte Lücking, Camilla Colombo, Colin R. McInnes Advanced Space Concepts Laboratory, University
More informationMeteorological Missions
Meteorological Missions Guido Levrini ESA GSC Space Segment Programme Manager Page 1 Introduction ESA initiated Europe s entry into satellite meteorology with the development and launch of the first Meteosat
More information, (2) German Aerospace Center (DLR), Porz-Wahnheide, Linder Hoehe, Koeln Germany,
TRAJECTORY AND SYSTEM DESIGN OF AN ELECTRICALLY PROPELLED ORBITER FOR A MARS SAMPLE RETURN MISSION Uwe Derz (1), Wolfgang Seboldt (2) (1) EADS Astrium Space Transportation, Airbus Allee 1, 28199 Bremen
More informationESMO Mission Analysis
Changing the economics of space ESMO Mission Analysis SRR Workshop Alison Gibbings 22 nd 26 th March 2010 Review of the existing baseline Sensitivity analysis Contents At lunar Injection Along the WSB-Moon
More informationFinal Examination 2015
THE UNIVERSITY OF SYDNEY School of Aerospace, Mechanical and Mechatronic Engineering AERO 2705: Space Engineering 1 Final Examination 2015 READ THESE INSTRUCTIONS CAREFULLY! Answer at least 4 (four of
More informationJulia Figa-Saldaña & Klaus Scipal
Julia Figa-Saldaña & Klaus Scipal julia.figa@eumetsat.int klaus.scipal@esa.int C. Anderson, F. Fois, C. Lin, M. Loiselet, F. Ticconi, J.J.W. Wilson Meeting, Outline Overview and objectives of European
More informationMicroscope : A scientific Microsatellite development
Microscope : A scientific Microsatellite development V. CIPOLLA, Y. ANDRE, P.Y. GUIDOTTI, A.ROBERT B. POUILLOUX, P. PRIEUR, L.PERRAUD Centre National d Etudes Spatiales 18 av. Edouard Belin Toulouse France
More informationBravoSat: Optimizing the Delta-V Capability of a CubeSat Mission. with Novel Plasma Propulsion Technology ISSC 2013
BravoSat: Optimizing the Delta-V Capability of a CubeSat Mission with Novel Plasma Propulsion Technology Sara Spangelo, NASA JPL, Caltech Benjamin Longmier, University of Michigan Interplanetary Small
More informationOrbits for Polar Applications Malcolm Macdonald
Orbits for Polar Applications Malcolm Macdonald www.strath.ac.uk/mae 25 June 2013 malcolm.macdonald.102@strath.ac.uk Slide 1 Image Credit: ESA Overview Where do we currently put spacecraft? Where else
More informationLAUNCHES AND LAUNCH VEHICLES. Dr. Marwah Ahmed
LAUNCHES AND LAUNCH VEHICLES Dr. Marwah Ahmed Outlines 2 Video (5:06 min) : https://youtu.be/8t2eyedy7p4 Introduction Expendable Launch Vehicles (ELVs) Placing Satellite into GEO Orbit Introduction 3 Introduction
More informationProspector-1: A Low-Cost Commercial Asteroid Mission Grant Bonin SmallSat 2016
Prospector-1: A Low-Cost Commercial Asteroid Mission Grant Bonin SmallSat 2016 About DSI A space technology and resources company Vision to enable the human space development by harvesting asteroid materials
More informationLow Complexity and Low Cost Electric Propulsion System for Telecom Satellites Based on HEMP Thruster Assembly
Low Complexity and Low Cost Electric Propulsion System for Telecom Satellites Based on HEMP Thruster Assembly IEPC-2007-114 Presented at the 30 th International Electric Propulsion Conference, Florence,
More informationFlight S4-002 Status of Hayabusa2: Asteroid Sample Return Mission to C-type Asteroid Ryugu. Yuichi Tsuda, Makoto Yoshikawa (ISAS/JAXA)
Flight S4-002 Status of Hayabusa2: Asteroid Sample Return Mission to C-type Asteroid Ryugu Yuichi Tsuda, Makoto Yoshikawa (ISAS/JAXA) Highlights of Hayabusa2 Hayabusa2 is the 2nd Japanese sample return
More informationTHE METOP-A ORBIT ACQUISITION STRATEGY AND ITS LEOP OPERATIONAL EXPERIENCE
THE METOP-A ORBIT ACQUISITION STRATEGY AND ITS LEOP OPERATIONAL EXPERIENCE K. Merz (1), M. A. Martín Serrano (2), D. Kuijper (3), M.A. García Matatoros (4) (1) EDS Operations Services at ESA/ESOC, Robert-Bosch-Strasse
More informationHERA MISSION & CM16 lessons learned
HERA MISSION HERA MISSION & CM16 lessons learned (CM16) Schedule criticality for 2020 launch Prepare Asteroid mission with launch opportunities in 2023 (with back-up in 2024 and 2025) (CM16) Payload selection
More informationRESERVE THALES ALENIA SPACE CHANGE RECORDS ISSUE DATE DESCRIPTION OF CHANGES AUTHOR
ISSUE : 1 Page : 2/35 CHANGE RECORDS ISSUE DATE DESCRIPTION OF CHANGES AUTHOR 1 03/10/07 Initial issue (MTG-TAF-SA-RS-39) J. VIEILLOT 1 20/09/10 Updated version for kick off : L.OUCHET New reference (MTG-TAF-SA-SS-0039)
More informationResults and Analyses of Debris Tracking from Mt Stromlo
Results and Analyses of Debris Tracking from Mt Stromlo Jizhang Sang 1, Ian Ritchie, Matt Pearson, and Craig Smith EOS Space Systems Pty Ltd, Australia Abstract In the last 2 years, EOS Space Systems has
More informationSpace Travel on a Shoestring: CubeSat Beyond LEO
Space Travel on a Shoestring: CubeSat Beyond LEO Massimiliano Vasile, Willem van der Weg, Marilena Di Carlo Department of Mechanical and Aerospace Engineering University of Strathclyde, Glasgow 5th Interplanetary
More informationAeolus ESA s Wind Lidar Mission: Technical Status & Latest Results
Aeolus ESA s Wind Lidar Mission: Technical Status & Latest Results Anders Elfving Project Manager European Space Agency/ESTEC Aeolus Cal/Val Workshop Meteo France, Toulouse, 28/03/2017 ESA UNCLASSIFIED
More informationsentinel-3 A BIGGER PICTURE FOR COPERNICUS
sentinel-3 A BIGGER PICTURE FOR COPERNICUS SATELLITES TO SERVE By providing a set of key information services for a wide range of practical applications, Europe s Copernicus programme has been put in place
More informationChart 1 Changing the Perspective: Atmospheric Research on the ISS Prof. Dr. Hansjörg Dittus German Aerospace Center (DLR)
www.dlr.de Chart 1 Changing the Perspective: Atmospheric Research on the ISS Prof. Dr. Hansjörg Dittus German Aerospace Center (DLR) www.dlr.de Chart 2 DLR German Aerospace Center Research Institution
More informationSmall Satellite Aerocapture for Increased Mass Delivered to Venus and Beyond
Small Satellite Aerocapture for Increased Mass Delivered to Venus and Beyond Adam Nelessen / Alex Austin / Joshua Ravich / Bill Strauss NASA Jet Propulsion Laboratory Ethiraj Venkatapathy / Robin Beck
More information483 Lecture. Space Mission Requirements. February11, Definition Examples Dos/ Don ts Traceability
483 Lecture Space Mission February11, 2012 Photo Credit:: http://www.spacewallpapers.info/cool-space-wallpaper What s a Requirement? ification? Requirement A concept independent statement of a mix of needs,
More information