GENERATOR INTERCONNECTION APPLICATION

Size: px
Start display at page:

Download "GENERATOR INTERCONNECTION APPLICATION"

Transcription

1 GENERATOR INTERCONNECTION APPLICATION FOR BUY-ALL/SELL-ALL PROJECTS WITH AGGREGATE GENERATOR OUTPUT OF MORE THAN 20 KW BUT LESS THAN OR EQUAL TO 1 MW Electric Utility Contact Information Great Lakes Energy Gustavo Paz, P.E. Director, Interconnection Services & Agency Compliance P.O. Box Boyne Avenue Boyne City, MI Interconnection Hotline: Interconnection gpaz@glenergy.com For Office Use Only Customer / Account Information Electric Utility Customer Information: ( As shown on utility bill ) Customer Name ( Last, First, Middle): Customer Mailing Address: Customer Address: ( optional ) Electric Service Account # Electric Service Meter Number: Generation System Site Information Physical Site Service Address (if not Billing Address): Annual Site Requirements Without Generation in Kilowatthours Peak Annual Site Demand in Kilowatts (only for customers billed on demand rates) kwh/year kw/year Attached Site Plan: Attached Electrical One-Line Drawing (See the Appendix D for a sample Inverter Type Project) (Per MPSC Order in Case No. U The one-line diagram must be signed and sealed by a licensed professional engineer, licensed in the State of Michigan or by an electrical contractor licensed by the State of Michigan with the electrical contractor's license number noted on the diagram.) Page # Page # Synchronous/Induction Generators: Must fill out Appendix A or B and provide a Detail One-Line Diagram See Appendix E and F for a sample the Detail One-Line Diagram for Synchronous or Induction projects Note: The following information on these system components shall appear on the preliminary Detail One-Line Diagram Page # Breakers - Rating, location and normal operating status (open or closed) Buses - Operating voltage Capacitors - Size of bank in Kvar Circuit Switchers - Rating, location and normal operating status (open or closed) Current Transformers - Overall ratio, connected ratio Fuses - normal operating status, rating (Amps), type Generators - Capacity rating (kva), location, type, method of grounding Grounding Resistors - Size (ohms), current (Amps) Isolating transformers - Capacity rating (kva), location, impedance, voltage ratings, primary and secondary connections and method of grounding Potential Transformers - Ratio, connection Reactors - Ohms/phase Relays - Types, quantity, IEEE device number, operator lines indicating the device initiated by the relays. Switches - Location and normal operating status (open or closed), type, rating Tagging Point - Location, identification Page 1 of 9

2 GENERATOR INTERCONNECTION APPLICATION FOR BUY-ALL/SELL-ALL PROJECTS WITH AGGREGATE GENERATOR OUTPUT OF MORE THAN 20 KW BUT LESS THAN OR EQUAL TO 1 MW Generation System - Manufacturer Information System Type ( Solar, Wind, Biomass, Methane Digester, etc): Generator Type ( Inverter, Induction, Synchronous): Total Generator(s) Nameplate DC Rating (Solar Only): Total Generator(s) Nameplate AC Rating: Expected Annual Output in Kilowatthours AC Output Operating Voltage: Generator Wiring Configuration ( Single Phase, Three Phase): Is the Inverter tested to IEEE1547.1? o Yes o No o Not Applicable kw kw kwh/year Inverter Based Systems: Manufacturer Model ( Name / Number ) Inverter Output Power Rating (kw) No. of Inverter(s) Induction & Synchronous Based Systems Manufacturer Model ( Name / Number ) Installation Information Project Single Point of Contact: ( Electric Utility Customer, Developer, or other ) Name: Company ( If Applicable ): Phone Number: Address: Requested In Service Date: Licensed Professional Engineer Name (If applicable) Licensed Electrical Contractor Name (If applicable) Electrical Contractor/PE Phone #: Electrical Contractor/PE Customer and Contractor Signature and Fees o Attached $100 Interconnection Application Fee (Check # / Money Order #) ( Sign and Return complete application with Application Fee to Electric Utility Contact ) To the best of my knowledge, all the information provided in this Application Form is complete and correct. Customer Project Developer/Contractor (If Applicable) Note: Refer to the applicable "Michigan Electric Utility Generator Interconnection Procedures" for a detailed explanation of the Interconnection Process, Fees, Timelines, and Page 2 of 9

3 APPENDIXES Appendix A: Technical Information for Synchronous-Type Generators Appendix B: Technical Information for Induction-Type Generators Appendix C: Sample Site Plan Appendix D: Sample One-Line diagram for Inverter Type Project Appendix E: Sample One-Line diagram for Synchronous Type Project Appendix F: Sample One-Line diagram for Induction Type Project Page 3 of 9

4 Appendix A Synchronous Generators Generator Information a. Generator Nameplate Voltage b. Generator Nameplate Watts or Volt-Amperes c. Generator Nameplate Power Factor (pf) d. RPM a. b. c. d. Technical Information e. Minimum and Maximum Acceptable Terminal Voltage f. Direct axis reactance (saturated) g. Direct axis reactance (unsaturated) h. Quadrature axis reactance (unsaturated) i. Direct axis transient reactance (saturated) j. Direct axis transient reactance (unsaturated) k. Quadrature axis transient reactance (unsaturated) l. Direct axis sub-transient reactance (saturated) m. Direct axis sub-transient reactance (unsaturated) n. Leakage Reactance o. Direct axis transient open circuit time constant p. Quadrature axis transient open circuit time constant q. Direct axis subtransient open circuit time constant r. Quadrature axis subtransient open circuit time constant s. Open Circuit saturation curve t. Reactive Capability Curve showing overexcited and underexcited limits (Reactive Information if non-synchronous) u. Excitation System Block Diagram with values for gains and time constants (Laplace transforms) v. Short Circuit Current contribution from generator at the Point of Common Coupling w. Rotating inertia of overall combination generator, prime mover, couplers and gear drives x. Station Power load when generator is off-line, Watts, pf y. Station Power load during start-up, Watts, pf z. Station Power load during operation, Watts, pf e. f. g. h. i. j. k. l. m. n. o. p. q. r. s. t. u. v. w. x. y. z. Page 4 of 9

5 Appendix B Induction Generators Generator Information a. Generator Nameplate Voltage b. Generator Nameplate Watts or Volt-Amperes c. Generator Nameplate Power Factor (pf) d.rpm a. b. c. d. Technical Information e. Synchronous Rotational Speed f. Rotation Speed at Rated Power g. Slip at Rated Power h. Minimum and Maximum Acceptable Terminal Voltage i. Motoring Power (kw) j. Neutral Grounding Resistor (If Applicable) 2 k. I 2 t or K (Heating Time Constant) l. Rotor Resistance m. Stator Resistance n. Stator Reactance o. Rotor Reactance p. Magnetizing Reactance q. Short Circuit Reactance r. Exciting Current s. Temperature Rise t. Frame Size u. Design Letter v. Reactive Power Required in Vars (No Load) w. Reactive Power Required in Vars (Full Load) x. Short Circuit Current contribution from generator at the Point of Common Coupling y. Rotating inertia, H in Per Unit on kva Base, of overall combination generator, prime mover, couplers and gear drivesy. z. Station Power load when generator is off-line, Watts, pf aa. Station Power load during start-up, Watts, pf bb. Station Power load during operation, Watts, pf e. f. g. h. i. j. k. l. m. n. o. p. q. r. s. t. u. v. w. x. z. aa. bb. Page 5 of 9

6 Appendix C: Sample Site Plan - Provided for Reference Only Customer Name: Project Site Address: Site Plan Prepared By: Prepared Date: Page 6 of 9

7 Appendix D - Sample One Line Drawing for Net Metering Inverter Based Generators NOTE: One-line diagram must be signed and sealed by a licensed Professional Engineer, licensed in the State of Michigan or by an electrical contractor licensed by the State of Michigan Customer Name: Project Site Address: Licensed Professional Engineer Name (If applicable): Licensed Professional Engineer Signature: Electrical Contractor License Number: Date: Page 7 of 9

8 Appendix E: Sample One-Line Drawing for Synchronous Generators (Not Required for Flow-Back) NOTE: One-line diagram must be signed and sealed by a licensed Professional Engineer, licensed in the State of Michigan or by an electrical contractor licensed by the State of Michigan Customer Name: Project Site Address: Licensed Professional Engineer Name (If applicable): Licensed Professional Engineer Signature: Electrical Contractor License Number: Date: Page 8 of 9

9 Appendix F: Sample One-Line Drawing for Induction Generators (Not Required for Flow-Back) NOTE: One-line diagram must be signed and sealed by a licensed Professional Engineer, licensed in the State of Michigan or by an electrical contractor licensed by the State of Michigan Customer Name: Project Site Address: Licensed Professional Engineer Name (If applicable): Licensed Professional Engineer Signature: Electrical Contractor License Number: Date: Page 9 of 9

10 No. 3 Electric Great Lakes Energy Cooperative Original Sheet No. D RENEWABLE ENERGY STANDING OFFER LIMITED PURCHASE AND SALE PROGRAM (BUY-ALL/SELL-ALL) In order to provide for the safety of Member-Consumers, Cooperative personnel, and others, and to ensure reliable electric service consistent with the generation and transmission Cooperative s ( G&T ) standing offer for 10 MW of solar and wind renewable energy, the following requirements are established for connection and/or operation of Member-Consumer generation facilities in parallel with the Cooperative s distribution system. Availability The Cooperative s Buy-All/Sell-All Program is available on a first come, first serve, limited basis until the G&T s standing offer expires December 31, 2019 or upon full 10 MW subscription. These requirements govern all Member-Consumer-owned generation facilities, which generate all of their electricity using a solar or wind renewable energy generator ( Member-Consumer Facility ), with a nameplate of 1 MW or less. Member-Consumers wishing to participate in the Buy-All/Sell-All program shall submit a completed Buy-All/Sell-All Application and the $100 application fee to the Cooperative for review. Upon approval of the Buy-All/Sell-All Application, the Cooperative shall issue a Buy-All/Sell-All Interconnection and Purchase Agreement ( Agreement ) between the Member-Consumer, the Cooperative, and the G&T. Member-Consumers must complete construction and meet commercial operation of the Member- Consumer Facility within 180 days of signing the Buy-All/Sell-All Interconnection and Purchase Agreement. The nameplate of the renewable energy generator size is limited to 1 MW per Member-Consumer. The Member-Consumer s entire renewable energy generator must fit within the limit and must be located on the Member-Consumer s premises. If a Member-Consumer has more than one renewable energy generator, the generators ratings must be summed and the sum may not exceed 1 MW. Upon enrolling in the Buy-All/Sell-All program, the term of the Agreement is 20 years. A participating Member-Consumer may terminate participation in the Buy-All/Sell-All program at any time and for any reason. If the Member-Consumer does not meet (or, for the term of the Agreement, continue to meet) all of the requirements of the Agreement, as well as the requirements listed below, the Cooperative may require termination of parallel operation and the Member-Consumer shall be liable for any damages or injury resulting from unauthorized or improper connection and/or operation of the Member-Consumer's Facility. (Continued on Sheet No. D-25.01) Issued: December 14, 2016 Effective for bills rendered on and after By Bill Scott March 1, 2017 President and CEO Boyne City, Michigan

11 No. 3 Electric Great Lakes Energy Cooperative Original Sheet No. D RENEWABLE ENERGY STANDING OFFER LIMITED PURCHASE AND SALE PROGRAM (BUY-ALL/SELL-ALL) (Continued from Sheet 25.00) Safety and Reliability Requirements The Member-Consumer shall submit for the Cooperative's review detailed electric diagrams, equipment nameplate data, including the interface device and control system of the Member-Consumer's power source and a site plan. The Member-Consumer's control and protection system and site plan must be acceptable to the Cooperative and in accordance with these safety and reliability standards. This system shall provide for immediate automatic shutdown or separation of the Facility and the Cooperative system in the event of momentary or extended loss of power from the Cooperative, including loss of one or more phases if the Member-Consumer is generating three phase power. The shutdown or separation must continue until normal utility service is restored. The shutdown or separation shall occur when frequency, voltage, and/or current deviate from normal utility standards. The Member-Consumer shall be liable if the Member- Consumer's protection system fails to function. A disconnecting device suitable for use as a protective tag location may be required so as to be accessible and in reasonably close proximity to the billing meter. The completed installation must meet all local, state and national codes and regulations and is subject to inspection by proper enforcement authorities before commencement of parallel operation. In addition, the Cooperative may, at its discretion, inspect or test the facility at any time. The Member-Consumer shall advise the Cooperative prior to making any revisions to the Facility, the control system, or the interface between the two power systems after the installation. Any such revision must be acceptable to the Cooperative. Should the parallel operation of the Facility cause interference or adversely affect voltage, frequency, harmonic content or power factor in the Cooperative's system or other Member-Consumers' service, the Cooperative may require disconnection of parallel operation until the condition has been corrected. Metering Separate metering shall be installed to determine generation output. The Member-Consumer Facility must deliver, to the Cooperative s system, all energy generated. The Member-Consumer shall pay the incremental cost of all such metering above the cost for meters provided for similarly situated nongenerating Member-Consumers. Any service upgrades or protective equipment/devices necessary to accommodate the output of the generating unit(s), as determined by the Cooperative, shall be at the Member-Consumer s expense. (Continued on Sheet No. D-25.02) Issued: December 14, 2016 Effective for bills rendered on and after By Bill Scott March 1, 2017 President and CEO Boyne City, Michigan

12 No. 3 Electric Great Lakes Energy Cooperative Original Sheet No. D RENEWABLE ENERGY STANDING OFFER LIMITED PURCHASE AND SALE PROGRAM (BUY-ALL/SELL-ALL) (Continued from Sheet 25.01) Reimbursement of Costs The Member-Consumer shall pay for all costs associated with any addition to (or alteration of) the Cooperative's equipment required for metering and for the safe and reliable operation of the Facility in parallel with the Cooperative's system, as noted above, as well as an interconnection study, at the request of the Cooperative. The Member-Consumer shall also pay for costs of changes required due to safety or adverse effects on other Member-Consumers and/or on the Cooperative caused by the connection and/or operation of the Member-Consumer's renewable energy generator. The Cooperative may require reasonable and adequate insurance coverage by the interconnecting Member-Consumer and the Member-Consumer shall provide proof of liability coverage as may be required by the Cooperative. Monthly Charges and Credits The Member-Consumer shall pay the full retail rate in accordance with the Cooperative s standard service tariff applicable to the Member-Consumer for all energy delivered to the Member-Consumer by the Cooperative, including energy necessary to operate the Member-Consumer s renewable energy generator. The Cooperative, as agent for the G&T, shall pay the Member-Consumer 10 cents per kwh for all energy delivered to the Cooperative by the Member-Consumer as a credit on the Member-Consumer s monthly bill. The credit will be applied to the total charges of the standard service tariff applicable to the Member- Consumer and will be applied to the bill for that period. Any credit that is not used up during the current billing period shall be carried forward for use in subsequent billing periods. If a credit accumulates to an amount greater than $100, the Cooperative may pay the balance to the Member-Consumer as an agent for the G&T. If a Member-Consumer terminates service with the Cooperative while having a remaining credit amount on their account, the G&T shall pay, through its agent, the Cooperative, the remaining credit amount to the Member-Consumer following a final reading by the Cooperative of the Member-Consumer s meter. Issued: December 14, 2016 Effective for bills rendered on and after By Bill Scott March 1, 2017 President and CEO Boyne City, Michigan

13 ˇ ˆ " " " 8 9 " " 7 " ˆ : ˆ 6 4! " ; ˇ ; ; 3 0 < ˇ 2 < = ˇ ˇ > 0 ; ˇ 1 < A ˇ 3 ˇ 1 < 0 0 B 6 A 2 ˇ ; = > 0 < ˇ ; D ; 3 0 < 0 ; = ˇ ˇ < 0 E 9 < 7 ˇ > < 0 ; : 3 0 < 0 ; ; : = < ˇ < " ; ˇ 3 0 < 0 0 ; ˇ > 0 < = ˇ 0 > 0 ; ˇ 3 0 < 0 ˇ < < ; 0 F ; 0 ˇ G 0 D ; ˇ 3 0 < 0 B ; 7 ˇ > 0 < ˇ H < F ˇ = ˇ ; ˇ 3 ˇ 1 < 0 0 ; ; 4 < 4 > 0 7 ˇ 3 0 < 0 ˇ < 0 ; ˇ B = 0 2 > ˇ ; 0 ; ˇ 3 0 < 0 B = 7 ˇ 3 0 < 0 B 0 0 < < ˇ = ˇ ˇ ; < 7 ˇ 0 ˇ ; ˇ = ; ˇ 3 0 < 0 B ˇ 0 ˇ ; 0 0 H ; = ; 0 ˇ 2 ; 0 ˇ ; ˇ 3 0 < 0 ˇ ˇ = 7 ˇ ˇ = ˇ ˇ = ˇ = ˇ ; > 2 2 ; ˇ 3 0 < 0 ˇ < < ; ˇ 3 0 < 0 B 0 ; ; 9 < ; 0 < > < < < H 0 ˇ < 0 7 ˇ < F < ; 0 ˇ < ; ; " 2 ˇ ˇ ; 0 " # $ % & ' % ( ) * +, - *. / / 0 1 / 2 3 ˇ ˇ ˆ!

14 I J K L M N O P Q R S T Q U S P V R W V X P Y N Z P S [ \ ] J J ^ P S V R T _ P ` S T [ T Z V O a b P P R I J K c d L K e f { N } g { N z N I ~ a ` { ` x N { ~ g ` I ` x { W W N W U N I N { ~ g ` I ] g W g ~ g N a ] J Z R T Z h P i S J w a b P P R I J K c d L K e e ~ b P z P w P S d ] J Z Y h w P S Y b V O O V i _ T Y P R b P ] J J ^ P S V R T _ P ^ S T J S R J w V X T Z [ V Z \ S P _ T Y T J Z Y R J R b P z P w P S d ] J Z Y h w P S Y [ P Z P S V R T J Z V Q T O T R \ y R b P Q J Z R S J O Y \ Y R P w y J S R b P T Z R P S V Q P P R ƒ P P Z R b P R ƒ J ^ J ƒ P S Y \ Y R P w Y V R P S R b P T Z Y R V O O V R T J Z K Z \ Y h Q b S P _ T Y T J Z w h Y R P V Q Q P ^ R V O P R J R b P ] J J ^ P S V R T _ P K a b J h O i R b P ^ V S V O O P O J ^ P S V R T J Z J R b P z P w P S d ] J Z Y h w P S Y [ P Z P S V R T J Z V Q T O T R \ Q V h Y P T Z R P S P S P Z Q P J S V i _ P S Y P O \ V P Q R _ J O R V [ P y S P h P Z Q \ y b V S w J Z T Q Q J Z R P Z R J S ^ J ƒ P S V Q R J S T Z R b P ] J J ^ P S V R T _ P Y Y \ Y R P w J S J R b P S z P w P S d ] J Z Y h w P S Y Y P S _ T Q P y R b P ] J J ^ P S V R T _ P w V \ S P h T S P i T Y Q J Z Z P Q R T J Z J ^ V S V O O P O J ^ P S V R T J Z h Z R T O R b P Q J Z i T R T J Z b V Y P P Z Q J S S P Q R P i K { P T w h S Y P w P Z R J ] J Y R Y ~ b P z P w P S d ] J Z Y h w P S Y b V O O ^ V \ J S V O O Q J Y R Y V Y Y J Q T V R P i ƒ T R b V Z \ V i i T R T J Z R J J S V O R P S V R T J Z J R b P ] J J ^ P S V R T _ P Y P h T ^ w P Z R S P h T S P i J S w P R P S T Z [ V Z i J S R b P Y V P V Z i S P O T V O P J ^ P S V R T J Z J R b P z P w P S d ] J Z Y h w P S Y [ P Z P S V R T Z [ P h T ^ w P Z R T Z ^ V S V O O P O ƒ T R b R b P ] J J ^ P S V R T _ P Y Y \ Y R P w K ~ b P z P w P S d ] J Z Y h w P S Y b V O O V O Y J ^ V \ J S Q J Y R Y J Q b V Z [ P Y S P h T S P i i h P R J Y V P R \ J S V i _ P S Y P P P Q R Y J Z J R b P S z P w P S d ] J Z Y h w P S Y V Z i J S J Z R b P ] J J ^ P S V R T _ P Q V h Y P i \ R b P Q J Z Z P Q R T J Z V Z i J S J ^ P S V R T J Z J R b P z P w P S d ] J Z Y h w P S Y [ P Z P S V R T J Z V Q T O T R \ K ~ b P ] J J ^ P S V R T _ P w V \ S P h T S P S P V Y J Z V O P V Z i V i P h V R P T Z Y h S V Z Q P Q J _ P S V [ P \ R b P T Z R P S Q J Z Z P Q R T Z [ z P w P S d ] J Z Y h w P S V Z i R b P z P w P S d ] J Z Y h w P S Y b V O O ^ S J _ T i P ^ S J J J O T V T O T R \ Q J _ P S V [ P V Y w V \ P S P h T S P i \ R b P ] J J ^ P S V R T _ P K a V O P Y R J ] J J ^ P S V R T _ P z P w P S d ] J Z Y h w P S Y ƒ T Y b T Z [ R J Y P O O ^ J ƒ P S w h Y R V S S V Z [ P R J i J Y J ƒ T R b R b P [ P Z P S V R T J Z V Z i R S V Z Y w T Y Y T J Z ] J J ^ P S V R T _ P ƒ b T Q b ^ S J _ T i P Y V O O J R b P ] J J ^ P S V R T _ P Y ^ J ƒ P S S P h T S P w P Z R Y K { V R P Y J S Y h Q b Y V O P Y ƒ T O O P Y h P Q R R J R b P U ~ Y R V S T ^ S J _ T Y T J Z Y K z P w P S d ] J Z Y h w P S Y Y P O O T Z [ ^ J ƒ P S R J R b P U ~ ƒ T O O P Q b V S [ P i f w T O O ^ P S X b Y J O i R J Q J _ P S R b P ] J J ^ P S V R T _ P V i w T Z T Y R S V R T _ P Q J Y R Y K g Y Y h P i j k l m n l o p q r s t q u v \ a R P _ P Z W K v J P Q X w V Z x S P Y T i P Z R V Z i ] N ` v J \ Z P ] T R \ y z T Q b T [ V Z

SSC-JE EE POWER SYSTEMS: GENERATION, TRANSMISSION & DISTRIBUTION SSC-JE STAFF SELECTION COMMISSION ELECTRICAL ENGINEERING STUDY MATERIAL

SSC-JE EE POWER SYSTEMS: GENERATION, TRANSMISSION & DISTRIBUTION SSC-JE STAFF SELECTION COMMISSION ELECTRICAL ENGINEERING STUDY MATERIAL 1 SSC-JE STAFF SELECTION COMMISSION ELECTRICAL ENGINEERING STUDY MATERIAL Power Systems: Generation, Transmission and Distribution Power Systems: Generation, Transmission and Distribution Power Systems:

More information

Week No. 6 Chapter Six: Power Factor Improvement

Week No. 6 Chapter Six: Power Factor Improvement Week No. 6 Chapter Six: Power Factor Improvement The electrical energy is almost wholly generated, transmitted and distributed in the form of alternating current. Therefore, the question of power factor

More information

CHAPTER ONE. 1.1 International System of Units and scientific notation : Basic Units: Quantity Basic unit Symbol as shown in table 1

CHAPTER ONE. 1.1 International System of Units and scientific notation : Basic Units: Quantity Basic unit Symbol as shown in table 1 CHAPTER ONE 1.1 International System of Units and scientific notation : 1.1.1 Basic Units: Quantity Basic unit Symbol as shown in table 1 Table 1 1.1.2 Some scientific notations : as shown in table 2 Table

More information

Fault Calculation Methods

Fault Calculation Methods ELEC9713 Industrial and Commercial Power Systems Fault Calculation Methods There are two major problems that can occur in electrical systems: these are open circuits and short circuits. Of the two, the

More information

Energy saving in electromechanical equipment with power coefficient correction. Dimitris Al. Katsaprakakis Aeolian Land S.A.

Energy saving in electromechanical equipment with power coefficient correction. Dimitris Al. Katsaprakakis Aeolian Land S.A. Energy saving in electromechanical equipment with power coefficient correction Dimitris Al. Katsaprakakis Aeolian Land S.A. www.aiolikigi.gr Introduction Electricity production companies (utilities) provide

More information

NZQA registered unit standard version 2 Page 1 of 6

NZQA registered unit standard version 2 Page 1 of 6 Page 1 of 6 Title Demonstrate and apply knowledge of capacitance, inductance, power factor, and power factor correction Level 3 Credits 7 Purpose This unit standard covers an introduction to alternating

More information

Power System Analysis Prof. A. K. Sinha Department of Electrical Engineering Indian Institute of Technology, Kharagpur

Power System Analysis Prof. A. K. Sinha Department of Electrical Engineering Indian Institute of Technology, Kharagpur Power System Analysis Prof. A. K. Sinha Department of Electrical Engineering Indian Institute of Technology, Kharagpur Lecture - 9 Transmission Line Steady State Operation Welcome to lesson 9, in Power

More information

KINGS COLLEGE OF ENGINEERING Punalkulam

KINGS COLLEGE OF ENGINEERING Punalkulam KINGS COLLEGE OF ENGINEERING Punalkulam 613 303 DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING POWER SYSTEM ANALYSIS QUESTION BANK UNIT I THE POWER SYSTEM AN OVERVIEW AND MODELLING PART A (TWO MARK

More information

EE2351 POWER SYSTEM OPERATION AND CONTROL UNIT I THE POWER SYSTEM AN OVERVIEW AND MODELLING PART A

EE2351 POWER SYSTEM OPERATION AND CONTROL UNIT I THE POWER SYSTEM AN OVERVIEW AND MODELLING PART A EE2351 POWER SYSTEM OPERATION AND CONTROL UNIT I THE POWER SYSTEM AN OVERVIEW AND MODELLING PART A 1. What are the advantages of an inter connected system? The advantages of an inter-connected system are

More information

EE Branch GATE Paper 2010

EE Branch GATE Paper 2010 Q.1 Q.25 carry one mark each 1. The value of the quantity P, where, is equal to 0 1 e 1/e 2. Divergence of the three-dimensional radial vector field is 3 1/r 3. The period of the signal x(t) = 8 is 0.4

More information

Power Systems - Basic Concepts and Applications - Part I

Power Systems - Basic Concepts and Applications - Part I PDHonline Course E104A (1 PDH) Power Systems - Basic Concepts and Applications - Part I Instructor: Shih-Min Hsu, Ph.D., P.E. 01 PDH Online PDH Center 57 Meadow Estates Drive Fairfax, VA 030-6658 Phone

More information

Module 3 : Sequence Components and Fault Analysis

Module 3 : Sequence Components and Fault Analysis Module 3 : Sequence Components and Fault Analysis Lecture 12 : Sequence Modeling of Power Apparatus Objectives In this lecture we will discuss Per unit calculation and its advantages. Modeling aspects

More information

LO 1: Three Phase Circuits

LO 1: Three Phase Circuits Course: EEL 2043 Principles of Electric Machines Class Instructor: Dr. Haris M. Khalid Email: hkhalid@hct.ac.ae Webpage: www.harismkhalid.com LO 1: Three Phase Circuits Three Phase AC System Three phase

More information

Chapter 3 AUTOMATIC VOLTAGE CONTROL

Chapter 3 AUTOMATIC VOLTAGE CONTROL Chapter 3 AUTOMATIC VOLTAGE CONTROL . INTRODUCTION TO EXCITATION SYSTEM The basic function of an excitation system is to provide direct current to the field winding of the synchronous generator. The excitation

More information

Power Factor Improvement

Power Factor Improvement Salman bin AbdulazizUniversity College of Engineering Electrical Engineering Department EE 2050Electrical Circuit Laboratory Power Factor Improvement Experiment # 4 Objectives: 1. To introduce the concept

More information

B.E. / B.Tech. Degree Examination, April / May 2010 Sixth Semester. Electrical and Electronics Engineering. EE 1352 Power System Analysis

B.E. / B.Tech. Degree Examination, April / May 2010 Sixth Semester. Electrical and Electronics Engineering. EE 1352 Power System Analysis B.E. / B.Tech. Degree Examination, April / May 2010 Sixth Semester Electrical and Electronics Engineering EE 1352 Power System Analysis (Regulation 2008) Time: Three hours Answer all questions Part A (10

More information

Brief Steady of Power Factor Improvement

Brief Steady of Power Factor Improvement International Journal of Electrical Engineering. ISSN 0974-2158 Volume 6, Number 5 (2013), pp. 531-539 International Research PublicationHouse http://www.irphouse.com Brief Steady of Power Factor Improvement

More information

Lesson 17: Synchronous Machines

Lesson 17: Synchronous Machines Lesson 17: Synchronous Machines ET 332b Ac Motors, Generators and Power Systems Lesson 17_et332b.pptx 1 Learning Objectives After this presentation you will be able to: Explain how synchronous machines

More information

Effects of Capacitor Bank Installation in a Medium Voltage (MV) Substation

Effects of Capacitor Bank Installation in a Medium Voltage (MV) Substation Effects of Capacitor Bank Installation in a Medium Voltage (MV) Substation Adesina, Lambe Mutalub Department of Engineering & Standardization, Eko Electricity Distribution Plc, 24/25, Marina, Lagos Island,

More information

ECE 585 Power System Stability

ECE 585 Power System Stability Homework 1, Due on January 29 ECE 585 Power System Stability Consider the power system below. The network frequency is 60 Hz. At the pre-fault steady state (a) the power generated by the machine is 400

More information

EEE3405 ELECTRICAL ENGINEERING PRINCIPLES 2 - TEST

EEE3405 ELECTRICAL ENGINEERING PRINCIPLES 2 - TEST ATTEMPT ALL QUESTIONS (EACH QUESTION 20 Marks, FULL MAKS = 60) Given v 1 = 100 sin(100πt+π/6) (i) Find the MS, period and the frequency of v 1 (ii) If v 2 =75sin(100πt-π/10) find V 1, V 2, 2V 1 -V 2 (phasor)

More information

SECTION 3 BASIC AUTOMATIC CONTROLS UNIT 12 BASIC ELECTRICITY AND MAGNETISM

SECTION 3 BASIC AUTOMATIC CONTROLS UNIT 12 BASIC ELECTRICITY AND MAGNETISM SECTION 3 BASIC AUTOMATIC CONTROLS UNIT 12 BASIC ELECTRICITY AND MAGNETISM Unit Objectives Describe the structure of an atom. Identify atoms with a positive charge and atoms with a negative charge. Explain

More information

Single Phase Motors Technical Datasheets

Single Phase Motors Technical Datasheets Single Phase Motors Technical Datasheets EN A dynamic, strong and ambitious Group: Orange1 Holding is an international renown Group, one of the most important European manufacturers of single-phase and

More information

Massachusetts Institute of Technology Department of Electrical Engineering and Computer Science Electric Machines

Massachusetts Institute of Technology Department of Electrical Engineering and Computer Science Electric Machines Massachusetts Institute of Technology Department of Electrical Engineering and Computer Science 6.685 Electric Machines Problem Set 10 Issued November 11, 2013 Due November 20, 2013 Problem 1: Permanent

More information

Electromagnetic Energy Conversion Exam 98-Elec-A6 Spring 2002

Electromagnetic Energy Conversion Exam 98-Elec-A6 Spring 2002 Front Page Electromagnetic Energy Conversion Exam 98-Elec-A6 Spring 2002 Notes: Attempt question 1 and FOUR (4) other questions (FVE (5) questions in all). Unless you indicate otherwise, the first five

More information

MATLAB SIMULINK Based DQ Modeling and Dynamic Characteristics of Three Phase Self Excited Induction Generator

MATLAB SIMULINK Based DQ Modeling and Dynamic Characteristics of Three Phase Self Excited Induction Generator 628 Progress In Electromagnetics Research Symposium 2006, Cambridge, USA, March 26-29 MATLAB SIMULINK Based DQ Modeling and Dynamic Characteristics of Three Phase Self Excited Induction Generator A. Kishore,

More information

University of Jordan Faculty of Engineering & Technology Electric Power Engineering Department

University of Jordan Faculty of Engineering & Technology Electric Power Engineering Department University of Jordan Faculty of Engineering & Technology Electric Power Engineering Department EE471: Electrical Machines-II Tutorial # 2: 3-ph Induction Motor/Generator Question #1 A 100 hp, 60-Hz, three-phase

More information

CHAPTER 2 OVERVOLTAGE DUE TO SELF-EXCITATION AND INRUSH CURRENT DUE TO CAPACITOR SWITCHING

CHAPTER 2 OVERVOLTAGE DUE TO SELF-EXCITATION AND INRUSH CURRENT DUE TO CAPACITOR SWITCHING 20 CHAPTER 2 OVERVOLTAGE DUE TO SELF-EXCITATION AND INRUSH CURRENT DUE TO CAPACITOR SWITCHING 2.1 INTRODUCTION It is becoming more common to find use of shunt capacitors for the application of powerfactor

More information

Synchronous Machines

Synchronous Machines Synchronous Machines Synchronous generators or alternators are used to convert mechanical power derived from steam, gas, or hydraulic-turbine to ac electric power Synchronous generators are the primary

More information

Lecture 11 - AC Power

Lecture 11 - AC Power - AC Power 11/17/2015 Reading: Chapter 11 1 Outline Instantaneous power Complex power Average (real) power Reactive power Apparent power Maximum power transfer Power factor correction 2 Power in AC Circuits

More information

Model M3484 Industrial Line Noise Filter Module Customer Reference Manual

Model M3484 Industrial Line Noise Filter Module Customer Reference Manual Model M3484 Industrial Line Noise Filter Module Customer Reference Manual Web: www.bonitron.com Tel: 615-244-2825 Email: info@bonitron.com Bonitron, Inc. Bonitron, Inc. Nashville, TN An industry leader

More information

Current Electricity.notebook. December 17, 2012

Current Electricity.notebook. December 17, 2012 1 Circuit Diagrams and Assembly 1. Draw a circuit diagram containing a battery, a single throw switch, and a light. 2. Once the diagram has been checked by your teacher, assemble the circuit. Keep the

More information

CHAPTER 3 ANALYSIS OF THREE PHASE AND SINGLE PHASE SELF-EXCITED INDUCTION GENERATORS

CHAPTER 3 ANALYSIS OF THREE PHASE AND SINGLE PHASE SELF-EXCITED INDUCTION GENERATORS 26 CHAPTER 3 ANALYSIS OF THREE PHASE AND SINGLE PHASE SELF-EXCITED INDUCTION GENERATORS 3.1. INTRODUCTION Recently increase in energy demand and limited energy sources in the world caused the researchers

More information

ECEN 460 Exam 1 Fall 2018

ECEN 460 Exam 1 Fall 2018 ECEN 460 Exam 1 Fall 2018 Name: KEY UIN: Section: Score: Part 1 / 40 Part 2 / 0 Part / 0 Total / 100 This exam is 75 minutes, closed-book, closed-notes. A standard calculator and one 8.5 x11 note sheet

More information

Exercise Dr.-Ing. Abdalkarim Awad. Informatik 7 Rechnernetze und Kommunikationssysteme

Exercise Dr.-Ing. Abdalkarim Awad. Informatik 7 Rechnernetze und Kommunikationssysteme Exercise1 1.10.015 Informatik 7 Rechnernetze und Kommunikationssysteme Review of Phasors Goal of phasor analysis is to simplify the analysis of constant frequency ac systems v(t) = max cos(wt + q v ) i(t)

More information

11. AC Circuit Power Analysis

11. AC Circuit Power Analysis . AC Circuit Power Analysis Often an integral part of circuit analysis is the determination of either power delivered or power absorbed (or both). In this chapter First, we begin by considering instantaneous

More information

Harmonic Modeling of Networks

Harmonic Modeling of Networks Harmonic Modeling of Networks Thomas H. Ortmeyer ECE Dept. Clarkson University Potsdam, NY 13699-5720 M. Fayyaz Akram Dept. of Elec. Eng. Univ. of Engineering and Technology Lahore, Pakistan Takashi Hiyama

More information

Work, Energy and Power

Work, Energy and Power 1 Work, Energy and Power Work is an activity of force and movement in the direction of force (Joules) Energy is the capacity for doing work (Joules) Power is the rate of using energy (Watt) P = W / t,

More information

BASIC PRINCIPLES. Power In Single-Phase AC Circuit

BASIC PRINCIPLES. Power In Single-Phase AC Circuit BASIC PRINCIPLES Power In Single-Phase AC Circuit Let instantaneous voltage be v(t)=v m cos(ωt+θ v ) Let instantaneous current be i(t)=i m cos(ωt+θ i ) The instantaneous p(t) delivered to the load is p(t)=v(t)i(t)=v

More information

POWER SYSTEM STABILITY AND CONTROL

POWER SYSTEM STABILITY AND CONTROL POWER SYSTEM STABILITY AND CONTROL P. KUNDUR Vice-President, Power Engineering Powertech Labs Inc., Surrey, British Columbia Formerly Manager Analytical Methods and Specialized Studies Department Power

More information

PUB NLH 185 Island Interconnected System Supply Issues and Power Outages Page 1 of 9

PUB NLH 185 Island Interconnected System Supply Issues and Power Outages Page 1 of 9 PUB NLH 1 Page 1 of 1 Q. Provide Hydro s list of outage cause codes and indicate how troublemen are managed and trained to properly use the codes. Explain the method used to report outage causes. A. Hydro

More information

Introduction to Synchronous. Machines. Kevin Gaughan

Introduction to Synchronous. Machines. Kevin Gaughan Introduction to Synchronous Machines Kevin Gaughan The Synchronous Machine An AC machine (generator or motor) with a stator winding (usually 3 phase) generating a rotating magnetic field and a rotor carrying

More information

EXEMPLAR NATIONAL CERTIFICATE (VOCATIONAL) ELECTRICAL PRINCIPLES AND PRACTICE NQF LEVEL 3 ( ) (X-Paper) 09:00 12:00

EXEMPLAR NATIONAL CERTIFICATE (VOCATIONAL) ELECTRICAL PRINCIPLES AND PRACTICE NQF LEVEL 3 ( ) (X-Paper) 09:00 12:00 NATIONAL CERTIFICATE (VOCATIONAL) ELECTRICAL PRINCIPLES AND PRACTICE NQF LEVEL 3 2008 (12041002) (X-Paper) 09:00 12:00 EXEMPLAR This question paper consists of 7 pages. EXEMPLAR -2- NC(V) TIME: 3 HOURS

More information

Energy Losses in the Electrical Circuits

Energy Losses in the Electrical Circuits Energy Losses in the Electrical Circuits Motors, lighting systems, wiring, mechanical terminations, distribution panels, protective devices, transformers, switchgear, and all end of circuit equipment experience

More information

400 Volts, 50HZ 480 Volts, 60HZ 600 Volts, 60HZ TECHNICAL REFERENCE MANUAL

400 Volts, 50HZ 480 Volts, 60HZ 600 Volts, 60HZ TECHNICAL REFERENCE MANUAL 400 Volts, 50HZ 480 Volts, 60HZ 600 Volts, 60HZ TECHNICAL REFERENCE MANUAL FORM: MAP-TRM-E REL. July 2013 REV. 015 2013 MTE Corporation IMPORTANT USER INFORMATION NOTICE The MTE Corporation Matrix AP Harmonic

More information

670 Intro Physics Notes: Electric Current and Circuits

670 Intro Physics Notes: Electric Current and Circuits Name: Electric Current Date: / / 670 Intro Physics Notes: Electric Current and Circuits 1. Previously, we learned about static electricity. Static electricity deals with charges that are at rest. 2. Now

More information

Pretest ELEA1831 Module 11 Units 1& 2 Inductance & Capacitance

Pretest ELEA1831 Module 11 Units 1& 2 Inductance & Capacitance Pretest ELEA1831 Module 11 Units 1& 2 Inductance & Capacitance 1. What is Faraday s Law? Magnitude of voltage induced in a turn of wire is proportional to the rate of change of flux passing through that

More information

Section 1 Electric Charge and Force

Section 1 Electric Charge and Force CHAPTER OUTLINE Section 1 Electric Charge and Force Key Idea questions > What are the different kinds of electric charge? > How do materials become charged when rubbed together? > What force is responsible

More information

GATE 2010 Electrical Engineering

GATE 2010 Electrical Engineering GATE 2010 Electrical Engineering Q.1 Q.25 carry one mark each 1. The value of the quantity P, where P = xe dx, is equal to (A) 0 (B) 1 (C) e (D) 1/e 2. Divergence of the three-dimensional radial vector

More information

Chapter 18. Direct Current Circuits

Chapter 18. Direct Current Circuits Chapter 18 Direct Current Circuits Sources of emf The source that maintains the current in a closed circuit is called a source of emf Any devices that increase the potential energy of charges circulating

More information

SYLLABUS. Departmental Syllabus. Electromechanical Systems ELET0101. Departmental Syllabus. Departmental Syllabus. Departmental Syllabus

SYLLABUS. Departmental Syllabus. Electromechanical Systems ELET0101. Departmental Syllabus. Departmental Syllabus. Departmental Syllabus SYLLABUS DATE OF LAST REVIEW: 02/2013 CIP CODE: 46.0302 SEMESTER: COURSE TITLE: COURSE NUMBER: Electromechanical Systems ELET0101 CREDIT HOURS: 3 INSTRUCTOR: OFFICE LOCATION: OFFICE HOURS: TELEPHONE: EMAIL:

More information

EE 6501 POWER SYSTEMS UNIT I INTRODUCTION

EE 6501 POWER SYSTEMS UNIT I INTRODUCTION EE 6501 POWER SYSTEMS UNIT I INTRODUCTION PART A (2 MARKS) 1. What is single line diagram? A Single line diagram is diagrammatic representation of power system in which the components are represented by

More information

Module 1 Units 3,4,5

Module 1 Units 3,4,5 Module 1 Units 3,4,5 1. What is matter? Anything that occupies space or has mass 2. What are the two general categories of substances? Elements and compounds 3. How many naturally occurring elements are

More information

F F FAULT CURRENT Prospective. 1. Introduction. 2. Types of fault conditions

F F FAULT CURRENT Prospective. 1. Introduction. 2. Types of fault conditions FAULT CURRENT F F13-13 FAULT CURRENT - Contents 1. Introduction 2. Types of fault conditions 3 fault current must be determined 3.1 Purposes for which of prospective fault current magnitudes are used 3.2

More information

EE 451 Power System Stability

EE 451 Power System Stability EE 451 Power System Stability Power system operates in synchronous mode Power system is subjected to a wide range of disturbances (small and large) - Loads and generation changes - Network changes - Faults

More information

Alternating Current (AC): Alternating Current is electric current that reverses directions at regular intervals.

Alternating Current (AC): Alternating Current is electric current that reverses directions at regular intervals. Glossary Alternating Current (AC): Alternating Current is electric current that reverses directions at regular intervals. American National Standards Institute (ANSI): American National Standards Institute

More information

1. Explain the various methods of methods of grounding. In power system, grounding or earthing means connecting frame of electrical equipment (non-cur

1. Explain the various methods of methods of grounding. In power system, grounding or earthing means connecting frame of electrical equipment (non-cur 1. Explain the various methods of methods of grounding. In power system, grounding or earthing means connecting frame of electrical equipment (non-current carrying part) or some electrical part of the

More information

PUMP PERFORMANCE MEASUREMENTS Jacques Chaurette p. eng. April 2003

PUMP PERFORMANCE MEASUREMENTS Jacques Chaurette p. eng.  April 2003 PUMP PERFORMANCE MEASUREMENTS Jacques Chaurette p. eng. www.lightmypump.com April 003 Synopsis This article examines how to take flow and pressure measurement and then calculate the total head of a pump

More information

ECE 325 Electric Energy System Components 7- Synchronous Machines. Instructor: Kai Sun Fall 2015

ECE 325 Electric Energy System Components 7- Synchronous Machines. Instructor: Kai Sun Fall 2015 ECE 325 Electric Energy System Components 7- Synchronous Machines Instructor: Kai Sun Fall 2015 1 Content (Materials are from Chapters 16-17) Synchronous Generators Synchronous Motors 2 Synchronous Generators

More information

We Make Energy Engaging. Improving Your Power Factor

We Make Energy Engaging. Improving Your Power Factor We Make Energy Engaging Improving Your Power Factor Meet Your Panelist Mike Carter 2 NEEA Northwest Industrial Training Provided by: Northwest Regional Industrial Training Center: (888) 720-6823 industrial-training@industrial.neea.org

More information

Power System Stability and Control. Dr. B. Kalyan Kumar, Department of Electrical Engineering, Indian Institute of Technology Madras, Chennai, India

Power System Stability and Control. Dr. B. Kalyan Kumar, Department of Electrical Engineering, Indian Institute of Technology Madras, Chennai, India Power System Stability and Control Dr. B. Kalyan Kumar, Department of Electrical Engineering, Indian Institute of Technology Madras, Chennai, India Contents Chapter 1 Introduction to Power System Stability

More information

Capacitor Application Issues

Capacitor Application Issues Capacitor Application Issues Thomas Blooming, P.E. Daniel J. Carnovale, P.E. IEEE Industry Applications Society 53 rd Pulp & Paper Industry Technical Conf. Williamsburg, Virginia June 24-29, 2007 Introduction

More information

EE 3120 Electric Energy Systems Study Guide for Prerequisite Test Wednesday, Jan 18, pm, Room TBA

EE 3120 Electric Energy Systems Study Guide for Prerequisite Test Wednesday, Jan 18, pm, Room TBA EE 3120 Electric Energy Systems Study Guide for Prerequisite Test Wednesday, Jan 18, 2006 6-7 pm, Room TBA First retrieve your EE2110 final and other course papers and notes! The test will be closed book

More information

Weather Company Energy and Power Products

Weather Company Energy and Power Products Service Weather Company Energy and Power Products This Service (SD) describes the Cloud Service IBM provides to Client. Client means the company and its authorized users and recipients of the Cloud Service.

More information

FGH40T120SQDNL4. IGBT - Ultra Field Stop. 40 A, 1200 V V CEsat = 1.7 V E off = 1.1 mj

FGH40T120SQDNL4. IGBT - Ultra Field Stop. 40 A, 1200 V V CEsat = 1.7 V E off = 1.1 mj FGHTSQDNL IGBT - Ultra Field Stop This Insulated Gate Bipolar Transistor (IGBT) features a robust and cost effective Ultra Field Stop Trench construction, and provides superior performance in demanding

More information

MAY/JUNE 2006 Question & Model Answer IN BASIC ELECTRICITY 194

MAY/JUNE 2006 Question & Model Answer IN BASIC ELECTRICITY 194 MAY/JUNE 2006 Question & Model Answer IN BASIC ELECTRICITY 194 Question 1 (a) List three sources of heat in soldering (b) state the functions of flux in soldering (c) briefly describe with aid of diagram

More information

DC Circuits. Circuits and Capacitance Worksheet. 10 Ω resistance. second? on the sodium is the same as on an electron, but positive.

DC Circuits. Circuits and Capacitance Worksheet. 10 Ω resistance. second? on the sodium is the same as on an electron, but positive. Circuits and Capacitance Worksheet DC Circuits 1. A current of 1.30 A flows in a wire. How many electrons are flowing past any point in the wire per second? 2. What is the current in amperes if 1200 Na

More information

Analysis of AC Power RMS and Phasors Power Factor. Power Factor. Eduardo Campero Littlewood

Analysis of AC Power RMS and Phasors Power Factor. Power Factor. Eduardo Campero Littlewood Power Factor Eduardo Campero Littlewood Universidad Autónoma Metropolitana Azcapotzalco Campus Energy Department Content 1 Analysis of AC Power 2 RMS and Phasors 3 Power Factor Recommended Bibliography

More information

THE UNIVERSITY OF NEW SOUTH WALES. School of Electrical Engineering & Telecommunications FINALEXAMINATION. Session

THE UNIVERSITY OF NEW SOUTH WALES. School of Electrical Engineering & Telecommunications FINALEXAMINATION. Session Name: Student ID: Signature: THE UNIVERSITY OF NEW SOUTH WALES School of Electrical Engineering & Telecommunications FINALEXAMINATION Session 00 ELEC46 Power System Analysis TIME ALLOWED: 3 hours TOTAL

More information

Trade of Electrician. Power and Energy

Trade of Electrician. Power and Energy Trade of Electrician Standards Based Apprenticeship Power and Energy Phase 2 Module No. 2.1 Unit No. 2.1.6 COURSE NOTES SOLAS Electrical Course Notes - Unit 2.1.6 Created by Gerry Ryan - Galway TC Revision

More information

Analogue Meters CQ2x07 series

Analogue Meters CQ2x07 series Analogue Meters CQ2x07 series Analogue Power Meters Active, reactive, apparent power meters and Power factor meters with exchangeable scales EQ0207/2207/0107/2107 & YQ0207/2207/0107/2107 o Measurement

More information

Electrical Machines and Energy Systems: Operating Principles (Part 2) SYED A Rizvi

Electrical Machines and Energy Systems: Operating Principles (Part 2) SYED A Rizvi Electrical Machines and Energy Systems: Operating Principles (Part 2) SYED A Rizvi AC Machines Operating Principles: Synchronous Motor In synchronous motors, the stator of the motor has a rotating magnetic

More information

Resistivity and Temperature Coefficients (at 20 C)

Resistivity and Temperature Coefficients (at 20 C) Homework # 4 Resistivity and Temperature Coefficients (at 0 C) Substance Resistivity, Temperature ( m) Coefficient, (C ) - Conductors Silver.59 x 0-0.006 Copper.6 x 0-0.006 Aluminum.65 x 0-0.0049 Tungsten

More information

CHAPTER 2 CAPACITANCE REQUIREMENTS OF SIX-PHASE SELF-EXCITED INDUCTION GENERATORS

CHAPTER 2 CAPACITANCE REQUIREMENTS OF SIX-PHASE SELF-EXCITED INDUCTION GENERATORS 9 CHAPTER 2 CAPACITANCE REQUIREMENTS OF SIX-PHASE SELF-EXCITED INDUCTION GENERATORS 2.. INTRODUCTION Rapidly depleting rate of conventional energy sources, has led the scientists to explore the possibility

More information

Pursuant to Section 205 of the Federal Power Act ( FPA ) 1 and the Commission s

Pursuant to Section 205 of the Federal Power Act ( FPA ) 1 and the Commission s PJM Interconnection 2750 Monroe Boulevard Norristown, PA 19403-2497 Steven R. Pincus Associate General Counsel 610.666.4370 fax 610.666.8211 steven.pincus@pjm.com July 31, 2017 Honorable Kimberly D. Bose

More information

AM 500A 500 WATT AM 1A 1 KILOWATT AM BROADCAST TRANSMITTERS. October, 1999 IM No

AM 500A 500 WATT AM 1A 1 KILOWATT AM BROADCAST TRANSMITTERS. October, 1999 IM No AM 500A 500 WATT AM 1A 1 KILOWATT AM BROADCAST TRANSMITTERS October, 1999 IM No. 597 1112 EQUIPMENT LOST OR DAMAGED IN TRANSIT. When delivering the equipment to you, the truck driver or carrier s agent

More information

Lecture 05 Power in AC circuit

Lecture 05 Power in AC circuit CA2627 Building Science Lecture 05 Power in AC circuit Instructor: Jiayu Chen Ph.D. Announcement 1. Makeup Midterm 2. Midterm grade Grade 25 20 15 10 5 0 10 15 20 25 30 35 40 Grade Jiayu Chen, Ph.D. 2

More information

ELECTRIC POWER CIRCUITS BASIC CONCEPTS AND ANALYSIS

ELECTRIC POWER CIRCUITS BASIC CONCEPTS AND ANALYSIS Contents ELEC46 Power ystem Analysis Lecture ELECTRC POWER CRCUT BAC CONCEPT AND ANALY. Circuit analysis. Phasors. Power in single phase circuits 4. Three phase () circuits 5. Power in circuits 6. ingle

More information

SFH612A/ SFH655A. Pb Pb-free. Optocoupler, Photodarlington Output. Vishay Semiconductors

SFH612A/ SFH655A. Pb Pb-free. Optocoupler, Photodarlington Output. Vishay Semiconductors Optocoupler, Photodarlington Output Features High Isolation Test Voltage 5300 V RMS Standard Plastic DIP-4 Package Lead-free component Component in accordance to RoHS 2002/95/EC and WEEE 2002/96/EC A 1

More information

Colorado PUC E-Filings System

Colorado PUC E-Filings System Attachment A.1 RES Summary Colorado PUC E-Filings System Total RECs Acquired Non-Distributed Generation Distributed Generation Retail Distributed Generation Carry Forward Previous Carry Forward Total Carry

More information

Work, Energy and Power

Work, Energy and Power 1 Work, Energy and Power Work is an activity of force and movement in the direction of force (Joules) Energy is the capacity for doing work (Joules) Power is the rate of using energy (Watt) P = W / t,

More information

Electricity Test Review

Electricity Test Review Electricity Test Review Definitions; Series Circuit, Parallel Circuit, Equivalent Resistance, Fuse, Circuit Breaker, kilowatt hour, load, short circuit, dry cell, wet cell, fuel cells, solar cells, fossil

More information

POWER FACTOR IN THE DIGITAL AGE A N E N V I R O N M E N T A L P O T E N T I A L S W H I T E P A P E R. Power Quality For The Digital Age

POWER FACTOR IN THE DIGITAL AGE A N E N V I R O N M E N T A L P O T E N T I A L S W H I T E P A P E R. Power Quality For The Digital Age Power Quality For The Digital Age POWER FACTOR IN THE DIGITAL AGE A N E N V I R O N M E N T A L P O T E N T I A L S W H I T E P A P E R Introduction One method to measure the efficiency of the electrical

More information

MJW18020G. NPN Silicon Power Transistors High Voltage Planar 30 AMPERES 1000 VOLTS BV CES 450 VOLTS BV CEO, 250 WATTS

MJW18020G. NPN Silicon Power Transistors High Voltage Planar 30 AMPERES 1000 VOLTS BV CES 450 VOLTS BV CEO, 250 WATTS NPN Silicon Power Transistors High Voltage Planar The MJW18020 planar High Voltage Power Transistor is specifically Designed for motor control applications, high power supplies and UPS s for which the

More information

ROEVER COLLEGE OF ENGINEERING & TECHNOLOGY ELAMBALUR, PERAMBALUR DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING ELECTRICAL MACHINES I

ROEVER COLLEGE OF ENGINEERING & TECHNOLOGY ELAMBALUR, PERAMBALUR DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING ELECTRICAL MACHINES I ROEVER COLLEGE OF ENGINEERING & TECHNOLOGY ELAMBALUR, PERAMBALUR-621220 DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING ELECTRICAL MACHINES I Unit I Introduction 1. What are the three basic types

More information

ANALYSIS OF ELECTRIC MACHINERY AND DRIVE SYSTEMS

ANALYSIS OF ELECTRIC MACHINERY AND DRIVE SYSTEMS ANALYSIS OF ELECTRIC MACHINERY AND DRIVE SYSTEMS IEEE Press 445 Hoes Lane Piscataway, NJ 08854 IEEE Press Editorial Board 2013 John Anderson, Editor in Chief Linda Shafer Saeid Nahavandi George Zobrist

More information

VTU E-LEARNING NOTES ON:

VTU E-LEARNING NOTES ON: VTU E-LEARNING NOTES ON: 10EE35 ELECTRICAL AND ELECTRONIC MEASUREMENTS AND INSTRUMENTATION BY DR. M.S. RAVIPRAKASHA PROFESSOR & HEAD DEPT. OF E&E ENGG. MALNAD COLLEGE OF ENGG. HASSAN 573 201. SUBJECT CODE

More information

CHAPTER 5 SIMULATION AND TEST SETUP FOR FAULT ANALYSIS

CHAPTER 5 SIMULATION AND TEST SETUP FOR FAULT ANALYSIS 47 CHAPTER 5 SIMULATION AND TEST SETUP FOR FAULT ANALYSIS 5.1 INTRODUCTION This chapter describes the simulation model and experimental set up used for the fault analysis. For the simulation set up, the

More information

Features. T A =25 o C unless otherwise noted

Features. T A =25 o C unless otherwise noted NDS65 NDS65 P-Channel Enhancement Mode Field Effect Transistor General Description These P-Channel enhancement mode field effect transistors are produced using ON Semiconductor s proprietary, high cell

More information

BSS84 P-Channel Enhancement Mode Field-Effect Transistor

BSS84 P-Channel Enhancement Mode Field-Effect Transistor BSS8 P-Channel Enhancement Mode Field-Effect Transistor Features -. A, - V, R DS(ON) = Ω at V GS = - V Voltage-Controlled P-Channel Small-Signal Switch High-Density Cell Design for Low R DS(ON) High Saturation

More information

Acknowledgment of Aramco Asia. Supplier Code of Conduct

Acknowledgment of Aramco Asia. Supplier Code of Conduct Acknowledgment of Aramco Asia Supplier Code of Conduct (Applicable to Vendors, Manufacturers, and Contractors) Aramco Asia is committed to the highest ethical and legal standards in the conduct of its

More information

ELECTRICITY UNIT REVIEW

ELECTRICITY UNIT REVIEW ELECTRICITY UNIT REVIEW S1-3-04: How does the Atomic Model help to explain static electricity? 1. Which best describes static electricity? a) charges that can be collected and held in one place b) charges

More information

1 Unified Power Flow Controller (UPFC)

1 Unified Power Flow Controller (UPFC) Power flow control with UPFC Rusejla Sadikovic Internal report 1 Unified Power Flow Controller (UPFC) The UPFC can provide simultaneous control of all basic power system parameters ( transmission voltage,

More information

Optocoupler, Phototransistor Output, no Base Connection

Optocoupler, Phototransistor Output, no Base Connection Optocoupler, Phototransistor Output, no Base Connection FEATURES A C NC 1 2 3 6 5 4 NC C E Isolation test voltage, 5 V RMS No base terminal connection for improved common mode interface immunity Long term

More information

URD Cable Fault Prediction Model

URD Cable Fault Prediction Model 1 URD Cable Fault Prediction Model Christopher Gubala ComEd General Engineer Reliability Analysis 2014 IEEE PES General Meeting Utility Current Practices & Challenges of Predictive Distribution Reliability

More information

Colorado PUC E-Filings System

Colorado PUC E-Filings System Colorado PUC E-Filings System Attachment A.1 RES Summary Total Acquired Non-Distributed Generation Distributed Generation Retail Distributed Generation Carry Forward Previous Carry Forward Total Carry

More information

NCV8450, NCV8450A. Self-Protected High Side Driver with Temperature and Current Limit

NCV8450, NCV8450A. Self-Protected High Side Driver with Temperature and Current Limit NCV85, NCV85A Self-Protected High Side Driver with Temperature and Current Limit The NCV85/A is a fully protected High Side Smart Discrete device with a typical R DS(on) of. and an internal current limit

More information

Electrical Test Report on PS3300 Series Uninterruptible Power Supply for Powerstar Inc. Gaithersburg MD

Electrical Test Report on PS3300 Series Uninterruptible Power Supply for Powerstar Inc. Gaithersburg MD Test Report No. 10746.1 No. of Pages 88 Electrical Test Report on PS3300 Series Uninterruptible Power Supply for Powerstar Inc. Gaithersburg MD Prepared by NU Laboratories, Inc. 312 Old Allerton Road,

More information

2N5655G, 2N5657G. Plastic NPN Silicon High-Voltage Power Transistors 0.5 AMPERE POWER TRANSISTORS NPN SILICON VOLTS, 20 WATTS

2N5655G, 2N5657G. Plastic NPN Silicon High-Voltage Power Transistors 0.5 AMPERE POWER TRANSISTORS NPN SILICON VOLTS, 20 WATTS , Plastic NPN Silicon High-Voltage Power Transistors These devices are designed for use in lineoperated equipment such as audio output amplifiers; lowcurrent, highvoltage converters; and AC line relays.

More information

AC Power Analysis. Chapter Objectives:

AC Power Analysis. Chapter Objectives: AC Power Analysis Chapter Objectives: Know the difference between instantaneous power and average power Learn the AC version of maximum power transfer theorem Learn about the concepts of effective or value

More information