Dry-Contact switch Installation Guide

Size: px
Start display at page:

Download "Dry-Contact switch Installation Guide"

Transcription

1 Dry-Cntact switch Installatin Guide Overview The SlarEdge Smart Energy Management slutins allw increasing the self-cnsumptin f a site. One methd used fr this purpse is cntrlling the usage (cnsumptin) f lads using Device Cntrl prducts. The SlarEdge Device Cntrl units divert pwer t an appliance (lad) accrding t pre-cnfigured schedules, using the fllwing mdes: Refer t Figure 2 fr examples f the device mdes f peratin. Dry-Cntact switch Installatin Guide Schedule - TThe device turns n and ff at times set by the user fr the user s cnvenience, regardless f available PV pwer.w Smart Save - The device (typically a biler r water pump) is cntrlled autmatically t maximize selfcnsumptin. Grid pwer is used nly if PV pwer is insufficient t meet the user s ready by time. Fr example, t heat water fr 2 hurs and have ht water by 18:00, set Ttal Time t 2 hurs and Ready by t 18:00. The biler may wrk befre 16:00 if there is available PV pwer, but in any case yu are guaranteed t have ht water by 18:00.w Yu can re-cnfigure the schedules at any time and manually switch appliances n and ff. Yu can cnfigure the Device Cntrl prducts lcally thrugh the SlarEdge inverter r remtely, via the SlarEdge mnitring prtal. The SlarEdge Dry-Cntact switch (referred t as "the device") is a ZigBee wireless lad management device. It switches lads (e.g. a heat pump) n and ff accrding t system cnfiguratin. It can functin as an AC switch r as a cntrl signal t indicate when the PV system is prducing excess energy. It supprts a wide input vltage range f up t 250V and a wide input current range f up t 13A. Figure 1: SlarEdge System with Dry-Cntact switch SlarEdge-Dry-Cntact switch Installatin Guide 1

2 Installatin The fllwing figure illustrates a typical example f device peratin with Smart Save and Schedule mdes. Nte that in Smart Save mde, the cnsumptin is reduced by taking advantage f excess PV earlier in the day. Figure 2: Examples f device peratin T enable the Dry-Cntact switch functinality, the fllwing supprting devices must be installed: Device Cntrl ZigBee Mdule, installed inside the inverter. Fr physical installatin refer t SlarEdge Mdbus Meter. Refer t Installatin Figure 3: The Dry-Cntact switch 2 SlarEdge Dry-Cntact switch Installatin Guide

3 Dry-Cntact switch Installatin Guide CAUTION! This prduct must be perated under the specified perating specificatins, as described in the latest technical specificatin datasheet. Cnfigure the prduct s that the lad cnnected is nt switched n r ff mre frequently than specified by the lad manufacturer. D nt cnnect lads that require a cntinuus current supply (e.g. fridge, freezer). D nt use the prduct if it is damaged r malfunctining. Never cnnect lads that can cause injuries r fire if they are switched n unintentinally (e.g. an irn). D nt let the prduct cme int cntact with water r ther liquids. The enclsed dcumentatin is an integral part f this prduct. Keep the dcumentatin in a cnvenient place fr future reference and bserve all instructins cntained therein. 1. Release the tw screws f the device frnt cver and remve the cver. 2. Psitin the device against the wall and mark the drilling hle lcatins, at a maximum distance f 50 m frm the inverter. D nt use the device as a drilling template as it may damage the enclsure.e 3. Drill the hles and munt the device using screws and nuts. Fasten the unit t the wall. 4. Release the three internal screws at the bttm f the device, and remve the cable bracket. Figure 4: Dry-Cntact switch cnnectins SlarEdge-Dry-Cntact switch Installatin Guide MAN

4 Cnfiguratin 5. Cnnect the lad wires t the terminal blcks (see Figure 4, Figure 5 and Figure 6 ):w 230 Vac (cnnectins 1,2 ) - t Line and Neutral. The cnnectins are interchangeable. Dry-cntact 250V / 13A maximum (cnnectins 3, 5) - t a dedicated vltage surce frm the appliance (see Figure 3), r an external pwer supply accrding t the input cntrl specificatins f the appliance (see Figure 4). Managed lad (cnnectins 4,6) -t the appliance input cntrl The tw switches have a single cntrl. That is, either bth are clsed r bth are pened. Figure 5: Cnnecting t appliance with internal vltage surce (Vut) Figure 6: Cnnecting t appliance with external vltage surce 6. Place the cable bracket ver the cables and fasten using the screws. 7. Attach the cver t the device and fasten the screws. Cnfiguratin NOTE Verify that the inverter is cnnected t the mnitring prtal (refer t the Inverter Installatin Guide fr details n setting up cmmunicatin). T assciate the device with the ZigBee netwrk: 1. Enter the inverter Setup mde as described in the Inverter Installatin Guide. 2. Select Cmmunicatin è ZigBee Cnf.. 3. Select: Device Typeè HA (Hme Autmatin) Prtcl è HAM (Hme Autmatin) D e v i c e T y p e < H A > P r t c l < H A M > P A N I D S c a n C h a n n e l L a d Z B D e f a u l t s 4 SlarEdge Dry-Cntact switch Installatin Guide

5 Dry-Cntact switch Installatin Guide When HA Device Type is selected, a Device Manager menu item will appear in the main cnfiguratin menu: C u n t r y < I t a l y > L a n g u a g e < E n g > C m m u n i c a t i n P w e r D i s p l a y C n t r l M a i n t e n a n c e I n f r m a t i n 4. Frm the main menu select Device Manager. The Device Manager screen is displayed: A d d D e v i c e s < 0 > 5. Select Add Devices t start the device assciatin with the inverter. 6. Press the assciatin buttn n the Dry-Cntact switch (see Figure 1). The Device Manager screen shuld display a new line fr each discvered device, including the 3 last digits f its serial number, perating mde and perating state. Discvery time may take up t 3 minutes. Yu can press the inverter LCD light buttn r the internal ESC buttn t exit the discvery prcess when all devices are discvered. Device types: A d d D e v i c e s < 3 > R e g x x x < A u t, O F F > S E - S W x x x < M a n, O F F > S E - S - P L G x x x < M a n, O F F > R e m v e A l l REG - Immersin heater cntrller SE-SW - Dry cntact switch SE-S-PLG - Plug-in scket SE-S-SW - AC switch with meter 7. Select the device. The device cnfiguratin screen is displayed: M d e < M a n u a l > S t a t e < O F F > D e v i c e R e m v e I n f D e v i c e Fr the fllwing device cnfiguratin steps, yu can use either the inverter LCD buttns r the mnitring prtal. The steps herein shw cnfiguratin using the inverter LCD. SlarEdge-Dry-Cntact switch Installatin Guide 5

6 Cnfiguratin 8. Select Mde. The mde cnfiguratin screen is displayed: M a n u a l A u t Manual - turns the device t ON r OFF, as described belw Aut - allws setting tw types f schedules fr device cntrl, as described in the next sectins: Smart Save - set the device peratin requirements (ready-by and duratin values). This mde is useful fr maximizing self-cnsumptin using excess PV pwer: the device perates autnmusly based n cnfigured settings. Schedule - set the device start and stp times regardless f available excess PV pwer. T set Manual mde: 1. Select Mde è Manual 2. Select ON r OFF t turn the device n r ff. T set Aut mde: 1. Select Aut. The fllwing screen is displayed, shwing ptins fr setting the device parameters: M d e < A u t > A d d D e v i c e D e v i c e R e m v e S c h e d u l e P r p e r t i e s I n f D e v i c e 2. Select Device Prperties and set the fllwing prperties: L a d R a t i n g < x. x K W > E x p r t T H < x x x x W > I m p r t T H < x x x x W > M i n O n T i m e < x x x > Lad Rating - the appliance rated pwer (in kw) Exprt TH (threshld) - ptinal; the minimum pwer (in W) abve which the excess PV pwer will be diverted t the appliance. This value can be lwer than the lad rating. The default value is 5% abve the Lad Rating. Imprt TH (threshld) - ptinal; the maximum pwer (in W) purchased frm the grid and diverted t the appliance. The default value is 5% f the Lad Rating. NOTE If changing the Exprt TH and Imprt TH default values, make sure they sum up t a value that equals r greater than the appliance Lad Rating value. Otherwise, the device will turn ff when there is insufficient pwer t divert t the appliance. Min ON Time - (ptinal); the minimum duratin (in minutes) the appliance shuld remain ON nce switched n, even when n excess PV pwer is available. The default value is 1 minute.e 6 SlarEdge Dry-Cntact switch Installatin Guide

7 3. Select Add Schedule. The fllwing screen is displayed, shwing schedule setting ptins. Yu can cnfigure up t fur different schedules. S m a r t S c h e d u l e D i s a b l e D e l e t e S a v e Use Disable t deactivate a schedule r Delete t remve it. 4. Select and set ne f the scheduling ptins: Smart Save: S e t < S m a r t > R e a d y b y < 0 0 : 0 0 > D u r a t i n < 0 0 > M a x D u r a t i n < 0 0 > W e e k D a y s < > Ready by - requested energy must be diverted t the lad by this time (default: 00:00; frmat: hurs:minutes). Duratin - minimum accumulated time the lad must remain n (in minutes; default: 00). Schedule: Max Duratin - maximum accumulated time the lad can be n thrughut the day (in minutes; default: 00). If the value f Max Duratin is lnger than the value f Duratin, the device will use up nly excess PV energy in the difference time. Fr example, if Max Duratin = T1 and Duratin = T2, during (T1-T2) nly excess PV pwer will be used. Week Days (ptinal) - days t repeat the settings (default: every day). S e t < S c h e d u l e > S t a r t T i m e < 0 0 : 0 0 > S t p T i m e < 0 0 : 0 0 > W e e k D a y s < > Dry-Cntact switch Installatin Guide Start/Stp Time - the time f day by which the Dry-Cntact switch must start/cmplete its task f delivering energy t the lad (default: 00:00; frmat: hurs:minutes). If these values are nt set, nly the excess PV pwer is used. Week Days (ptinal) - days t repeat the settings (default: every day). NOTE In Aut mde, if yu cnfigure verlapping time-frames between Schedule and Smart Save ptins, Schedule mde takes precedence ver the Smart Save mde. SlarEdge-Dry-Cntact switch Installatin Guide 7

8 Verifying the Cnnectin Yu can re-cnfigure the device peratin mde and schedules at any time: T Manually turn the lad n r ff Mdify the schedule cnfiguratin Disable r delete a schedule Discnnect the device(s) frm the netwrk D this Select the device frm the Device Manager screen. Select Mde è Manual and set the device t either ON r OFF. Select the device frm the Device Manager screen. Select Mde è Aut and set the parameters f any menu: Smart Save/Schedule. Select Disable r Delete frm the Schedule screen. Select Remve Device r Remve All frm the device screen. Verifying the Cnnectin 1. Check the status screens: HA devices status, shwing the device name and state: ON, OFF, r an asterisk (*), which indicates n cmmunicatin with the device: H A D e v i c e s S t a t e : S E - S - P L G < O N > Cmmunicatin status, shwing the number f cmmunicating HA devices (under Prt) and the number f detected devices (under ##): w w w w w D e v P r t # # R S < > < - - > < - > Z i g B e e < H A > < 1 > < 1 > 2. T check the device details, frm the device cnfiguratin screen, select Device Inf. The fllwing screen is displayed: M A C : x x x x x x x x x x x L a s t s e e n : < D D : H H > M F G : M d e l : S l a r E d g e S E - S - P L G P w e r [ W ] : 0 MAC: the full MAC address f the device Last seen: The date and time when the device cmmunicated with the inverter MFG: The device manufacturer Mdel: The device mdel type Pwer [W]: The energy delivered t the lad 8 SlarEdge Dry-Cntact switch Installatin Guide

9 LED Indicatins The device has a bi-clr LED (red/ green) that prvides infrmatin abut its peratin status: LED functin Slid green (2 secnds), flashing green (2 secnds) Flashing red Flashing green Slid green Slid red Buttn Functinality Reset Indicatin N ZigBee assciatin with the inverter ZigBee assciatin in prcess ZigBee assciatin cmpleted and the relay is clsed ZigBee assciatin cmpleted and the relay is pen The fllwing table describes the device buttn functins depending n the netwrk assciatin state: Netwrk state Pressing duratin Result N ZigBee assciatin with the inverter ZigBee assciated with the inverter Any Up t 3 secnds (shrt press) Mre than 10 secnds (lng press) 3-10 secnds Trubleshting Attempt t assciate with the netwrk Manually tggle ON/OFF state (manual mde). T return t Aut/Scheduled states, cnfigure the device using the mbile applicatin r mnitring prtal. Discnnect frm the netwrk (the LED turns red and the device resets). Start a discvery search fr nearby devices. The discvery may take up t 3 minutes during which the device is nt functinal. Nt required fr nrmal peratin. Symptm / Errr Pssible cause Trubleshting An asterisk (*) is displayed next t the Device type in the device manager screen indicating that the device is nt cmmunicating. In the Cmmunicatin status screen, the number f detected devices des nt match the number f cmmunicating devices. The device is pwered n but the green LED is OFF The device is pwered n and the green LED is ON The device is nt assciated with the inverter The device is Assciated with the inverter but is nt cmmunicating. Try t slve using these ptins. If prblem is nt slved, prceed with the next ptin: Dry-Cntact switch Installatin Guide Turn the device OFF and ON. Recheck cmmunicatin. Reset the device by pressing the buttn fr mre than 10 secnds and then repeat the assciatin prcess. Recnfiguratin is nt required. Frm the Device Manager screen select Remve Device and repeat the discvery prcess. Recnfiguratin is required in this case. Cntact SlarEdge supprt. All the devices are nt cmmunicating N ZigBee errr is displayed n the inverter Turn OFF the AC t the inverter. Check that the ZigBee mdule is inserted crrectly inside the inverter. SlarEdge-Dry-Cntact switch Installatin Guide 9

10 Trubleshting Symptm / Errr Pssible cause Trubleshting LCD - The inverter has nt detected the installed ZigBee mdule. Turn ON the AC t the inverter. Try t slve using these ptins. If prblem is nt slved, prceed with the next ptin: Check the ZigBee status screen: Verify that PAN has been established and Channel is nt 0: Errr message Device limit reached. Remve devices frm the device list is displayed in the LCD. Netwrk prblems Yu are attempting t assciate mre than 10 devices t the lad managemnt netwrk. P A N : X X X X X C H : X X / X X X X R S S I : < L > M I D : X X X X X X Turn the inverter OFF and ON (pwer cycle). Reset all the devices using the assciatin buttn and begin the discvery prcess again fr all devices. Frm the Device Manager screen select Remve All and repeat the discvery prcess fr all the devices. Cntact SlarEdge supprt. Remve an unused device frm the device list befre attempting t add anther device. 10 SlarEdge Dry-Cntact switch Installatin Guide

11 Dry-Cntact switch Installatin Guide Specificatins ELECTRICAL SERVICE Operating Vltage Range - Line t Neutral Vac AC Frequency 50/60 Hz Maximum Lad Current 13 A Dry-cntact Vltage Range V COMMUNICATION Supprted Cmmunicatin Prtcl ZigBee Hme Autmatin Nminal Transmit Pwer 10 dbm Operating Frequency Range GHz Outdr (LOS) Range 400 m Indr Range 1 50 m STANDARD COMPLIANCE Radi ETSI EN V 1.8.1, ETSI EN , ETSI EN Safety EN , EN , EN Immunity EN Emissins INSTALLATION SPECIFICATIONS EN , EN , EN Operating Temperature Range 0 t +50 C Prtectin Rating Dimensins (H x W x D) 110 x 70 x 25 mm IP30 Munting Type Wall munt 1 Apprximate value. May differ depending n specific installatin cnditins. SlarEdge-Dry-Cntact switch Installatin Guide 11

AC Switch with Meter Installation Guide Overview

AC Switch with Meter Installation Guide Overview AC Switch with Meter Installatin Guide AC Switch with Meter Installatin Guide Overview The SlarEdge Smart Energy Management slutins allw increasing the self-cnsumptin f a site. One methd used fr this purpse

More information

Application Note - Energy Metering at a Medium Voltage Connection Point using a Voltage Transformer

Application Note - Energy Metering at a Medium Voltage Connection Point using a Voltage Transformer Applicatin Nte - Energy Metering at a Medium Vltage Cnnectin Pint using a Vltage Transfrmer This dcument describes the cnnectin and cnfiguratin f a Janitza meter at a medium vltage (MV) cnnectin pint t

More information

APPLICATION GUIDE (v4.1)

APPLICATION GUIDE (v4.1) 2.2.3 VitalSensrs VS-300 Sensr Management Statin Remte/Relay Guide Implementing Remte-IN/Relay-OUT Digital I/O Fieldbus Objective: Equipment: Becme familiar with the instrument wiring requirements fr the

More information

Temperature sensor / Dual Temp+Humidity

Temperature sensor / Dual Temp+Humidity www.akcp.cm Temperature sensr / Dual Temp+Humidity Intrductin Temperature sensrs are imprtant where ptimum temperature cntrl is paramunt. If there is an air cnditining malfunctin r abnrmal weather cnditins,

More information

Temperature sensor / Dual Temp+Humidity

Temperature sensor / Dual Temp+Humidity www.akcp.cm Temperature sensr / Dual Temp+Humidity Intrductin Temperature sensrs are imprtant where ptimum temperature cntrl is paramunt. If there is an air cnditining malfunctin r abnrmal weather cnditins,

More information

Electric Duct Heater. HECB Series Modbus Communication Module User Guide. HECB-Modbus Guide docx

Electric Duct Heater. HECB Series Modbus Communication Module User Guide. HECB-Modbus Guide docx Electric Duct Heater HECB Series Mdbus Cmmunicatin Mdule User Guide HECB-Mdbus Guide-150630.dcx Mdbus User Guide Cntents Intrductin... 1 Hlding s Table... 2 Table Glssary... 2 Hlding Table... 2 Ntes...

More information

Universal Pump Control

Universal Pump Control Universal Pump Cntrl Operatinal Instructins versin 1.00 UPC Operatinal Features The TXAM Pumps Universal Pump Cntrl is available in AC, DC r Brushless Mtr cnfiguratins. Can be cnfigured t perate ALL TXAM

More information

N C R S I L V E R Q U A N T U M F A Q

N C R S I L V E R Q U A N T U M F A Q N C R S I L V E R Q U A N T U M F A Q V 2 Cntents NCR Silver Quantum Overview... 2 What is NCR Silver Quantum?... 2 Hw is it different than Silver n ios r the Silver Andrid?... 2 Pwer Related Questins...

More information

Purpose: Use this reference guide to effectively communicate the new process customers will use for creating a TWC ID. Mobile Manager Call History

Purpose: Use this reference guide to effectively communicate the new process customers will use for creating a TWC ID. Mobile Manager Call History Purpse: Use this reference guide t effectively cmmunicate the new prcess custmers will use fr creating a TWC ID. Overview Beginning n January 28, 2014 (Refer t yur Knwledge Management System fr specific

More information

IntesisBox PA-AC-KNX-1i v1.5

IntesisBox PA-AC-KNX-1i v1.5 IntesisBx PA-AC-KNX-1i v1.5 User's Manual Issue Date: 08/2015 r5 eng IntesisBx KNX - Panasnic A.C. (Etherea line) Intesis Sftware S.L. 2015 All Rights Reserved. Infrmatin in this dcument is subject t change

More information

Synchronous Motor V-Curves

Synchronous Motor V-Curves Synchrnus Mtr V-Curves 1 Synchrnus Mtr V-Curves Intrductin Synchrnus mtrs are used in applicatins such as textile mills where cnstant speed peratin is critical. Mst small synchrnus mtrs cntain squirrel

More information

Purchase Order Workflow Processing

Purchase Order Workflow Processing P a g e 1 Purchase Order Wrkflw Prcessing P a g e 2 Table f Cntents PO Wrkflw Prcessing...3 Create a Purchase Order...3 Submit a Purchase Order...4 Review/Apprve the PO...4 Prcess the PO...6 P a g e 3

More information

IntesisBox MH-RC-KNX-1i v1.1. User's Manual Issue Date: 08/2013 r2.0 eng

IntesisBox MH-RC-KNX-1i v1.1. User's Manual Issue Date: 08/2013 r2.0 eng IntesisBx MH-RC-KNX-1i v1.1 User's Manual Issue Date: 08/2013 r2.0 eng IntesisBx KNX Mitsubishi Heavy Industries A.C. Intesis Sftware S.L. All Rights Reserved. Infrmatin in this dcument is subject t change

More information

Peripheral Zone Card.

Peripheral Zone Card. Peripheral Zne Card Cmpatible with Standard r Dide Bases Up t * devices per circuit (*device range dependant) Individually Cnfigured Zne circuits Shrt = Alarm Optin Intrinsic Safety Optin Nn-latching Optin

More information

IntesisBox ME-AC-KNX-1i v1.0

IntesisBox ME-AC-KNX-1i v1.0 IntesisBx ME-AC-KNX-1i v1.0 User's Manual Issue Date: 28/11/2011 r0 eng IntesisBx KNX Mitsubishi Electric A.C. Intesis Sftware S.L. All Rights Reserved. Infrmatin in this dcument is subject t change withut

More information

IntesisBox PA-AC-KNX-1i v1.2

IntesisBox PA-AC-KNX-1i v1.2 IntesisBx PA-AC-KNX-1i v1.2 User's Manual Issue Date: 15/02/2012 r3 eng IntesisBx KNX - Panasnic A.C. (Etherea line) Intesis Sftware S.L. All Rights Reserved. Infrmatin in this dcument is subject t change

More information

TRAINING GUIDE. Overview of Lucity Spatial

TRAINING GUIDE. Overview of Lucity Spatial TRAINING GUIDE Overview f Lucity Spatial Overview f Lucity Spatial In this sessin, we ll cver the key cmpnents f Lucity Spatial. Table f Cntents Lucity Spatial... 2 Requirements... 2 Supprted Mdules...

More information

IntesisBox HS-RC-KNX-1i v1.1

IntesisBox HS-RC-KNX-1i v1.1 IntesisBx HS-RC-KNX-1i v1.1 KNX (TP-1) Interface fr HISENSE VRF Air Cnditining. User's Manual Issue Date: 01/2018 r1.0 EN Order Cde: IBKNXHIS001R000 IntesisBx KNX Hisense Intesis Sftware S.L.U. All Rights

More information

Rotator PTR-35. Operating instructions

Rotator PTR-35. Operating instructions Rtatr PTR-35 Versin 3.01 - January 2012 Page 2 Cntents 1 Safety...4 2 General Infrmatin...5 3 Getting Started...6 4 Operatin f PTR-35...8 5 Specificatins...11 6 Guarantee and service...13 Versin 3.01 -

More information

Electronic Fan Coil Controller

Electronic Fan Coil Controller Electrnic Fan Cil Cntrller EFCB10TU2 EFCB10TU4 EFCB11TU2 EFCB11TU4 EFCB12TU2 EFCB12TU4 (24Vac / 2 relays) (24Vac / 4 relays) (120Vac / 2 relays) (120Vac /4 relays) (240Vac / 2 relays) (240Vac / 4 relays)

More information

Networkable Fan Coil Controller

Networkable Fan Coil Controller Netwrkable Fan Cil Cntrller EFCB-OE1 Series EFCB10T OE1 (24Vac / 0 relays) EFCB12T OE1 (240Vac / 0 relays) EFCB10TU4 OE1 (24Vac / 4 relays) EFCB12TU2 OE1 (240Vac / 2 relays) EFCB12TU4 OE1 (240Vac / 4 relays)

More information

IntesisBox DK-RC-KNX-1i v2.0

IntesisBox DK-RC-KNX-1i v2.0 IntesisBx DK-RC-KNX-1i v2.0 User's Manual Issue Date: 25/02/2016 r1.0 eng Intesis Sftware S.L. 2016 All Rights Reserved. Infrmatin in this dcument is subject t change withut ntice. The sftware described

More information

IntesisBox LG-RC-KNX-1i v2.0

IntesisBox LG-RC-KNX-1i v2.0 IntesisBx LG-RC-KNX-1i v2.0 User's Manual Issue Date: 06/2014 r1 eng IntesisBx KNX LG VRF lines Intesis Sftware S.L. 2014 All Rights Reserved. Infrmatin in this dcument is subject t change withut ntice.

More information

Edexcel GCSE Physics

Edexcel GCSE Physics Edexcel GCSE Physics Tpic 10: Electricity and circuits Ntes (Cntent in bld is fr Higher Tier nly) www.pmt.educatin The Structure f the Atm Psitively charged nucleus surrunded by negatively charged electrns

More information

2/3 Axis Position Indicator

2/3 Axis Position Indicator SERIES Z-89 2/3 Axis Psitin Indicatr Pwer dwn memry Selectable decimal pint Multi edge functin Pulse factr Reference value External reset r preset inputs Digital brightness cntrl Z89-000-E_21-06.dc Dku

More information

Physics 2010 Motion with Constant Acceleration Experiment 1

Physics 2010 Motion with Constant Acceleration Experiment 1 . Physics 00 Mtin with Cnstant Acceleratin Experiment In this lab, we will study the mtin f a glider as it accelerates dwnhill n a tilted air track. The glider is supprted ver the air track by a cushin

More information

IntesisBox PA-RC2-KNX-1i v1.3

IntesisBox PA-RC2-KNX-1i v1.3 IntesisBx PA-RC2-KNX-1i v1.3 User's Manual Issue Date: 08/2015 r2.2 eng IntesisBx PA-RC2-KNX-1i Intesis Sftware S.L. 2015 All Rights Reserved. Infrmatin in this dcument is subject t change withut ntice.

More information

SAP Note Missing documentation on enhancement MDR10001

SAP Note Missing documentation on enhancement MDR10001 SAP Nte 303613 - Missing dcumentatin n enhancement Nte Language: English Versin: 2 Validity: Valid Since 31.07.2000 Summary Symptm Missing dcumentatin n SAP enhancement Additinal key wrds CMOD, rder quantity

More information

Differentiation Applications 1: Related Rates

Differentiation Applications 1: Related Rates Differentiatin Applicatins 1: Related Rates 151 Differentiatin Applicatins 1: Related Rates Mdel 1: Sliding Ladder 10 ladder y 10 ladder 10 ladder A 10 ft ladder is leaning against a wall when the bttm

More information

ECE 545 Project Deliverables

ECE 545 Project Deliverables ECE 545 Prject Deliverables Tp-level flder: _ Secnd-level flders: 1_assumptins 2_blck_diagrams 3_interface 4_ASM_charts 5_surce_cde 6_verificatin 7_timing_analysis 8_results

More information

RN52-STK2 Starter Kit

RN52-STK2 Starter Kit The RN52-STK2 Starter Kit has everything yu need t kick-start yur prject and is a great tl fr develpers: Prf f cncept prttypes as well as final cmmercial slutins. fr educatinal use: Natural sciences curses

More information

RN53 Radon Detector. RN53-STK Starter Kit

RN53 Radon Detector. RN53-STK Starter Kit The RN53-STK Starter Kit has everything yu need t kick-start yur prject and is a great tl fr develpers: Prf f cncept prttypes as well as final cmmercial slutins. fr educatinal use: Natural science curses

More information

Heat Management Methodology for Successful UV Processing on Heat Sensitive Substrates

Heat Management Methodology for Successful UV Processing on Heat Sensitive Substrates Heat Management Methdlgy fr Successful UV Prcessing n Heat Sensitive Substrates Juliet Midlik Prime UV Systems Abstract: Nw in 2005, UV systems pssess heat management cntrls that fine tune the exthermic

More information

Tutorial 3: Building a spectral library in Skyline

Tutorial 3: Building a spectral library in Skyline SRM Curse 2013 Tutrial 3 Spectral Library Tutrial 3: Building a spectral library in Skyline Spectral libraries fr SRM methd design and fr data analysis can be either directly added t a Skyline dcument

More information

OpenPowerNet Release Notes Version 1.7.0

OpenPowerNet Release Notes Version 1.7.0 OpenPwerNet Release Ntes Versin 1.7.0 Institut für Bahntechnik GmbH Branch Office Dresden Dcument N. 1.7.0 l:\pn\10_dcuments\20_prgram_dcumentatin\30_release_ntes\rn_pn_01.07.00.dcx Authr Date Martin Jacb

More information

CONTENTS. VII. Functions VIII. Specifications IX. Included with tia NC-9900 X. Troubleshooting

CONTENTS. VII. Functions VIII. Specifications IX. Included with tia NC-9900 X. Troubleshooting CONTENTS I. Safety Precautins II. Intrductin III. Prir t Use IV. Prduct Descriptin (tia NC-9900) V. Using yur tia VI. Settings Unit f Measure Alarm Setup Bdy r Surface Mde Ttal Variatin Laser / Light Setup

More information

NEBB-ASHRAE Technical E-Learning Courses

NEBB-ASHRAE Technical E-Learning Courses NEBB-ASHRAE Technical E-Learning Curses If yu re a NEBB certificatin Candidate lking t enhance yur knwledge within a specific area, OR if yu already are a NEBB Certified Prfessinal r Certified Technician

More information

Three charges, all with a charge of 10 C are situated as shown (each grid line is separated by 1 meter).

Three charges, all with a charge of 10 C are situated as shown (each grid line is separated by 1 meter). Three charges, all with a charge f 0 are situated as shwn (each grid line is separated by meter). ) What is the net wrk needed t assemble this charge distributin? a) +0.5 J b) +0.8 J c) 0 J d) -0.8 J e)

More information

1. Transformer A transformer is used to obtain the approximate output voltage of the power supply. The output of the transformer is still AC.

1. Transformer A transformer is used to obtain the approximate output voltage of the power supply. The output of the transformer is still AC. PHYSIS 536 Experiment 4: D Pwer Supply I. Intrductin The prcess f changing A t D is investigated in this experiment. An integrated circuit regulatr makes it easy t cnstruct a high-perfrmance vltage surce

More information

Five Whys How To Do It Better

Five Whys How To Do It Better Five Whys Definitin. As explained in the previus article, we define rt cause as simply the uncvering f hw the current prblem came int being. Fr a simple causal chain, it is the entire chain. Fr a cmplex

More information

SFDMB3638F. Specifications and Applications Information. orce LED Driver. Mass: 7 grams typ. 10/15/08 Preliminary. Package Configuration

SFDMB3638F. Specifications and Applications Information. orce LED Driver. Mass: 7 grams typ. 10/15/08 Preliminary. Package Configuration Specificatins and Applicatins Infrmatin 1/1/8 Prelimary Smart Fr rce LED Driver The ERG Smart Frce Series f LED Drivers are specifically designed fr applicatins which require high efficiency, small ftprt

More information

Forensic Science. Group: Background information

Forensic Science. Group: Background information Frensic Science Grup: Backgrund infrmatin One f the graduate students in the Department f Bilgy n the campus f the University f Flrida went missing. A week later, a crime scene was discvered n a remte

More information

GENESIS Structural Optimization for ANSYS Mechanical

GENESIS Structural Optimization for ANSYS Mechanical P3 STRUCTURAL OPTIMIZATION (Vl. II) GENESIS Structural Optimizatin fr ANSYS Mechanical An Integrated Extensin that adds Structural Optimizatin t ANSYS Envirnment New Features and Enhancements Release 2017.03

More information

Experiment #3. Graphing with Excel

Experiment #3. Graphing with Excel Experiment #3. Graphing with Excel Study the "Graphing with Excel" instructins that have been prvided. Additinal help with learning t use Excel can be fund n several web sites, including http://www.ncsu.edu/labwrite/res/gt/gt-

More information

LDS emarket. Section 11 - Catalog Load Process

LDS emarket. Section 11 - Catalog Load Process LDS emarket Sectin 11 - Catalg Lad Prcess Catalg Lad Prcess There are three types f catalgs in LDS emarket: Supplier Direct Web Site An nline catalg f items hsted by the supplier using HTML cding PRG A

More information

EVCB14NIT2S EVCB14NDT4S EVCB14NIT4SF. EVCB14N-V410-Modbus Guide ESA.docx

EVCB14NIT2S EVCB14NDT4S EVCB14NIT4SF. EVCB14N-V410-Modbus Guide ESA.docx Mdbus Cmmunicatin Mdule User Guide EVCB14NIT0S EVCB14NIT2S EVCB14NIT4S EVCB14NDT4S EVCB14NIT0SF EVCB14NIT4SF (0 TRIACS / pressure independent) (2 TRIACS / pressure independent) (4 TRIACS / pressure independent)

More information

Product specification and build instructions BV401. I2C Input / Output Board. ByVac 2006 ByVac Page 1 of 10

Product specification and build instructions BV401. I2C Input / Output Board. ByVac 2006 ByVac Page 1 of 10 Prduct Specificatin and Build Instructins Prduct specificatin and build instructins Jan 006 v0.a ByVac 006 ByVac Page f 0 Prduct Specificatin and Build Instructins Cntents. Intrductin.... Features... 3.

More information

Lecture 02 CSE 40547/60547 Computing at the Nanoscale

Lecture 02 CSE 40547/60547 Computing at the Nanoscale PN Junctin Ntes: Lecture 02 CSE 40547/60547 Cmputing at the Nanscale Letʼs start with a (very) shrt review f semi-cnducting materials: - N-type material: Obtained by adding impurity with 5 valence elements

More information

Space Shuttle Ascent Mass vs. Time

Space Shuttle Ascent Mass vs. Time Space Shuttle Ascent Mass vs. Time Backgrund This prblem is part f a series that applies algebraic principles in NASA s human spaceflight. The Space Shuttle Missin Cntrl Center (MCC) and the Internatinal

More information

Physics 2B Chapter 23 Notes - Faraday s Law & Inductors Spring 2018

Physics 2B Chapter 23 Notes - Faraday s Law & Inductors Spring 2018 Michael Faraday lived in the Lndn area frm 1791 t 1867. He was 29 years ld when Hand Oersted, in 1820, accidentally discvered that electric current creates magnetic field. Thrugh empirical bservatin and

More information

Relativity Integration Points Guide. July 3, 2018 Version

Relativity Integration Points Guide. July 3, 2018 Version Relativity Integratin Pints Guide July 3, 2018 Versin 9.6.50.31 Fr the mst recent versin f this dcument, visit ur dcumentatin website. Table f Cntents 1 Relativity Integratin Pints 4 1.1 Integratin Pints

More information

CHM112 Lab Graphing with Excel Grading Rubric

CHM112 Lab Graphing with Excel Grading Rubric Name CHM112 Lab Graphing with Excel Grading Rubric Criteria Pints pssible Pints earned Graphs crrectly pltted and adhere t all guidelines (including descriptive title, prperly frmatted axes, trendline

More information

DEFENSE OCCUPATIONAL AND ENVIRONMENTAL HEALTH READINESS SYSTEM (DOEHRS) ENVIRONMENTAL HEALTH SAMPLING ELECTRONIC DATA DELIVERABLE (EDD) GUIDE

DEFENSE OCCUPATIONAL AND ENVIRONMENTAL HEALTH READINESS SYSTEM (DOEHRS) ENVIRONMENTAL HEALTH SAMPLING ELECTRONIC DATA DELIVERABLE (EDD) GUIDE DEFENSE OCCUPATIOL AND ENVIRONMENTAL HEALTH READINESS SYSTEM (DOEHRS) ENVIRONMENTAL HEALTH SAMPLING ELECTRONIC DATA DELIVERABLE (EDD) GUIDE 20 JUNE 2017 V1.0 i TABLE OF CONTENTS 1 INTRODUCTION... 1 2 CONCEPT

More information

Assume that the water in the nozzle is accelerated at a rate such that the frictional effect can be neglected.

Assume that the water in the nozzle is accelerated at a rate such that the frictional effect can be neglected. 1 HW #3: Cnservatin f Linear Mmentum, Cnservatin f Energy, Cnservatin f Angular Mmentum and Turbmachines, Bernulli s Equatin, Dimensinal Analysis, and Pipe Flws Prblem 1. Cnservatins f Mass and Linear

More information

Chapter 16. Capacitance. Capacitance, cont. Parallel-Plate Capacitor, Example 1/20/2011. Electric Energy and Capacitance

Chapter 16. Capacitance. Capacitance, cont. Parallel-Plate Capacitor, Example 1/20/2011. Electric Energy and Capacitance summary C = ε A / d = πε L / ln( b / a ) ab C = 4πε 4πε a b a b >> a Chapter 16 Electric Energy and Capacitance Capacitance Q=CV Parallel plates, caxial cables, Earth Series and parallel 1 1 1 = + +..

More information

User Guide: Operation of ActiveAhead Mobile Application

User Guide: Operation of ActiveAhead Mobile Application 1 (11) User Guide: Operatin f ActiveAhead Mbile Applicatin The ActiveAhead mbile applicatin allws yu t adjust the luminaire parameters f an ActiveAhead slutin. T use this applicatin yu must have an apprved

More information

WebStats User s Guide (Windows Version) Advanced Internet Technologies, Inc. December 18, 2005

WebStats User s Guide (Windows Version) Advanced Internet Technologies, Inc. December 18, 2005 Page 1 f 50 WebStats User s Guide (Windws Versin) WebStats User s Guide (Windws Versin) Advanced Internet Technlgies, Inc. December 18, 2005 Search All Yur Favrite Engines frm a Single Surce with tybit!!!

More information

Packaging in trays T 850 Traysealer

Packaging in trays T 850 Traysealer Packaging in trays T 850 Traysealer 2 MULTIVAC is a majr manufacturer f autmatic traysealers. Each machine is individually designed t each custmer s specific requirements in terms f tray and prduct infeed,

More information

THERMAL TEST LEVELS & DURATIONS

THERMAL TEST LEVELS & DURATIONS PREFERRED RELIABILITY PAGE 1 OF 7 PRACTICES PRACTICE NO. PT-TE-144 Practice: 1 Perfrm thermal dwell test n prtflight hardware ver the temperature range f +75 C/-2 C (applied at the thermal cntrl/munting

More information

Standard Title: Frequency Response and Frequency Bias Setting. Andrew Dressel Holly Hawkins Maureen Long Scott Miller

Standard Title: Frequency Response and Frequency Bias Setting. Andrew Dressel Holly Hawkins Maureen Long Scott Miller Template fr Quality Review f NERC Reliability Standard BAL-003-1 Frequency Respnse and Frequency Bias Setting Basic Infrmatin: Prject number: 2007-12 Standard number: BAL-003-1 Prject title: Frequency

More information

Quick Start and Troubleshooting Guide

Quick Start and Troubleshooting Guide Quick Start and Trubleshting Guide By RXDesign Cpyright July 2003 Quick Start and Trubleshting Guide Rev 3 Oct 2010 Wellcme... tt tthe wrrlld ff tthe CAT.. 1 Addendum - Quick Start Alright... it is installed!

More information

READING STATECHART DIAGRAMS

READING STATECHART DIAGRAMS READING STATECHART DIAGRAMS Figure 4.48 A Statechart diagram with events The diagram in Figure 4.48 shws all states that the bject plane can be in during the curse f its life. Furthermre, it shws the pssible

More information

IntesisBox KNX HA-AC-KNX-8/16/64 v1.0

IntesisBox KNX HA-AC-KNX-8/16/64 v1.0 IntesisBx KNX HA-AC-KNX-8/16/64 v1.0 User's Manual r1 eng Issue Date: 11/2017 IntesisBx KNX - Haier A.C. (VRF line) Interface fr integratin f Haier air cnditiners int KNX TP-1 (EIB) cntrl systems. Cmpatible

More information

CEE3430 Engineering Hydrology HEC HMS Bare Essentials Tutorial and Example

CEE3430 Engineering Hydrology HEC HMS Bare Essentials Tutorial and Example CEE3430 Engineering Hydrlgy HEC HMS Bare Essentials Tutrial and Example Margaret Matter and David Tarbtn February 2010 This tutrial prvides sme bare essentials step by step guidance n starting t use HEC

More information

Metering Principles & Configurations

Metering Principles & Configurations Metering Principles & Cnfiguratins CT PT Startc Western Energy Cmpany DCS Presenters Western Energy Cmpany Mnte Wilke Electrical Superintendent Curt Brckel Electrical Supervisr Brady Clbert Electrical

More information

Lab 1 The Scientific Method

Lab 1 The Scientific Method INTRODUCTION The fllwing labratry exercise is designed t give yu, the student, an pprtunity t explre unknwn systems, r universes, and hypthesize pssible rules which may gvern the behavir within them. Scientific

More information

I. Analytical Potential and Field of a Uniform Rod. V E d. The definition of electric potential difference is

I. Analytical Potential and Field of a Uniform Rod. V E d. The definition of electric potential difference is Length L>>a,b,c Phys 232 Lab 4 Ch 17 Electric Ptential Difference Materials: whitebards & pens, cmputers with VPythn, pwer supply & cables, multimeter, crkbard, thumbtacks, individual prbes and jined prbes,

More information

BASIC DIRECT-CURRENT MEASUREMENTS

BASIC DIRECT-CURRENT MEASUREMENTS Brwn University Physics 0040 Intrductin BASIC DIRECT-CURRENT MEASUREMENTS The measurements described here illustrate the peratin f resistrs and capacitrs in electric circuits, and the use f sme standard

More information

NEW Pecan Scab Model Description

NEW Pecan Scab Model Description Edited: June 28, 2005 NEW Pecan Scab Mdel Descriptin Mdel active frm March 1 t August 31 The Oklahma Mesnet, in cperatin with scientists and prfessinals frm Oklahma State University and the University

More information

UNIT 6 DETERMINATION OF FLASH AND FIRE POINT OF A LUBRICATING OIL BY OPEN CUP AND CLOSED CUP METHODS

UNIT 6 DETERMINATION OF FLASH AND FIRE POINT OF A LUBRICATING OIL BY OPEN CUP AND CLOSED CUP METHODS UNIT 6 DETERMINATION OF FLASH AND FIRE POINT OF A LUBRICATING OIL BY OPEN CUP AND CLOSED CUP METHODS Determinatin f Flash and Fire Pint f a Cup and Clsed Cup Structure 6. Intrductin Objectives 6. Experiment

More information

Interoperability/ Conformance Test dpmr Mode 1

Interoperability/ Conformance Test dpmr Mode 1 Interperability/ Cnfrance Test dpmr Mde 1 IOP test Mde 1 Cpyright 2012 dpmr MU All Rights Reserved Draft Versin 1.1 0 Revisin Histry Versin Date Change By 0v1 21 Nv 2011 First draft derived fr ISF/CSF

More information

T0521SB. Applications. Features. Mechanical Characteristics. Circuit Diagram I/O_1. Description. Pin Configuration

T0521SB. Applications. Features. Mechanical Characteristics. Circuit Diagram I/O_1. Description. Pin Configuration Features Transient prtectin fr high-speed data lines IEC 61000-4-2 (ESD) ±25kV (Air) ±20kV (Cntact) IEC 61000-4-2 (EFT)40A(5/50 ns) Cable Discharge Event (CDE) Package ptimized fr high-speed lines Ultra-small

More information

APEX DYNAMICS, INC. Stainless. No. 10, Keyuan 3rd Rd., Situn District, Taichung City 40763, Taiwan (R.O.C.) APEX AE/AER Series - 1.

APEX DYNAMICS, INC. Stainless. No. 10, Keyuan 3rd Rd., Situn District, Taichung City 40763, Taiwan (R.O.C.) APEX AE/AER Series - 1. PEX DYNMIS, IN. HIGH PREISION PLNETRY GERBOX E / ER Series N. 0, Keyuan rd Rd., Situn District, Taichung ity 0, Taiwan (R.O..) PEX-0-09-E/ER Series -.0V Stainless High precisin high speed planetary gearbx

More information

100KG/300KG/600KG/1000KG/2000KG MAGNETIC LIFTER

100KG/300KG/600KG/1000KG/2000KG MAGNETIC LIFTER Vlume 1 OPERATIONAL MANUAL MODEL: 100KG/300KG/600KG/1000KG/2000KG MAGNETIC LIFTER by BLUEROCK Tls 100KG/3 0 0 K G / 6 0 0 K G / 1 0 0 0 K G / 2 0 0 0 K G M A G N E T I C L I F T E R UNPACKING THE ITEM

More information

Activity Guide Loops and Random Numbers

Activity Guide Loops and Random Numbers Unit 3 Lessn 7 Name(s) Perid Date Activity Guide Lps and Randm Numbers CS Cntent Lps are a relatively straightfrward idea in prgramming - yu want a certain chunk f cde t run repeatedly - but it takes a

More information

ECI motors. Commutation sequences. Chronological signal sequence of integrated Hall sensors (= RLG) at the corresponding connections.

ECI motors. Commutation sequences. Chronological signal sequence of integrated Hall sensors (= RLG) at the corresponding connections. ECI mtrs ECI mtrs Are yu lking fr high dynamic prperties, high trque and full pwer n call? The electrnically cmmutated, internal rtr mtrs f the ECI series are the prfessinal drive slutin when shrt timing

More information

Bicycle Generator Dump Load Control Circuit: An Op Amp Comparator with Hysteresis

Bicycle Generator Dump Load Control Circuit: An Op Amp Comparator with Hysteresis Bicycle Generatr Dump Lad Cntrl Circuit: An Op Amp Cmparatr with Hysteresis Sustainable Technlgy Educatin Prject University f Waterl http://www.step.uwaterl.ca December 1, 2009 1 Summary This dcument describes

More information

ALE 21. Gibbs Free Energy. At what temperature does the spontaneity of a reaction change?

ALE 21. Gibbs Free Energy. At what temperature does the spontaneity of a reaction change? Name Chem 163 Sectin: Team Number: ALE 21. Gibbs Free Energy (Reference: 20.3 Silberberg 5 th editin) At what temperature des the spntaneity f a reactin change? The Mdel: The Definitin f Free Energy S

More information

Air distribution systems. Please note, type code is new, see last page. Floor twist outlets DB-E... for commercial rooms DS 1146 E 02.

Air distribution systems. Please note, type code is new, see last page. Floor twist outlets DB-E... for commercial rooms DS 1146 E 02. Air distributin systems Please nte, type cde is new, see last page. Flr twist utlets DB-E... fr cmmercial rms DS E 0.0/ Flr twist utlets nstructin design Preliminary remarks Air utlets frm KRANTZ KOMPONENTEN

More information

Lab 11 LRC Circuits, Damped Forced Harmonic Motion

Lab 11 LRC Circuits, Damped Forced Harmonic Motion Physics 6 ab ab 11 ircuits, Damped Frced Harmnic Mtin What Yu Need T Knw: The Physics OK this is basically a recap f what yu ve dne s far with circuits and circuits. Nw we get t put everything tgether

More information

BASD HIGH SCHOOL FORMAL LAB REPORT

BASD HIGH SCHOOL FORMAL LAB REPORT BASD HIGH SCHOOL FORMAL LAB REPORT *WARNING: After an explanatin f what t include in each sectin, there is an example f hw the sectin might lk using a sample experiment Keep in mind, the sample lab used

More information

Pipetting 101 Developed by BSU CityLab

Pipetting 101 Developed by BSU CityLab Discver the Micrbes Within: The Wlbachia Prject Pipetting 101 Develped by BSU CityLab Clr Cmparisns Pipetting Exercise #1 STUDENT OBJECTIVES Students will be able t: Chse the crrect size micrpipette fr

More information

THE LIFE OF AN OBJECT IT SYSTEMS

THE LIFE OF AN OBJECT IT SYSTEMS THE LIFE OF AN OBJECT IT SYSTEMS Persns, bjects, r cncepts frm the real wrld, which we mdel as bjects in the IT system, have "lives". Actually, they have tw lives; the riginal in the real wrld has a life,

More information

LED Quantity 3 SL-SPOT 3 UH

LED Quantity 3 SL-SPOT 3 UH IP Pb Pb-free RHS CMPLIANT SL-SPTSeries //// high pwer LEDs lighting RDERING INFRMATIN Mdel SL-SPT UH SL-SPT UH SL-SPT UH SL-SPT UH SL-SPT UH FEATURES SPECIFICATIN CLR RANGE SURCE LIFE LED TYPE BEAM ANGLE

More information

Revision: August 19, E Main Suite D Pullman, WA (509) Voice and Fax

Revision: August 19, E Main Suite D Pullman, WA (509) Voice and Fax .7.4: Direct frequency dmain circuit analysis Revisin: August 9, 00 5 E Main Suite D Pullman, WA 9963 (509) 334 6306 ice and Fax Overview n chapter.7., we determined the steadystate respnse f electrical

More information

NUMBERS, MATHEMATICS AND EQUATIONS

NUMBERS, MATHEMATICS AND EQUATIONS AUSTRALIAN CURRICULUM PHYSICS GETTING STARTED WITH PHYSICS NUMBERS, MATHEMATICS AND EQUATIONS An integral part t the understanding f ur physical wrld is the use f mathematical mdels which can be used t

More information

EVCB14NIT4X. Modbus Communication Module User Guide

EVCB14NIT4X. Modbus Communication Module User Guide 4 TRIACS / pressure independent/external mtr EVCB14NIT4X-V500-Mdbus Guide-180927-ESA Intrductin The EVCB Series prvides infrmatin fr using Neptrnic cmmunicatin feature. The cntrller uses Mdbus cmmunicatin

More information

Chapter 3: Cluster Analysis

Chapter 3: Cluster Analysis Chapter 3: Cluster Analysis } 3.1 Basic Cncepts f Clustering 3.1.1 Cluster Analysis 3.1. Clustering Categries } 3. Partitining Methds 3..1 The principle 3.. K-Means Methd 3..3 K-Medids Methd 3..4 CLARA

More information

TELETERM M SERIES RTU s

TELETERM M SERIES RTU s TELETERM M SERIES RTU s O U T L I N E C r p r a t e O v e r v i e w a name synnymus with quality OMNIFLEX has been designing and manufacturing electrnic prducts and systems fr the autmatin and cntrl industry

More information

IXD4902. Three-Terminal Negative Voltage Regulator FEATURES DESCRIPTION APPLICATIONS

IXD4902. Three-Terminal Negative Voltage Regulator FEATURES DESCRIPTION APPLICATIONS Three-Terminal Negative Vltage Regulatr FEATURES Output Current up t 200 ma (350 ma max) Input Vltage Range -2.4 V - -16 V Output Vltage Range frm -2.5 V t -12 V (fixed values) Drput Vltage 400 mv @ 100

More information

Exam #1. A. Answer any 1 of the following 2 questions. CEE 371 October 8, Please grade the following questions: 1 or 2

Exam #1. A. Answer any 1 of the following 2 questions. CEE 371 October 8, Please grade the following questions: 1 or 2 CEE 371 Octber 8, 2009 Exam #1 Clsed Bk, ne sheet f ntes allwed Please answer ne questin frm the first tw, ne frm the secnd tw and ne frm the last three. The ttal ptential number f pints is 100. Shw all

More information

Model : LGI-050T Please read this manual carefully before using the instrument Labnics Equipment

Model : LGI-050T Please read this manual carefully before using the instrument Labnics Equipment GENERAL INCUBATOR Instructin Manual Mdel : LGI-050T Please read this manual carefully befre using the instrument Labnics Equipment Table f Cntent CHAPTER CONTENT PAGE NO. 1. Befre Use 1 2. Safety Precautin

More information

DISCRETE SEMICONDUCTORS DATA SHEET. BF996S N-channel dual-gate MOS-FET. Product specification File under Discrete Semiconductors, SC07

DISCRETE SEMICONDUCTORS DATA SHEET. BF996S N-channel dual-gate MOS-FET. Product specification File under Discrete Semiconductors, SC07 DISCRETE SEMICONDUCTORS DATA SHEET File under Discrete Semicnductrs, SC7 April 1991 FEATURES Prtected against excessive input vltage surges by integrated back-t-back dides between gates and surce. DESCRIPTION

More information

Exam #1. A. Answer any 1 of the following 2 questions. CEE 371 March 10, Please grade the following questions: 1 or 2

Exam #1. A. Answer any 1 of the following 2 questions. CEE 371 March 10, Please grade the following questions: 1 or 2 CEE 371 March 10, 2009 Exam #1 Clsed Bk, ne sheet f ntes allwed Please answer ne questin frm the first tw, ne frm the secnd tw and ne frm the last three. The ttal ptential number f pints is 100. Shw all

More information

Samples. Lutum+Tappert DV-Beratung GmbH

Samples. Lutum+Tappert DV-Beratung GmbH Samples Lutum+Tappert DV-Beratung GmbH EasyMap Cmments abut prvided sample maps Please pen ne f the prvided sample maps by pinting n SAMPLES n the HELP menu (?) after starting EasyMap. Then, select ne

More information

Department of Electrical Engineering, University of Waterloo. Introduction

Department of Electrical Engineering, University of Waterloo. Introduction Sectin 4: Sequential Circuits Majr Tpics Types f sequential circuits Flip-flps Analysis f clcked sequential circuits Mre and Mealy machines Design f clcked sequential circuits State transitin design methd

More information

Fibre-reinforced plastic composites Declaration of raw material characteristics Part 5: Additional requirements for core materials

Fibre-reinforced plastic composites Declaration of raw material characteristics Part 5: Additional requirements for core materials CEN/TC 249 N494 Date: 2010-02 pren xxx-5:2010 CEN/TC 249 Secretariat: NBN Fibre-reinfrced plastic cmpsites Declaratin f raw material characteristics Part 5: Additinal requirements fr cre materials Einführendes

More information

MATHEMATICS Higher Grade - Paper I

MATHEMATICS Higher Grade - Paper I Higher Mathematics - Practice Eaminatin B Please nte the frmat f this practice eaminatin is different frm the current frmat. The paper timings are different and calculatrs can be used thrughut. MATHEMATICS

More information

SM10T Series Miniature SMD Crystal November 2016

SM10T Series Miniature SMD Crystal November 2016 SM0T Series Nvember 206 Pletrnics SM0T Series is a miniature surface munt crystal. Package is ideal fr autmated surface munt assembly and reflw practices. Tape and Reel packaging 2 MHz t 67.5 MHz 2.5 x

More information

Workshop 2 Data-Logger Principles

Workshop 2 Data-Logger Principles 1 The University f British Clumbia GEOG 309 / Andreas Christen February 7, 2008 Wrkshp 2 Data-Lgger Principles Gals 1 Becme familiar with a digital data-lgger. 2 Prgram the data-lgger and recrd a signal

More information