1 Example T alculation Procedure (Rated System Path Method) Seasonal ase ase MV MV Max Rating power transfer from to has been proposed and this example will attempt to demonstrate how the maximum possible reliable transfer is determined. This illustration displays flows that would be obtained from a seasonal base case power flow model, and represent the branches of the Identified - Path. Red quantities are maximum allowable flows based on most limiting equipment.,, & represent areas or points in the system that contain generation and/or distributed load. Note for this example: Total Transfer apability (TT) for each segment is considered equal to the maximum flow rating. Existing Transmission ommitments (ET) for each segment is equal to the flow shown here resulting from the base case power flow simulation.

2 Power Transfer from to Simulated during Normal System onditions MV 78 TF IT This is the limiting element because it can accommodate the least total transfer. In other words, if the generator and load were increased to 158MW, this branch would have MV flowing, and the flows on all other branches would be less than maximum. This figure illustrates how branch flows in the transfer path would change for an arbitrary but realistic interchange of 40MW. The flows shown here are during N-0 or normal system conditions with all elements in service. linear analysis is then used to calculate the maximum possible transfer: 1. alculate the Transfer istribution Factor (TF) for each branch. TF represents what fraction of the total transfer appears on a given segment. 2. alculate the Incremental Transfer apability (IT) for each branch. IT represents the maximum total transfer each branch could accommodate over and above base flows. 3. The branch with the lowest IT will be the limiting element for this transfer. 4. alculate the T for that limiting element: T = TT ET** 5. The T of this limiting element is considered the T for this - path during normal system conditions. Segment - is the limiting element in transfer path - with an IT = 158MV, therefore the T for path - is TT ET for this element. T = 28 = 87MV during N-0 onditions. Notice that simply calculating TT- ET for each branch and using the minimum would not yield the same results. **(TRM and M neglected and considered zero in this example)

3 Power Transfer from to Simulated during N-1 onditions (Loss of a Single Transmission Element) Standards state that T values shall be valid during normal system conditions (N-0) and single contingency conditions (N-1). Therefore, all significant outages within the system must be considered, and the previous analysis effectively repeated to determine the limiting path element during outage conditions. The following figures will attempt to demonstrate this analysis process. lthough only the five branch segments in this example are opened and the power transfer analyzed, the real power system must consider many more outages greatly exceeding those in the transfer path. FF 132 This is how much the flow changed This was the flow on the outaged branch FTF FIT MV MV Line Segment Out of Service The flows shown here are during N-1 or single outage conditions. The same linear analysis is performed to calculate the maximum possible transfer for this outage: 1. Introduce and calculate yet another quantity called First ontingency istribution Factor (FF) for each branch. FF represents what fraction of the flow that was on the outaged branch shifts and flows on the given branch. This value will be particularly useful when calculating Ts for slightly varying system conditions. 2. alculate the First ontingency Transfer istribution Factor (FTF) for each branch. FTF represents what fraction of the total transfer appears on a given segment. 3. alculate the First ontingency Incremental Transfer apability (FIT) for each branch. FIT represents the maximum total transfer each branch could accommodate, over and above base flows. 4. The branch with the lowest FIT will be the limiting element for this transfer and this outage. ranch - is the limiting element for this outage with an IT of 28MW. This means that during this outage, with these system conditions, only 28MW of total transfer would be possible. (neglecting TRM and M)

4 MV MV Line Segment Out of Service Line Segment Out of Service

5 MV MV Line Segment - Out of Service MV MV Line Segment - Out of Service

6 Interpreting the Results N-0 NLYSIS Segment - was the limiting branch in the Transfer Path because the Incremental Transfer apability was the smallest at IT=158. Therefore, the T for this - path during normal system conditions is: T for Path = TT for this branch - ET for this branch (pre-transfer) T = 28 = 87MV N-1 NLYSIS Looking at the results of all outages, indicates that branch - is the limiting element for an outage of -. - had the smallest IT of 28, meaning that only 28MV of total transfer is possible if branch - is out of service. Therefore, the T for this - path during single outage conditions is: T for Path = TT for this branch - ET for this branch (pre-transfer, post-outage) T = 132 = 28MV The minimum of N-0, N-1 T determines the Overall T rating for this - path for these modeled system conditions. FINL RESULT.. Path - T = 28MV

7 alculating T for Varying System onditions fter the T analysis and istribution Factors are calculated, the T for this path can be determined for moderately varying system conditions. Using N-0 flows (possibly real time or historical S) on the worst outage element (-) and limiting element (-), a new T can be determined. onsider the known or predicted flows shown in the different normal system conditions figure below. What would be the resulting T for this - path? FF FTF 92 = 44+(1.0)* Forecasted Normal onditions Worst Outage onditions New Flow = Old Flow + FF*(pre-outage element flow) Using the Worst Outage results shows that - would have 92 MV of flow for worst outage conditions. With Total Transfer apacity of, these determine T = 92 = 68 MV. There is 68MV of apacity left on this line for further commercial activity. Since the FTF of this line is, means that 68/1.0 = 68MW of total transfer would be possible. If 68MW of total transfer is occurring, branch - would be loaded to MV while all other branches are less than maximum loaded. Other branch loadings could also be predicted using the istribution Factors calculated in the detailed T analysis. elow are the results which agree well with power flow model MW 34.8 MV MW Maximum Transfer uring Worst Outage Predicted onditions uthor: dan.lyons@aquila.com Use it any way you like

RTO Winter Resource Adequacy Assessment Status Report

RTO Winter Resource Adequacy Assessment Status Report RTO Winter Resource Adequacy Assessment Status Report RAAS 03/31/2017 Background Analysis performed in response to Winter Season Resource Adequacy and Capacity Requirements problem statement. Per CP rules,

More information

Alectra Utilities List of Station Capacity

Alectra Utilities List of Station Capacity lectra Utilities List of Station Capacity s per Distribution System Code this list represents the llocated Capacity on stations owned by lectra Utilities (formerly PowerStream) as of July 1st, 2018. llocated

More information

Winter Season Resource Adequacy Analysis Status Report

Winter Season Resource Adequacy Analysis Status Report Winter Season Resource Adequacy Analysis Status Report Tom Falin Director Resource Adequacy Planning Markets & Reliability Committee October 26, 2017 Winter Risk Winter Season Resource Adequacy and Capacity

More information

2015 Summer Readiness. Bulk Power Operations

2015 Summer Readiness. Bulk Power Operations 2015 Summer Readiness Bulk Power Operations TOPICS 2014 Summer Review Peak Snap Shot Forecast vs Actual 2015 Winter Review Peak Snap Shot Forecast vs Actual 2015 Summer Weather Forecast Peak Demand Forecast

More information

APPENDIX 7.4 Capacity Value of Wind Resources

APPENDIX 7.4 Capacity Value of Wind Resources APPENDIX 7.4 Capacity Value of Wind Resources This page is intentionally left blank. Capacity Value of Wind Resources In analyzing wind resources, it is important to distinguish the difference between

More information

Electric Distribution Storm Hardening Initiatives. Paul V. Stergiou Distribution Engineering October 14 th, 2015

Electric Distribution Storm Hardening Initiatives. Paul V. Stergiou Distribution Engineering October 14 th, 2015 Consolidated Edison Company of New York, Inc. Electric Distribution Storm Hardening Initiatives Paul V. Stergiou Distribution Engineering October 14 th, 2015 Energy For New York City And Westchester 3.3

More information

Prediction of Power System Balancing Requirements and Tail Events

Prediction of Power System Balancing Requirements and Tail Events Prediction of Power System Balancing Requirements and Tail Events PNNL: Shuai Lu, Yuri Makarov, Alan Brothers, Craig McKinstry, Shuangshuang Jin BPA: John Pease INFORMS Annual Meeting 2012 Phoenix, AZ

More information

16PESGM2316 Characterizing Transmission System Harmonic Impedances with R-X Loci Plots. David Mueller

16PESGM2316 Characterizing Transmission System Harmonic Impedances with R-X Loci Plots. David Mueller 1 16PESGM2316 Characterizing Transmission System Harmonic Impedances with R-X Loci Plots David Mueller 2 Transmission System Harmonics Studies In the US, the closure of older coal fired plants is a driver

More information

System Impact Assessment Addendum #2 Greenfield & St. Clair Energy Centres

System Impact Assessment Addendum #2 Greenfield & St. Clair Energy Centres IESO_REP_0292 System Impact Assessment Addendum #2 Greenfield & St. lair Energy entres onnection Assessment & Approval Process Issue 3.0 Greenfield Energy entre AA I 2004-167 Applicant: Greenfield Energy

More information

EE115C Digital Electronic Circuits Homework #4

EE115C Digital Electronic Circuits Homework #4 EE115 Digital Electronic ircuits Homework #4 Problem 1 Power Dissipation Solution Vdd =1.0V onsider the source follower circuit used to drive a load L =20fF shown above. M1 and M2 are both NMOS transistors

More information

Proper Security Criteria Determination in a Power System with High Penetration of Renewable Resources

Proper Security Criteria Determination in a Power System with High Penetration of Renewable Resources Proper Security Criteria Determination in a Power System with High Penetration of Renewable Resources Mojgan Hedayati, Kory Hedman, and Junshan Zhang School of Electrical, Computer, and Energy Engineering

More information

Information Document Calculation of Pool Price and Transmission Constraint Rebalancing Costs During a Constraint Event ID # R

Information Document Calculation of Pool Price and Transmission Constraint Rebalancing Costs During a Constraint Event ID # R Information Documents are not authoritative. Information Documents are for information purposes only and are intended to provide guidance. In the event of any discrepancy between an Information Document

More information

Outage Coordination and Business Practices

Outage Coordination and Business Practices Outage Coordination and Business Practices 1 2007 Objectives What drove the need for developing a planning/coordination process. Why outage planning/coordination is crucial and important. Determining what

More information

Applications of GIS in Electrical Power System. Dr. Baqer AL-Ramadan Abdulrahman Al-Sakkaf

Applications of GIS in Electrical Power System. Dr. Baqer AL-Ramadan Abdulrahman Al-Sakkaf Applications of GIS in Electrical Power System Dr. Baqer AL-Ramadan Abdulrahman Al-Sakkaf OUTLINES: Objective Importance of GIS GIS data development Application of GIS Findings Conclusions and Recommendations

More information

Performance. 7. Aircraft Performance -Basics

Performance. 7. Aircraft Performance -Basics Performance 7. Aircraft Performance -Basics In general we are interested in finding out certain performance characteristics of a vehicle. These typically include: how fast and how slow an aircraft can

More information

Assessment of Available Transfer Capability Incorporating Probabilistic Distribution of Load Using Interval Arithmetic Method

Assessment of Available Transfer Capability Incorporating Probabilistic Distribution of Load Using Interval Arithmetic Method Assessment of Available Transfer Capability Incorporating Probabilistic Distribution of Load Using Interval Arithmetic Method Prabha Umapathy, Member, IACSIT, C.Venkataseshaiah and M.Senthil Arumugam Abstract

More information

Colorado PUC E-Filings System

Colorado PUC E-Filings System Page 1 of 10 30-Minute Flex Reserve on the Public Service Company of Colorado System Colorado PUC E-Filings System Prepared by: Xcel Energy Services, Inc. 1800 Larimer St. Denver, Colorado 80202 May 13,

More information

Reliability Assessment of Radial distribution system incorporating weather effects

Reliability Assessment of Radial distribution system incorporating weather effects International Journal of Engineering Research and Development e-issn: 2278-067X, p-issn: 2278-800X, www.ijerd.com Volume 6, Issue 7 (pril 2013), PP. 45-51 Reliability ssessment of Radial distribution system

More information

EE5250 TERM PROJECT. Report by: Akarsh Sheilendranath

EE5250 TERM PROJECT. Report by: Akarsh Sheilendranath EE5250 TERM PROJECT Analytical Approaches for Optimal Placement of Distributed Generation Sources in Power System Caisheng Wang, student member, IEEE, and M. Hashem Nehrir, senior member, IEEE Report by:

More information

DEMAND FORECASTING PROTOCOL

DEMAND FORECASTING PROTOCOL FIRST REPLACEMENT VOLUME NO. II Original Sheet No. 443 DEMAND FORECASTING PROTOCOL FIRST REPLACEMENT VOLUME NO. II Original Sheet No. 444 DEMAND FORECASTING PROTOCOL Table of Contents DFP 1 OBJECTIVES,

More information

A possible notion of short-term value-based reliability

A possible notion of short-term value-based reliability Energy Laboratory MIT EL 1-13 WP Massachusetts Institute of Technology A possible notion of short-term value-based reliability August 21 A possible notion of short-term value-based reliability Yong TYoon,

More information

AESO Load Forecast Application for Demand Side Participation. Eligibility Working Group September 26, 2017

AESO Load Forecast Application for Demand Side Participation. Eligibility Working Group September 26, 2017 AESO Load Forecast Application for Demand Side Participation Eligibility Working Group September 26, 2017 Load forecasting for the Capacity Market Demand Considerations Provide further information on forecasting

More information

New Formulations of the Optimal Power Flow Problem

New Formulations of the Optimal Power Flow Problem New Formulations of the Optimal Power Flow Problem Prof. Daniel Kirschen The University of Manchester 2010 D. Kirschen and The University of Manchester 1 2010 D. Kirschen and The University of Manchester

More information

Role of Synchronized Measurements In Operation of Smart Grids

Role of Synchronized Measurements In Operation of Smart Grids Role of Synchronized Measurements In Operation of Smart Grids Ali Abur Electrical and Computer Engineering Department Northeastern University Boston, Massachusetts Boston University CISE Seminar November

More information

STATE ESTIMATION IN DISTRIBUTION SYSTEMS

STATE ESTIMATION IN DISTRIBUTION SYSTEMS SAE ESIMAION IN DISRIBUION SYSEMS 2015 CIGRE Grid of the Future Symposium Chicago (IL), October 13, 2015 L. Garcia-Garcia, D. Apostolopoulou Laura.GarciaGarcia@ComEd.com Dimitra.Apostolopoulou@ComEd.com

More information

EXERTIONAL HEAT ILLNESS PREVENTION

EXERTIONAL HEAT ILLNESS PREVENTION EXERTIONAL HEAT ILLNESS PREVENTION MINIMIZING EXERTIONAL HEAT ILLNESS IN TRIATHLON The incidence of exertional heat stroke (EHS) varies from event to event and increases with rising ambient temperature

More information

Wind power and management of the electric system. EWEA Wind Power Forecasting 2015 Leuven, BELGIUM - 02/10/2015

Wind power and management of the electric system. EWEA Wind Power Forecasting 2015 Leuven, BELGIUM - 02/10/2015 Wind power and management of the electric system EWEA Wind Power Forecasting 2015 Leuven, BELGIUM - 02/10/2015 HOW WIND ENERGY IS TAKEN INTO ACCOUNT WHEN MANAGING ELECTRICITY TRANSMISSION SYSTEM IN FRANCE?

More information

Ameren Missouri Peak Load Forecast Energy Forecasting Meeting, Las Vegas. April 17-18, 2013

Ameren Missouri Peak Load Forecast Energy Forecasting Meeting, Las Vegas. April 17-18, 2013 Ameren Missouri Peak Load Forecast Energy Forecasting Meeting, Las Vegas April 17-18, 2013 Motivation for End Use Peak Forecasting Missouri IRP rules have extremely detailed load analysis and forecasting

More information

4/26/94 Revised 12/26/96 5/9/99 7/30/01 WSCC UNSCHEDULED FLOW MITIGATION PLAN

4/26/94 Revised 12/26/96 5/9/99 7/30/01 WSCC UNSCHEDULED FLOW MITIGATION PLAN 4/26/94 Revised 12/26/96 5/9/99 7/30/01 WSCC UNSCHEDULED FLOW MITIGATION PLAN WSCC UNSCHEDULED FLOW MITIGATION PLAN TABLE OF CONTENTS SECTION PAGE 1 PARTIES... 1 2 RECITALS...1 3 TERM... 3 4 DEFINITIONS...

More information

Min-max Transfer Capability: A New Concept

Min-max Transfer Capability: A New Concept roceedings of the 34th Hawaii International Conference on System Sciences - 00 Min-max Transfer Capability: A New Concept D. Gan X. Luo D. V. Bourcier dgan@iso-ne.com xluo@iso-ne.com dbourcie@iso-ne.com

More information

Chapter 2. Planning Criteria. Turaj Amraee. Fall 2012 K.N.Toosi University of Technology

Chapter 2. Planning Criteria. Turaj Amraee. Fall 2012 K.N.Toosi University of Technology Chapter 2 Planning Criteria By Turaj Amraee Fall 2012 K.N.Toosi University of Technology Outline 1- Introduction 2- System Adequacy and Security 3- Planning Purposes 4- Planning Standards 5- Reliability

More information

Bringing Renewables to the Grid. John Dumas Director Wholesale Market Operations ERCOT

Bringing Renewables to the Grid. John Dumas Director Wholesale Market Operations ERCOT Bringing Renewables to the Grid John Dumas Director Wholesale Market Operations ERCOT 2011 Summer Seminar August 2, 2011 Quick Overview of ERCOT The ERCOT Market covers ~85% of Texas overall power usage

More information

Reducing Contingency-based Windfarm Curtailments through use of Transmission Capacity Forecasting

Reducing Contingency-based Windfarm Curtailments through use of Transmission Capacity Forecasting Reducing Contingency-based Windfarm Curtailments through use of Transmission Capacity Forecasting Doug Bowman Southwest Power Pool Jack McCall Lindsey Manufacturing Co. CIGRE US National Committee 2017

More information

The North American Electric Reliability Corporation hereby submits Informational Filing of the North American Electric Reliability Corporation.

The North American Electric Reliability Corporation hereby submits Informational Filing of the North American Electric Reliability Corporation. !! January 19, 2016 VIA ELECTRONIC FILING Jim Crone Director, Energy Division Manitoba Innovation, Energy and Mines 1200-155 Carlton Street Winnipeg MB R3C 3H8 Re: North American Electric Reliability Corporation

More information

An improved methodology for determining MV to LV voltage unbalance transfer coefficient

An improved methodology for determining MV to LV voltage unbalance transfer coefficient University of Wollongong Research Online Faculty of Engineering - Papers (Archive) Faculty of Engineering and Information Sciences 2008 An improved methodology for determining MV to LV voltage unbalance

More information

Module 6 : Preventive, Emergency and Restorative Control. Lecture 27 : Normal and Alert State in a Power System. Objectives

Module 6 : Preventive, Emergency and Restorative Control. Lecture 27 : Normal and Alert State in a Power System. Objectives Module 6 : Preventive, Emergency and Restorative Control Lecture 27 : Normal and Alert State in a Power System Objectives In this lecture you will learn the following Different states in a power system

More information

Integrated Electricity Demand and Price Forecasting

Integrated Electricity Demand and Price Forecasting Integrated Electricity Demand and Price Forecasting Create and Evaluate Forecasting Models The many interrelated factors which influence demand for electricity cannot be directly modeled by closed-form

More information

Base Cases for Assessing Risk in Transmission System Planning

Base Cases for Assessing Risk in Transmission System Planning Conference on Probabilistic Methods Applied to Power Systems June 218, Boise, ID PMAPS 218 Base Cases for Assessing Risk in Transmission System Planning Dimitry Gorinevsky Mitek Analytics LLC Palo Alto,

More information

PREDICTING OVERHEATING RISK IN HOMES

PREDICTING OVERHEATING RISK IN HOMES PREDICTING OVERHEATING RISK IN HOMES Susie Diamond Inkling Anastasia Mylona CIBSE Simulation for Health and Wellbeing 27th June 2016 - CIBSE About Inkling Building Physics Consultancy Susie Diamond Claire

More information

A Unified Framework for Defining and Measuring Flexibility in Power System

A Unified Framework for Defining and Measuring Flexibility in Power System J A N 1 1, 2 0 1 6, A Unified Framework for Defining and Measuring Flexibility in Power System Optimization and Equilibrium in Energy Economics Workshop Jinye Zhao, Tongxin Zheng, Eugene Litvinov Outline

More information

Dynamic characteristics Pertain to a system where quantities to be measured vary rapidly with time.

Dynamic characteristics Pertain to a system where quantities to be measured vary rapidly with time. In 1849 the Bourdon tube pressure gauge was patented in France by Eugene Bourdon. It is still one of the most widely used instruments for measuring the pressure of liquids and gases of all kinds, including

More information

This case study also provides recommendations for future lightning protection design for existing (brownfield) substation.

This case study also provides recommendations for future lightning protection design for existing (brownfield) substation. A Case Study for Substation Lightning Strike Risk Evaluation Stephen Chuang 111 Dunsmuir Street #400, Vancouver, BC V6B 5W3 604-6644123 Stephen.chuang@amecfw.com Abstract Shielding of substations from

More information

A New Approach to Constructing Seasonal Nomograms in Planning and Operations Environments at Idaho Power Co.

A New Approach to Constructing Seasonal Nomograms in Planning and Operations Environments at Idaho Power Co. Paper # 485 1 A New Approach to Constructing Seasonal Nomograms in Planning and Operations Environments at Idaho Power Co. M. Papic 1, Senior Member, IEEE, M. Y. Vaiman 2, Member, IEEE, M. M. Vaiman 2,

More information

Winter Season Resource Adequacy Analysis

Winter Season Resource Adequacy Analysis Winter Season Resource Adequacy Analysis Patricio Rocha-Garrido Sr. Engineer Resource Adequacy Planning RAAS August 4, 2017 Introduction Reliability requirements for the RTO and LDAs are calculated based

More information

PROJECT ECONOMIC ANALYSIS

PROJECT ECONOMIC ANALYSIS Electricity Transmission Expansion and Supply Improvement Project (RRP NEP 41155) PROJECT ECONOMIC ANALYSIS A. Overview 1. The economic analysis undertaken for the Electricity Transmission and Supply Improvement

More information

FORECAST ACCURACY REPORT 2017 FOR THE 2016 NATIONAL ELECTRICITY FORECASTING REPORT

FORECAST ACCURACY REPORT 2017 FOR THE 2016 NATIONAL ELECTRICITY FORECASTING REPORT FORECAST ACCURACY REPORT 2017 FOR THE 2016 NATIONAL ELECTRICITY FORECASTING REPORT Published: November 2017 Purpose The National Electricity Rules (Rules) require AEMO to report to the Reliability Panel

More information

Ch 8. Three-phase systems

Ch 8. Three-phase systems Ch 8. Three-ase systems Lecture outcomes (what you are supposed to learn): Generation of three-ase voltages Connection of three-ase circuits Wye-Delta transformation Power of three-ase connected loads

More information

Probabilistic Assessment of Atc in the Deregulated Network

Probabilistic Assessment of Atc in the Deregulated Network Australian Journal of Basic and Applied Sciences, 5(6): 882-890, 2011 ISSN 1991-8178 Probabilistic Assessment of Atc in the Deregulated Network Mojtaba Najafi and Mohsen Simab Department of Engineering,

More information

Recent US Wind Integration Experience

Recent US Wind Integration Experience Wind Energy and Grid Integration Recent US Wind Integration Experience J. Charles Smith Nexgen Energy LLC Utility Wind Integration Group January 24-25, 2006 Madrid, Spain Outline of Topics Building and

More information

EE2351 POWER SYSTEM OPERATION AND CONTROL UNIT I THE POWER SYSTEM AN OVERVIEW AND MODELLING PART A

EE2351 POWER SYSTEM OPERATION AND CONTROL UNIT I THE POWER SYSTEM AN OVERVIEW AND MODELLING PART A EE2351 POWER SYSTEM OPERATION AND CONTROL UNIT I THE POWER SYSTEM AN OVERVIEW AND MODELLING PART A 1. What are the advantages of an inter connected system? The advantages of an inter-connected system are

More information

Security Monitoring and Assessment of an Electric Power System

Security Monitoring and Assessment of an Electric Power System International Journal of Performability Engineering Vol. 10, No. 3, May, 2014, pp. 273-280. RAMS Consultants Printed in India Security Monitoring and Assessment of an Electric Power System PUROBI PATOWARY

More information

Cost of Inflow Forecast Uncertainty for Day Ahead Hydropower Production Scheduling

Cost of Inflow Forecast Uncertainty for Day Ahead Hydropower Production Scheduling Cost of Inflow Forecast Uncertainty for Day Ahead Hydropower Production Scheduling HEPEX 10 th University Workshop June 25 th, 2014 NOAA Center for Weather and Climate Thomas D. Veselka and Les Poch Argonne

More information

Probabilistic production cost simulation. EG2200 Lectures 12 14, autumn 2015 Mikael Amelin

Probabilistic production cost simulation. EG2200 Lectures 12 14, autumn 2015 Mikael Amelin Probabilistic production cost simulation EG2200 Lectures 12 14, autumn 2015 Mikael Amelin 1 Course objectives Apply probabilistic production cost simulation to calculate the expected operation cost and

More information

MEDIUM TERM PASA PROCESS DESCRIPTION

MEDIUM TERM PASA PROCESS DESCRIPTION MEDIUM TERM PASA PROCESS DESCRIPTION PREPARED BY: Systems Capability DOCUMENT REF: 42 VERSION: 3.0 DATE: 30 May 2013 FINAL Australian Energy Market Operator Ltd ABN 94 072 010 327 www.aemo.com.au inlo@oemo.com.au

More information

Branch Outage Simulation for Contingency Studies

Branch Outage Simulation for Contingency Studies Branch Outage Simulation for Contingency Studies Dr.Aydogan OZDEMIR, Visiting Associate Professor Department of Electrical Engineering, exas A&M University, College Station X 77843 el : (979) 862 88 97,

More information

The Dayton Power and Light Company Load Profiling Methodology Revised 7/1/2017

The Dayton Power and Light Company Load Profiling Methodology Revised 7/1/2017 The Dayton Power and Light Company Load Profiling Methodology Revised 7/1/2017 Overview of Methodology Dayton Power and Light (DP&L) load profiles will be used to estimate hourly loads for customers without

More information

Reliability of Bulk Power Systems (cont d)

Reliability of Bulk Power Systems (cont d) Reliability of Bulk Power Systems (cont d) Important requirements of a reliable electric power service Voltage and frequency must be held within close tolerances Synchronous generators must be kept running

More information

Pursuant to Section 205 of the Federal Power Act ( FPA ) 1 and the Commission s

Pursuant to Section 205 of the Federal Power Act ( FPA ) 1 and the Commission s PJM Interconnection 2750 Monroe Boulevard Norristown, PA 19403-2497 Steven R. Pincus Associate General Counsel 610.666.4370 fax 610.666.8211 steven.pincus@pjm.com July 31, 2017 Honorable Kimberly D. Bose

More information

Contingency Analysis Enhancements

Contingency Analysis Enhancements Contingency Analysis Enhancements Kiamran Radjabli Utilicast, San Diego, USA Email: kradjabli@utilicast.com Abstract Contingency Analysis can provide a powerful insight into potential operational emergencies

More information

Operational event attribution

Operational event attribution Operational event attribution Peter Stott, NCAR, 26 January, 2009 August 2003 Events July 2007 January 2009 January 2009 Is global warming slowing down? Arctic Sea Ice Climatesafety.org climatesafety.org

More information

ML ML Digital to Analog Converters with Serial Interface

ML ML Digital to Analog Converters with Serial Interface OS LSI L L Digital to Analog onverters with Serial Interface Legacy Device: otorola/reescale, The L and L are low cost 6 bit D/A converters with serial interface ports to provide communication with OS

More information

A combinatorial technique for weighbridge verification

A combinatorial technique for weighbridge verification VERIFICATION/WEIGHING A combinatorial technique for weighbridge verification MARK T. CLARKSON Measurement Standards Laboratory of New Zealand Industrial Research Ltd. P O Box 31-310, Lower Hutt, New Zealand

More information

Report on Phase 2: System Performance Evaluation. Prepared for:

Report on Phase 2: System Performance Evaluation. Prepared for: THE EFFECTS OF INTEGRATING WIND POWER ON TRANSMISSION SYSTEM PLANNING, RELIABILITY, AND OPERATIONS Report on Phase 2: System Performance Evaluation Prepared for: THE NEW YORK STATE ENERGY RESEARCH AND

More information

PROPOSED STRATEGY FOR CAPACITOR ALLOCATION IN RADIAL DISTRIBUTION FEEDERS

PROPOSED STRATEGY FOR CAPACITOR ALLOCATION IN RADIAL DISTRIBUTION FEEDERS IMPACT: International ournal of Research in Engineering & Technology (IMPACT: IRET) ISSN 2321-8843 Vol. 1, Issue 3, Aug 2013, 85-92 Impact ournals PROPOSED STRATEGY FOR CAPACITOR ALLOCATION IN RADIAL DISTRIBUTION

More information

Demand Forecasting Models

Demand Forecasting Models E 2017 PSE Integrated Resource Plan Demand Forecasting Models This appendix describes the econometric models used in creating the demand forecasts for PSE s 2017 IRP analysis. Contents 1. ELECTRIC BILLED

More information

Analysis and the methods of forecasting of the intra-hour system imbalance

Analysis and the methods of forecasting of the intra-hour system imbalance POSTER 2016, PRAGUE MAY 24 1 Analysis and the methods of forecasting of the intra-hour system imbalance Štěpán KRATOCHVÍL 1, Jan BEJBL 2 1,2 Dept. of Economy, management and humanities, Czech Technical

More information

Procedure for Uncertainty Determination for Calibration Consoles

Procedure for Uncertainty Determination for Calibration Consoles Category: ELECTRICITY Procedure: EL-ENG-09-01 Page: 1 of 19 Procedure for Uncertainty Determination for Calibration Consoles Adnan Rashid Senior Electrical Engineer Engineering and Laboratory Services

More information

! Inverter Power. ! Dynamic Characteristics. " Delay ! P = I V. ! Tricky part: " Understanding I. " (pairing with correct V) ! Dynamic current flow:

! Inverter Power. ! Dynamic Characteristics.  Delay ! P = I V. ! Tricky part:  Understanding I.  (pairing with correct V) ! Dynamic current flow: ESE 570: Digital Integrated ircuits and LSI Fundamentals Lecture Outline! Inverter Power! Dynamic haracteristics Lec 10: February 15, 2018 MOS Inverter: Dynamic haracteristics " Delay 3 Power Inverter

More information

WHAT SEISMIC HAZARD INFORMATION THE DAM ENGINEERS NEED FROM SEISMOLOGISTS AND GEOLOGISTS?

WHAT SEISMIC HAZARD INFORMATION THE DAM ENGINEERS NEED FROM SEISMOLOGISTS AND GEOLOGISTS? WHAT SEISMIC HAZARD INFORMATION THE DAM ENGINEERS NEED FROM SEISMOLOGISTS AND GEOLOGISTS? Martin WIELAND 1 ABSTRACT For large dam projects a site-specific seismic hazard analysis is usually recommended.

More information

R. W. Erickson. Department of Electrical, Computer, and Energy Engineering University of Colorado, Boulder

R. W. Erickson. Department of Electrical, Computer, and Energy Engineering University of Colorado, Boulder . W. Erickson Department of Electrical, Computer, and Energy Engineering University of Colorado, Boulder Part II" Converter Dynamics and Control! 7.!AC equivalent circuit modeling! 8.!Converter transfer

More information

Integrating Wind Resources Into the Transmission Grid

Integrating Wind Resources Into the Transmission Grid Integrating Wind Resources Into the Transmission Grid Gary D. Bachman Wisconsin Public Utility Institute May 26, 2010 Introduction Statement of FERC Chairman Jon Wellinghoff on Efficient Integration of

More information

SN54HC138, SN74HC138 3-LINE TO 8-LINE DECODERS/DEMULTIPLEXERS

SN54HC138, SN74HC138 3-LINE TO 8-LINE DECODERS/DEMULTIPLEXERS SNH8, SNH8 -LINE TO 8-LINE DEODERS/DEMULTIPLEXERS Designed Specifically for High-Speed Memory Decoders and Data Transmission Systems Incorporate Three Enable Inputs to Simplify ascading and/or Data Reception

More information

Probabilistic weather hazard forecast guidance for transoceanic flights based on merged global ensemble forecasts

Probabilistic weather hazard forecast guidance for transoceanic flights based on merged global ensemble forecasts Probabilistic weather hazard forecast guidance for transoceanic flights based on merged global ensemble forecasts Matthias Steiner National Center for Atmospheric Research, Boulder, Colorado, USA msteiner@ucar.edu

More information

A Model for a Zonal Operating Reserve Demand Curve

A Model for a Zonal Operating Reserve Demand Curve A Model for a Zonal Operating Reserve Demand Curve Yen-Yu Lee Electrical and Computer Engineering University of Texas at Austin March 5, Outline What is operating reserves? Why do we need elastic reserves

More information

Contents Economic dispatch of thermal units

Contents Economic dispatch of thermal units Contents 2 Economic dispatch of thermal units 2 2.1 Introduction................................... 2 2.2 Economic dispatch problem (neglecting transmission losses)......... 3 2.2.1 Fuel cost characteristics........................

More information

ELECTRIC SYSTEM RELIABILITY ANNUAL REPORT

ELECTRIC SYSTEM RELIABILITY ANNUAL REPORT ELECTRIC SYSTEM RELIABILITY ANNUAL REPORT 2015 LIBERTY UTILITIES (CALPECO ELECTRIC) LLC (U 933 E) -- PUBLIC VERSION -- Prepared for California Public Utilities Commission July 15, 2016 EXECUTIVE SUMMARY

More information

Variable Selection in Predictive Regressions

Variable Selection in Predictive Regressions Variable Selection in Predictive Regressions Alessandro Stringhi Advanced Financial Econometrics III Winter/Spring 2018 Overview This chapter considers linear models for explaining a scalar variable when

More information

Chapter 7 Forecasting Demand

Chapter 7 Forecasting Demand Chapter 7 Forecasting Demand Aims of the Chapter After reading this chapter you should be able to do the following: discuss the role of forecasting in inventory management; review different approaches

More information

15-30 Chapter 15: Homework Problems

15-30 Chapter 15: Homework Problems 15-30 hapter 15: Homework Prolems 8.1 Let s start with a simple prolem. Determining the forces on the front and rear tires of car that weighs 2400 ls. You may assume that a = 2.15ft. and = 2.65ft.. What

More information

Scot Siegel, Planning and Building Services Director Leslie Hamilton, Senior Planner

Scot Siegel, Planning and Building Services Director Leslie Hamilton, Senior Planner T: :, v, UJET: #2 ( -) TE: 22, 2 EETI TE: 2, 2 2, 2, () f v ( ),. T f 2 vf f f, f ff q J, f f q v f f f v f f (). T q, f. T z f f ff q f.. f v ; Ex f : -. v,, v. I f - f f. I, v f. (, f,.) I,,, f v v f

More information

International Workshop on Wind Energy Development Cairo, Egypt. ERCOT Wind Experience

International Workshop on Wind Energy Development Cairo, Egypt. ERCOT Wind Experience International Workshop on Wind Energy Development Cairo, Egypt ERCOT Wind Experience March 22, 21 Joel Mickey Direcr of Grid Operations Electric Reliability Council of Texas jmickey@ercot.com ERCOT 2 2

More information

The Study of Overhead Line Fault Probability Model Based on Fuzzy Theory

The Study of Overhead Line Fault Probability Model Based on Fuzzy Theory Energy and Power Engineering, 2013, 5, 625-629 doi:10.4236/epe.2013.54b121 Published Online July 2013 (http://www.scirp.org/journal/epe) The Study of Overhead Line Fault Probability Model Based on Fuzzy

More information

Fault Calculation Methods

Fault Calculation Methods ELEC9713 Industrial and Commercial Power Systems Fault Calculation Methods There are two major problems that can occur in electrical systems: these are open circuits and short circuits. Of the two, the

More information

ECE 585 Power System Stability

ECE 585 Power System Stability Homework 1, Due on January 29 ECE 585 Power System Stability Consider the power system below. The network frequency is 60 Hz. At the pre-fault steady state (a) the power generated by the machine is 400

More information

Peak Load Forecasting

Peak Load Forecasting Peak Load Forecasting Eugene Feinberg Stony Brook University Advanced Energy 2009 Hauppauge, New York, November 18 Importance of Peak Load Forecasting Annual peak load forecasts are important for planning

More information

U.S. ARMY CORPS OF ENGINEERS

U.S. ARMY CORPS OF ENGINEERS CORPS FACTS Regulating Mississippi River Navigation Pools U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG Historical Background Federal improvements in the interest of navigation on the Mississippi River

More information

THE electric power system is a complex cyber-physical

THE electric power system is a complex cyber-physical Implication of Unobservable State-and-topology Cyber-physical Attacks Jiazi Zhang, Student Member, IEEE, Lalitha Sankar, Senior Member, IEEE arxiv:509.00520v [cs.sy] Sep 205 Abstract This paper studies

More information

MISO September 15 Maximum Generation Event Overview. October 11, 2018

MISO September 15 Maximum Generation Event Overview. October 11, 2018 MISO September 15 Maximum Generation Event Overview October 11, 2018 Purpose & Key Takeaways Purpose: Summarize operations during the September 15 South Region Maximum Generation Event Key Takeaways: MISO

More information

Effects of Capacitor Bank Installation in a Medium Voltage (MV) Substation

Effects of Capacitor Bank Installation in a Medium Voltage (MV) Substation Effects of Capacitor Bank Installation in a Medium Voltage (MV) Substation Adesina, Lambe Mutalub Department of Engineering & Standardization, Eko Electricity Distribution Plc, 24/25, Marina, Lagos Island,

More information

Course notes for EE394V Restructured Electricity Markets: Locational Marginal Pricing

Course notes for EE394V Restructured Electricity Markets: Locational Marginal Pricing Course notes for EE394V Restructured Electricity Markets: Locational Marginal Pricing Ross Baldick Copyright c 2013 Ross Baldick www.ece.utexas.edu/ baldick/classes/394v/ee394v.html Title Page 1 of 132

More information

Real-Time Course. Clock synchronization. June Peter van der TU/e Computer Science, System Architecture and Networking

Real-Time Course. Clock synchronization. June Peter van der TU/e Computer Science, System Architecture and Networking Real-Time Course Clock synchronization 1 Clocks Processor p has monotonically increasing clock function C p (t) Clock has drift rate For t1 and t2, with t2 > t1 (1-ρ)(t2-t1)

More information

R O B U S T E N E R G Y M AN AG E M E N T S Y S T E M F O R I S O L AT E D M I C R O G R I D S

R O B U S T E N E R G Y M AN AG E M E N T S Y S T E M F O R I S O L AT E D M I C R O G R I D S ROBUST ENERGY MANAGEMENT SYSTEM FOR ISOLATED MICROGRIDS Jose Daniel La r a Claudio Cañizares Ka nka r Bhattacharya D e p a r t m e n t o f E l e c t r i c a l a n d C o m p u t e r E n g i n e e r i n

More information

HAZUS-MH: Earthquake Event Report

HAZUS-MH: Earthquake Event Report HAZUS-MH: Earthquake Event Report Region Name: El Paso County Earthquake Scenario: El Paso County Random EQ Print Date: February 08, 2006 Disclaimer: The estimates of social and economic impacts contained

More information

Section 5. TADS Data Reporting Instruction Manual DRAFT Section 5 and Associated Appendices With Proposed Event Type Numbers

Section 5. TADS Data Reporting Instruction Manual DRAFT Section 5 and Associated Appendices With Proposed Event Type Numbers Section 5 TADS Data Reporting Instruction Manual DRAFT Section 5 and Associated Appendices With Proposed Event Type Numbers Rev. 5/10/2010 1 Section 5 Form for Event ID and Event Type Number Data TO s

More information

Predicting Future Energy Consumption CS229 Project Report

Predicting Future Energy Consumption CS229 Project Report Predicting Future Energy Consumption CS229 Project Report Adrien Boiron, Stephane Lo, Antoine Marot Abstract Load forecasting for electric utilities is a crucial step in planning and operations, especially

More information

EIA411 May 1, A Report to the Office of Energy Emergency Operations Department of Energy Under EIA-411

EIA411 May 1, A Report to the Office of Energy Emergency Operations Department of Energy Under EIA-411 EIA411 May 1, 2006 A Report to the Office of Energy Emergency Operations Department of Energy Under EIA-411 All questions concerning this data should be directed to: Jason Speer Southwest Power Pool 415

More information

2011 Summer Operating Expected Conditions. Bulk Power Operations Power Coordination Center

2011 Summer Operating Expected Conditions. Bulk Power Operations Power Coordination Center 2011 Summer Operating Expected Conditions Bulk Power Operations Power Coordination Center TOPICS 2010 Review 2011 SOCO Balancing Authority (BA) Area Summer Weather Forecast Peak Demand Forecast Transmission

More information

Future State Visualization in Power Grid

Future State Visualization in Power Grid Future State Visualization in Power Grid Keith P. Hock Ameren St. Louis, USA Kiamran Radjabli Utilicast San Diego, USA Abstract Electrical utilities are faced with a challenge of processing large amount

More information

Tutorial 2: Modelling Transmission

Tutorial 2: Modelling Transmission Tutorial 2: Modelling Transmission In our previous example the load and generation were at the same bus. In this tutorial we will see how to model the transmission of power from one bus to another. The

More information

Weekly Operational Constraints Update

Weekly Operational Constraints Update Weekly Operational Constraints Update Applicable from 19 November 2018 to 25 November 2018 (Week 47) 16 November 2018 Disclaimer EirGrid plc, the Transmission System Operator (TSO) for Ireland, and SONI

More information