1 J Electr Eng Technol Vol. 8, No. 5: , 2013 htt://dx.doi.org/ /jeet SSN(Print) SSN(Online) Adative Protection Algorithm for Overcurrent Relay in Distribution System with DG Byung Chul Sung*, Soo Hyoung Lee**, Jung-Wook Park and A. P. S. Meliooulos** Abstract This aer rooses the new adative rotection algorithm for inverse-time overcurrent relays (OCRs) to ensure their roer oerating time and rotective coordination. The alication of the roosed algorithm requires digital rotection relays with microcontroller and memory. The oerating arameters of digital OCRs are adjusted based on the available data whenever system conditions (system with distributed generation (DG)) vary. Moreover, it can reduce the calculation time required to determine the oerating arameters for achieving its urose. To verify its effectiveness, several case studies are erformed in time-domain simulation. The results show that the roosed adative rotection algorithm can kee the roer oerating time and rovide the rotective coordination time interval with fast resonse. Keywords: Adative rotection algorithm, Coordination time interval, Distributed generation, nverse-time overcurrent relay, Protective coordination 1. ntroduction The overcurrent relays (OCRs) have been most commonly used as an efficient device to rotect radial distribution systems. n such systems, the OCRs must oerate raidly to minimize fault duration and damage of equiment. Also, the aroriate time-lag between rimary and back-u rotections in OCRs must be ensured to avoid unnecessary oeration or false tri. n general, the OCR taking its rimary rotection zone must oerate firstly. Then, the OCR for back-u rotection should oerate only if rimary rotection fails to oerate correctly and after waiting for the aroriate delay duration, which is referred to as the coordination time interval. This means that all rotection functions must be coordinated roerly with their fast oeration for faults occurred in rimary zone. On the other hand, the interest to renewable energies and distributed generation (DG, PV, wind) results in increasing number of installations not only because of its eco-friendly asects but also its commercial advantages. Since the conventional relays including the OCR oerate with fixed arameters (settings), it is difficult to ensure the roer rotection oeration when oerating conditions of radial distribution system are changing as DGs connect and disconnect in the system. This roblem becomes more serious if multile DGs are connected to the system. n articular, the re-determined coordination between the Corresonding Author: School of Electrical and Electronic Engineering, Yonsei University, Seoul, Korea (jungark@yonsei. ac.kr) * School of Electrical and Electronic Engineering, Yonsei University, Seoul, Korea (guardchul@yonsei.ac.kr) ** School of Electrical and Comuter Engineering, Georgia nstitute of Technology, Atlanta, GA , USA (resonable21@gmail.com, sakis.m@gatech.edu) Received: January 22, 2013; Acceted: May 5, 2013 OCRs is affected by the increased fault current due to the connection of DGs and its reverse flow [1-4]. To solve this roblem, a new adative rotection algorithm is roosed utilizing the caabilities of the digital rotection relay such as intelligent electronic device (ED). Because the digital rotection relay is equied with microcontroller and memory, it is ossible to rogram it with the real-time oerating scheme and to store the required data. Moreover, it has communication links to exchange data and oerating signals between themselves as well as to reset the rotective function settings. t is also noted that they can communicate with the uer-level system such as suervisory control and data acquisition (SCADA) system in modern substation. Therefore, it can adjust their oerating arameters and characteristics corresonding to the changes in the distribution system [5-9]. n this aer, the roosed adative rotection algorithm kees the roer oerations and coordination of OCRs with the system data from the digital rotection relay even when the oerating conditions change due to load variations and/or connection of DGs. Also, it can reduce the comutation time required to calculate the oerating arameters of OCRs such as ick-u current and time dial setting. The erformance of the roosed algorithm is evaluated with several case studies in a radial distribution system by using the ower systems comuter aided design/electromagnetic transients including DC (PSCAD / EMTDC ) software. 2. nverse-time Overcurrent Relay The inverse-time OCR, which is oerated by monitoring the magnitude of fault current, is the one of various 1002

2 Byung Chul Sung, Soo Hyoung Lee, Jung-Wook Park and A. P. S. Meliooulos rotection functions. The OCR transfers a tri signal when the fault current exceeds a re-determined ick-u current, ick-u. ts inverse-time current characteristic is exressed as (1) and (2), which resent the dynamics of induction disk OCR [10]. T0 1 dt = 1 (1) 0 t( ) A t( ) = TDS + B M 1 where T 0 is the oerating time, is the fault current seen by the OCR, TDS is the time dial setting, and M is the ratio of / ick-u. Also, A, B, and are coefficients which so selected as to reresent inverse, very inverse, and extremely inverse tyes of OCR. t is observed from (1) and (2) that the tri time, t() is the function of the fault current,, which may vary during the fault. Therefore, the value of t() may be also changed according to the time. This recirocal number of varying t() is integrated from zero unless the fault current is reduced below the ick-u current. f the integration value becomes 1, then, the OCR issues a tri command to the OCR. n other words, the fault current is integrated from zero to the oerating time, T 0. n most cases, the OCRs are alied to a radial distribution system as shown in Fig. 1. Since the current is flowing from the substation to downward only in one direction, the OCR is connected to the radial line right behind the related bus. Only one OCR is used er a rotection zone while two other OCRs are necessary for each direction if the bi-directional flows of fault current are considered. This one-way fault current flowing to downward is assed through a current transformer (CT) between distribution line and OCR. Then, the fault current measured by the CT is used as the inut of OCR to determine its oerating time. Also, the magnitude of fundamental comonent of fault current sensed by the CT is samled as the inut for the digital OCR. (2) The rimary and back-u rotection zones for OCR-1 and OCR-2 are shown in Fig. 1. n general, several rotective devices installed in series should have the secified oeration sequence as in Fig. 1. This relationshi among rotective devices are said to be coordinated or selective. n order to isolate the minimum ossible faulted area with, the relays of rimary rotection zone should be firstly oerated deending on the location of the fault, and their associated back-u relays should tri only when the rimary relays are not oerated correctly. For examle, if a fault occurs at the oint between the bus 2 and the bus 3 in Fig. 1, the OCR-2 oerates as the rimary rotection to minimize the outage area, which must be isolated by the oeration of the breaker. Also, the OCR-1 should serve as the back-u rotection to cut off the fault current if the OCR-2 cannot oerate normally. Moreover, it is essential to maintain the roer time interval between the rimary and back-u rotection. This is called the coordination time interval (CT) [11-12], which is usually 0.2 s to 0.5 s. This CT is required to aly all rotection devices such as even reclosers and fuses as well as relays in a distribution system. ts associated equation is given as in (3). t t CT (3) back u rimary where t rimary and t back-u are the oeration times of rimary and back-u rotections, resectively. The oerating time of the back-u rotection is generally larger than that of the rimary rotection. Therefore, the difference between them should exceed the CT as (3), which has 0.2 sec as the minimum value as mentioned before. When the DG is connected to a radial distribution system, it can increase the fault current and ossibly reverse the direction of ower flow. The latter case is illustrated in Fig. 2 that the flow of fault current is changed by connecting the DG at bus 2. n other words, the fault current from the DG flows reversely to the fault location, F1 in Fig. 1. Then, it is added to the fault current flowing from the substation. This results in increasing the fault Fig. 1. Alication of OCRs to a radial distribution system Fig. 2. Fault current increased by connecting the DG and its reverse ower flow 1003

3 Adative Protection Algorithm for Overcurrent Relay in Distribution System with DG time required to determine their oerating arameters will also increase [6, 7, 9]. For this reason, the adative rotection algorithm to drastically reduce the comutational effort is roosed in this section. 3.1 Determination of ick-u current Fig. 3. Protective coordination between the rimary and back-u relays considering CT when the DG is connected current when comared to the case without the DG. Moreover, when the fault occurs at the fault location, F2, it is also increased due to the DG even though there is no reverse flow of the fault current. f the fault occurs at the fault location, F3 on the adjacent feeder, its magnitude sensed by OCR-n also becomes larger since the fault current from DG flows reversely to the F3. Therefore, the OCR-n might function incorrectly unless its oerating arameters are changed roerly [2, 4, 12]. n summary, the increased fault current can have the undesirable effect on the oeration of OCRs in the distribution system. Because the OCRs have the inversetime current characteristics as given in (1) and (2), their oerating times are decreased corresondingly to the amount of increase in fault current. n other words, the larger the magnitude of fault current becomes, the faster the OCR will oerate. However, note that a too-fast oeration of relay may lead to unnecessary removal of a larger ortion of the system. As shown in Fig. 3, the rimary OCR might have difficulty in coordinating with the back-u OCR when the fault current is increased. That is, the required coordination time is reduced as the available fault current increases. This results in mis-coordination. f this fault current is further increased over the rated value of rimary relay, it is unable to coordinate with the back-u relay, resulting in ossible misoeration. Therefore, the oerating arameters of OCRs must be correctly adjusted for the revailing fault conditions with the direction-sensitive caability of whether the current flows in either direction [4]. 3. Proosed Adative Protection Algorithm Otimization of the oerating sequence of all rotective devices while maintaining their rotective coordination in the resence of multile DGs is very comlex. n articular, as the number of OCRs and DGs increases, the calculation Assume that the ick-u current, ick-u of OCR is calculated eriodically from the monitored current. t will have different value whenever the system configuration is changed. For each time interval, the load current calculated after a fixed time from its starting oint is used to determine the value of ick-u. The rovision of a time delay to stabilize the distribution system is necessary to select a stable load current corresonding to the connection of DG. Then, the value of ick-u is determined as shown in (4). = 1.5 (4) ick u L N where L N is the load current calculated after the fixed time from its starting oint of N-th time interval. As (4), the new ick-u is set to be 1.5 times the selected load current because a safety margin must be given to it. This safety margin is necessary so that the OCR oerate by the normal load current of the steady-state, which is used to determine ick-u. n other words, the OCR will tri the intact art of the ower system if the value of L N is set as the ick-u current. Moreover, the multilier, 1.5, can be adjusted to rovide the required safety margin. Therefore, the ick-u current can be obtained with the load current, which reflects the condition of the system. Note that the length of time interval must be roerly set not to calculate the ick-u current too frequently. After another time delay, the value of ick-u is alied to determine the oerating arameters of OCR. This time delay is required so that the OCR oerates with its redetermined arameters in case of the fault occurred at the oint, where the L N is obtained. n other words, if this fault current is used as the ick-u current of OCR directly, it might be too large to searate the fault area from the distribution system correctly. Moreover, this waiting eriod rovides the sufficient time to calculate the new value of time dial setting (TDS), which is described in the following section. 3.2 Determination of time dial setting As mentioned reviously, the OCR has two imortant oerating arameters, the ick-u current and TDS. The ick-u current is firstly calculated with the load current by (4). Then, the new TDS, TDS new is comuted by (5) to maintain its original oerating time and CT without regard to the change of system condition. n other words, the TDS new is determined to make the OCR oerate similarly to the re-determined oeration time according to the OCR characteristic in (2). 1004

4 Byung Chul Sung, Soo Hyoung Lee, Jung-Wook Park and A. P. S. Meliooulos TDS =TDS ( A+ B( M 1))( M ' 1) new ( A+ B ( M ' 1))( M 1) where the A, B, and are the associated coefficients of OCR, and M is the ratio of / ick-u for the current time interval. The M becomes different from the M determined form the revious time interval if the ick-u and fault current is varied deending on the system condition. Their relationshi is defined as (6) M ' (5) = km (6) n (5), the values of A, B,, and TDS are ket to be constant even after the system condition is changed. Note that the M can be known by the fault current data stored in the OCR memory. Moreover, analysis of off-line fault current in a distribution system is conducted if it is required to udate with the changed data. Therefore, the M can be easily calculated by transmitting it to the OCR through the communication links. Consequently, it is ossible to obtain the TDS new raidly because all values in (5) are already known. As well, the TDS can also be obtained more easily for the case that loads and OCR characteristics are changed. n summary, when the load is changed, the udate of fault current data is not necessary because it may remain constant in ractice. n contrast, the ick-u current is relaced by the new one according to variations of load current. Therefore, only M is changed into M, and the TDS new is obtained by using (5). Also, if only characteristics of the OCR are changed, the new TDS is comuted with new coefficients, as given by (7). n this case, the M for revious time interval is the same as the M for current time interval because there is no change in both ick-u current and fault current. A + B M M ( 1 ' 2 1 1( 1))( 1) TDS new =TDS ( A ' B2 ( M 1))( M 1) (7) ick u. re TDS re = 1.5 ick u L N ick u N= N+ 1 TDS new ick u TDS new TDS new Fig. 4. Procedure to imlement the roosed adative rotection algorithm 1005

5 Adative Protection Algorithm for Overcurrent Relay in Distribution System with DG where (A 1, B 1, 1 ) and (A 2, B 2, 2 ) are the coefficients for reviously and newly chosen characteristics, resectively. By the roosed method, the TDS new in (7) can be simly determined in the case that multile transitions occur. n other words, after the ick-u current and TDS are calculated newly, these oerating arameters are then alied to the OCR at the same time. 3.3 Procedure to imlement the roosed algorithm The overall rocedure to imlement the roosed adative rotection algorithm is shown in Fig. 4. Firstly, the values of re-determined oerating arameters, which are ick-u.re and TDS re, are obtained. Also, the fault current data is stored. Thereafter, the value of ick-u seen by the OCR is calculated with the information of load current, and held during the time delay before the roosed algorithm is alied to the OCR. Without any changes in a distribution system, it is ossible that the value of ick-u becomes different from that in the revious time interval. n most cases, it occurs in the first time interval. n this case, the fault current data stored in the OCR is used to find the values of M and M in (6) until the fault current data is changed according to the system condition. Then, the two TDS new corresonding to close-in faults for both rimary and back-u rotection zones are comuted by (5) for each OCR during the short time delay. Note that the last OCR in line uses the TDS for only rimary rotection zone because it avoids roviding the back-u rotection. After determining the values of icku and two TDS new, they are used to relace the redetermined oerating arameters. n a steady-state condition, the next interval is udated with the above new oerating arameters. Then, the value of ick-u is calculated again. f there are still no changes in the system, there is no need to calculate the two TDS new because the value of ick-u is identical to that for the revious time interval. n other words, the TDSs are ket to be constant with the same ick-u without changes in system condition. n the case that there is a change in system by load variation, or connection of DGs, the value of ick-u becomes different from that of ick-u.re or ick-u determined in the revious time interval. This does not aly to the case that the characteristic of OCR is changed. Then, the two TDS new for the rimary and back-u rotection are determined as reviously. n articular, the udated fault current data is unnecessary for the cases of change in load and OCR s characteristic, as mentioned in sub-section 3.2. Therefore, the two TDSs for these two cases are comuted by using (5) and (7), resectively. n contrast, the connection of DG requires udating the fault current data. After transmitting this udated information to the OCR, the M and M are calculated by (6). Thereafter, the TDS new is obtained by (5). f the condition of system is not changed any more, the alied oerating arameters are fixed. When a fault occurs in the distribution line, the OCR will resond according to the oerating arameters, ick-u and TDS new, which are calculated in above. Then, each OCR determines the oerating mode between rimary and back-u rotections by checking the fault location, which can be found by comaring the monitored fault current to the stored data. Finally, the oerating modes of OCR are selected with the roer TDS according to whether it corresonds to the rimary or back-u rotection. 4. Test Distribution System and OCR Setting A test system has been used to evaluate the erformance of roosed rotection algorithm. The test distribution system is shown in Fig. 5. This distribution system consists of a 154-kV substation, a 154/22.9-kV transformer of 10 MVA, four loads on the 22.9-kV line, and three OCRs. The load and line imedance data are given in Tables 1 and 2, resectively. t is assumed that a three-hase short-circuit fault with its fault imedance, R f of 0.01 Ω is alied at bus 4. Then, the system is rotected by three coordinated OCRs, which are named OCR-1, OCR-2, and OCR-3. The CT ratios of each OCR are set to be 200:5, 150:5, and 100:5, resectively. The oerating characteristics of three OCRs in Table 3 are selected based on the EEE standard C [10]. Note that a three-hase short-circuit fault might occur at each line. Then, according to the fault location, the close-in Table 1. Load data Fig. 5. Radial distribution test system Load S [MVA] P [MW] Q [Mvar] Load Load Load Load Table 2. Line imedances Line medance [Ω] From bus To Series resistance bus (R) Series reactance (X) Z TR R f Total

6 Byung Chul Sung, Soo Hyoung Lee, Jung-Wook Park and A. P. S. Meliooulos Table 3. Constants and exonent for various OCR characteristics from EEE Standard C Characteristic A B Moderately inverse (M) Very inverse (V) Extremely inverse (E) Fig. 6. Equivalent circuit of distribution system by the imedance method and far-bus faults have their maximum and minimum values, resectively. n general, the equivalent circuit of distribution system shown in Fig. 6 is used to calculate the short-circuit current by using the imedance method. Each art of ower system such as external grid, transformer, and line is converted to its imedance [13-14]. Then, the oerating arameters of OCRs are determined after calculating the short-circuit current with the load and imedance data in Tables 1 and 2. For examle, when a three-hase short-circuit occurs at bus 4 (therefore, it is the far-bus fault of OCR-3), it is calculated by both the value of total series imedance from source to fault location, which is the sum of the imedance for the equivalent circuit in Fig. 6, and the voltage level of the ower system as (8). U S sc3 = = [A] 3 Z + Z + Z + R S TR L f (8) Table 4. Pre-determined oerating arameters of OCRs sc3 [A] T o [sec] Currnet (A) Current (A) OCR-1 OCR-2 OCR-3 Line12 C FB Line23 C FB Line34 C FB CT ratio 200:5 150:5 100:5 Characteristic V V M ick-u [A] TDS Line12 C FB Cal Line23 C FB Line34 C FB Line12 C FB Sim Line23 C FB Line34 C FB Time (sec) (a) Time (sec) (b) Symmetrical AC comonent of SC3 (RMS) DC comonent of SC3 Fig. 7. Waveforms of sc3 when a three-hase short-circuit occurs at bus 4 (a) resonse of a-hase sc3 (b) symmetrical AC and the DC comonent of sc3 where sc3 is the magnitude of the three-hase short-circuit current, and U S is the hase-to-hase voltage. Because the source imedance is so small that it can be neglected, the total series imedance from source to fault location is 0.06+j24[Ω], and its magnitude is aroximately 24 Ω. The waveform of short-circuit current flowing from bus 3 to bus 4 is shown in Fig. 7(a). The short-circuit current consists of the DC comonent, which is decreased exonentially based on the ratio of resistance to reactance, and the symmetrical AC comonent. The resonses of these two comonents are shown in Fig. 7(b). As mentioned reviously, the magnitude of the symmetrical AC comonent is used as the inut of OCRs. t is known from Fig. 7(b) that the root-mean-square (RMS) value of symmetrical AC comonent is obtained as aroximately 550 A. Note that this value is almost same as that of shortcircuit current calculated by (8). n Table 4, the short-circuit currents as close-in (C) and far-bus (FB) faults are obtained in each line of test distribution system by simulation. Also, their values are comared with those of short-circuit currents calculated by the imedance method as given in (8). t is clearly observed from Table 4 that as the fault location is closer to the substation, the magnitude of short-circuit current becomes increasing. After calculating the short-circuit current in each line, the oerating arameters of all OCRs are determined so that the distribution system can be 1007

7 Adative Protection Algorithm for Overcurrent Relay in Distribution System with DG rotected within a roer time. t is assumed that the C fault current flowing toward downward in line is equal to the FB fault current flowing toward uward in line [11]. Thereafter, all arameters and selected characteristics of three OCRs are given in Table 4. The oerating times obtained from simulation are the times when the integration becomes one as given in (1) and its oerating signal is released. When they are comared with the calculated oerating times by (2), the results show that they are almost same. For both cases, the CT of 0.2 s is roerly determined for all lines. Also, the time interval required to calculate the new ick-u current and TDSs is assumed to be 1 s. Then, the time delays for measuring the load current and calculating new TDSs of OCRs are 0.3 s and 0.1 s, resectively. 5. Performance Evaluation To evaluate the erformance of the roosed algorithm, the condition of distribution system is changed by connecting the DG of 4 MVA at bus 2 as shown in Fig. 8. The outut voltage of DG is 10 kv, and it is connected to the system through a 10/22.9 kv transformer. First, the ick-u current is calculated based on the load current after 0.3 s from the starting oint of time interval, which is 0.5 s. t is known from the result in Fig. 9 that the load current seen by OCR-1 is decreased to 1.61 A after connecting the DG. n contrast, the load currents seen by OCR-2 and OCR-3 are slightly changed. When a three-hase short-circuit with the fault imedance of R f is alied to bus 4, the equivalent circuit considering the connection of DG is formed as shown in Fig. 10 by alying the imedance method. n this case, there are two sources of fault current, and it is described that the two sources are connected in arallel. Moreover, the magnitude of short-circuit current deends on the location, where the DG is connected. Therefore, it is necessary to consider the ratio l, which is defined as the distance from substation to DG over the distance from source to fault location. Since the line distance can be equivalent with its corresonding imedance, the distance between any two buses is reresented by the imedance data in Tables 2 and 5. Then, the total summation of all imedances in the equivalent circuit in Fig. 10 is calculated by (9). ( ZS + ZTR + l ZL ) ( ZTR _ DG + Z DG ) Ztot = + (1 l) Z Z + Z + l Z + Z + Z S TR L TR _ DG DG where Z TR_DG and Z DG are the imedance of transformer connected to the DG and the DG itself, resectively. n the equivalent circuit, the imedances are referred to the secondary side of the transformer, as given in Table 5. Also, the value of l is 0.4 in this case. sc3 U S = = = [ A] 3 Z tot L (9) (10) sc3,dg Z TR_DG Z DG Fig. 8. Distribution system with the DG connected to bus 2 through the transformer sc3,substation Z S Z TR l Z L (1-l) Z L 4 R f 3.5 U S Current (A) A 1.61 A 3.73 A Fig. 10. Equivalent circuit when the DG is connected Table 5. medance data of DG transformer and DG itself 2 Load current seen by OCR-1 Load current seen by OCR-2 Load current seen by OCR Time (sec) Fig. 9. Load current seen by each OCR at the secondary side of CT before and after the connection of DG medance medance [Ω] Series resistance (R) Series reactance (X) Z DG Z TR_DG Total medance by reflecting referred to secondary side

8 Byung Chul Sung, Soo Hyoung Lee, Jung-Wook Park and A. P. S. Meliooulos = sc3, substation sc3 Z + Z TR _ DG DG Z + Z + l Z + Z + Z S TR L TR _ DG DG (11) Finally, the total short-circuit current, sc3, which is the sum of sc3, DG and sc3, substation in the arallel circuit of Fig. 10, is comuted by (10) similar to (8). Moreover, since OCR-1 can monitor only sc3, substation from Fig. 8 and the value of sc3 is divided into sc3, DG and sc3, substation, the value of the inut for it can be calculated by (11) according to the equivalent circuit. On the other hand, the shortcircuit current for the C fault at line34 can be also calculated by the same manner as (10). n this case, the value of l is 0.6 because the DG is still connected at bus 2, however the fault occurs close to bus 3 [15]. After connecting the DG, the short-circuit currents, sc3 seen by the OCRs for the C and FB faults at line34 are given in Table 6. However, the oerating times, T o of OCR- 2 and OCR-3 changed by the connection of DG under the revious setting in Table 4 are s and s, resectively. Because they oerate quickly, the difference of T o between them is about 0.11 s, which is smaller than the required minimum CT of 0.2 s. This might cause a rotective coordination roblem. When the roosed method in Fig. 4 is alied, the new ick-u currents for OCR-1, OCR-2 and OCR-3 are calculated by (4), they are 2.42 A, 5.57 A, and 5.60 A, resectively. Then, two TDS new fitting to these new ick-u currents are obtained so that the T o of OCRs is ket to be the reviously established values required as given in Table 4. The values of TDS new and T o are given in Table 6. t is observed that T o for OCR-2 and OCR-3 are now changed to s and s, resectively. The difference is s, which is greater than the required minimum CT of 0.2 s. Therefore, they satisfy the rotective coordination requirements. Since the short-circuit occurs at line34, OCR-2 and OCR-3 oerate as back-u and rimary rotection, resectively. Then, the C fault current at bus 3 is considered to evaluate the rotection coordination between the OCR-2 and the OCR-3. Therefore, the OCR-3 setting TDS new is for the rimary rotection. n contrast, the TDS new for OCR-2 is determined for the back-u rotection by the C fault at line34. Because the OCR-3 is the last rotective device in the radial line, the setting TDS new is for the rimary rotection only. Therefore, the roer rotection can be still rovided by the OCR-3 even though the T o for the rimary rotection is slightly increased to s from s in Table 4. Differently from the above case, the OCR-2 oerates as the rimary rotection if the short-circuit occurs at line23 in Fig. 8. Moreover, the OCR-1 oerates as the back-u rotection. n this case, the new ick-u currents for OCR- 1, OCR-2 and OCR-3 are equal to the above case. However, the T o of OCR-1 and OCR-2 are changed by connecting the DG. As given in Table 7, those values are s and s, resectively. t is observed that the T o of OCR-2 is reduced greatly from s (see Table 4) to s. This is because only OCR-2 is affected by the short-circuit current from the connected DG. Therefore, the difference of s in T o, which is still valid for the rotective coordination because it is larger than the re-determined CT of 0.2 s. Also, the values of TDS new and T o with new setting for the OCR-1 and OCR-2 are given in Table 7. The TDS new of OCR-2 is whereas that for the back-u rotection is as given in Table 6. This means that the OCR-2 can select the oerating mode with different TDS new deending on the fault location. When the OCR-2 oerates as the rimary rotection based on the related TDS new, , the T o for C fault at line23 is s, which is very similar to the reviously established T o of s (in Table 4). Moreover, the CT between the OCR-1 and OCR-2 decreases from s to s, which is the same to the re-determined CT and still satisfies the required minimum CT of 0.2 s. For the FB fault at line23, it is verified that line23 can be rotected by the rimary rotection of OCR-2 because the To of s is similar to its re-established value of s in Table 4. Table 6. New oerating arameters of OCRs by connecting DG to Bus2 when fault occurs at Line34 OCR-1 OCR-2 OCR-3 sc3 [A] C FB C Cal T o with old FB setting [sec] C Sim FB Load current at 0.8 sec [A] New ick-u current [A] k for C New TDS C Cal T o with new FB setting [sec] C Sim FB Table 7. New oerating arameters for connection of DG at Bus2 with fault at Line23 OCR-1 OCR-2 OCR-3 sc3 [A] C FB C Cal T o with old FB setting [sec] C Sim FB Load current at 0.8 sec [A] New ick-u current [A] k for C New TDS C Cal T o with new FB setting [sec] C Sim FB

9 Adative Protection Algorithm for Overcurrent Relay in Distribution System with DG 6. Conclusions This aer roosed a new adative rotection algorithm for digital overcurrent relays (OCRs) in radial distribution systems that adats to changes in a distribution system due to connecting/ disconnecting DGs. The roosed method can be alied to the intelligent electronic devices (ED) such as digital (numerical) rotection relays because these devices can rovide the functions required for data rocessing, data storage, and communication links. The rotection erformance of the roosed method was evaluated with simulations on an examle system and several case studies. The results showed that the oerating time and coordination time interval (CT) are almost same as their re-determined values while the oerating arameters of OCRs are automatically udated by the roosed simle rocedure. Therefore, it could reduce the required calculation time. n future studies, the adative rotection algorithm for bi-directional flows of fault currents in both radial and loo distribution systems is will be investigated. Acknowledgements This work was suorted by the National Research Foundation (NRF) of Korea under Grant , funded by the Korea government (MEST). References [1] S. Santoso, and T. A. Short, dentification of Fuse and Recloser Oerations in Radial Distribution System, EEE Trans. Power Delivery, vol. 22, no. 4, , Oct [2] W. J. Park, B. C. Sung, K. B. Song, and J. W. Park, Parameter Otimization of SFCL With Wind- Turbine Generation System Based on ts Protective Coordination, EEE Trans. Alied Suerconductivity, vol. 21, no. 3, , Jun [3] S. Chaitusaney, and A. Yokoyama, Prevention of Reliability Degradation from Recloser-Fuse Miscoordination Due to Distributed Generation, EEE Trans. Power systems, vol. 23, no. 4, , Oct [4] H. J. Lee, G. T. Son, and J. W. Park, Study on Wind- Turbine Generator System Sizing Considering Voltage Regulation and Overcurrent Relay Coordination, EEE Trans. Power Systems, vol. 26, no. 3, , Aug [5] A. P. S. Meiooulos, G. Cokkinides, R. Huang, E. Farantatos, S. Choi, Y. Lee, and X. Yu, Smart Grid Technologies for Autonomous Oeration and Control, EEE Trans. Smart Grid, vol.2, no.1,.1-10, Mar [6] M. M. Mansour, S. F. Mekhamer, and N. El-Sherif El-Kharbawe, A Modified Particle Swarm Otimizer for the Coordination of Directional Overcurrent Relay, EEE Trans. Power Delivery, vol. 22, no. 3, , Jul [7] A. C. Enrizquez, E. V. Martinez, and H. J. Altuve, Time Overcurrent Adative Relay, Elsevier, Electrical Power and Energy system, vol.25, , Ar [8] V. Calderaro, V. Galdi, A. Piccolo, and P. Siano, Adative Relays for Overhead Line Protection, Elsevier, Electric Power Systems Research, vol. 77, , Dec [9] A. Conde, and E. Vázquez, Oeration Logic Proosed for Time Overcurrent Relays, EEE Trans. Power Delivery, vol. 22, no. 4, , Oct [10] EEE Standard nverse-time Characteristic Equations for Overcurrent Relays, EEE standard C [11] J. L. Blackburn, Protective Relaying: Princiles and Alications, 2 nd ed., Marcel Dekker, nc., [12] EEE Guide for Protective Relay Alications to Distribution Lines, EEE standard C [13] A. Berizzi, S. Massucco, A. Silvestri, and D. Zaninelli, Short-circuit current calculation: A comarison between methods of EC and ANS standards using dynamic simulation as reference, EEE Trans. ndustry Alications, vol. 30, no. 4, , Aug [14] Schneider Electric, Calculation of Short-circuit Current, 2005, [15] D. N. Gaonkar, Distributed Generation, ntech, Byung Chul Sung received the B.S. and M.S. degree from the School of Electrical and Electronic Engineering, Yonsei University, Seoul, Korea, in 2006 and 2009, resectively. He is currently ursuing his Ph.D. degree in Yonsei University. His research interests are in ower system oeration and control, fault-current-limiter (FCL) control connected ower grid, develoment of bi-directional rotection coordination technique for distributed generation. Soo Hyoung Lee received the B.S. and Ph.D. degrees from the School of Electrical and Electronic Engineering, Yonsei University, Seoul, Korea, in 2008 and 2012, resectively. He is currently a Post-doctoral Research Associate in the School of Electrical and Comuter Engineering, Georgia nstitute of Technology, Atlanta, GA, USA. His research interests are in load flow of ower system, otimization of grid connected distributed generation systems, anti- 1010

10 Byung Chul Sung, Soo Hyoung Lee, Jung-Wook Park and A. P. S. Meliooulos islanding algorithms and inverter control for distributed generation systems, and measurement based load modeling. He was the reciient of the Gold Prize Paer Award from the TMS nstitute of Technology and Second Prize Paer Award from the Yonsei Electric Power Research Center. Jung-Wook Park was born in Seoul, Korea. He received the B.S. degree (summa cum laude) from the Deartment of Electrical Engineering, Yonsei University, Seoul, Korea, in 1999, and the M.S.E.C.E. and Ph.D. degrees from the School of Electrical and Comuter Engineering, Georgia nstitute of Technology, Atlanta, USA in 2000 and 2003, resectively. He was a Post-doctoral Research Associate in the Deartment of Electrical and Comuter Engineering, University of Wisconsin, Madison, USA during 2003~2004, and a Senior Research Engineer with LG Electronics nc., Korea during He is currently an Associate Professor in the School of Electrical and Electronic Engineering, Yonsei University, Seoul, Korea. He is now leading the National Leading Research Laboratory (NLRL) designated by Korea government to the subject of integrated otimal oeration for smart grid. He is also a chair of Yonsei Power and Renewable Energy FuturE technology Research Center (Yonsei-PREFER) in School of Electrical and Electronic Engineering, Yonsei University, Seoul, Korea. His current research interests are in ower system dynamics, renewable energies based distributed generations, ower control of electric vehicle, and otimization control algorithms. Prof. Park was the reciient of Second Prize Paer Award in 2003 from ndustry Automation Control Committee and Prize Paer Award in 2008 from Energy Systems Committee of the EEE ndustry Alications Society (AS). He is currently a vice chair of ntelligent Systems Technical Alications Committee of EEE Comutational ntelligence Society (CS) A. P. S. Meliooulos was born in Katerini, Greece, in He received the M. E. and E. E. diloma from the National Technical University of Athens, Greece, in 1972; the M.S.E.E. and Ph.D. degrees from the Georgia nstitute of Technology in 1974 and 1976, resectively. n 1971, he worked for Western Electric in Atlanta, Georgia. n 1976, he joined the Faculty of Electrical Engineering, Georgia nstitute of Technology, where he is resently a Georgia Power Distinguished Professor. He is active in teaching and research in the general areas of modeling, analysis, and control of ower systems. He has made significant contributions to ower system grounding, harmonics, and reliability assessment of ower systems. He is the author of the books, Power Systems Grounding and Transients, Marcel Dekker, June 1988, Lightning and Overvoltage Protection, Section 27, Standard Handbook for Electrical Engineers, McGraw Hill, He holds three atents and he has ublished over 220 technical aers. n 2005 he received the EEE Richard Kaufman Award and in 2010 the George Montefiori Award. Dr. Meliooulos is the Chairman of the Georgia Tech Protective Relaying Conference, a Fellow of the EEE and a member of Sigma Xi. 1011

An Investigation on the Numerical Ill-conditioning of Hybrid State Estimators

An Investigation on the Numerical Ill-conditioning of Hybrid State Estimators An Investigation on the Numerical Ill-conditioning of Hybrid State Estimators S. K. Mallik, Student Member, IEEE, S. Chakrabarti, Senior Member, IEEE, S. N. Singh, Senior Member, IEEE Deartment of Electrical

More information

MODELING THE RELIABILITY OF C4ISR SYSTEMS HARDWARE/SOFTWARE COMPONENTS USING AN IMPROVED MARKOV MODEL

MODELING THE RELIABILITY OF C4ISR SYSTEMS HARDWARE/SOFTWARE COMPONENTS USING AN IMPROVED MARKOV MODEL Technical Sciences and Alied Mathematics MODELING THE RELIABILITY OF CISR SYSTEMS HARDWARE/SOFTWARE COMPONENTS USING AN IMPROVED MARKOV MODEL Cezar VASILESCU Regional Deartment of Defense Resources Management

More information

Characterizing the Behavior of a Probabilistic CMOS Switch Through Analytical Models and Its Verification Through Simulations

Characterizing the Behavior of a Probabilistic CMOS Switch Through Analytical Models and Its Verification Through Simulations Characterizing the Behavior of a Probabilistic CMOS Switch Through Analytical Models and Its Verification Through Simulations PINAR KORKMAZ, BILGE E. S. AKGUL and KRISHNA V. PALEM Georgia Institute of

More information

Mitigation of Distributed Generation Impact on Protective Devices in a Distribution Network by Superconducting Fault Current Limiter *

Mitigation of Distributed Generation Impact on Protective Devices in a Distribution Network by Superconducting Fault Current Limiter * Energy and Power Engineering, 2013, 5, 258-263 doi:10.4236/epe.2013.54b050 Published Online July 2013 (http://www.scirp.org/journal/epe) Mitigation of Distributed Generation Impact on Protective Devices

More information

Oil Temperature Control System PID Controller Algorithm Analysis Research on Sliding Gear Reducer

Oil Temperature Control System PID Controller Algorithm Analysis Research on Sliding Gear Reducer Key Engineering Materials Online: 2014-08-11 SSN: 1662-9795, Vol. 621, 357-364 doi:10.4028/www.scientific.net/kem.621.357 2014 rans ech Publications, Switzerland Oil emerature Control System PD Controller

More information

Indirect Rotor Field Orientation Vector Control for Induction Motor Drives in the Absence of Current Sensors

Indirect Rotor Field Orientation Vector Control for Induction Motor Drives in the Absence of Current Sensors Indirect Rotor Field Orientation Vector Control for Induction Motor Drives in the Absence of Current Sensors Z. S. WANG *, S. L. HO ** * College of Electrical Engineering, Zhejiang University, Hangzhou

More information

An Adaptive Three-bus Power System Equivalent for Estimating Voltage Stability Margin from Synchronized Phasor Measurements

An Adaptive Three-bus Power System Equivalent for Estimating Voltage Stability Margin from Synchronized Phasor Measurements An Adative Three-bus Power System Equivalent for Estimating oltage Stability argin from Synchronized Phasor easurements Fengkai Hu, Kai Sun University of Tennessee Knoxville, TN, USA fengkaihu@utk.edu

More information

Lower Confidence Bound for Process-Yield Index S pk with Autocorrelated Process Data

Lower Confidence Bound for Process-Yield Index S pk with Autocorrelated Process Data Quality Technology & Quantitative Management Vol. 1, No.,. 51-65, 15 QTQM IAQM 15 Lower onfidence Bound for Process-Yield Index with Autocorrelated Process Data Fu-Kwun Wang * and Yeneneh Tamirat Deartment

More information

A MIXED CONTROL CHART ADAPTED TO THE TRUNCATED LIFE TEST BASED ON THE WEIBULL DISTRIBUTION

A MIXED CONTROL CHART ADAPTED TO THE TRUNCATED LIFE TEST BASED ON THE WEIBULL DISTRIBUTION O P E R A T I O N S R E S E A R C H A N D D E C I S I O N S No. 27 DOI:.5277/ord73 Nasrullah KHAN Muhammad ASLAM 2 Kyung-Jun KIM 3 Chi-Hyuck JUN 4 A MIXED CONTROL CHART ADAPTED TO THE TRUNCATED LIFE TEST

More information

On Line Parameter Estimation of Electric Systems using the Bacterial Foraging Algorithm

On Line Parameter Estimation of Electric Systems using the Bacterial Foraging Algorithm On Line Parameter Estimation of Electric Systems using the Bacterial Foraging Algorithm Gabriel Noriega, José Restreo, Víctor Guzmán, Maribel Giménez and José Aller Universidad Simón Bolívar Valle de Sartenejas,

More information

ADVANCED SIGNAL PROCESSING METHODS FOR EVALUATION OF HARMONIC DISTORTION CAUSED BY DFIG WIND GENERATOR

ADVANCED SIGNAL PROCESSING METHODS FOR EVALUATION OF HARMONIC DISTORTION CAUSED BY DFIG WIND GENERATOR ADVANCED SIGNAL PROCESSING METHODS FOR EVALUATION OF HARMONIC DISTORTION CAUSED BY DFIG WIND GENERATOR Przemyslaw Janik, Zbigniew Leonowicz, Jacek Rezmer Wroclaw University of Technology Wroclaw, Poland

More information

Minimax Design of Nonnegative Finite Impulse Response Filters

Minimax Design of Nonnegative Finite Impulse Response Filters Minimax Design of Nonnegative Finite Imulse Resonse Filters Xiaoing Lai, Anke Xue Institute of Information and Control Hangzhou Dianzi University Hangzhou, 3118 China e-mail: laix@hdu.edu.cn; akxue@hdu.edu.cn

More information

Participation Factors. However, it does not give the influence of each state on the mode.

Participation Factors. However, it does not give the influence of each state on the mode. Particiation Factors he mode shae, as indicated by the right eigenvector, gives the relative hase of each state in a articular mode. However, it does not give the influence of each state on the mode. We

More information

Robust Predictive Control of Input Constraints and Interference Suppression for Semi-Trailer System

Robust Predictive Control of Input Constraints and Interference Suppression for Semi-Trailer System Vol.7, No.7 (4),.37-38 htt://dx.doi.org/.457/ica.4.7.7.3 Robust Predictive Control of Inut Constraints and Interference Suression for Semi-Trailer System Zhao, Yang Electronic and Information Technology

More information

Genetic Algorithm Based PID Optimization in Batch Process Control

Genetic Algorithm Based PID Optimization in Batch Process Control International Conference on Comuter Alications and Industrial Electronics (ICCAIE ) Genetic Algorithm Based PID Otimization in Batch Process Control.K. Tan Y.K. Chin H.J. Tham K.T.K. Teo odelling, Simulation

More information

Scaling Multiple Point Statistics for Non-Stationary Geostatistical Modeling

Scaling Multiple Point Statistics for Non-Stationary Geostatistical Modeling Scaling Multile Point Statistics or Non-Stationary Geostatistical Modeling Julián M. Ortiz, Steven Lyster and Clayton V. Deutsch Centre or Comutational Geostatistics Deartment o Civil & Environmental Engineering

More information

Radial Basis Function Networks: Algorithms

Radial Basis Function Networks: Algorithms Radial Basis Function Networks: Algorithms Introduction to Neural Networks : Lecture 13 John A. Bullinaria, 2004 1. The RBF Maing 2. The RBF Network Architecture 3. Comutational Power of RBF Networks 4.

More information

Solved Problems. (a) (b) (c) Figure P4.1 Simple Classification Problems First we draw a line between each set of dark and light data points.

Solved Problems. (a) (b) (c) Figure P4.1 Simple Classification Problems First we draw a line between each set of dark and light data points. Solved Problems Solved Problems P Solve the three simle classification roblems shown in Figure P by drawing a decision boundary Find weight and bias values that result in single-neuron ercetrons with the

More information

Research of power plant parameter based on the Principal Component Analysis method

Research of power plant parameter based on the Principal Component Analysis method Research of ower lant arameter based on the Princial Comonent Analysis method Yang Yang *a, Di Zhang b a b School of Engineering, Bohai University, Liaoning Jinzhou, 3; Liaoning Datang international Jinzhou

More information

Methods for detecting fatigue cracks in gears

Methods for detecting fatigue cracks in gears Journal of Physics: Conference Series Methods for detecting fatigue cracks in gears To cite this article: A Belšak and J Flašker 2009 J. Phys.: Conf. Ser. 181 012090 View the article online for udates

More information

On Fractional Predictive PID Controller Design Method Emmanuel Edet*. Reza Katebi.**

On Fractional Predictive PID Controller Design Method Emmanuel Edet*. Reza Katebi.** On Fractional Predictive PID Controller Design Method Emmanuel Edet*. Reza Katebi.** * echnology and Innovation Centre, Level 4, Deartment of Electronic and Electrical Engineering, University of Strathclyde,

More information

CHAPTER-II Control Charts for Fraction Nonconforming using m-of-m Runs Rules

CHAPTER-II Control Charts for Fraction Nonconforming using m-of-m Runs Rules CHAPTER-II Control Charts for Fraction Nonconforming using m-of-m Runs Rules. Introduction: The is widely used in industry to monitor the number of fraction nonconforming units. A nonconforming unit is

More information

A generalization of Amdahl's law and relative conditions of parallelism

A generalization of Amdahl's law and relative conditions of parallelism A generalization of Amdahl's law and relative conditions of arallelism Author: Gianluca Argentini, New Technologies and Models, Riello Grou, Legnago (VR), Italy. E-mail: gianluca.argentini@riellogrou.com

More information

Estimation of component redundancy in optimal age maintenance

Estimation of component redundancy in optimal age maintenance EURO MAINTENANCE 2012, Belgrade 14-16 May 2012 Proceedings of the 21 st International Congress on Maintenance and Asset Management Estimation of comonent redundancy in otimal age maintenance Jorge ioa

More information

Frequency-Weighted Robust Fault Reconstruction Using a Sliding Mode Observer

Frequency-Weighted Robust Fault Reconstruction Using a Sliding Mode Observer Frequency-Weighted Robust Fault Reconstruction Using a Sliding Mode Observer C.P. an + F. Crusca # M. Aldeen * + School of Engineering, Monash University Malaysia, 2 Jalan Kolej, Bandar Sunway, 4650 Petaling,

More information

Combining Logistic Regression with Kriging for Mapping the Risk of Occurrence of Unexploded Ordnance (UXO)

Combining Logistic Regression with Kriging for Mapping the Risk of Occurrence of Unexploded Ordnance (UXO) Combining Logistic Regression with Kriging for Maing the Risk of Occurrence of Unexloded Ordnance (UXO) H. Saito (), P. Goovaerts (), S. A. McKenna (2) Environmental and Water Resources Engineering, Deartment

More information

Optimal Design of Truss Structures Using a Neutrosophic Number Optimization Model under an Indeterminate Environment

Optimal Design of Truss Structures Using a Neutrosophic Number Optimization Model under an Indeterminate Environment Neutrosohic Sets and Systems Vol 14 016 93 University of New Mexico Otimal Design of Truss Structures Using a Neutrosohic Number Otimization Model under an Indeterminate Environment Wenzhong Jiang & Jun

More information

Uncorrelated Multilinear Principal Component Analysis for Unsupervised Multilinear Subspace Learning

Uncorrelated Multilinear Principal Component Analysis for Unsupervised Multilinear Subspace Learning TNN-2009-P-1186.R2 1 Uncorrelated Multilinear Princial Comonent Analysis for Unsuervised Multilinear Subsace Learning Haiing Lu, K. N. Plataniotis and A. N. Venetsanooulos The Edward S. Rogers Sr. Deartment

More information

COMPARISON OF VARIOUS OPTIMIZATION TECHNIQUES FOR DESIGN FIR DIGITAL FILTERS

COMPARISON OF VARIOUS OPTIMIZATION TECHNIQUES FOR DESIGN FIR DIGITAL FILTERS NCCI 1 -National Conference on Comutational Instrumentation CSIO Chandigarh, INDIA, 19- March 1 COMPARISON OF VARIOUS OPIMIZAION ECHNIQUES FOR DESIGN FIR DIGIAL FILERS Amanjeet Panghal 1, Nitin Mittal,Devender

More information

Shadow Computing: An Energy-Aware Fault Tolerant Computing Model

Shadow Computing: An Energy-Aware Fault Tolerant Computing Model Shadow Comuting: An Energy-Aware Fault Tolerant Comuting Model Bryan Mills, Taieb Znati, Rami Melhem Deartment of Comuter Science University of Pittsburgh (bmills, znati, melhem)@cs.itt.edu Index Terms

More information

Outline. EECS150 - Digital Design Lecture 26 Error Correction Codes, Linear Feedback Shift Registers (LFSRs) Simple Error Detection Coding

Outline. EECS150 - Digital Design Lecture 26 Error Correction Codes, Linear Feedback Shift Registers (LFSRs) Simple Error Detection Coding Outline EECS150 - Digital Design Lecture 26 Error Correction Codes, Linear Feedback Shift Registers (LFSRs) Error detection using arity Hamming code for error detection/correction Linear Feedback Shift

More information

Dynamic System Eigenvalue Extraction using a Linear Echo State Network for Small-Signal Stability Analysis a Novel Application

Dynamic System Eigenvalue Extraction using a Linear Echo State Network for Small-Signal Stability Analysis a Novel Application Dynamic System Eigenvalue Extraction using a Linear Echo State Network for Small-Signal Stability Analysis a Novel Alication Jiaqi Liang, Jing Dai, Ganesh K. Venayagamoorthy, and Ronald G. Harley Abstract

More information

An Improved Calibration Method for a Chopped Pyrgeometer

An Improved Calibration Method for a Chopped Pyrgeometer 96 JOURNAL OF ATMOSPHERIC AND OCEANIC TECHNOLOGY VOLUME 17 An Imroved Calibration Method for a Choed Pyrgeometer FRIEDRICH FERGG OtoLab, Ingenieurbüro, Munich, Germany PETER WENDLING Deutsches Forschungszentrum

More information

Evaluating Circuit Reliability Under Probabilistic Gate-Level Fault Models

Evaluating Circuit Reliability Under Probabilistic Gate-Level Fault Models Evaluating Circuit Reliability Under Probabilistic Gate-Level Fault Models Ketan N. Patel, Igor L. Markov and John P. Hayes University of Michigan, Ann Arbor 48109-2122 {knatel,imarkov,jhayes}@eecs.umich.edu

More information

Estimation of the large covariance matrix with two-step monotone missing data

Estimation of the large covariance matrix with two-step monotone missing data Estimation of the large covariance matrix with two-ste monotone missing data Masashi Hyodo, Nobumichi Shutoh 2, Takashi Seo, and Tatjana Pavlenko 3 Deartment of Mathematical Information Science, Tokyo

More information

Chapter 1 Fundamentals

Chapter 1 Fundamentals Chater Fundamentals. Overview of Thermodynamics Industrial Revolution brought in large scale automation of many tedious tasks which were earlier being erformed through manual or animal labour. Inventors

More information

Tests for Two Proportions in a Stratified Design (Cochran/Mantel-Haenszel Test)

Tests for Two Proportions in a Stratified Design (Cochran/Mantel-Haenszel Test) Chater 225 Tests for Two Proortions in a Stratified Design (Cochran/Mantel-Haenszel Test) Introduction In a stratified design, the subects are selected from two or more strata which are formed from imortant

More information

Controllability and Resiliency Analysis in Heat Exchanger Networks

Controllability and Resiliency Analysis in Heat Exchanger Networks 609 A ublication of CHEMICAL ENGINEERING RANSACIONS VOL. 6, 07 Guest Editors: Petar S Varbanov, Rongxin Su, Hon Loong Lam, Xia Liu, Jiří J Klemeš Coyright 07, AIDIC Servizi S.r.l. ISBN 978-88-95608-5-8;

More information

A STUDY ON THE UTILIZATION OF COMPATIBILITY METRIC IN THE AHP: APPLYING TO SOFTWARE PROCESS ASSESSMENTS

A STUDY ON THE UTILIZATION OF COMPATIBILITY METRIC IN THE AHP: APPLYING TO SOFTWARE PROCESS ASSESSMENTS ISAHP 2005, Honolulu, Hawaii, July 8-10, 2003 A SUDY ON HE UILIZAION OF COMPAIBILIY MERIC IN HE AHP: APPLYING O SOFWARE PROCESS ASSESSMENS Min-Suk Yoon Yosu National University San 96-1 Dundeok-dong Yeosu

More information

Understanding and Using Availability

Understanding and Using Availability Understanding and Using Availability Jorge Luis Romeu, Ph.D. ASQ CQE/CRE, & Senior Member Email: romeu@cortland.edu htt://myrofile.cos.com/romeu ASQ/RD Webinar Series Noviembre 5, J. L. Romeu - Consultant

More information

Study on the Electromagnetic Force Affected by Short-Circuit Current in Vertical and Horizontal Arrangement of Busbar System

Study on the Electromagnetic Force Affected by Short-Circuit Current in Vertical and Horizontal Arrangement of Busbar System International Conference on Electrical, Control and Comuter Engineering Pahang, Malaysia, June 1-, 011 Study on the Electromagnetic Force Affected by Short-Circuit Current in Vertical and Horizontal Arrangement

More information

Generalized Coiflets: A New Family of Orthonormal Wavelets

Generalized Coiflets: A New Family of Orthonormal Wavelets Generalized Coiflets A New Family of Orthonormal Wavelets Dong Wei, Alan C Bovik, and Brian L Evans Laboratory for Image and Video Engineering Deartment of Electrical and Comuter Engineering The University

More information

Understanding and Using Availability

Understanding and Using Availability Understanding and Using Availability Jorge Luis Romeu, Ph.D. ASQ CQE/CRE, & Senior Member C. Stat Fellow, Royal Statistical Society Past Director, Region II (NY & PA) Director: Juarez Lincoln Marti Int

More information

Feedback-error control

Feedback-error control Chater 4 Feedback-error control 4.1 Introduction This chater exlains the feedback-error (FBE) control scheme originally described by Kawato [, 87, 8]. FBE is a widely used neural network based controller

More information

4. Score normalization technical details We now discuss the technical details of the score normalization method.

4. Score normalization technical details We now discuss the technical details of the score normalization method. SMT SCORING SYSTEM This document describes the scoring system for the Stanford Math Tournament We begin by giving an overview of the changes to scoring and a non-technical descrition of the scoring rules

More information

Factors Effect on the Saturation Parameter S and there Influences on the Gain Behavior of Ytterbium Doped Fiber Amplifier

Factors Effect on the Saturation Parameter S and there Influences on the Gain Behavior of Ytterbium Doped Fiber Amplifier Australian Journal of Basic and Alied Sciences, 5(12): 2010-2020, 2011 ISSN 1991-8178 Factors Effect on the Saturation Parameter S and there Influences on the Gain Behavior of Ytterbium Doed Fiber Amlifier

More information

Power System Dynamics Prediction with Measurement-Based AutoRegressive Model

Power System Dynamics Prediction with Measurement-Based AutoRegressive Model 21, rue d Artois, F-75008 PARIS CIGRE US National Committee htt : //www.cigre.org 2014 Grid of the Future Symosium Power System Dynamics Prediction with Measurement-Based AutoRegressive Model C. LI 1*,

More information

Algorithms for Air Traffic Flow Management under Stochastic Environments

Algorithms for Air Traffic Flow Management under Stochastic Environments Algorithms for Air Traffic Flow Management under Stochastic Environments Arnab Nilim and Laurent El Ghaoui Abstract A major ortion of the delay in the Air Traffic Management Systems (ATMS) in US arises

More information

The Noise Power Ratio - Theory and ADC Testing

The Noise Power Ratio - Theory and ADC Testing The Noise Power Ratio - Theory and ADC Testing FH Irons, KJ Riley, and DM Hummels Abstract This aer develos theory behind the noise ower ratio (NPR) testing of ADCs. A mid-riser formulation is used for

More information

arxiv: v1 [physics.data-an] 26 Oct 2012

arxiv: v1 [physics.data-an] 26 Oct 2012 Constraints on Yield Parameters in Extended Maximum Likelihood Fits Till Moritz Karbach a, Maximilian Schlu b a TU Dortmund, Germany, moritz.karbach@cern.ch b TU Dortmund, Germany, maximilian.schlu@cern.ch

More information

Feedback-Based Iterative Learning Control for MIMO LTI Systems

Feedback-Based Iterative Learning Control for MIMO LTI Systems International Journal of Control, Feedback-Based Automation, Iterative and Systems, Learning vol. Control 6, no., for. MIMO 69-77, LTI Systems Aril 8 69 Feedback-Based Iterative Learning Control for MIMO

More information

Logistics Optimization Using Hybrid Metaheuristic Approach under Very Realistic Conditions

Logistics Optimization Using Hybrid Metaheuristic Approach under Very Realistic Conditions 17 th Euroean Symosium on Comuter Aided Process Engineering ESCAPE17 V. Plesu and P.S. Agachi (Editors) 2007 Elsevier B.V. All rights reserved. 1 Logistics Otimization Using Hybrid Metaheuristic Aroach

More information

Elliptic Curves and Cryptography

Elliptic Curves and Cryptography Ellitic Curves and Crytograhy Background in Ellitic Curves We'll now turn to the fascinating theory of ellitic curves. For simlicity, we'll restrict our discussion to ellitic curves over Z, where is a

More information

Simulation of 3-Phase 2- Stator Induction Motor Using MATLAB Platform

Simulation of 3-Phase 2- Stator Induction Motor Using MATLAB Platform International Journal of Alied Engineering Research ISSN 0973-456 Volume 3, Number (08). 9437-944 Simulation of 3-Phase - Stator Induction Motor Using MATLAB Platform Pallavi R.Burande Deartment of Electrical

More information

Research of PMU Optimal Placement in Power Systems

Research of PMU Optimal Placement in Power Systems Proceedings of the 5th WSEAS/IASME Int. Conf. on SYSTEMS THEORY and SCIENTIFIC COMPUTATION, Malta, Setember 15-17, 2005 (38-43) Research of PMU Otimal Placement in Power Systems TIAN-TIAN CAI, QIAN AI

More information

The Graph Accessibility Problem and the Universality of the Collision CRCW Conflict Resolution Rule

The Graph Accessibility Problem and the Universality of the Collision CRCW Conflict Resolution Rule The Grah Accessibility Problem and the Universality of the Collision CRCW Conflict Resolution Rule STEFAN D. BRUDA Deartment of Comuter Science Bisho s University Lennoxville, Quebec J1M 1Z7 CANADA bruda@cs.ubishos.ca

More information

Multiple Resonance Networks

Multiple Resonance Networks 4 IEEE TRANSACTIONS ON CIRCUITS AND SYSTEMS I: FUNDAMENTAL THEORY AND APPLICATIONS, VOL 49, NO, FEBRUARY [4] Y-Y Cao, Y-X Sun, and J Lam, Delay-deendent robust H control for uncertain systems with time-varying

More information

State Estimation with ARMarkov Models

State Estimation with ARMarkov Models Deartment of Mechanical and Aerosace Engineering Technical Reort No. 3046, October 1998. Princeton University, Princeton, NJ. State Estimation with ARMarkov Models Ryoung K. Lim 1 Columbia University,

More information

Period-two cycles in a feedforward layered neural network model with symmetric sequence processing

Period-two cycles in a feedforward layered neural network model with symmetric sequence processing PHYSICAL REVIEW E 75, 4197 27 Period-two cycles in a feedforward layered neural network model with symmetric sequence rocessing F. L. Metz and W. K. Theumann Instituto de Física, Universidade Federal do

More information

Approximate Dynamic Programming for Dynamic Capacity Allocation with Multiple Priority Levels

Approximate Dynamic Programming for Dynamic Capacity Allocation with Multiple Priority Levels Aroximate Dynamic Programming for Dynamic Caacity Allocation with Multile Priority Levels Alexander Erdelyi School of Oerations Research and Information Engineering, Cornell University, Ithaca, NY 14853,

More information

Unit-3. Question Bank

Unit-3. Question Bank Unit- Question Bank Q.1 A delta connected load draw a current of 15A at lagging P.F. of.85 from 400, -hase, 50Hz suly. Find & of each hase. Given P = = 400 0 I = 15A Ans. 4.98, 5.7mH So I P = 15 =8.66A

More information

Availability and Maintainability. Piero Baraldi

Availability and Maintainability. Piero Baraldi Availability and Maintainability 1 Introduction: reliability and availability System tyes Non maintained systems: they cannot be reaired after a failure (a telecommunication satellite, a F1 engine, a vessel

More information

Position Control of Induction Motors by Exact Feedback Linearization *

Position Control of Induction Motors by Exact Feedback Linearization * BULGARIAN ACADEMY OF SCIENCES CYBERNETICS AND INFORMATION TECHNOLOGIES Volume 8 No Sofia 008 Position Control of Induction Motors by Exact Feedback Linearization * Kostadin Kostov Stanislav Enev Farhat

More information

Periodic scheduling 05/06/

Periodic scheduling 05/06/ Periodic scheduling T T or eriodic scheduling, the best that we can do is to design an algorithm which will always find a schedule if one exists. A scheduler is defined to be otimal iff it will find a

More information

q-ary Symmetric Channel for Large q

q-ary Symmetric Channel for Large q List-Message Passing Achieves Caacity on the q-ary Symmetric Channel for Large q Fan Zhang and Henry D Pfister Deartment of Electrical and Comuter Engineering, Texas A&M University {fanzhang,hfister}@tamuedu

More information

KEY ISSUES IN THE ANALYSIS OF PILES IN LIQUEFYING SOILS

KEY ISSUES IN THE ANALYSIS OF PILES IN LIQUEFYING SOILS 4 th International Conference on Earthquake Geotechnical Engineering June 2-28, 27 KEY ISSUES IN THE ANALYSIS OF PILES IN LIQUEFYING SOILS Misko CUBRINOVSKI 1, Hayden BOWEN 1 ABSTRACT Two methods for analysis

More information

Node-voltage method using virtual current sources technique for special cases

Node-voltage method using virtual current sources technique for special cases Node-oltage method using irtual current sources technique for secial cases George E. Chatzarakis and Marina D. Tortoreli Electrical and Electronics Engineering Deartments, School of Pedagogical and Technological

More information

DETC2003/DAC AN EFFICIENT ALGORITHM FOR CONSTRUCTING OPTIMAL DESIGN OF COMPUTER EXPERIMENTS

DETC2003/DAC AN EFFICIENT ALGORITHM FOR CONSTRUCTING OPTIMAL DESIGN OF COMPUTER EXPERIMENTS Proceedings of DETC 03 ASME 003 Design Engineering Technical Conferences and Comuters and Information in Engineering Conference Chicago, Illinois USA, Setember -6, 003 DETC003/DAC-48760 AN EFFICIENT ALGORITHM

More information

Iterative Methods for Designing Orthogonal and Biorthogonal Two-channel FIR Filter Banks with Regularities

Iterative Methods for Designing Orthogonal and Biorthogonal Two-channel FIR Filter Banks with Regularities R. Bregović and T. Saramäi, Iterative methods for designing orthogonal and biorthogonal two-channel FIR filter bans with regularities, Proc. Of Int. Worsho on Sectral Transforms and Logic Design for Future

More information

Hotelling s Two- Sample T 2

Hotelling s Two- Sample T 2 Chater 600 Hotelling s Two- Samle T Introduction This module calculates ower for the Hotelling s two-grou, T-squared (T) test statistic. Hotelling s T is an extension of the univariate two-samle t-test

More information

MODULAR LINEAR TRANSVERSE FLUX RELUCTANCE MOTORS

MODULAR LINEAR TRANSVERSE FLUX RELUCTANCE MOTORS MODULAR LINEAR TRANSVERSE FLUX RELUCTANCE MOTORS Dan-Cristian POPA, Vasile IANCU, Loránd SZABÓ, Deartment of Electrical Machines, Technical University of Cluj-Naoca RO-400020 Cluj-Naoca, Romania; e-mail:

More information

NEW RECLOSER CHARACTERISTIC TO IMPROVE FUSE SAVING IN DISTRIBUTION NETWORKS WITH DISTRIBUTED GENERATION

NEW RECLOSER CHARACTERISTIC TO IMPROVE FUSE SAVING IN DISTRIBUTION NETWORKS WITH DISTRIBUTED GENERATION Rev. Roum. Sci. Techn. Électrotechn. et Énerg. Vol. 62, 3, pp. 240 245, Bucarest, 2017 NEW RECLOSER CHARACTERISTIC TO IMPROVE FUSE SAVING IN DISTRIBUTION NETWORKS WITH DISTRIBUTED GENERATION SADEGH JAMALI,

More information

A New Method of DDB Logical Structure Synthesis Using Distributed Tabu Search

A New Method of DDB Logical Structure Synthesis Using Distributed Tabu Search A New Method of DDB Logical Structure Synthesis Using Distributed Tabu Search Eduard Babkin and Margarita Karunina 2, National Research University Higher School of Economics Det of nformation Systems and

More information

Using a Computational Intelligence Hybrid Approach to Recognize the Faults of Variance Shifts for a Manufacturing Process

Using a Computational Intelligence Hybrid Approach to Recognize the Faults of Variance Shifts for a Manufacturing Process Journal of Industrial and Intelligent Information Vol. 4, No. 2, March 26 Using a Comutational Intelligence Hybrid Aroach to Recognize the Faults of Variance hifts for a Manufacturing Process Yuehjen E.

More information

Robust Performance Design of PID Controllers with Inverse Multiplicative Uncertainty

Robust Performance Design of PID Controllers with Inverse Multiplicative Uncertainty American Control Conference on O'Farrell Street San Francisco CA USA June 9 - July Robust Performance Design of PID Controllers with Inverse Multilicative Uncertainty Tooran Emami John M Watkins Senior

More information

Session 5: Review of Classical Astrodynamics

Session 5: Review of Classical Astrodynamics Session 5: Review of Classical Astrodynamics In revious lectures we described in detail the rocess to find the otimal secific imulse for a articular situation. Among the mission requirements that serve

More information

Keywords: pile, liquefaction, lateral spreading, analysis ABSTRACT

Keywords: pile, liquefaction, lateral spreading, analysis ABSTRACT Key arameters in seudo-static analysis of iles in liquefying sand Misko Cubrinovski Deartment of Civil Engineering, University of Canterbury, Christchurch 814, New Zealand Keywords: ile, liquefaction,

More information

Monopolist s mark-up and the elasticity of substitution

Monopolist s mark-up and the elasticity of substitution Croatian Oerational Research Review 377 CRORR 8(7), 377 39 Monoolist s mark-u and the elasticity of substitution Ilko Vrankić, Mira Kran, and Tomislav Herceg Deartment of Economic Theory, Faculty of Economics

More information

Distributed Rule-Based Inference in the Presence of Redundant Information

Distributed Rule-Based Inference in the Presence of Redundant Information istribution Statement : roved for ublic release; distribution is unlimited. istributed Rule-ased Inference in the Presence of Redundant Information June 8, 004 William J. Farrell III Lockheed Martin dvanced

More information

dn i where we have used the Gibbs equation for the Gibbs energy and the definition of chemical potential

dn i where we have used the Gibbs equation for the Gibbs energy and the definition of chemical potential Chem 467 Sulement to Lectures 33 Phase Equilibrium Chemical Potential Revisited We introduced the chemical otential as the conjugate variable to amount. Briefly reviewing, the total Gibbs energy of a system

More information

Uncertainty Modeling with Interval Type-2 Fuzzy Logic Systems in Mobile Robotics

Uncertainty Modeling with Interval Type-2 Fuzzy Logic Systems in Mobile Robotics Uncertainty Modeling with Interval Tye-2 Fuzzy Logic Systems in Mobile Robotics Ondrej Linda, Student Member, IEEE, Milos Manic, Senior Member, IEEE bstract Interval Tye-2 Fuzzy Logic Systems (IT2 FLSs)

More information

Linear diophantine equations for discrete tomography

Linear diophantine equations for discrete tomography Journal of X-Ray Science and Technology 10 001 59 66 59 IOS Press Linear diohantine euations for discrete tomograhy Yangbo Ye a,gewang b and Jiehua Zhu a a Deartment of Mathematics, The University of Iowa,

More information

MATHEMATICAL MODELLING OF THE WIRELESS COMMUNICATION NETWORK

MATHEMATICAL MODELLING OF THE WIRELESS COMMUNICATION NETWORK Comuter Modelling and ew Technologies, 5, Vol.9, o., 3-39 Transort and Telecommunication Institute, Lomonosov, LV-9, Riga, Latvia MATHEMATICAL MODELLIG OF THE WIRELESS COMMUICATIO ETWORK M. KOPEETSK Deartment

More information

Recent Developments in Multilayer Perceptron Neural Networks

Recent Developments in Multilayer Perceptron Neural Networks Recent Develoments in Multilayer Percetron eural etworks Walter H. Delashmit Lockheed Martin Missiles and Fire Control Dallas, Texas 75265 walter.delashmit@lmco.com walter.delashmit@verizon.net Michael

More information

Chapter 7 Sampling and Sampling Distributions. Introduction. Selecting a Sample. Introduction. Sampling from a Finite Population

Chapter 7 Sampling and Sampling Distributions. Introduction. Selecting a Sample. Introduction. Sampling from a Finite Population Chater 7 and s Selecting a Samle Point Estimation Introduction to s of Proerties of Point Estimators Other Methods Introduction An element is the entity on which data are collected. A oulation is a collection

More information

An Analysis of Reliable Classifiers through ROC Isometrics

An Analysis of Reliable Classifiers through ROC Isometrics An Analysis of Reliable Classifiers through ROC Isometrics Stijn Vanderlooy s.vanderlooy@cs.unimaas.nl Ida G. Srinkhuizen-Kuyer kuyer@cs.unimaas.nl Evgueni N. Smirnov smirnov@cs.unimaas.nl MICC-IKAT, Universiteit

More information

Fault Calculation Methods

Fault Calculation Methods ELEC9713 Industrial and Commercial Power Systems Fault Calculation Methods There are two major problems that can occur in electrical systems: these are open circuits and short circuits. Of the two, the

More information

Re-entry Protocols for Seismically Active Mines Using Statistical Analysis of Aftershock Sequences

Re-entry Protocols for Seismically Active Mines Using Statistical Analysis of Aftershock Sequences Re-entry Protocols for Seismically Active Mines Using Statistical Analysis of Aftershock Sequences J.A. Vallejos & S.M. McKinnon Queen s University, Kingston, ON, Canada ABSTRACT: Re-entry rotocols are

More information

On the Relationship Between Packet Size and Router Performance for Heavy-Tailed Traffic 1

On the Relationship Between Packet Size and Router Performance for Heavy-Tailed Traffic 1 On the Relationshi Between Packet Size and Router Performance for Heavy-Tailed Traffic 1 Imad Antonios antoniosi1@southernct.edu CS Deartment MO117 Southern Connecticut State University 501 Crescent St.

More information

Mathematical Efficiency Modeling of Static Power Converters

Mathematical Efficiency Modeling of Static Power Converters Fabrício Hoff Duont Regional Integrated University of Uer Uruguai and Missions (URI Av. Assis Brasil, 9, 980 000 Frederico Westhalen, RS, Brazil Contact: fhd@ieee.org Mathematical Efficiency Modeling of

More information

Computer arithmetic. Intensive Computation. Annalisa Massini 2017/2018

Computer arithmetic. Intensive Computation. Annalisa Massini 2017/2018 Comuter arithmetic Intensive Comutation Annalisa Massini 7/8 Intensive Comutation - 7/8 References Comuter Architecture - A Quantitative Aroach Hennessy Patterson Aendix J Intensive Comutation - 7/8 3

More information

INTRODUCING THE SHEAR-CAP MATERIAL CRITERION TO AN ICE RUBBLE LOAD MODEL

INTRODUCING THE SHEAR-CAP MATERIAL CRITERION TO AN ICE RUBBLE LOAD MODEL Symosium on Ice (26) INTRODUCING THE SHEAR-CAP MATERIAL CRITERION TO AN ICE RUBBLE LOAD MODEL Mohamed O. ElSeify and Thomas G. Brown University of Calgary, Calgary, Canada ABSTRACT Current ice rubble load

More information

Calculation of MTTF values with Markov Models for Safety Instrumented Systems

Calculation of MTTF values with Markov Models for Safety Instrumented Systems 7th WEA International Conference on APPLIE COMPUTE CIENCE, Venice, Italy, November -3, 7 3 Calculation of MTTF values with Markov Models for afety Instrumented ystems BÖCÖK J., UGLJEA E., MACHMU. University

More information

Radar Dish. Armature controlled dc motor. Inside. θ r input. Outside. θ D output. θ m. Gearbox. Control Transmitter. Control. θ D.

Radar Dish. Armature controlled dc motor. Inside. θ r input. Outside. θ D output. θ m. Gearbox. Control Transmitter. Control. θ D. Radar Dish ME 304 CONTROL SYSTEMS Mechanical Engineering Deartment, Middle East Technical University Armature controlled dc motor Outside θ D outut Inside θ r inut r θ m Gearbox Control Transmitter θ D

More information

System Reliability Estimation and Confidence Regions from Subsystem and Full System Tests

System Reliability Estimation and Confidence Regions from Subsystem and Full System Tests 009 American Control Conference Hyatt Regency Riverfront, St. Louis, MO, USA June 0-, 009 FrB4. System Reliability Estimation and Confidence Regions from Subsystem and Full System Tests James C. Sall Abstract

More information

EKT103 ELECTRICAL ENGINEERING

EKT103 ELECTRICAL ENGINEERING EKT13 EECTRCA ENGNEERNG Chater 1 Three-Phase System 1 COURSE OUTCOME (CO) CO1: Ability to define and exlain the concet of single-hase and threehase system. 2 Revision A sinusoid is a signal that has the

More information

Topology Optimization of Three Dimensional Structures under Self-weight and Inertial Forces

Topology Optimization of Three Dimensional Structures under Self-weight and Inertial Forces 6 th World Congresses of Structural and Multidiscilinary Otimization Rio de Janeiro, 30 May - 03 June 2005, Brazil Toology Otimization of Three Dimensional Structures under Self-weight and Inertial Forces

More information

Modeling and Estimation of Full-Chip Leakage Current Considering Within-Die Correlation

Modeling and Estimation of Full-Chip Leakage Current Considering Within-Die Correlation 6.3 Modeling and Estimation of Full-Chi Leaage Current Considering Within-Die Correlation Khaled R. eloue, Navid Azizi, Farid N. Najm Deartment of ECE, University of Toronto,Toronto, Ontario, Canada {haled,nazizi,najm}@eecg.utoronto.ca

More information

John Weatherwax. Analysis of Parallel Depth First Search Algorithms

John Weatherwax. Analysis of Parallel Depth First Search Algorithms Sulementary Discussions and Solutions to Selected Problems in: Introduction to Parallel Comuting by Viin Kumar, Ananth Grama, Anshul Guta, & George Karyis John Weatherwax Chater 8 Analysis of Parallel

More information

Active and reactive power control schemes for distributed generation systems under voltage dips Wang, F.; Duarte, J.L.; Hendrix, M.A.M.

Active and reactive power control schemes for distributed generation systems under voltage dips Wang, F.; Duarte, J.L.; Hendrix, M.A.M. Active and reactive ower control schemes for distributed generation systems under voltage dis Wang, F.; Duarte, J.L.; Hendrix, M.A.M. ublished in: roceedings IEEE Energy Conversion Congress and Exosition

More information